Implementation Status & Results Paraguay Road Maintenance (P082026)

Similar documents
Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Feasibility Study for the Improvement of the National Route 2 and Route 7 Final Report CHAPTER 8 EXISTING TRAFFIC CONDITIONS

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Public Disclosure Copy

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

January 2018 Air Traffic Activity Summary

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

Infrastructure Plans of the New Direction for Paraguay

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1412 Project Name

3.3 COST ESTIMATION OF THE MAIN PROJECTS. (1) Main projects. 1) Improvement of export corridor

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

New Mexico Monthly Traffic Fatality Report, 2017

Month to Month Comparison of Crash-related Fatalities. Fatalities. - Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Month to Month Comparison of Crash-related Fatalities. Fatalities. - Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Month to Month Comparison of Crash-related Fatalities. Fatalities. - Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Board Box. October Item # Item Staff Page 1. Key Performance Indicators Sep 2018 M. Mungia Financial Report Aug 2018 H.

Chromatic variation in populations of Xenodon merremi (Serpentes: Dipsadidae) in Paraguay

Birth Register and Statistics. A big challenge for the Pan American Health Organization (PAHO) Dr Fatima Marinho, HDM/HA Coordinator

LOVE FIELD ENVIRONMENTAL ADVISORY COMMITTEE QUARTERLY REPORT. October December 2016

Check List. New and noteworthy snake species records (Colubridae and Dipsadidae) for the Reserva Natural Laguna Blanca, eastern Paraguay

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

3.3 ROAD TRAFFIC FLOW MOVEMENT Tollgate traffics 3-14 # # # # (1) Outline of tollgate traffic

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

2007/08 Full Year Results Investor Briefing

Line of José Francisco Alvarado and María Faustina Lizárraga (Six Generations) 1. First Generation

Sound Transit Operations December 2014 Service Performance Report. Ridership

Monthly SunPass Transponder Sales Inception to June 2012

METRO OPERATIONS COMMITTEE

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

PAHO Regional Perspective: Strengthening CR-VS in the Americas

Significant increase in accommodation activity but slightly less than in the previous month

TRADE, SERVICES AND DEVELOPMENT

Sound Transit Operations August 2015 Service Performance Report. Ridership

Assessing the Impacts of ENSO on South American Agriculture

Financing of Aviation Development Projects by the Asian Development Bank. Asian Development Bank

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015

-Dr Panambi Abadie Executive Secretary, AUGM

Full Year 2009 Results

Results of Tourism Activity

Disaster relief emergency fund (DREF) Paraguay: Hailstorm

Sound Transit Operations February 2018 Service Performance Report. Ridership

26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER

Results of Tourism Activity. July, 2017

CARICOM Single ICT Space Digital Transformation is a Journey

P/01REV. Accountability and Performance Report of the ICAO NACC Regional Office to Member States. Nassau, Bahamas, May 2016

Sound Transit Operations March 2018 Service Performance Report. Ridership

HCPI COMESA Monthly News Release

Manual vs. Automatic Operation and Operational Restrictions

Performance monitoring report 2017/18

FASTRAK PROGRESS REPORT

Presentation on Results for the 3rd Quarter FY Idemitsu Kosan Co.,Ltd. February 2, 2016

Analysts and Investors conference call. Q results. 15 May 2013

Sound Transit Operations January 2014 Service Performance Report. Ridership

Sound Transit Operations March 2017 Service Performance Report. Ridership. Total Boardings by Mode

Sound Transit Operations January 2017 Service Performance Report. Ridership. Total Boardings by Mode

Results of Tourism Activity Mexico, March 2017

Sound Transit Operations June 2016 Service Performance Report. Ridership

RIDERSHIP TRENDS. October 2017

ST. EUSTATIUS. Sea Arrivals ( Summer ( Winter Yacht Arrivals 11, % 32.1%

Transcription:

Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation Seq.No: 18 Status: ARCHIVED Archive : 09-Jul-2013 Country: Paraguay Approval FY: 2007 Product Line: IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key s Board Approval 24-Aug-2006 Original Closing 30-Jun-2012 Planned Mid Term Review 06-Sep-2011 Last Archived ISR 20-Jun-2012 Effectiveness 03-Jan-2008 Revised Closing Actual Mid Term Review 29-Nov-2011 Project Development Objectives Project Development Objective (from Project Appraisal Document) The project's development objective is to establish a sustainable road management strategy that ensures the upgrading and maintenance of the road network through a rational and balanced use of scarce resources. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost Strengthening of Road Management and Strategic Planning 6.51 Improvement and Maintenance of Paved Road Network 43.35 Improvement and Maintenance of the Unpaved Road Network 42.90 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Unsatisfactory Overall Risk Rating Substantial Implementation Status Overview To date, 1,271 km of the paved road network are been rehabilitated and are under maintenance using performance-based contracts financed by both the WB and the IDB, the rehabilitation of 140 km of the unpaved road network has been contracted out, and six microenterprises are currently carrying out routine maintenance of unpaved road sections. In terms of institutional rehabilitated activities, most have been completed or are well under way. The activities recently initiated are: the implementation and supervision of the Toll Network Improvement, the Road Inventory, and the Traffic Count Survey System. The Borrower has progressed by improving the management of maintenance contracts (GMANS), Page 1 of 9

completing and operating the transparency and accountability electronic governance tool, and having two project supported laws promulgated: The Road Classification Law and National Transit Law. Locations Country First Administrative Division Location Planned Actual Paraguay Not Entered Yuty Paraguay Not Entered Arroyo Ytororó Paraguay Not Entered Ypane Paraguay Not Entered Ypacarai Paraguay Not Entered Yhú Paraguay Not Entered Yby Yaú Paraguay Not Entered Yataity Paraguay Not Entered Yarati-í Paraguay Not Entered Yaguarón Paraguay Not Entered Villa Florida Paraguay Not Entered Veinticinco de Diciembre Paraguay Not Entered Unión Paraguay Not Entered Tuna Paraguay Not Entered Río Tebicuary Paraguay Not Entered Tavaí Paraguay Not Entered Tarumá Paraguay Not Entered Tapytá Paraguay Not Entered Tacuara Paraguay Not Entered Santa Rosa Paraguay Not Entered Santa Rita Paraguay Not Entered San Pedro de Ycuamandiyú Paraguay Departamento de San Pedro Departamento de San Pedro Paraguay Not Entered San Patricio Page 2 of 9

Country First Administrative Division Location Planned Actual Paraguay Not Entered San Pablo de Ycuámandyyú Paraguay Not Entered Potrero San Miguel Paraguay Not Entered San Miguel Paraguay Not Entered San Lorenzo Paraguay Not Entered San Juan Nepomuceno Paraguay Not Entered San Juan Bautista Paraguay Not Entered San José Paraguay Not Entered San Joaquín Paraguay Not Entered San Ignacio Paraguay Not Entered San Francisco Paraguay Not Entered San Estanislao Paraguay Not Entered San Bernardino Paraguay Not Entered San Antonio Paraguay Not Entered San Agustin Paraguay Not Entered Salto del Guairá Paraguay Not Entered Rosario Paraguay Not Entered R. I. Tres Corrales Paraguay Not Entered Repatriación Paraguay Not Entered Raul Oviedo Paraguay Not Entered Quiindy Paraguay Not Entered Estero Pirí Pucú Paraguay Not Entered Pilar Paraguay Not Entered Pedro Juan Caballero Paraguay Not Entered Departamento de Paraguarí Paraguay Not Entered Paraguarí Page 3 of 9

Paraguay Not Entered Nueva Londres Paraguay Not Entered Departamento de Ñeembucú Paraguay Not Entered Departamento de Misiones Paraguay Not Entered Limpio Paraguay Not Entered Lima Paraguay Not Entered La Pastora Paraguay Not Entered Itauguá Paraguay Not Entered Departamento de Itapúa Paraguay Not Entered Río Itanará Paraguay Not Entered Itacurubí de la Cordillera Paraguay Not Entered Itá Paraguay Not Entered Hernandarias Paraguay Not Entered Guarambaré Paraguay Not Entered Departamento del Guairá Paraguay Not Entered Guaica Paraguay Not Entered General Isidoro Resquín Paraguay Not Entered General Elizardo Aquino Paraguay Not Entered General Delgado Paraguay Not Entered Eusebio Ayala Paraguay Not Entered Encarnación Paraguay Not Entered Emboscada Paraguay Not Entered Doctor Juan Manuel Frutos Paraguay Not Entered Doctor Cecilio Báez Paraguay Not Entered Cuatro Mojones Paraguay Not Entered Coronel Oviedo Page 4 of 9

Paraguay Not Entered Coronel Bogado Paraguay Not Entered Departamento de la Cordillera Paraguay Not Entered Departamento de Concepción Paraguay Not Entered Concepción Paraguay Not Entered Colonia Liberación Paraguay Not Entered Ciudad del Este Paraguay Not Entered Chore Paraguay Not Entered Departamento Central Paraguay Not Entered Carmen del Paraná Paraguay Not Entered Carayaó Paraguay Not Entered Carapeguá Paraguay Not Entered Capiatá Paraguay Not Entered Departamento de Canindeyú Paraguay Departamento de Caazapa Departamento de Caazapa Paraguay Not Entered Caapucú Paraguay Departamento de Caaguazu Departamento de Caaguazu Paraguay Not Entered Caaguazú Paraguay Not Entered Caacupé Paraguay Not Entered Buena Vista Paraguay Not Entered Asunción Paraguay Not Entered Arroyos y Esteros Paraguay Not Entered Departamento del Amambay Paraguay Not Entered Departamento del Alto Paraná Paraguay Not Entered Abaí Paraguay Asuncion Asuncion Page 5 of 9

Paraguay Asuncion Asuncion Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target San Pedro Department: Vehicle Operating Number Value 18149.23 17526.70 Cost; Truck Caazapa Department Vehicle Operating Cost: Number Value 17885.74 17272.25 Truck Caaguazú Department: Vehicle Operating Number Value 18324.46 17695.92 Cost; Truck Number of Public Transport Vehicles in San Number Value 17.00 20.00 Pedro Department Number of Public transport Vehicles in the Number Value 8.00 10.00 Caazapá Department Number of Public transport Vehicles in Number Value 9.00 12.00 Caaguazú Department Intermediate Results Indicators Page 6 of 9

Indicator Name Core Unit of Measure Baseline Current End Target Component 1 - Number of law, decrees and Number Value 0.00 5.00 2.00 regulations related to the project enacted Road Classification Law and Road Transit Law Component 1 - Creation of Road Strategic Planning Unit Component 1 - Road Strategy and five-year plan implemented Component 1 - Programming and follow-up of the result-based management and budget implemented Component 1 - Strategy of Internal and external communication on road maintenance implemented COMPLETED. Road Planning Directorate Ministerial Decree issued; Road Strategy prepared; Five year plan under implementation; RoadTransit Law and Road Classification Law, both promulgated -- indicator was surpassed Text Value No Unit COMPLETED. DPV was created and is operative and eqquiped and being trained by consultants Road Classification Law and Road Transit both Promulgated UPE operational, equipped and trained 31-Mar-2013 Text Value No Strategy or plan COMPLETED. The five year plan is under implementation and being monitored. With assistance from the IADB a master plan has been prepared which includes a medium and short term plan Text Value Non-existent COMPLETED. A report is presented to MoF and the Bank The results' based budget is monitored by MEF quarterly Text Value No strategy COMPLETED. Plan prepared and under implementation. Information is being uploaded in MOPC's web site as per IGAP Strategy prepared and published Report on execution of budget for results Communications plan prepared and implemented implementation Page 7 of 9

Component 2 - Km of road networked maintained under level of service Percentage in compliance with standards of the length contracted Component 3 - Km of Unpaved Road Network Improved Component 3 - Length of unpaved roads maintained at appropriate standards Data on Financial Performance (as of 22-Apr-2013) Financial Agreement(s) Key s Strategy is under implementation and publication in MOPC's website Kilometers Value 0.00 1270.70 968.00 COMPLETED. Roads rehabilitated and under maintenance. Includes 3 WB GMANS contracts for 624 km and 2 IDB contracts for 647 km Roads rehabilitated and under routine maintenance Percentage Value 0.00 94.00 90.00 30-Jun-2006 COMPLETED and on target. Percentage in conformity with standards for the three GMANS contracts 28-Feb-2015 Kilometers Value 0.00 0.00 140.00 15-Jun-2013 Ongoing. Three contracts have been signed and contractors are mobilizing for road works in the departments of San Pedro, Caaguazu ycaazapa Kilometers Value 0.00 101.00 140.00 31-Mar-2013 Ongoing. Unpaved roads Length of unpaved roads with routine maintenance maintained at appropriate performed by standards microenterprises operating and trained Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P082026 IBRD-74060 Effective 24-Aug-2006 13-Oct-2006 03-Jan-2008 30-Jun-2012 Disbursements (in Millions) Page 8 of 9

Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P082026 IBRD-74060 Effective USD 74.00 74.00 0.00 35.47 38.53 48.00 Disbursement Graph Key Decisions Regarding Implementation None Restructuring History Level two Approved on 11-Jun-2012, Level two Approved on 28-Mar-2013 Related Projects There are no related projects. Page 9 of 9