Lake Manitoba Lake St. Martin

Similar documents
Design and Construction of the Lake St. Martin Emergency Outlet

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

Committee. Presentation Outline

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Tenders. Manitoba Infrastructure

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

Otter Lake Landowners Association (OLLA) Otter Lake News

Establishing a National Urban Park in the Rouge Valley

Tenders. Manitoba Infrastructure

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Update Report - Etobicoke Creek and South Mimico Creek Trails

MINISTER S MESSAGE. Dear friends:

Manitoba Infrastructure

Keeyask Generation Project. Project Description. Supporting Volume. Environmental Impact Statement

Common Ground Drainage Channel Diversion. Design Report

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Highway Speed Regulation, amendment

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

Hydrology Input for West Souris River IWMP

Little Limestone Lake Provincial Park. Draft Management Plan

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Three Sisters Campground Redevelopment

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

Equitable Water Apportionment on the Canadian Prairies

Sasagiu Rapids Provincial Park. Draft Management Plan

Bridges and Structures

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Crown Lands and Property Agency. Name Client # LAST (Please Print) FIRST MIDDLE (no initials) Mailing Address. Postal Code

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Project Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

EAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

Keeyask Generation Project. Project Description. Supporting Volume. Environmental Impact Statement

Waterfront Concept Plan: Community Survey Summary

DEPARTMENT OF MANITOBA INFRASTRUCTURE

Capilano Substation Upgrade

January Sunday Monday Tuesday Wednesday Thursday Friday Saturday. Hydro 2012/13 & 2013/14 GRA - Hearing. Hydro 2012/13 & 2013/14 GRA - Hearing

Conservation Area Management Statement

2.1 Physical and Biological Description Matabitchuan River Watershed

Union Station Rail Corridor East Enhancements Project

Hydro-Electric Schemes Compliance Report June June 2013

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

DOW Number: Survey ID Date: 08/21/2018. Windom Southern

San Martin Boulevard over Riviera Bay Project Development & Environment (PD&E) Study Update PID A

Guide for Permits Development adjacent to Provincial Highways

Newcastle Transport Program Newcastle Light Rail Determination Report

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

A63 Preferred Route Announcement

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

LAKE SURVEY REPORT DRAFT VERSION PRELIMINARY DATA (AS OF 07/24/2018) Fisheries Management. DOW Number: Survey ID Date: 07/16/2018

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

Community Services Associates, Inc. (CSA) Maintenance, Enhancements and Major Projects Committee March 1 st, 2018

Aboriginal Traditional Knowledge

Boardman River Dams Implementation Team. DRAFT Meeting Minutes

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council

Public Open House Notes

M621. Junctions 1 to 7 Improvement scheme. Share your views

4. Hydrology of the Olentangy River Watershed

FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013

SHORES OF LAKE AGASSIZ Self-Directed Mountain Biking Tour

Minnesota Department of Natural Resources

(This page intentionally left blank.)

Grand Rapids Provincial Park. Draft Management Plan

Keeping Fun Safe. A public discussion paper on a new Amusement Ride Regulation for Manitoba

Locations. Emerson Morris Sainte Agathe Saint Adolphe Saint Norbert Winnipeg (The Forks) St. Andrews Lockport Selkirk Netley Creek

Welcome to Atwood Lake Park Master Plan Update

Geoscape Toronto The Oak Ridges Moraine Activity 2 - Page 1 of 10 Information Bulletin

Buffalo Pass Trails Project

Hydrological study for the operation of Aposelemis reservoir Extended abstract

White Mountain National Forest. Campton Day Use Area Development Project. Scoping Report. Prepared by the Pemigewasset Ranger District May 2013

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

in Northumberland Preferred Route Announcement September 2017

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

A30 Chiverton to Carland Cross Statement of Community Consultation

Staff Report of Oakland Bay Activities 10/1/08 to 12/31/08. 1/15/09 Stephanie Kenny. Funded through Consolidated Contract # C14956

TOWN BOARD BUDGET WORKSHOP MEETING NOVEMBER 15, 2016

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

Minnesota Department of Natural Resources

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Watershed Runoff Analysis

QEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.

SH73 Route Security Strategic Study Project Summary

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

Inclusion on the City of Toronto's Heritage Register Midtown in Focus Phase 1: Main Street Properties

Presentation Overview

Transcription:

Lake Manitoba Lake St. Martin Outlet Channels Public Information Session June 29, 2017 July 13, 2017

Background & History 2011 Spring Flood Event High flows recorded on most streams and rivers in the Assiniboine and Lake Manitoba Watershed 2011 Flood Review Task Force Report (Farlinger) Lake Manitoba and Lake St. Martin Regulation Review Committee Report (Westdal) Assiniboine River and Lake Manitoba Basins Flood Mitigation Study (KGS Group) Consideration to Water Retention along Assiniboine River Water Control on Waterhen River Pumping Lake Winnipegosis to Cedar Lake Increased Outlet Capacity from Lake Manitoba and Lake St. Martin Lake Manitoba and Lake St. Martin Outlet Channel; Conceptual Design Stage 1 (KGS Group) Development of Six Options for Lake Manitoba Outlet Development of Two Options for Lake St. Martin Outlet 2014 Summer Rain Event Public Open House, Ashern MB, September 2014 Lake Manitoba and Lake St. Martin Outlet Channel; Conceptual Design Stage 2 (KGS Group) Further development of Options C and D on Lake Manitoba Channel Addition of two options for Lake St Martin Outlet Channel

Background & History July 2015 Federal and Provincial Governments announce cost sharing of Outlet Channel Project 50/50 cost share of $495 Million Budget Estimate Desirable completion in 2020/21 creates accelerated schedule Environmental Data Collection and Field Investigation (M. Forster Enterprises) Study area included options within Stage 2 Conceptual Design Lake Manitoba Outlet Channel Options Lake St. Martin Outlet Channel Options Lake St. Martin OC Access Road Alignment Lake St. Martin OC Hydro Distribution Line Investigation and Preliminary Engineering for the Lake Manitoba Outlet Channel; Options C and D (KGS Group) Further investigation, preliminary engineering and evaluation of Options C and D Recommendation of Route D as the preferred alternative Preliminary Design for Reach 2 of the Lake St. Martin Outlet Channel (KGS Group) Evaluation of 4 alternatives Recommendation of Option 4 with preliminary engineering design Spring 2017 RM of Grahamdale and Impacted Landowner Meetings; June 29 th Public Information Session, Moosehorn July 13 th Public Information Session, Winnipeg

Project Location Overview

Basins and Watersheds of Manitoba

Proposed Lake Manitoba Outlet Channel

Lake Manitoba Outlet Channel Bedrock Details - Channel Excavation in Bedrock - Channel Excavation in Till Excavation in bedrock creates high risk of aquifer contamination Proposed channel will be excavated in Till Proposed Channel Profile with Bedrock Information provided by KGS Group

Local Watersheds Vicinity of Lake Manitoba Outlet Channel Perimeter ditching to accommodate local area drainage

Lake Manitoba Outlet Channel Typical Channel Cross Sections Proposed Channel Profile Information provided by KGS Group

Lake Manitoba Outlet Channel PR 239 Realignment

Lake Manitoba Outlet Channel Structure Locations Township Road Bridge Structure Carne Ridge Road Bridge Structure PTH 6 Bridge Structure Iverson Road Water Control & Bridge Structure

Existing Lake St. Martin Emergency Outlet Channel Lake St. Martin Emergency Outlet Channel available for use during construction Lake St. Martin Emergency Outlet Channel used to maintain water levels in Big Buffalo Lake complex No long term impacts to Big Buffalo Lake / Buffalo Creek aquatic system Construction costs are similar between options Future opportunities for environmental compensation

Proposed Lake St. Martin Outlet Channel

Lake St. Martin Outlet Channel Drainage Area

Lake St. Martin Outlet Channel Proposed Access Road Alignment

Lake St. Martin Outlet Channel Typical Channel Cross Sections Channel Drop Structure Detail Information provided by KGS Group

Lake Manitoba - Lake St. Martin Outlet Channels Water Control Structure Details - Conceptual Information provided by KGS Group

Lake Manitoba Outlet Channel Channel Alignment Options Option C Option D Information provided by KGS Group

Lake Manitoba Outlet Channel Channel Alignment Options Summary of Results Information provided by KGS Group

Proposed Operating Guidelines Lake Manitoba Outlet Channel

Proposed Operating Guidelines Lake St. Martin Outlet Channel

Project Schedule / Next Steps * * Lake St. Martin Outlet Channel access road construction commences summer of 2017

Questions / Comments Feedback forms available here today or please feel free to share your feedback at Survey Monkey using the following link: https://www.surveymonkey.com/r/bt7fyxj Reach out to one of the Manitoba Infrastructure or KGS Group Representatives here today! They would be happy to answer any questions or discuss the project with you! OR Contact: Mark Allard, P.Eng. Project Director Phone: 204-622-2261 Email: Mark.Allard@gov.mb.ca For any Environmental Assessment Information Contact Christine Baljko Environmental Coordinator Phone: 204-479-6025 Email: Christine.Baljko@gov.mb.ca