FDOT Treasure Coast Traffic Impact Report

Similar documents
FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

November 21, 2012 Barbara Kelleher, (954)

Palm Beach County Traffic Report July 13 through July 20, 2012

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

October 31, 2014 Chuck McGinness, (954)

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Palm Beach County Traffic Report August 24 through August 31, 2012

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Palm Beach County Traffic Report. Aug. 25 through Sept. 1, 2017

Florida Department of Transportation MIKE DEW SECRETARY

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Guide to. Road Construction Projects

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

State Route 8 Corridor. Northern Summit County s Path to Success

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Important Lane Closures, April 3 9, 2011

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Ohio Department of Transportation Construction Update

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

US 19 Sunset Point Rd to Countryside Blvd.

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

Springettsbury Township. Road Improvement Projects

Hospital Link Project Project Update Winter 2018

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 9

PennDOT Interstate Work next week March 30-April 3:

APPENDIX F List of Commitments

Weekly East Tennessee Construction Report for May 31-June 6, 2018

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

Weekly construction update

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

2 Construction Program

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

El Dorado County / Tahoe Roadwork Schedule

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

MARTIN COUNTY MANATEE PROTECTION ZONES

Route 29 Solutions Projects

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO

Important Lane Closures March 1 5, 2010

Road Construction Ahead January-April 2015 NORTHWEST REGION

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

PROGRESS PARK CONNECTOR

5.1 Traffic and Transportation

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

2400 NW Via Della Court Port St. Lucie, FL f FORT PIERCE HUTCHINSON ISLAND PORT ST. LUCIE JENSEN BEACH

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Culpeper District. Albemarle County Monthly Report December 2011

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

PRIORITIES COMMITTEE MEETING

Monthly Traffic Update

All closures this week happen at night, including full closures of Mesa and I-10

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

Hospital Link Project Project Update September 2015

4. Safety Concerns Potential Short and Medium-Term Improvements

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Transcription:

July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane closures on state highways in Martin, St. Lucie and Indian River counties are expected during the week of June 30 through July 7. Weather permitting, work will be done at the following locations throughout the Treasure Coast. For updated lane closure information, please refer to www.d4fdot.com. Follow us on Twitter @ MyFDOT_SEFL. CONSTRUCTION PROJECTS MARTIN COUNTY 1. Kanner Highway / State Road 76 from Lost River Road to south of Monterey Road Description: Under this 4.3 mile long project, Kanner Highway is being widened from a four lane divided highway to a six lane divided highway. Additional work on this project includes: widening the bridge over the South Fork St. Lucie River; drainage improvements, including construction of five retention ponds; construction of sound walls at Fisherman s / Somerset Cove and Whitemarsh Reserve; guardrail improvements; signalization upgrades; and turn lane and bicycle lane improvements. Cost/Completion: $20.8 million. Completion is expected in spring 2019. The speed limit on Kanner Highway from Lost River Road to Indian Street has been reduced from 50 mph to 45 mph. The speed limit will remain at 45 mph after project completion. One lane in either direction of Kanner Highway from Lost River Road to Martin County High School may be closed intermittentlymonday through Friday between 9 a.m. and 4 p.m. for drainage work and roadway widening. One lane in either direction of Kanner Highway from Lost River Road to Martin County High

One lane in either direction of Kanner Highway from Lost River Road to Martin County High School may be closed intermittentlysunday through Thursday night between 9 p.m. and 6 a.m. for bridge and drainage work. The sidewalk along the east side of Kanner Highway just south of the high school will be intermittently impacted Monday through Friday between 9 a.m. and 4 p.m. with flagmen holding pedestrian traffic so construction vehicles can enter and exit the pond area. The sidewalk along southbound Kanner Highway from Pomeroy Street to South River Drive is closed through July for drainage work. Pedestrians will be detoured to the northbound sidewalk along Kanner Highway at Indian Street and Pomeroy Street. 2. I 95 Interchange at Kanner Highway (State Road 76 / Exit 101) Description: This 0.745 mile project includes widening Kanner Highway (SR 76) at the I 95 interchange, reconstructing the I 95 entrance and exit ramps, drainage, milling and resurfacing, signing & pavement markings, and signalization. If you need additional information about the project, please contact Terry B. Rauth P.E. at (772) 419 6936 or trauth@martin.fl.us. Cost/Completion: $5.8 million. Completion in summer 2017. All lanes are open through Friday, July 14. 3. State Road 710 / Warfield Boulevard from east of Kanner Highway (State Road 76) to the Martin / Palm Beach County Line Description: This 5.572 mile project includes reconstructing State Road 710 to a 4 lane divided roadway with a 40 foot sodded median, concrete pavement, installing a new drainage system, and constructing a new wildlife crossing west of Martin / Palm Beach County line. Cost/Completion: $28 million. Completion in spring 2020. The eastbound lane of SR 710 may be closed intermittently Monday through Friday between 7 a.m. and 7 p.m. for barrier wall installation. A flag crew will maintain two way traffic. 4. I 95 / Martin Highway (State Road 714) Interchange Landscape Improvements Description: The improvements under this contract consist of installing trees at the Martin Highway (SR 714) I 95 Interchange and irrigation and pump installation. Cost/Completion: $1.15 million. Completion in fall 2017. The shoulders at the I 95/Martin Highway interchange may be closed intermittently Monday through Friday between 7 a.m. and 5 p.m. through fall 2017. 5. I 95 Resurfacing Project from Indiantown Road to Bridge Road Description: The I 95 resurfacing project from south of Indiantown Road (State Road 706) in the Town of Jupiter to north of Bridge Road (County Road 708) in Martin County is anticipated to begin Tuesday, May 9.

The improvements under this contract consist of resurfacing the I 95 mainline from south of Indiantown Road to north of Bridge Road and the I 95 interchange ramps at Indiantown Road (Exit 87) and Bridge Road (Exit 96), minor shoulder and guardrail repairs, and replacement of the southbound bridge approach slab at approximate mile marker 89.5. Cost/Completion: $17.2 million. Completion in fall 2018. Two northbound lanes of I 95 from Indiantown Road to Bridge Road will be closed Sunday through Thursday night between 9 p.m. and 6 a.m. through August for paving. 6. Kanner Highway (State Road 76) I 95 Interchange Landscape Improvements Description: The improvements under this contract consist of installing trees at the Kanner Highway (SR 76) I 95 Interchange and an irrigation and pump system. Cost/Completion: $1.46 million. Completion is expected in fall 2017. The shoulders at the I 95/Kanner Highway interchange may be closed intermittently Monday through Friday between 7 a.m. and 5 p.m. through fall 2017. 7. State Road A1A and Sewall s Point Road Signalization Project Description: This project is expected to begin August 11. The improvements under this contract consist of upgrading signalization by installing new mast arms, pedestrian detectors, and closed circuit television cameras; sidewalk and driveway improvements; and minor landscaping on A1A/NE Ocean Boulevard at the intersection of Sewall s Point Road. Cost/Completion: $459,999. Completion in early 2018. Open House: On Wednesday, July 26, FDOT will host an informational Open House from 4 p.m. until 6 p.m. at the Sewall s Point Town Hall in the Commission Chambers, One South Sewall s Point Road, Sewall s Point, FL 34496. Project personnel will be on hand to discuss the scope of work, construction schedule, and address questions and comments one on one. No formal presentation will be made. ** See attached flyer 8. NE Causeway Boulevard from Indian River Drive to State Road A1A in Jensen Beach The right turn lane from westbound NE Causeway Boulevard to northbound Indian River Drive will be closed intermittently Monday through Friday between 9 a.m. and 3 p.m. through October. The sidewalk along the north side of NW Causeway Boulevard is closed for building construction through October. Pedestrians should use the sidewalk on the south side of the roadway. 9. Kanner Highway at Kansas Avenue in Stuart

Starting Tuesday, the northbound shoulder of Kanner Highway at Kansas Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. through July 28 for drainage work. 10. Roosevelt Bridge Fishing Pier in Stuart The fishing pier located under the Roosevelt Bridge will be closed through August to replace the handrails along the pier. While the fishing pier is closed, no one will be permitted to access this area. 11. U.S. 1 at Village Road in Stuart One northbound lane of U.S. 1 will be closed Monday through Friday between 9 a.m. and 3:30 p.m. for utility work. 12. State Road A1A at Sandpebble Trace in Stuart Advance Notice: The southbound turn lane from SR A1A into Sandpebble Beach Condos will be closed Monday, July 17 between 9 a.m. and 4 p.m. for utility work. 13. State Road 710 from Fox Brown Road to the Florida East Coast Railway in Indiantown One southbound lane of State Road 710 will be closed Thursday between 9 a.m. and 4 p.m. for asphalt repairs. A flag crew will maintain two way traffic. 14. State Road 710 from Martin Highway to Tommy Clements Street in Indiantown Advance Notice: Lanes in either direction of State Road 710 will be closed intermittently Thursday, August 3 and Friday, August 4 between 8:30 a.m. and 4 p.m. for railroad crossing repairs. A flag crew will maintain two way traffic. ST. LUCIE COUNTY 15. Indrio Road Widening Project in Fort Pierce Description: Indrio Road is being widened from west of the I 95 interchange to east of Emerson Avenue (State Road 607). This 2.7 mile project includes: reconstructing the existing two lane Indrio Road to a four lane, divided highway with a raised median; constructing a 6 foot sidewalk along the south side and a 12 foot wide multi purpose trail along the north side of Indrio Road; realigning Spanish Lakes Boulevard to connect with Koblegard Road; reconstructing Koblegard Road from Indrio Road north approximately.5 mile; and installing new highway lighting, signage and signalization.

Cost/Completion: $23.9 million. Completion in spring 2019. The speed limit on Indrio Road between I 95 and Emerson Avenue has been reduced from 55 mph to 45 mph. The speed limit will remain at 45 mph after project completion. One lane in either direction of Indrio Road may be closed Monday through Friday between 7 a.m. and 4:30 p.m. for widening. A flag crew will maintain two way traffic. One lane in either direction of Johnston Road may be closed Monday through Friday between 7 a.m. and 4:30 p.m. for widening. A flag crew will maintain two way traffic. One lane in either direction of Emerson Avenue may be closed Monday through Friday between 7 a.m. and 4:30 p.m. for widening. A flag crew will maintain two way traffic. One lane in either direction of Spanish Lakes Boulevard may be closed Monday through Friday between 7 a.m. and 4:30 p.m. for construction. A flag crew will maintain two way traffic. Starting Monday, July 10, Johnston Road south of Indrio Road will be reduced to one lane aroundthe clock through July 31 for road work. A flag crew will maintain two way traffic. 16. I 95 Bridge Deck Replacement Project at Gatlin Boulevard and Midway Road Description: The I 95 bridge deck replacement project over Gatlin Boulevard and Midway Road includes: removing & replacing the bridge decks on I 95 over Gatlin Boulevard and CR 712/Midway Road; milling and resurfacing approaches to bridge decks; and re striping approaches to bridge decks. Cost/Completion: $8.2 million. Completion in fall 2017. Two lanes in either direction of I 95 at Midway Road will be closed Sunday through Friday nights between 7:30 p.m. and 6:30 a.m. for striping. Two lanes in either direction of I 95 at Gatlin Boulevard will be closed Thursday night, July 12 through Sunday night, July 16 between 8 p.m. and 6:30 a.m. for striping. 17. Midway Road Widening Project from S. 25th Street to U.S. 1 Description: This 1.8 mile project includes: reconstructing the existing two lane Midway Road to a four lane, divided highway with a raised median; installing a new signal at Sunrise Boulevard; constructing a new bridge over the North Fork St. Lucie River; constructing a 6 foot sidewalk on the north side and a 12 foot multi purpose trail on the south side Midway Road; constructing 4 foot bike lanes on both sides of the roadway; reconstruction of S. 25th Street approximately 1000 to the south & north of Midway Road; reconstruction of Sunrise Boulevard from W. 1st Street to Charlotta Street; reconstruction of Oleander Avenue from W. 2nd Street to Merritt Ditch; drainage improvements, including constructing 6 retention ponds at 5 locations; and signage, signalization, and lighting improvements. Cost/Completion: $26.8 million. Completion in spring 2020. One lane in either direction of Midway Road from 25 th Street to U.S. 1 will be closed Monday through Friday between 9 a.m. and 4 p.m. A flag crew will maintain two way traffic. One lane in either direction of Oleander Avenue from W. 1 st Street to north of Midway Road will be closed intermittently Monday through Friday between 9 a.m. and 4 p.m. A flag crew will maintain two way traffic. One lane in either direction of Sunrise Boulevard from W. 1 st Street to Augusta Street will be closed intermittently Monday through Friday between 9 a.m. and 4 p.m. A flag crew will maintain two way traffic.

One lane in either direction of 25 th Street north and south of Midway Road may be closed Monday through Friday between 10 a.m. and 3 p.m. A flag crew will maintain two way traffic. The inside left turn lane from northbound U.S. 1 to westbound Midway Road is closed around theclock for widening. The inside left turn lane from southbound U.S. 1 to eastbound Midway Road is closed around theclock for widening. The right turn lane from eastbound Midway Road to southbound Oleander Avenue is closed aroundthe clock for roadway widening. Eastbound motorists can turn south from the through lane. The right turn lane from westbound Midway Road to northbound Oleander Avenue is closed aroundthe clock for roadway widening. Westbound motorists can turn north from the through lane. Magnolia Avenue is closed from Midway Road north for 100 feet through July 19 for drainage work. During this time, traffic will be detoured via Charlotta Street and Sunrise Boulevard. ** See attached flyer Starting Monday, July 10, drainage work is scheduled to begin along Melville Road from Midway Road to Brack Road that will necessitate five consecutive phases of full closures. These closures will start at the south end near Brack Road and move north to Midway Road and will take approximately 3 months total to complete. Motorists should detour via Brack Road to Oleander Avenue or U.S. 1 to Ulrich Road. Residents and emergency services will have access to properties along Melville Road at all times. The details of each phase are as follows: Phase 1: Melville Road from Brack Road north to 5175 Melville Road (approximately 800 feet) for three weeks. Phase 2: Melville Road from 5105 to 5101 Melville Road (approximately 100 feet) for one week. Phase 3: Melville Road from 5101 to 5009 Melville Road (approximately 350 feet) for three weeks. Phase 4: Melville Road from 5009 to 5001 Melville Road (approximately 370 feet) for two weeks Phase 5: Melville Road from 5001 Melville Road to Midway Road (approximately 290 feet) for three weeks ** See attached detour flyer 18. North 25th Street from St. Lucie Boulevard (County Road 608) to U.S. 1. Description: This 1.169 mile project includes: milling and resurfacing of N. 25th Street / SR 615; constructing new sidewalk on both sides of road from where existing sidewalk ends to U.S. 1; constructing 6 foot buffered bike lanes in each direction; rebuilding handicap ramps throughout project limits at qualifying locations; upgrading signs and pavement marking, and upgrading pedestrian signal control buttons and adding countdown timers at the St. Lucie Boulevard / N. 25th Street and U.S. 1 / N. 25th Street intersections. Cost/Completion: $2.14 million. Completion in fall 2017. The outside lane in each direction of 25 th Street from U.S. 1 to Industrial Avenue Three is closed around the clock through July. One lane in each direction of 25 th Street from Industrial Avenue Three to St. Lucie Boulevard will be closed Monday through Friday between 7 a.m. and 5 p.m. through June.

The sidewalk along 25 th Street from U.S. 1 to St. Lucie Boulevard may be closed intermittently Monday through Friday between 7 a.m. and 5 p.m. One lane in each direction of U.S. 1 at 25 th Street may be closed Monday through Friday between 7 a.m. and 5 p.m. through June. The right turn lane from southbound U.S. 1 to 25 th Street may be closed periodically Monday through Friday between 7 a.m. and 5 p.m. for sidewalk and signal work. Motorists turning right onto 25 th Street can use the outside through lane of U.S. 1. 19. I 95 Bridge Deck Replacement Project at Glades Cut Off Road (County Road 709) and Ten Mile Creek Description: On Monday, July 10, the I 95 bridge deck replacement project over Glades Cut Off Road and the Florida East Coast Railway (approximate mile marker 125) in the City of Port St. Lucie and over Ten Mile Creek just south of Okeechobee Road/Exit 129 will begin. This project includes replacing the bridge decks on I 95 over Glades Cut Off Road (CR 709) and the FEC Railroad and over Ten Mile Creek, milling and resurfacing approaches to the bridge decks and re striping approaches to bridge decks. Cost/Completion: $13.46 million. Completion is expected in summer 2019. One lane in either direction of I 95 at Glades Cut Off Road may be closed Monday through Thursday night between 9 p.m. and 6 a.m. One lane in either direction of I 95 at Ten Mile Creek overpass may be closed Monday through Thursday night between 9 p.m. and 6 a.m. Open House: On Wednesday, July 12, the Florida Department of Transportation (FDOT) will host an informational Open House from 4 p.m. to 6 p.m. at the St. Lucie County Fire District Administration Complex, 5160 NW Milner Drive, Port St. Lucie, FL 34983. Project personnel will be on hand to discuss the scope of work, construction schedule, and address questions and comments one on one. No formal presentation will be made. ** See attached flyer 20. McCarty Road North Bridge Replacement Project Description: This 0.12 mile project is expected to begin July 31. Work on this project includes: replacing the McCarty Road Bridge over Ten Mile Creek, raising the bridge approximately 2 feet above the existing bridge elevation to better accommodate flood creek water elevations; replacing both approach slabs; roadway reconstruction and widening immediately north and south of the new bridge; drainage improvements including new inlets and installation of a French drain system and providing slope protection/channel lining below the bridge to prevent erosion; and installing signing and pavement markings. The new bridge configuration will be a two lane undivided road with 12 lanes, outside shoulders, and a sidewalk on the east side of the bridge. Cost/Completion: $1.47 million. Completion in spring 2018. Open House: On Thursday, July 27, FDOT will host an informational Open House from 4 p.m. until 6 p.m. at the Project Team Field Office, 2552 Peters Road, Suite C, Fort Pierce, Florida 34950. Project personnel will be on hand to discuss the scope of work, construction schedule, and address questions and comments one on one. Please note: There will not be a formal presentation. Guests may arrive at any time between 4 p.m. and 6 p.m. ** See attached flyer.

Advance Notice: Starting the week of July 31, McCarty Road (County Road 712A) will undergo a full around the clock closure from Twin Creeks Drive north for 0.12 miles to replace the bridge. This full closure is anticipated to last approximately 9 months. During this time, motorists should detour via Okeechobee Road or Midway Road to Shin Road. 21. St. Lucie West Boulevard from the I 95 Interchange to Peacock Boulevard in Port St. Lucie One lane in either direction of St. Lucie West Boulevard will be closed Thursday between 12:30 p.m. and 3 p.m. for materials testing. 22. I 95 at Crosstown Parkway (Exit 120) in Port St. Lucie One southbound lane of I 95 at Crosstown Parkway will be closed Thursday night between 9 p.m. and 5 a.m. for bridge repairs. 23. I 95 at Indrio Road (Exit 138) in Fort Pierce One northbound lane of I 95 at Indrio Road will be closed Monday night between 9 p.m. and 12 a.m. for bridge repairs. 24. I 95 South of Orange Avenue (Exit 131) in Fort Pierce Advance Notice: One northbound lane of I 95 south of Orange Avenue will be closed Monday night, July 17 between 9 p.m. and 12 a.m. for bridge repairs. 25. I 95 at Midway Road (Exit 126) in Fort Pierce One northbound lane of I 95 at Midway Road will be closed Tuesday night between 9 p.m. and 12 a.m. for bridge repairs. 26. I 95 at Okeechobee Road (Exit 129) in Fort Pierce One northbound lane of I 95 at Okeechobee Road will be closed Wednesday between 12 a.m. and 2 a.m. for bridge repairs. One southbound lane of I 95 at Okeechobee Road will be closed Thursday between 2 a.m. and 5 a.m. for bridge repairs. 27. U.S. 1 from Virginia Avenue to Ohio Avenue in Fort Pierce

One lane in each direction of U.S. 1 will be closed Monday through Friday between 9 a.m. and 4 p.m. through August 25 for median work and to install mast arms. 28. State Road 70 from NE 31st Avenue to NE 34th Avenue in Fort Pierce One westbound lane of State Road 70 will be closed Monday through Friday between 9 a.m. and 4 p.m. for utility work. 29. 25 th Street between Juanita Avenue and Taylor Creek Bridge in Fort Pierce One northbound lane of 25 th Street will be closed Wednesday and Thursday between 9 a.m. and 4 p.m. for restriping. 30. State Road A1A from Pepper Lane to Nettles Boulevard in Jensen Beach The southbound lane of A1A will be closed Monday through Friday between 9 a.m. and 4 p.m. for utility work. A flag crew will maintain two way traffic. 31. State Road A1A from Florida Power and Light to Herman s Bay Beach in Jensen Beach The northbound lane of A1A will be closed Monday through Friday from 9 a.m. to 4 p.m. for utility work. A flag crew will maintain two way traffic. INDIAN RIVER COUNTY 32. I 95 (SR 9) from just north of State Road 60 (Osceola Boulevard/Exit 147) at Vero Beach to the Indian River/Brevard County Line Description: I 95 is being widened from just north of State Road 60 to the Indian River/Brevard County line. Improvements in this 12.5 mile long project include: adding one lane on I 95 in each direction; milling and resurfacing the existing lanes; signalization and lighting improvements; Intelligent Transportation System (ITS) improvements, including closed circuit television cameras, Dynamic Message Signs and vehicle detectors; removal/replacement of the existing bridges over CR 512 (Fellsmere Road); construction of a noise barrier wall adjacent to the Encore Sunshine Travel RV Resort; and reconstruction of the interchange at CR 512, including the ramps and turn lanes.the design/build contract started in May 2013. For information on this project, contact the Public Information Office at (772) 713 5570 ori95projectinfo@gbfinc.net. Cost/Completion: $50.6 million. Completion in summer 2017.

Motorists should be alert for slow moving construction vehicles entering and leaving the travel lanes. The speed limit has been reduced to 60 mph in the work zone. One lane in each direction of I 95 may be closed Sunday through Thursday nights between 9 p.m. and 6 a.m. for construction activities. I 95 northbound from MM 148 to MM 149 is shifted toward the median. The I 95 northbound entrance ramp from County Road 512 is shifted slightly to the east. I 95 southbound at MM 153 is diverted to the median for roadway work. I 95 southbound traffic from MM 156.5 to 155.8 is shifted to the new section of the CR 512 bridge. I 95 southbound at the Brevard County line is switched from a left lane closure to a right lane closure at MM 160. I 95 southbound from MM 160 to MM 158 is shifted toward the median to the two inside lanes. I 95 southbound from MM 158 to MM 156 is shifted toward the median to the two inside lanes. 33. Central Railroad Corridor Greenway (CRCG) Pedestrian Overpass Description: Construction began April 26, 2017 on the Central Railroad Corridor Greenway (CRCG) Pedestrian Overpass project from west of I 95 to North County Regional Park. Work of this project includes: constructing a 12 foot shared use path and a pedestrian overpass over I 95, providing pedestrians and bicyclists with convenient access to area parks, conservation areas, recreational and educational facilities; maintaining an open drainage system with swales and minor culvert crossings; and installing lighting, architectural towers, and specialty signage at the bridge location. Cost/Completion: $4.6 million. Completion in spring 2018. The shoulder along the I 95 northbound entrance ramp from County Road 512 may be closed intermittently Monday through Friday between 7 a.m. and 6 p.m. through fall 2017. The shoulder along the I 95 southbound exit ramp to County Road 512 may be closed intermittently Monday through Friday between 7 a.m. and 6 p.m. through fall 2017. Advance Notice: One lane in each direction of I 95 north of Fellsmere Road will be closed Tuesday, July 18 through Thursday night, July 20 between 9:30 p.m. and 6 a.m. for barrier wall installation. 34. U.S. 1 south of Oslo Road in Vero Beach The southbound bike lane of U.S. 1 at Toyota of Vero Beach will be closed Monday through Friday between 9 a.m. and 4 p.m. through July 14 to construct a driveway connection. During this time, cyclists heading south from Oslo Road should cross at Oslo Road. 35. State Road A1A just north of Orchid Island Drive in Vero Beach One lane in either direction of A1A will be closed Monday through Friday between 9 a.m. and 4 p.m. through July to construct a turn lane. Two way traffic will be maintained. 36. State Road 60 and 90 th Avenue Intersection in Vero Beach One westbound lane of State Road 60 will be closed Monday through Friday between 9 a.m. and 4

One westbound lane of State Road 60 will be closed Monday through Friday between 9 a.m. and 4 p.m. through Friday, July 14 for paving. One southbound lane of 90 th Avenue will be closed Monday through Friday between 9 a.m. and 4 p.m. through Friday, July 14 for paving. A flag crew will maintain two way traffic. www.fdot.gov Innovative, Efficient, Exceptional