Major Projects Overview

Similar documents
Update of MDX Open Road Tolling

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

SR 934 Project Development And Environment (PD&E) Study

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. South Florida

Transform66: Inside the Beltway

Westshore Development Forum April 9, 2014

US 19 Sunset Point Rd to Countryside Blvd.

Williamsburg Town Hall Meeting

Florida Department of TRANSPORTATION. First Coast Expressway

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

November 21, 2012 Barbara Kelleher, (954)

Fairfax County Parkway Widening Fairfax County

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

5.1 Traffic and Transportation

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Transportation Supporting Dulles Airport

Palm Beach County Traffic Report July 13 through July 20, 2012

Tolling New Capacity An Important Policy Direction for Florida DOT. Ed Regan CDM Smith

2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

PRIORITIES COMMITTEE MEETING

TBARTA: 2015 Master Plan and Tampa Bay Express Project

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

2 Construction Program

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FUNDED FOR CONSTRUCTION

Important Lane Closures, April 3 9, 2011

Basic Project Information

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

More than just express lanes

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

October 31, 2014 Chuck McGinness, (954)

Palm Beach County Traffic Report August 24 through August 31, 2012

Goodman Industrial Center Doral 2100 NW 88th Court, Doral, FL Marks. The Spot

FY 2009 TRANSPORTATION AUTHORITY MONITORING AND OVERSIGHT REPORT

Street Affected Delayed/ Closed From To Time Closed Time Open. Quarry Ln 58th Ave Lake Cahuilla Pilot Car 6:30AM 58th Ave ( Closed) Van Buren

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

Site Location and Setting

PennDOT Interstate Work next week March 30-April 3:

Florida s Turnpike System

$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Transportation TRANSPORTATION PROJECTS

FY 2018/19 CENTRAL FLORIDA MPO ALLIANCE - LIST OF PRIORITY PROJECTS

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

Miami/Ft. Lauderdale

Hampton Roads Express Lane Network

Mainline Description

A VISION FOR I-95. January 12, Delaware Department of Transportation

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

95 Express Monthly Operations Report May 2017

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Construction Staging Adelaide Street West

Managed Lanes. What s New for Colorado. Parsons Brinckerhoff, 2013.

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018

95 Express Monthly Operations Report July 2017

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

10.0 Recommendations Methodology Assumptions

Draft Year 2040 Cost Feasible Plan

List of Priority Projects

City of Doral FIU Trolley Route Expansion Feasibility Study. David Plummer & Associates

95 Express Managed Lanes Consolidated Analysis Technical Report

Capital Beltway HOT Lanes Project

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

CITY OF BROOKFIELD Capital Improvement Fund Budget

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

AGENDA CENTRAL FLORIDA EXPRESSWAY AUTHORITY OPERATIONS COMMITTEE MEETING September 19, :00 P.M.

FDOT Treasure Coast Traffic Impact Report

Jess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Highways: Interstate. Highways: State Highways

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Transcription:

Major Projects Overview Miami-Dade Expressway Authority February 2018

About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls MDX receives no sales tax, gas tax, property tax or half-penny sales tax Efficient transportation agency with staff of 36 public employees supported by contracted private sector consultants for specific tasks 100% of net revenues invested locally

The Need for Mobility is Growing Increased multimodal mobility to move freight, visitors and residents is needed 15.8 million overnight visitors in 2016 MIA total cargo tons reached 2.2 million, with 8 million tons arriving at the Port Miami-Dade s population increased 20% between Census 2000 and 2016 Miami-Dade is a global logistics hub. The increase in mobility provided by MDX s planned extensions is critical to enhance economic opportunities for residents Miami-Dade is not alone in the mobility race needed for jobs. Tampa, Jacksonville, Atlanta, Savannah are investing in smart highway systems

Major Projects on SR 836 Dolphin Station Park & Ride - In Construction SR 836 Interchange Modifications at 87 th Ave. - In Construction SR 836/I-95 Interchange Improvements - In DB Procurement SR 836 Southwest Extension Kendall Parkway - In PD&E SR 836 HEFT Ramps - In DB Procurement SR 836 Widening from 57 th Ave. to NW 17 th Ave. -In Construction

MAJOR PROJECTS SR 836 IN CONSTRUCTION Dolphin Station Park & Ride ($20.3 million) Partial funding by FDOT/MD County Includes parking spaces, bus bays, a transit hub building, landscaping, signage, fencing and lighting Supports express transit lane and technology initiatives on SR 836 Complete FY 2019

MAJOR PROJECTS SR 836 IN CONSTRUCTION SR 836 Interchange Modifications at 87 th Ave ($98.8 million) Reconstructs the SR 836 Mainline and 87 th Avenue Interchange Provides new connection of 82 nd Avenue to NW 12 th Street (contribution to MD County) Provides flyover ramp to WB SR 836 from WB NW 12 th Street Provides triple left turns from WB NW 12 th Street to SB 87 th Avenue EB SR 836 to NB NW 87 th Avenue SB 87 th Avenue to EB SR 836 Provides new connection from EB 836 to Palmetto Expressway NB & SB Improves safety and operations Provides for inside shoulder express transit lane and technology initiatives Complete FY 2019

MAJOR PROJECTS SR 836 IN CONSTRUCTION SR 836 Widening from 57 th Ave to 17 th Ave ($195.5 million) Improves interchanges at NW 57 th Ave., Le Jeune Rd., NW 27 th Ave., and NW 17 th Ave. Increases capacity and improves operations along SR 836 Provides for inside shoulder express transit lane and technology initiatives Complete FY 2019 SR 836 WB at NW 27 th Avenue SR 836 WB at NW 34 th Avenue SR 836 WB approaching NW 57 th Avenue

MAJOR PROJECTS SR 836 IN DESIGN-BUILD PROCUREMENT SR 836 / I-95 Interchange Improvements ($240.9 million) Improves SR 836 from NW 17 th Avenue to I-95 in conjunction with the FDOT I-395 project Widens and improves operations on SR 836 EB from NW 17 th Avenue to I-95 Interchange Widens SR 836 bridges over the Miami River and improves SR 836 WB mainline Provides new connector serving SB I-95 traffic destined WB on SR 836 and to the Civic Center Improves safety and mobility and improves access to Hospital District by providing a new access to North River Drive from I-95 and SR 836 Design-Build Start: Summer 2018

MAJOR PROJECTS SR 836 IN DESIGN-BUILD PROCUREMENT SR 836 New HEFT Ramps ($51.2 million) Provides access ramps to and from the Dolphin Station Park & Ride Constructs new SB HEFT to WB SR 836 Express Lane Ramp bridge 100% FTE funded Provides direct connection between SR 836 and HEFT to facilitate travel between the southwest and northwest areas of the county Design-Build Start: Summer 2018

MAJOR PROJECTS SR 836 IN PD&E SR 836 Southwest Extension ($42.4 million Planning & R/W) Provides new expressway extension of SR 836 from NW 137 th Avenue to the southwest Kendall area Addresses residents, businesses and educational facilities existing and future transportation needs Improves hurricane/emergency evacuation routes and travel times Provides for inside shoulder express transit lane and technology initiatives to provide congestion relief to Southwest Miami-Dade PD&E and R/W for Phase 1 (8 th Street to 157 th Ave) Complete FY 2021 Design-Build of Phase 1 (currently unfunded) Anticipated Start: 2019

Major Projects on SR 874 SR 874 /SW 72 nd Street Interchange - In PD&E SR 874 Ramp Connector to SW 128 th Street -In Construction

MAJOR PROJECTS SR 874 IN CONSTRUCTION SR 874 Ramp Connector to SW 128 th Street ($104.3 million) Provides expressway access to southwest Miami-Dade communities, presently only serviced by access to and from Florida s Turnpike, through the SW 120 th Street and SW 152 nd Street ramps Widens SW 128 th Street from two to four lanes from SW 122 nd Avenue to SW 137 th Avenue Improves SW 127 th Avenue just north and south of the intersection with SW 128 th Street to facilitate and improve vehicular access (funded by Miami-Dade County) Complete FY 2019 SR 138 th Street at SR 874 Ramp Connector SR 874 at SW 117 th Avenue looking North SW 138 th Street / SW 117 th Ave looking East

MAJOR PROJECTS SR 874 IN PD&E SR 874/SW 72 nd Street Interchange ($11.4 million) Provides new SB offramp to SW 72 nd Street and new NB on-ramp to SR 874 from SW 72 nd Street Provides access to SR 874 and SR 826 Reduces congestion at key intersections along SW 72 nd Street Design-Build Start: Summer 2019

Major Projects on SR 924 and SR 112 SR 924 Extension West to HEFT - In PD&E SR 924 Partial Interchange at NW 67 th Ave. - In PD&E SR 924 Extension East to I-95 - In PD&E SR 112 Ramp Improvements at NW 37 th Ave. - In PD&E

MAJOR PROJECTS SR 924 IN PD&E SR 924 Extension West to HEFT ($171.8 million) Provides connectivity to the HEFT from SR 924 and NW 138 th Street Provides access to major activity and employment centers in northwest Miami-Dade Reduces travel time from 20 minutes to 4 minutes from NW 138 th Street to the HEFT Increases vehicles utilizing the corridor by 30% Funds segment from HEFT to 97 th Avenue (97 th Avenue to SR 826 is not funded) Design-Build Start: Summer 2019 T Construction Funded Construction Unfunded Proposed Tolling Point T

MAJOR PROJECTS SR 924 IN PD&E SR 924 Partial Interchange at NW 67 th Avenue ($27.2 million) Constructs a new westbound on-ramp and off-ramp on SR 924 at NW 67 th Avenue and new eastbound on-ramp from NW 67 th Avenue Provides congestion relief to Miami Lakes and Hialeah by adding new traffic movements at SR 924 and NW 67 th Avenue Design-Build Start: Spring 2019

MAJOR PROJECTS SR 924 IN PD&E SR 924 Extension East to I-95 ($14.6 million Planning & Final Design) Reduces travel times and minimize delays on NW 119 th Street by separating pass-through traffic from local traffic Provides a critical east-west expressway connection Provides enhancements to the community - removes existing lanes, integrates residential and business communities north and south of NW 119 th Street, improves pedestrian connectivity, widens sidewalks, enhances lighting, provides bike lanes and landscaping Provides for inside shoulder express transit lane and technology initiatives Additional connectivity to I-95 from SR 924 (Gratigny Parkway) Final Design Start: Spring 2020

MAJOR PROJECTS SR 112 IN PD&E SR 112 Ramp Improvements at NW 37 th Avenue ($13.7 million) Constructs new partial interchange at SR 112 and NW 37 th Avenue Provides new movements including EB on-ramp at NW 37 th Avenue and WB off-ramp at NW 37 th Avenue Provides additional access to industrial hub, opens commercial area to expressway system and improves access to the MIC Design-Build Start: Fall 2019

Questions?