RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement

Similar documents
PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain

Honeywell.com PBN Concepts Krakow, Poland

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Performance Based Navigation Implementation of Procedures

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

RNP AR APCH Approvals: An Operator s Perspective

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Atlanta NextGen PBN Activities

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

RNP AR and Air Traffic Management

Think the solution, experience the change

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Título ponencia: Introduction to the PBN concept

SDM Workshop on PBN Airborne Perspective. Michael Hopp, Lufthansa Group Brussels,

Continuous Descent Arrivals (CDA) Workshop #2

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

FLIGHT OPERATIONS PANEL

Air Navigation Bureau ICAO Headquarters, Montreal

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

Updates to Procedures at St. John s International Airport

AERONAUTICAL INFORMATION CIRCULAR 18/18

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Airplane Navigation Capabilities

Learning Objectives. By the end of this presentation you should understand:

The VINGA project. Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress

ICAO Air Navigation Panels/Study Groups Work Programme

APAC PBN UPDATE Slide 1 of xx

Continuous Descent? And RNAV Arrivals

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Performance Based Navigation (PBN) Implementation Plan. The Gambia

ENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

ICAO PBN Symposium Montreal - October Captain Johnny Woods Head of Flight Operations & Chief Pilot

(RN R A N V A V & & RN R P N

34 th Airline/ATS Safety Forum

Required Navigation Performance (RNP) in the United States

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

PBN Implementation inside Italian Airspace Status update Summer 2013

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

European Aviation Safety Agency

Colombian PBN implementation: El Dorado case study

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

TERPS vs PANS-Ops Procedure Design and Operational Differences

Implementation challenges for Flight Procedures

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter.

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

KSFO RNAV TO GLS DEMONSTRATION

Required Navigation Performance at Alaska Airlines

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

New York Aviation Management Association Conference

TWELFTH AIR NAVIGATION CONFERENCE

EXPLANATION OF TPP TERMS AND SYMBOLS

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

IFR SEPARATION WITHOUT RADAR

UK Performance-based Navigation (PBN) Implementation Status

FLIGHT OPERATIONS PANEL (FLTOPSP)

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

PROCEDURES SPECIAL OPERATIONS

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Using The Approach Planner

Implementation of PBN in Armenian airspace

Naples Airport Authority Board of Commissioners and Noise Compatibility Committee Special Meeting on Central/South Florida Metroplex

Audit of Acme Air Training Manual to Advanced Aircrew Academy Online 135 Pilot Recurrent and Initial Curriculums - EXAMPLE

Navigation at the. Federal Aviation Administration Crossroads

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

Framework Brief. Edinburgh SIDs

AIRSPACE CHANGE COMMUNITY ENGAGEMENT REPORT

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Final Approach Operations Symposium

the atlantic challenge - aviation in a hostile environment

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL

Performance Based Navigation Implementation in Thailand

Christchurch PBN Flight Paths Trial. Interim Report

DSNA NAVIGATION STRATEGY

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

What is an Airspace Concept? Module 5

AIP AD SEYCHELLES 03 APR 14

North America Limited International Procedures Initial Detailed Syllabus

COMMUNITY NOISE MITIGATION SUGGESTIONS

Procedure Design Concepts for Logan Airport Community Noise Reduction

PBN and Procedure Design training

Transcription:

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement Dr. Philipp Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) ICANA, Frankfurt, November 2016 DIESER TEXT DIENT DER NAVIGATION

Our history of RNP Austria has extensive experience with RNP AR Procedures First RNP AR in Innsbruck published in 2005 (before ICAO had provided full guidelines, therefore still based on FAA TERPS) Since then, several other RNP AR procedures designed and published (Salzburg and Innsbruck), including a pioneering hybrid approach (RNP merge) in Innsbruck Common element to all of them: terrain avoidance! Hence the application of RNP AR for noise reduction and environmental considerations was a new chapter in our PBN story 2

RNP-AR in Austria: from avoiding solid rock to noise abatement 3

Noise Sensitivity at Vienna International Airport (LOWW) Densely Populated! 4

LOWW conventional mode of operation 5

LOWW RWY16 conventional mode of operation (RNAV 1 transitions) 6

LOWW RWY16 conventional mode of operation (ILS) FAF to THLD Distance is 13.8nm Straight Final (of course!) 7

LOWW RWY16 RNP AR the new approach curved and adapted to minimize community impact straight final segment of 3nm 8

RNP AR RWY 16 - the Publication published as AIC to underline trial status 9

Charting 10

Coding Table 11

Feedback Emirates (I/II) Thank you for your kindly support for Capt XXXX s flight and our line crew VMC evaluations. We found out the significant numbers of benefit from your new procedures. Capt Kurt flight track is shown as follows. His flight followed RNP AR approach course nicely ( Black line) We found the Fuel benefit around 100kg-300kg per flight, 200kg-600kg /Day. Emission saving will be around 300kg-900kg per flight, 600kg-1800kg/Day This number is big benefit for us to save the fuel and emission. We appreciate your effort for the introduction of these efficient RNP AR approaches. Not only from us, All industry members would recognize your effort and achievement. We are happy to have good work relationship with Austrocontrol, please keep us in the development process of all airspace projects in Enroute and at Vienna. As Capt XXXX already requested, please develop RNP AR for RWY 11 with us for further Vienna operational efficiency enhancement.. Congratulations of this achievements! Best regards. Emirates Flight OPS Team 12

Feedback Emirates (II/II) 13

Handling of the Procedure Statements from LOWW APP with speed instructions, multiple RNP AR entries can be accomodated for aircraft flying the approach in sequence, however only in low-demand situations a full zip-lock system seems not feasible at the moment, as questions such as along track vs. lateral spacing would have to be clarified first (work ongoing in ICAO SASP Reduction to 2.5nm when established on the same final approach track can theoretically be applied when established on the RNP track (hardly ever occurs) Procedure has also been flown by home carrier as track mile saver in VMC (without AR Approval, so officially as visual approach) Noise exposure footprint is reduced by short straight final distance of 3nm rather than 13.8nm (FAF to THLD on ILS) 14

More Findings Airlines had requested relaxed speed limitations at WW005 and WW003 (currently at 210 kts and 185 kts, respectively) they requested 230 kts and 190 kts, but procedure design criteria did not allow for that Air Traffic Controllers are happy with the approach but see the need for intervention by means of radar vectoring if the approach is used in a mixed-mode (ILS/RNP) this is contrary to the RNP AR concept Airlines argue against the relatively high burden of AR approval cost for non terrain/obstacle critical AR procedures this discussion is also pursued on an ICAO Level (i.e. the possibility of exempting non-critical AR procedures from the approval requirement not likely to happen! 15

Outlook In a revised version, the RNP AR Approach to Runway 16 will have an improved track layout to avoid overflight of even more communities The revised version will have an even shorter straight final segment of 2.3nm rather than 3nm (roll-out to THLD) A future RNP AR to Runway 29 is planned which is the main runway for night operations in Vienna Austro Control is also rolling out RF legs on SIDs in Vienna, to even further reduce and funnel noise footprints 16

Thank you very much Any question? 17