Memorandum / Letter of Intent

Similar documents
URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

August 30, Adam Sayre City of Verona Planning & Development 111 Lincoln Street Verona, WI 53593

416 East Verona Ave. Letter of Intent

Development Agreement No. DA16-002

Madison Metro Transit System

Addendum - Airport Development Alternatives (Chapter 6)

Northwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE

Community Development Department Council Chambers, 7:30 PM, December 20, 2012

DOWNTOWN BRT ALTERNATIVE - 19th AVE

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

Great Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

TORONTO TRANSIT COMMISSION REPORT NO.

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Spadina Avenue Built Form Study Preliminary Report

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

TORONTO TRANSIT COMMISSION REPORT NO.

ARLINGTON COUNTY, VIRGINIA

Claremont Project Background and Update Community Meeting September 11, 2017

SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: -

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

RECREATIONAL VEHICLE EXAMPLES

1.2 Corridor History and Current Characteristics

URBAN DESIGN REVIEW BOARD 3:00 P.M. THURSDAY, DECEMBER 20, rd FLOOR JESSE LOWE CONFERENCE ROOM OMAHA DOUGLAS CIVIC CENTER FARNAM STREET

Concept Curtin Precinct Map and Code

Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011

The Recreational Trail along Cushing Park road has been a successful addition to the city

Maryland Transit Administration. Master Plan Alignment Trail

Request Conditional Use Permit (Indoor Recreational Facility) Staff Planner Kevin Kemp

Site Location and Setting

Washington Township MASTER PLAN. Addendum: Washington Township Master Plan

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

Community Development Committee

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

CHAPTER 4: ALTERNATIVES

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

TORONTO TRANSIT COMMISSION REPORT NO.

MONTGOMERY COUNTY PUBLIC SCHOOLS BETHESDA-CHEVY CHASE MIDDLE SCHOOL #2 SAMAHA ASSOCIATES, PC

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

North Forty Area ( area bounded by Lark Avenue, Los Gatos Boulevard, Highway 85 and

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

IL 390 Station. Wood Dale Open House Summary 5/18/17

MLS # $202, Acres residential development site in Bay County, Florida

Classifications, Inventory and Level of Service

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Construction Staging Adelaide Street West

Architectural Review Commission

The rezoning application is recommended for consideration of approval.

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE

MOSCONE EXPANSION PROJECT PUBLIC MEETING 2 OCTOBER 16, 2013

Table of Contents TABLE OF CONTENTS. HOW THIS BY-LAW WORKS... i PART 1 - ADMINISTRATION, INTERPRETATION, ENFORCEMENT, AND DEFINITIONS

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Figure San Dimas Bonita at San Dimas Avenue (view looking west)

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

Election of Acting Chair

3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

RETAIL POTENTIAL ON 1/2 ACRE SITE

VILLAGE OF ALGONQUIN PLANNING AND ZONING COMMISSION Meeting Minutes William J. Ganek Municipal Center-Board Room February 13, :30 p.m.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Hello Hello. Hello Hello Hello. East Midtown Study

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

CITY PLANNING COMMISSION AGENDA ITEM NOS: 5.A, 5.B STAFF: MICHAEL SCHULTZ

REGIONAL WATER QUALITY MANAGEMENT PLAN WALWORTH COUNTY METROPOLITAN SEWERAGE DISTRICT / ELKHORN SANITARY SEWER SERVICE AREA

SADDLE CREEK ENTRANCE (PRIVACY) GATE OPERATING AGREEMENT BETWEEN SADDLE CREEK COMMUNITY SERVICES DISTRICT AND CASTLE & COOKE CALIFORNIA, INC

PUBLIC INFORMATION SESSION #2

Minutes of the Tuesday May 22, 2018 Planning and Zoning Commission Meeting

The Baker/Carver Regional Trail is intended to

CHASKA PLANNNING COMMISSION MINUTES September 13, 2017

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

DECISION/DIRECTION NOTE

AGRITOURISM PERMIT APPLICATION PROCEDURES

Westbrook Station. Transit Oriented Development Opportunity

Traffic Management Plan 2018

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

WHITEHALL PLANNING COMMISSION MINUTES MARCH 3, 2016

CITY COUNCIL AGENDA MEMORANDUM

SECTION 106 ACTIVITIES ANNUAL REPORT

Disposition of Spadina Expressway Properties - Memorandum of Understanding with Infrastructure Ontario

The District of North Vancouver FACT SHEET

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

SAN RAFAEL CITY COUNCIL AGENDA REPORT

Preliminary Plat Extension Agreement (Cortona)

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Transcription:

VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com Re: Forward Development Group West Verona Avenue Hotel Concept Plan JSD Project #: 17-7831A Date: September 7, 2017 cc: Ron Henshue and Konner Kearney (FDG); Dave Jenkins, Rachel Holloway, Adam Kaniewski, and Justin Frahm (JSD) City of Verona Staff: On behalf of SCC Hospitality, LLC, project developer Forward Development Group (FDG) and JSD Professional Services, Inc. are hereby submitting concept plans for preliminary review by City Staff and Plan Commission for the proposed hotel and restaurant development at 509 West Verona Avenue in the City of Verona. Upon review of the concept plans, the project team plans to submit site plans for review along with a Certified Survey Map (CSM) and a Conditional Use application for the proposed land uses (commercial indoor lodging and indoor commercial entertainment). Project Boundary: FDG s proposed plan comprises approximately 2 acres of land located on the south side of West Verona Avenue between Legion Street and Half Mile Road. The site utilizes a 0.95-acre parcel currently owned by Verona West LLC and part of the adjacent parcel owned by St. Vincent De Paul; the new parcel would be created via CSM as part of a future submittal and will be contiguous to the Sugar Creek Commons General Development Plan previously approved by the City of Verona in spring of 2017. Site Plan & Land Use: FDG is proposing a development plan that will feature hotel and restaurant buildings. The hotel would consist of a 4- story, 15,000 square foot building with approximately 100 guest rooms. The attached restaurant would be a 1-story building approximately 4,500 square feet in size. The conceptual site plan has been developed to provide access to the site from West Verona Avenue via two access points, both of which use existing curb cuts. A private drive would provide access to the west end of the site and to the east a second drive would provide shared access to the hotel site and the adjacent Sugar Creek Commons mixed use development. 145 surface parking stalls are provided based on the hotel s 100-room count and estimated 11 peak-shift staff, and the typical capacity of a restaurant of this size. The proposed amount of parking is based on the fact that peak parking times are different for hotels (6pm-6am) and restaurants (6pm-midnight), and the expectation that a substantial portion of the restaurant clientele will be hotel guests. The parking is designed with multiple smaller parking lot areas, with the majority of the parking located along the sides of the hotel building. This configuration would utilize the shared driveway with Sugar Creek Commons in its current alignment, maximize the area available on the hotel and restaurant site for landscaping, and minimize aesthetic impacts to adjacent residential to the east by placing parking off of the W. Verona Ave. right-of-way between the two site buildings. The total number of stalls will be further refined for the Site Plan and Conditional Use submittals. Stormwater management facilities will be located underground. Building & Site Information: ~100 Total Guest Room (final unit count to be determined) Surface Parking Stalls including accessible locations (total number to be determined) Building Setbacks: Consistent with Urban Commercial Zoning District 161 Horizon Drive, Suite 101 Verona, WI 53593 Phone: 608.848.5060 Fax: 608.848.2255

Proposed Building Height: Maximum of 4 stories / 45 feet for the hotel, and 1 story for the restaurant (measured from average grade to average mid-point of roofline) Landscape & Architectural Design: The Concept Plan proposes 4-story construction for the hotel with architectural design to create a development that is complimentary to the character of Verona and the Verona Avenue corridor. The conceptual plans have been developed utilizing Urban Commercial zoning standards, the current zoning district for this property. The proposed building alignment and architectural elements will establish an aesthetically pleasing presence on all sides of the site, with particular attention to the north and east. High quality materials will complement the neighborhood character. Site activity will be focused along West Verona Avenue. The building will be designed to provide safe access and circulation by using pedestrian sidewalks and a parking arrangement characterized by smaller parking bays and sufficient surface parking. As much parking as possible will be located behind, between or to the sides of the buildings, in order to foster a more attractive and pedestrian friendly development along W. Verona Ave.. A drive-through canopy and other elements will be used to help visitors identify building entries. Landscaping and outdoor spaces will be provided throughout the development to provide welcoming places to sit or walk around the building, including enhanced landscaping to provide visual buffers at property edges. Conceptual landscaping areas are shown on the plan surrounding the building and parking areas. Special consideration will be given to the Verona Avenue street frontage, property boundaries as well as the eastern hotel entrance that faces proposed residential and mixed-use buildings. JSD intends to formally submit for the City of Verona s CSM, Conditional Use and Site Plan review process on behalf of Forward Development Group in fall of 2017. Additional requests for information and/or questions can be directed to JSD Professional Services, Inc. Page 2

North Nine Mound Road Mark Drive West Verona Avenue Half Mile Road SITE AREA Legion Street South Nine Mound Road SUGAR CREEK COMMONS Location: Verona, Wisconsin Date: 05.11.17 06.08.17 PROPOSED HOTEL SITE LOCATION

General Development Plan Boundary MIXED-USE COMMERCIAL/ RESIDENTIAL HOTEL SITE NOT INCLUDED IN SUGAR CREEK COMMONS GDP RESIDENTIAL SUGAR CREEK COMMONS Location: Verona, Wisconsin Date: 02.21.17 CONCEPT PLAN PLEASE NOTE: POTENTIAL BUILDING AND SITE LAYOUTS SHOWN ON THIS PLAN ARE FOR ILLUSTRATION PURPOSES ONLY AND ARE COPYRIGHT PROTECTED BY JSD PROFESSIONAL SERVICES. 02-21-2017 MIXED-USE COMMERCIAL/ RESIDENTIAL

Sugar Creek Commons Planned Development H. Gabbei Meats Sugar Creek Commons Planned Development Proposed Property Line Existing Property Line 5 Pavement Setback 10 Building Setback E 20 Building Setback NU E V A A N O R VE T S E W 5 Pavement Setback RESTAURANT HOTEL 5,000 SF 1-Story 100 Rooms 15,000 SF 4-Stories Hayes Transport 145 Total Parking Stalls Turnaround for Proposed Hotel and St. Vincent de Paul Store 15 Building Setback 10 Pavement Setback St. Vincent de Paul Store SUGAR CREEK COMMONS Location: Verona, WI Date: 09.07.17 HOTEL CONCEPT SITE PLAN PLEASE NOTE: POTENTIAL BUILDING AND SITE LAYOUTS SHOWN ON THIS PLAN ARE FOR ILLUSTRATION PURPOSES ONLY AND ARE COPYRIGHT PROTECTED BY JSD PROFESSIONAL SERVICES. 2017 5 Pavement Setback 10 Building Setback

SugarCreekCommonsHotel Location:Verona,WI CONCEPTRENDERING