Packaging Information IPS-CTS Gas Hard Sided Bundles

Similar documents
IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS C2204A

PL500A Platform Extension

INSTALLATION INSTRUCTIONS FOR BALCO, INC. FLOOR MATS FM2R-(A, C, D) W/O FRAME 4V

Tactical vest -10 MANUAL

Butler Personnel Parachute Systems, LLC

Section 4 Strapping & Accessories

All Restoration Hardware beds are designed to meet the highest safety standards and comply with all U.S. and Canadian beds and beds regulations.

Hammer, Discus, Shot Put, Javelin

2522 and 2523 Fiber Optic Splice Organizer Tray

ABS Model Background Stand

Canvas Buckets & Lineman Accessories

DURABLE LIGHTWEIGHT TABLES ABS RECTANGLE

Installation Guide Cable

Building Permit Application

RIO BRAVO SUBDIVISION PROPERTY OWNERS ASSOCIATION, INC. PROPERTY CHANGES AND MAINTENANCE

Alternative Daily Cover Evaluation

Installation Guide. Single-Control Kitchen Sink Faucets

HOCKEY THIRD EDITION

WARNING: Read these materials prior to assembling and using this trampoline and enclosure

ULTRAMAX CANOPY ENCLOSURE KIT Assembly Instructions

3 Nomad Scraper Matting 9100 (formerly 3M Entrap Recessed Well Matting)

ASSEMBLY GUIDE. Customer Service: INCH² 2-BURNER & 864 INCH² 2-BURNER

Softopper Installation Instructions (CB)

Wave Curtain Workroom Guide

MEDICAL PRODUCTS FOLDER

JOINING MULLION (DIRECT MULL) ASSEMBLY INSTRUCTIONS FOR 3-WAY OR 4-WAY JOINTS FOR IMPERVIA AWNING, CASEMENT AND LARGE AWNING

New Products for 2010

TOOLS. P. P. Cord PET STEEL

Sales support Global website

User s Manual Trampoline 8

Professional Installation Guidelines LVT with Roll-out Loop over LocPlate products. Required Tools

29PC RATCHET SCREWDRIVER SET

HANDLING. Doc. No.: TKO AS3 Addendum 1 Revision: 0 Page: 2/10 SHORT INSTRUCTIONS FOR THE USE OF SWAGED ROTARY DRILLING AND VIBRATOR HOSES

CHAPTER 16 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES*

Induction hardened cutting knives for long life. Thick, exceptionally tough, high-dielectric white inner coating is bonded to the tool

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY INTERDIVISIONAL TARIFF NO. 132 SUPPLEMENT NO. 29 LOCAL RATES OF FARE AND REGULATIONS GOVERNING

FACT SHEET Program: Lab Fire Safety

A properly mounted pair of Rocky Mountain Saddle Bags. Bag Orientation

How to Build Your Own Flour Mill and Sifter

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS D4101. REVISED vers6 BY: JL 8/6/2015 TECH SUPPORT (800)

Vinyl French Door Assembly Instructions

VERO BEACH RECREATION DEPARTMENT TH STREET VERO BEACH, FL (772) FAX (772)

CAPRI PLUS. Instruction Manual. 28' x 38' Including sidewall and connector instructions.

Longitudinal Joint Construction. Mike Robinson, PE

Electrician's Insulated Tools

Frame and Mullion Lite Pattern Options. Style 10 LP001-6 Lites 2 wide x 3 high. Style 1996 LP101 over 2wx2h Lites. Style 996L

TC36 CHALET BURNER KIT INSTALLATION INSTRUCTIONS

UNIDO CLARIFICATIONS no. 1. INVITATION TO BID (ITB) No

Clovis Fire Department

USER MANUAL PRESERVE I : Model FFE 201 (- D) PRESERVE III : Model GE 21 (- B)

S E L E C T I O N. Abdominal Crunch. User manual

Softopper Installation Instructions

OIA MTBs - 112th CONGRESS

Insulated Screwdrivers and Nut Drivers

DO NOT USE WITH CROSSBAR SPREAD LESS THAN 24.

flatbed kit InstalLation Instructions kit contents KIT (tacoma ) kit (hilux )

BENEFITS OF A MOBILE TOOL CART STATION

DIAMOND TECH INTERNATIONAL Innovations For Creativity DIAMOND LASER BAND SAW OPERATIONS MANUAL

Installation Instructions Traditional Awnings in a box Classic Awnings in a Box

Tents and Air Supported Membrane Structures

Required Tools: Phillips screw driver to remove original soft top. Torx sockets are required to completely remove the original soft top hardware.

The Folding Carton Specialists

Product Description of Klozit Sliding Glass Door Closing and Latching System

Design Goals: The cart must be able to carry and organize all of the tools and parts an engineer needs and be...

Heavy Duty Waterproof Case

When moving the frame don t force anything! Move the leg to allow the brace to go over the rod.

Custom Sublimated Fabrics, Cut & Sew apparel manufacturing & pattern making

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS. Part # C3206. REVISED Version 6 BY: JL 8/5/2015 TECH SUPPORT (800)

Ceramic Probe Replacement Instructions Accessory G

Installation Instructions for Wall Mount, Deck Mount and Pre-rinse Faucets

Encore Packaging, LLC. Selling Only to Distributors

Core Systems Installation Instructions

LOCARNO CLASSIFICATION List of Goods in Class Order

A Step By Step Instructional Guide

USER MANUAL FLEXI Tent&Trailer Comfort

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS D2101/D2115/D2118. REVISED vers7 BY: JL 8/6/15 TECH SUPPORT (800)

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual

TCWS54 SEE THRU DIAMOND BURNER INSTALLATION KIT INSTRUCTIONS

FibreGuard Closure with SLIDE-N-LOCK Fiber Management

Otter Pro X-Over Lodge Installation and Set-Up Instructions

Contents Superior Pet Goods Superior Pet Goods 3

Product Design HL 2015

TC36 CHALET II BURNER KIT INSTALLATION INSTRUCTIONS

70704 safety vest Orange. Item No. Size Medium Large X-Large. 100 Pk Blue - 4 Mil 100 Pk Black - 5 Mil.

PALM BEACH INTERNATIONAL AIRPORT OPERATING PERMIT APPLICATION FORM

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS C4201. REVISED Version7 BY: JL 8/6/2015 TECH SUPPORT (800)

Mitchell. Furniture Systems

ANODIZED ALUMINUM STAINLESS CONSTRUCTION

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES:

TCWS.38NG03.C BLACK DIAMOND BURNER KIT INSTRUCTIONS

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS. Part # A7006

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS F2011. REVISED vers6 BY:JL 8/7/15 TECH SUPPORT (800)

FLY THE "MISSING" LINK

02 Storage. Roller cabinet. Magnetic tray 25 Modular storage 28 Fixed storage 30. Metal trolley. Plastic box. Aluminium case.

Fiberglass 80 meter Vertical BASE

Ridgeline (A) Installation Instructions

Ratchet Strap Operation

TC30 HEARTWOOD BURNER INSTALLATION INSTRUCTIONS

Tipi Instructions. Hello and thanks for buying one of our Tipi Tents.

Antenna Tower Positioning System

Transcription:

Gas Hard Sided s Bag PERFORMANCE PIPE CTS PRUCTS HARD-SIDED BUNDLES IN BAGS (20 - ) Bag Bags Pallet s Truck 20 Truck 20 DR Truck 20 ½ Hard*.625 50 1,000 15 12 9,000 7 11 180,000 ¾ Hard*.875 30 600 12 12 4,320 7 11 1 Hard* 1.125 20 400 30 12 7,200 7 11 1 1/4 Hard* 1.375 20 400 24 12 5,760 7 11 86,400 144,000 115,200 Bag PERFORMANCE PIPE IPS PRUCTS HARD-SIDED BUNDLES IN BAGS (20 ) Bag Bags Pallet s Truck 20 Truck 20 DR Truck 20 ½ Hard*.840 30 600 15 12 5,400 7 11 108,000 ¾ Hard* 1.050 25 500 30 12 9,000 7 11 180,000 1 Hard* 1.315 15 300 15 12 2,700 7 11 54,000 *Denotes that this type of hard-sided bundle will require a 20 2x6 runner attached along the bottom inside on each side of the encasings to stabilize the bundle. should also be placed in plastic bags. See bundling standards section below for details. PERFORMANCE PIPE IPS PRUCTS HARD-SIDED BUNDLES (20, 40 & 50 ) s Truck 20 /40 /50 Truck 20 /40 /50 DR Truck 20 1 ¼ Hard 1.660 153 28 / NA /NA 4,284 / NA / NA 7 11 85,680 1 ½ Hard 1.900 129 28 / NA /NA 3,612 / NA / NA 7 11 72,240 Truck 40 Truck 50 2 Hard 2.375 88 26 / 13 / NA 2,288 / 1,144 / NA 7 45,760 45,760 28 / 14 / NA 2,464 / 1,232 / NA 9-17 49,280 49,280 3 Hard 3.500 50 28 / 14 / NA 1,400 / 700 / NA 21-32.5 28,000 28,000 4 Hard 4.500 29 28 / 14 / 14 812 / 406 / 406 21-32.5 16,240 16,240 6 Hard 6.625 13 28 / 14 / 14 364 / 182 / 182 21-32.5 7,280 7,280 9,100 8 Hard 8.625 14 16 / 8 / 8 224 / 112 / 112 21-32.5 4,480 4,480 5,600 s per truck and feet per truck are determined stacking the bundles on pipe when loading. formance, a division of 5085 W Park Blvd., Suite 500 Phone: 800-527-0662 Revised: 05/20/2010 Page 1 of 6

Gas Hard Sided s BUNDLE PACKAGING STANDARDS 1. Hard-Sided : (1/2 through 8.625 ) A. For encasing all straight lengths that are 8.625 or smaller. (1) All Hard-Side bundles to be constructed from hardwood/softwood 2 x 6 or 3 x 4 lumber. Grooved boards are preferable, but not mandatory as the banding will create a notch in some soft woods securing the banding in place. (Note: 2 x 6 boards actually have a thickness of approximately 1.5, 3 X 4 have a 2.5 thickness) B. Lumber s and Placement: (1) The Hard Side bundle is encased by lumber stated in (1) above. (a) Fifty-foot (50 ) straight lengths are encased at seven (7) or eight (8) equidistant locations depending on bundling cart and plant. (b) Forty-foot (40 ) straight lengths are encased at six (6) equidistant locations. (c) Twenty-foot (20 ) straight lengths are encased at three (3) equidistant locations. (d) Twenty-foot (20 ) straight lengths in sizes ½ CTS 1 IPS in bags are encased at (5) equidistant locations. 20 2x6 runners will be nailed/stapled to the bottom inside of each side of the encasings to stabilize the bundle. Four cross boards shall be placed across the bottom of the bundles between the five encasements. These boards are the width of the bundle and used to help prevent the pipe from sagging. should also be placed in plastic bags. The bags should be at least 4 mils thick x 10 wide. (Note: they can be purchased in 750 rolls and cut to size). (e) Any loose bags of 20 pipe shall be banded to the top of a full pack of another size and place on the top of the load on the truck. The size should be written on the outside of the bag. (f) Top, side and bottom board lengths are as follows: Top & Bottom / IPS Second Bottom Board Length Sideboard Length Product Length 1 ¼ 46 / 43 10 20 1 ½ 44 3/4 / 41 3/4 11 1/4 20 2 45 ¾ / 42 ¾ 11 3/4 20-40 3 48 1/2 12 1/2 20-40 4 48 12 1/4 20-40 6 49 3/8 18 20-40 -50 8 46 1/8 23 ½ 20-40 -50 formance, a division of 5085 W Park Blvd., Suite 500 Phone: 800-527-0662 Revised: 05/20/2010 Page 2 of 6

Gas Hard Sided s IPS/CTS in bags Top & Bottom / Second Bottom Board Length Product Length Sideboard Length ½ CTS 44 ½ / 41 ½ 8 1/2 20 ¾ CTS 44 ½ / 41 ½ 8 ½ 20 1 CTS 44 ½ / 41 ½ 19 20 1 ¼ CTS 44 ½ / 41 ½ 22 ½ 20 ½ IPS 44 ½ / 41 ½ 11 20 ¾ IPS 44 ½ / 41 ½ 20 20 1 IPS 44 ½ / 41 ½ 11 3/4 20 Single Bottom Double Bottom Second Bottom Double Bottom 2x6-20 Board Board Board Board W/Runner Runner s 3 8 IPS require single bottom board bundles s 1 ¼ - 2 IPS require double bottom board bundles s ½ CTS - 1 ¼ CTS and ½ IPS 1 IPS require double bottom boards, bags and 2 x 6 x 20 runners. (1) Banding: For Hard-Sided bundles, utilize 5/8.035 or ¾ X 050 polyester banding. (a) Use one (1) band to compress each set of top, side and bottom boards.. D. Storage: (1) Hard-Sided bundles may be aligned wood-on-wood or offset wood-on-pipe during storage except that DR 21 or thinner product must be stored wood-on-wood. For ease of handling with forklifts, the wood-on-wood method is recommended in storage yards. E. Transport: (1) Hard-sided bundles can be offset wood-on-pipe or wood-on-wood during transport. If shipping product with wood-on wood, the total bundles per load may need to be reduced to prevent exceeding the height restrictions. formance s Transport Strapping Policy established minimum requirements regarding the number of truckers straps used by all transportation providers to secure bundles. The policy also contains conditions regarding the tightening of straps after a carrier leaves a formance facility. formance, a division of 5085 W Park Blvd., Suite 500 Phone: 800-527-0662 Revised: 05/20/2010 Page 3 of 6

Packaging Information IPS-CTS Gas Hard Sided s IPS - Hard Sided s (Examples) 1 ¼ IPS 153 1 ½ IPS 129 2 IPS 88 formance, a division of Chevron Phillips Chemical Company LP 5085 W Park Blvd., Suite 500 Plano, TX 75093 Phone: 800-527-0662 Fax: 972-599-7348 Revised: 05/20/2010 Page 4 of 6

Packaging Information IPS-CTS Gas Hard Sided s IPS Hard Sided s (Examples) DR s 21 32.5 3 IPS 50 joints per bundles 4 IPS 29 joints per bundles 6 IPS 20 joints per bundle formance, a division of Chevron Phillips Chemical Company LP 8 IPS 14 joints per bundle 5085 W Park Blvd., Suite 500 Plano, TX 75093 Phone: 800-527-0662 Fax: 972-599-7348 Revised: 05/20/2010 Page 5 of 6

Gas Hard Sided s IPS CTS Hard Sided s (Examples) 20 in Bags IPS Hard Sided Patterns (20, 40 & 50 ) Height (Note 2) 1 ¼ 1.660 Hard 13.348 1 ½ 1.900 Hard 14.627 2 2.375 Hard 15.102 BTM Board Lengths (Note 1) (Note 3) 43 *46 41 3/4 *44 3/4 42 3/4 *45 ¾ Side Board Length s Truck 20 /40 /50 10 153 28 / NA / NA 11 1/4 129 28 / NA / NA 11 3/4 88 28 / 14 / NA 3 3.500 Hard 15.593 * 48 ½ 12 ½ 50 28 / 14 / NA Pattern 26/25/26/ 25/26/25 22/21/22/ 21/22/21 18/17/18/ 17/18 13/12/13/ 12 Feet 20 Feet 40 Feet 50 3,060 2,580 1,760 3,520 1,000 2,000 4 4.500 Hard 15.294 * 48 12 ¼ 29 28 / 14 / 14 10/9/10 580 1,160 1,450 6 6.625 Hard 21.100 * 49 3/8 18 20 20 / 10 / 10 7/6/7 400 800 1,000 8 8.625 Hard 26.564 * 46 1/8 23 ½ 14 16 / 8 / 8 5/4/5 280 560 700 Note 1: height determined using 1 ½ thick board - (Double bottom boards). Note 2: height determined using.1 ½ thick boards (Single bottom board) Note 3: * Figure is also top board length formance, a division of 5085 W Park Blvd., Suite 500 Phone: 800-527-0662 Revised: 05/20/2010 Page 6 of 6