PROGRESS PARK CONNECTOR

Similar documents
FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Route 29 Solutions Projects

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

PRIORITIES COMMITTEE MEETING

Springettsbury Township. Road Improvement Projects

Appendix 4.1 L. No-Build Project Descriptions

WELCOME US 83 Public Meeting

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

4. Safety Concerns Potential Short and Medium-Term Improvements

Fairfax County Parkway Widening Fairfax County

FDOT Treasure Coast Traffic Impact Report

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Transportation TRANSPORTATION PROJECTS

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

A. CONCLUSIONS OF THE FGEIS

5.1 Traffic and Transportation

FDOT Treasure Coast Traffic Impact Report

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

Lake Erie Commerce Center Traffic Analysis

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Pedestrian Safety Review Spadina Avenue

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

November 21, 2012 Barbara Kelleher, (954)

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Report to the Strategic Development Committee

State Project Reconstruction I-84

Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule


TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure

FDOT Treasure Coast Traffic Report through

Northeast Corridor Transportation Update

San Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center

PUBLIC INFORMATION SESSION #2

Guide to. Road Construction Projects

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

5.7 Local road upgrades

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

Important Lane Closures, April 3 9, 2011

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

M56. New Junction 11a Summary of the consultation report

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

State Route 189 Project and Draft Resolution of Support. November 2014

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington &

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

Palm Beach County Traffic Report July 13 through July 20, 2012

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First

Penny for Pasco Renewal. FY2014/15 thru FY2024/25

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Fairfax County Transportation Advisory Commission (TAC)

October 31, 2014 Chuck McGinness, (954)

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Chapter 4. Development Alternatives

US 19 Sunset Point Rd to Countryside Blvd.

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

HYANNIS ACCESS IMPLEMENTATION TASK FORCE NOTES April 12, PM CAPE COD COMMISSION CONFERENCE ROOM ATTENDEES. Hyannis Area Chamber of Commerce

2013 El Paso County Comprehensive Mobility Plan. December 16, 2013

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

Capital Beltway HOT Lanes Project

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

Delaware County Engineer

I-66 Inside the Beltway Feasibility Study

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

STUDY WORK GROUP MEETING No. 4. July 12, 2017

SOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Hospital Link Project Project Update Winter 2018

1.0 Purpose and Organization of the Community Impact Assessment Addendum

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Roadside Management Manual

Transcription:

PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates

PROGRESS PARK CONNECTOR ROAD ALTERNATIVES

ALTERNATIVE # 1 West from the intersection of E. Lee Trinkle Drive and Gator Lane intersection. Intersect Peppers Ferry Road approximately 1 ¼ miles east of the I 77 Interchange with Peppers Ferry Road. Peppers Ferry Road will be 6 lanes from its intersection with connector road to Country Lane where it will increase to 7 lanes until the northbound I 77 exit/entrance ramps.

ALTERNATIVE #1 PROS AND CONS PROS Fewer disturbances to undeveloped land Remains on existing Peppers Ferry alignment Acceptable level of service CONS May encounter environmental issues Significant town utility relocations Traffic queuing, major intersection and road section improvement Ramp widening (Interchange) Bridge widening (Interchange)

ALTERNATIVE # 2 West from the intersection of E. Lee Trinkle Drive and Gator Lane intersection. Intersect Peppers Ferry Road approximately 3/4 mile east of the I 77 Interchange with Peppers Ferry Road Peppers Ferry Road will be 6 lanes from its intersection with connector road to Country Lane where it will increase to 7 lanes until the northbound I 77 exit/entrance ramps.

ALTERNATIVE #2 PROS AND CONS PROS Fewer disturbances to undeveloped land Remains on existing Peppers Ferry alignment Acceptable level of service CONS May encounter environmental issues Significant town utility relocations Traffic queuing, major intersection and road section improvements Ramp widening (Interchange) Bridge widening (Interchange)

ALTERNATIVE # 3 Four lane divided Progress Park Connector route from the intersection of E. Lee Trinkle and Gator Lane intersection west to intersect Nye Road. Six lanes (4 northbound, 2 southbound) north from Nye Road intersection to Peppers Ferry Road to a signalized intersection at Peppers Ferry Road. Peppers Ferry Road will be 7 lanes from Country Lane to I 77 Northbound exit/entrance ramps. I 77 northbound exit/entrance ramps widened to 5 lanes. Peppers Ferry Road bridge over I 77 will be 6 lanes.

PROS Fewer disturbances to Peppers Ferry Road beyond interchange Nye Road remains on existing alignment Fewer (reduced) traffic queues than Alternative #1 and Alternative #2 Peppers Ferry Rd remains 2 lanes east of Granite Acres CONS Ramp widening (Interchange) Traffic queuing, major intersection and road section improvements Bridge widening (Interchange) Acceptable level of service ALTERNATIVE #3 PROS AND CONS

ALTERNATIVES #3A, 3AA Four lane divided Progress Park Connector route from the intersection of E. Lee Trinkle and Gator Lane intersection west and intersect with a Nye Road Extension. o Existing Nye Road will be right in/right out at Peppers Ferry Road. Alternative 3A: From Nye Road intersection, six lanes west to a signalized intersection at Peppers Ferry Road (4 westbound, 2 eastbound). Peppers Ferry Road will be 7 lanes to I 77 Northbound exit/entrance ramps. I 77 northbound exit/entrance ramps will be widened to 4 lane and the Peppers Ferry Road bridge over I 77 will be 4 lane.

PROS Fewer disturbances to undeveloped land Nye Road remains on existing alignment as a right in/right out Less ramp widening Peppers Ferry Rd remains 2 lanes east of Granite Acres Acceptable level of service Ramp widening (Interchange) Bridge widening (Interchange) CONS Traffic queuing, major intersection and road section improvements ALTERNATIVE #3A, 3AA PROS AND CONS

2024 Supplemental Analysis Progress Park Development Cap Two lane paved, graded for future median and four lane divided Progress Park Connector route from the intersection of E. Lee Trinkle and Gator Lane intersection west and intersect with Peppers Ferry Road (Alt. 1 and 2) and intersect with Nye Road (Alt. 3) Alternative 1: Minimal improvements at intersection with Peppers Ferry Road, up to 15,000 vehicles per day. Alternative 2: Minimal improvements at intersection with Peppers Ferry Road, up to 17,000 vehicles per day. Alternative 3: Minimal improvements at intersection with Nye Road, up to 12,000 vehicles per day.

Typical Roadway Section TWO LANE INITIAL BUILDOUT WITH GRADING FOR FOUR LANES ULTIMATE BUILDOUT

Progress Park Utilization TWO LANE INITIAL BUILDOUT WITH GRADING FOR FOUR LANES Two lane paved section will be adequate for Progress Park buildout utilizing typical trip generation traffic numbers for industrial land. The two lane section will be adequate until additional Board permitted development or development within the Town creates traffic conditions which exceed the development cap.

SCHEDULE DATE EVENT MARCH 30 JOINT MEETING WITH TOWN OF WYTHEVILLE Review Alignments within Town Limits APRIL 4 & 11 ADVERTISE FOR PUBLIC REVIEW MEETING MAY 6 MAY 11 22 MAY 26 MAY 27 PUBLIC REVIEW MEETING (WYTHE COUNTY BOARD CHAMBERS) Review Alignments with public and concerned citizens REVIEW PUBLIC COMMENTS PRESENT RECOMMENDED ALTERNATIVE TO BOARD OF SUPERVISORS PROCEED WITH DESIGN OF SELECTED ALTERNATIVE

QUESTIONS?

ALTERNATIVE # 3 Realigned I 77 Ramp Option Four lane divided Progress Park Connector route from the intersection of E. Lee Trinkle Drive and Gator Lane intersection west to intersect Nye Road. Six lanes (4 northbound, 2 southbound) north from intersection with Nye Road to a signalized intersection at Peppers Ferry Road opposite the I 77 ramps. Peppers Ferry Road will be 5 lanes west from Country Lane to signalized intersection. I 77 northbound exit/entrance ramps widened to 4 lanes. Peppers Ferry Road bridge over I 77 will be 4 lanes.

ALTERNATIVE #3 (Ramp Realignment) PROS AND CONS PROS CONS Fewer disturbances to Peppers Ferry Road beyond interchange Less queuing than other alternatives Only one major intersection upgrade Less road widening Nye Road remains on existing alignment Ramp widening and realignment (Interchange) Bridge widening (Interchange) Fewer (reduced) traffic queues than Alternative #1 and Alternative #2 Peppers Ferry Rd remains 2 lanes east of Granite Acres Acceptable level of service