ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT

Similar documents
ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

11/21/2008 ZDC-ZTL LOA Version 1. Letter of Agreement

Piedmont Triad International Airport

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

LETTER OF AGREEMENT 1. PURPOSE: 2. Cancellation: 3. vzdc Responsibilities, Arrivals: CAE MYR: FLO: CLT: 4. vzjx Responsibilities, Arrivals: RDU: FAY

JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006

Greenville Spartanburg International

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

ATLANTA ARTCC AND JACKSONVILLE ARTCC LETTER OF AGREEMENT. SUBJECT: INTERFACILITY COORDINATION EFFECTIVE: January 23, 2019

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

2 Purpose and Need. 2.1 The Need for the CLT OAPM Project Description of the Problem

MASTERS GOLF TOURNAMENT

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

Charlotte - Douglas International Airport Traffic Control Tower

- Updated formatting - Re-drawn airspace delegation diagram

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT

VATUSA CHICAGO ARTCC AND VATUSA MINNEAPOLIS ARTCC LETTER OF AGREEMENT

Burlington ATCT Standard Operating Procedures

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT

ZTL ARTCC. Augusta Regional

Albany ATCT Standard Operating Procedures

ERIE ATCT STANDARD OPERATING PROCEDURES

ATLANTA ARTC CENTER AND JACKSONVILLE ARTC CENTER LETTER OF AGREEMENT

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

Providence ATCT Standard Operating Procedures

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB

Southern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower

MASTERS GOLF TOURNAMENT AUGUSTA, GEORGIA APRIL 7 15, 2019

Version O January 21, 2019

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

Jacksonville ARTCC. F11 TRACON Standard Operating Procedures

Albuquerque Center Standard Operating Procedures

D01 TERMINAL RADAR APPROACH CONTROL

New York ARTCC (ZNY) & Potomac TRACON (PCT)

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC

SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

CHICAGOLAND SPEEDWAY NASCAR RACES

CHICAGOLAND SPEEDWAY NASCAR RACES

MIAMI ARTC CENTER AND JACKSONVILLE ARTC CENTER LETTER OF AGREEMENT

Letter of Agreement between Indianapolis & Washington Air Route Traffic Centers

SEATTLE AIR ROUTE TRAFFIC CONTROL CENTER SEATTLE GLIDER COUNCIL LETTER OF AGREEMENT. EFFECTIVE: June 1, 2015

Oakland Air Route Traffic Control Center, Northern California Terminal Radar Approach Control, and Pacific Soaring Council LETTER OF AGREEMENT

Letter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC

2 Purpose and Need. 2.1 The Need for the Proposed Action Description of the Problem

Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures

Letter of Agreement (LOA)

ALABAMA 500 MONSTER ENERGY NASCAR EVENT

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

BOSTON ARTCC (vzbw) TRAINING SYLLABUS LEVEL: Center Controller (C1)

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement

Federal Aviation Administration. Optimization of Airspace and Procedures in the Metroplex (OAPM) Study Team Final Report Charlotte Metroplex

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

GENERAL OPERATING PROCEDURES FINLAND(GOP)

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES

Standard Operating Procedures

Section 5. Radar Separation

AERONAUTICAL INFORMATION CIRCULAR

VATUSA Approval 3/21/18

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

Charlotte - Douglas International

LETTER OF AGREEMENT. Between

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

WASHINGTON DULLES ATCT STANDARD OPERATING PROCEDURES

Denver International Airport Air Traffic Control Tower. and. Denver Approach D01 LETTER OF AGREEMENT

Virtual Jacksonville Air Route Traffic Control Center Orlando International ATCT Standard Operating Procedures

Cape Area Airports Standard Operating Procedures

SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

THE AREA CONTROL CENTRE (CTR) POSITION

2018 UNITED STATES GRAND PRIX SPECIAL AIR TRAFFIC PROCEDURES

Pi Aero Instrument Rating Syllabus

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

AIRSPACE EXPANSION 2015

40 BEALEAFBI OCTOBER Chapter 8 RQ-4 OPERATIONS

Chapter 1 General Information

CONTROLLED AIRSPACE CONTAINMENT POLICY

10-February 2019 ZTL JO B VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER

vzny ARTCC & vzbw ARTCC

Holland-America Line Pilot Briefing. December 14, bvartcc.com

VIRTUAL AIR TRAFFIC SIMULATION NETWORK CARIBBEAN DIVISION ZSU SAN JUAN CERAP

- Initial. - Added MCRAY and new PDC s. - General update. - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes

Approach (TMA) Air Traffic Control. An Introduction to Approach/Departure Control Airspace and Operating Positions... 2

R L. FACILITY MANUAL Air Traffic Control New Sectors Edition 8 May Prepared by the ATC Training Support Specialist

Understanding Role of Flight Data Processing Across NAS Operational Domains

Jacksonville ARTCC. En Route Standard Operating Procedures

TO: Air Traffic Control System Command Center (ATCSCC) DATE: May 10, FROM: Paul McEwen, Traffic Management Officer, Anchorage ARTCC

CHAPTER 5 SEPARATION METHODS AND MINIMA

From: Commanding Officer, Naval Air Station Pensacola. Subj: NAVAL AIR STATION PENSACOLA CLOSED CONTROL TOWER AIRFIELD OPERATIONS

Transcription:

ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT EFFECTIVE: March 1, 2011 SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services in the airspace described in Annex 1 and to outline interfacility procedures supplemental to the Air Traffic Control Order. 2. CANCELLATION. This LOA cancels Atlanta ARTCC and Charlotte TRACON Letter of Agreement dated prior to the effective date of this document. 3. RESPONSIBILITIES: ARTCC delegates to TRACON authority and responsibility for control of IFR aircraft operations within the delegated airspace described in Annex 1. 4. PROCEDURES: ARTCC and TRACON shall transition arrivals and departures via the ATA's and DTA's depicted in Annex 1. Departures from CLT and satellite airports shall be established on the appropriate departure procedure prior to the ARTCC/TRACON boundary. This procedure shall be utilized for departures with requested altitudes of 11,000 feet and above. a. CLT Arrivals: 1) The common boundary shall serve as the TCP. 2) ARTCC shall clear turbojet and turboprop arrivals to CLT via the appropriate STAR. Prop arrivals may remain on filed routings. All arrivals shall cross the arrival transition fix (or TCP for prop arrivals not on STAR) in accordance with the following: (a) Turbojets: South Ops ADENA*/UNARM/JOHNS/SHINE* MAJIC/SHUDSY* North Ops ADENA*/UNARM/JOHNS/SHINE* MAJIC/SHUDSY* NOTE - * denotes RNAV STAR X TCP @ 12,000 @ 250kts X TCP @ 13,000 @ 250kts X TCP @ 11,000 @ 250kts X TCP @ 13,000 @ 250kts (b)turboprop/prop aircraft shall be handled in accordance with the following: 1. Turboprops through the Shine Sector shall cross 40NM from CLT AOB 7,000. NOTE- Make sure (if needed) you descend aircraft to 11,000 (GSP) or 13,000 (GSO) and hand off to either GSP/GSO TRACON. 1

3)ARTCC shall clear arrivals to CLT satellite airports as follows: (a) Turbojets shall be cleared via the appropriate STAR. (b) Turboprop/props shall be cleared as filed to cross the TCP AOB 8,000 and at an altitude appropriate for direction of flight. (c) JQF on the UNARM arrival shall be (1) NORTH Ops: Turboprops shall cross the common boundary at 9,000. (2) SOUTH Ops: Turboprops shall cross the common boundary at 11,000. (d) Arrivals to JQF, VUJ, and RUQ entering the Shine Sector shall be cleared via PEGTE direct and handled as followed: (1) Turbojets shall cross the common boundary at 7,000; (2) Turboprops/props shall cross the common boundary at 5,000. (e). Approach to SVH airport shall be handled as follows: (1) From south of SVH, CLT shall coordinate with ZTL and be responsible for the arrival. (2) From North of SVH, ZTL shall coordinate with CLT and be responsible for the arrival. NOTE Both facilities will advise when the arrival is no longer a factor (canceled IFR/landed). 4) CLT shall transition arrivals into TRACON airspace prior to the adjacent ARTCC sectors. 5) When notified that holding is required, ARTCC shall clear subsequent arrivals to the appropriate arrival transition fix depicted on Annex 1. 6) The airspace inside the ATA, 11,000-14,000 as depicted on Annex 1, is released to ARTCC in the event of holding OR if TRACON does not accept a handoff by 3 NM from the TCP. 2

b. Departures: (1) TRACON shall clear all RNAV equipped turbojet CLT departures via the appropriate RNAV SID. TRACON shall verbally coordinate CLT departures assigned an RNAV SID, but cleared via other routing. (2) TRACON shall clear turboprop/prop departures operating at or above 11,000 via the appropriate radial/dta associated with the Hugo DP. (3) South Operation CHOPN turboprop departures off CLT will be transitioned directly to ZJX. (4) CLT shall clear departures requesting 15,000 or above to maintain 14,000 and expect filed altitude 10 minutes after departure. (5) CLTshall clear aircraft requesting 14,000 feet or below, at requested altitude appropriate for direction of flight. (6) ARTCC only may delete the speed restriction to aircraft assigned a SID. ARTCC is authorized to delete the speed restriction within TRACON airspace. c. Overflights: (1) ARTCC shall ensure all overflight traffic is on a published route (airway) at an altitude AOB 8,000 for direction of flight. Aircraft 9,000 and above shall be coordinated. (2) ARTCC shall clear aircraft landing CAE, airspace via CLT.V37.CAE, descend them to 15,000 feet, and handoff to CLT. CLT shall transition these aircraft to CAE TRACON. (3) ARTCC shall descend aircraft landing SOP to 15,000' and handoff to CLT. CLT shall transition these aircraft to FAY TRACON. (4) ARTCC shall descend aircraft landing POB to 15,000' and handoff to CLT TRACON. CLT shall descend these aircraft to 11,000' and handoff to ZDC ARTCC. (5) ARTCC shall descend prop and turboprop aircraft landing RDU to 15,000' and handoff to CLT. ARTCC shall clear these aircraft via SDZ BUZZY STAR and handoff to CLT. CLT shall transition them into CLT airspace and handoff to ZDC ARTCC. 5. MISCELLANEOUS: a. TRACON shall provide a minimum of 7NM radar separation, constant or increasing, departures and/or en route aircraft entering ARTCC airspace at or via the same DTA. b. GSP arrivals shall be descending to 15,000 and handed off to CLT. CLT shall descend to 11,000 (or lower) and handoff to GSP TRACON. 3

6. ATTATCHMENTS: a. Annex 1 ZTL ARTCC / CLT TRACON Airspace b. Annex 2 Utilization 3 Miles Increasing to 5 Miles c. Annex 3 ZTL/ZJX/ZDC ARTCC Low Sectors ANNEX 1. 4

ANNEX 2. UTILIZATION 3 MILES INCREASING TO 5 MILES 1. BACKGROUND: This Annex contains procedures agreed upon between ZTL ARTCC and CLT TRACON. The procedures are established in order to apply the separation standard of 3 miles increasing to 5 miles or greater when transitioning from terminal to en route control. 2. PROCEDURES: a. This procedure may be applied to departure aircraft transitioning from TRACON to ARTCC SHINE and UNARM Sector s airspace. b. When this procedure is applied, the 7 mile radar separation standard established in the ZTL/CLT LOA, is waived. c. When transitioning from terminal to en route control, 3 miles separation increasing to 5 miles or greater can be used provided: (1) The aircraft are on diverging routes/courses; and (2) Separation is constantly increasing and the first center controller will establish 5NM or other appropriate form of separation prior to the aircraft departing the first center sector. ANNEX 3. 5