OR MISSION TRAIL ELEMENTARY

Similar documents
TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

SANTA FE. 82: p.108 POLLINATOR PRAIRIE PARK. 86: p : p : p.113. ARROWHEAD PARK 151st St. 41: p.102. Indian Creek Greenway PARK

Independence: overview

Cabarrus County line. Overland Connector. to Newell Park. Overland Connector

Confluence of Long Creek. Bellhaven Road. Approximate Corridor Length: 1.5 miles. Mecklenburg County Greenway Master Plan

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Site Location and Setting

CHAPTER 5. Chapter 5 Recreation Element

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

MEETING MINUTES District 1 Trail Planning Meeting 1

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Business Item No

S i t e A n a ly s i s

Each picture below has a brief explanation of the alignment. Please review and feel free to send any questions you might have.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

ABOUT METROGREEN. Marlene Nagel Director of Community Development Mid-America Regional Council

Welcome to the Cross County Trail Public Input Session!

Non-Motorized Transportation

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

CRANE LAKE TRAILS NETWORK AND SPACES

Major Projects Overview

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

Lawrence Loop SWOT Analysis

Self-Guided Tour for the Mission Park to Mission Canyon Multimodal Improvement Project

Classifications, Inventory and Level of Service

FEASIBILITY CRITERIA

Town of Frisco. Trails Master Plan. Legend. Planning Area 1. i l. 9 Campground. Lake Hill Development. Giberson Property. Frisco Transit Center

FINCH HYDRO CORRIDOR TRAIL PROJECT

A VISION FOR EL MIRAGE

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Welcome to the Future Kingston Point Rail Trail!

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

INFILL HARD CORNER & REDEVELOPMENT OPPORTUNITY 731 PROBANDT and 134 & 138 KING ROGER ST

University Region Non-Motorized Plan 2015

Coast to Coast Connector Summit

CLEVELAND PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION

The Impact of Trails on Communities. Jim Wood Chief, Office of Greenways & Trails Division of Recreation and Parks

Bicycle Wayfinding Signage Study

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Waukee Trailhead Public Art and Amenities Project

Needham Heights Neighborhood Association February Rail Trail Overview

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

Airport Planning Area

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

M E S T I Z O C U R T I S P A R K

SOUTH PARK AT FRESHKILLS PARK ANCHOR PARKS PROGRAM COMMUNITY VISIONING. JCC of Staten Island February 1, 2017

Design Charrette Public Meeting

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Trails, steps, & P-Patch to be south of I- 5 Colonnade

Basic Project Information

IL 390 Station. Wood Dale Open House Summary 5/18/17

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

Discovering the Trails of Prince George s County

America s Great Outdoors: Feasibility Study for Connecting Urban Refuges to the Rocky Mountain Greenway Trail Network

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

Arvidson, Adam R. Adam,

Park to Playa Trail. June 17, 2014

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Bonita to Bridgeport January 24, 2019

INVENTORY : introduction

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths.

MORGAN CREEK GREENWAY Final Report APPENDICES

APPENDIX 5: JUNEAU NORDIC SKI CLUB MEMO

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN

The Recreational Trail along Cushing Park road has been a successful addition to the city

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

CITY COUNCIL AGENDA MEMORANDUM

Mohawk Hudson Bike Hike Trail Crossroad Connection Study

The Vision for the San Juan Islands Scenic Byway

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

SWEDISH FIRST HILL MEDICAL CENTER

City of Haslett. City of East Lansing. City of East Lansing

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY

EXECUTIVE SUMMARY FALL Introduction. Findings

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner

Dungeness Recreation Area County Park Master Plan

DAKOTA CULTURE UPPER SIOUX COMMUNITY: AREA CHARACTER ANALYSIS ALIGNMENT STRATEGY

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

Public Open House. Chief Peguis Trail Project

Blue River Trail Master Plan JSA to Town Hall June 2004

SOUTHRIDGE RETAIL CENTER

Southwest Quadrant Distinctive Features

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar

LUDLAM TRAIL CORRIDOR DISTRICT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

MASTER PLAN MASTER PLAN

SAN RAFAEL City Council January 20, 2015

Transcription:

Leawood: overview OVERLAD PARK 24: p.70 I-LA PARK 32: p.72 TOMAHAWK PARK 23: p.69 31: p.71 GEZER PARK OR MISSIO TRAIL ELEMETARY 22: p.68 W 133rd St W 135th St KASAS CITY MO - other segments Beginning/end of segments Segment number & page The City of Leawood includes approximately 3 miles of the historic routes of the trails, stretching diagonally northeast to southwest from the area of West 123rd Street and State Line Road to all Road south of West 135th Street. The form of post-historic trail development of this area makes it impossible to follow the historic route precisely across existing residential neighborhoods. As an alternative, Leawood proposed two routes: both following West 123rd Street west to Mission Road, then one joining the existing Tomahawk Greenway, which then parallels the historic route southwest at a distance of approximately one mile (segments 23 24), and the other turning south on Mission Road then west on 133rd Street (segments 31 32). The second alternative is as close as is possible to following the historic route and crosses the route twice, although it is still as much as 0.75 1 miles away from the historic route at its most distant point. These two alternatives correspond directly to the two alternatives included in Overland Park. o extant historic trail sites are currently known in Leawood, and it does not yet have any developed national historic trail-related facilities.three potential trailhead locations are proposed for Leawood, at existing parks along the route. The proposed trail in Leawood is distant from public transit, although connections can be made at West 119th Street and all Road, or by continuing southwest on the Tomahawk Creek Greenway into Overland Park. The final length of the proposed retracement routes within Leawood is 5.9 miles, including both route options. all Ave Roe Ave State Line Rd 0 0.2 0.4 0.8 66 Trail alignments: Leawood

Leawood: selection considerations Tomahawk Park ativity Parish School Other route options were considered using some combination of State Line Road, 133rd and 137th Streets to remain somewhat closer to the historic route through Leawood, but the challenges associated with creating a safe and attractive pedestrian and bicycle route along State Line Road and other factors made the chosen options more desirable routes for the city. OVERLAD PARK Tomahawk Creek Greenway Mission Trail Elementary Leawood Elementary and Middle Country Club of Leawood W 133rd St KASAS CITY MO Tomahawk Creek Greenway near Roe Ave, looking east. Photo: Vireo Gezer Park W 135th St all Ave Roe Ave State Line Rd : SEE OPPOSITE PAGE 0 0.2 0.4 0.8 Entrance to I-Lan Park off of all Ave, looking north. Photo: Vireo Tomahawk Creek Greenway just east of I-Lan Park (upper) and in Tomahawk Park (lower). Trail alignments: Leawood 67

Leawood: Segment 22 ativity Parish School : SEE OPPOSITE PAGE State Line Rd 1.21 miles. West on West 123rd Street from State Line Road to Mission Road. Safe crossing of State Line Road must be a collaborative project between Leawood and Kansas City, Missouri 23 Wenonga Ln Leawood Elementary and Middle KASAS CITY, MO 21i CORRIDOR COECTIOS: Connects to Leawood Elementary and Middle Connects to existing access trail into Tomahawk Park at West 123rd Street and Mission Road OPPORTUITIES: Although bike lanes and sidewalks exist along this segment, a 10 foot wide trail would be optimum if right-of-way space allows RELATIOSHIP TO THE HISTORIC ROUTE: This segment intersects the historic route near Leawood Elementary and Middle, but continues west where the historic route continues to the southwest. At its most distant point, it is approximately 0.5 miles from the historic route. W 124th St 31 Country Club of Leawood Overbrook Rd Sidewalk and bike lanes on, looking west. Photo: PS 68 Trail alignments: Leawood

Leawood: Segment 23 0.65. Existing multi-use connector trail from Mission Road and West 123rd Street to Tomahawk Park. Existing Tomahawk Creek Greenway trail through Tomahawk Park. Tomahawk Park ativity Parish School Distance from historic route (0.5 1 miles) Route currently crosses both West 123rd Street and Mission Road (3 lanes of traffic each) at that intersection, which could slow circulation considerably TRAILHEAD: TOMAHAWK PARK CORRIDOR COECTIOS: Connects to Tomahawk Park and extended Tomahawk Creek Greenway to both north and south OVERLAD PARK W 124th St 24 31 22 OPPORTUITIES: Existing 10 foot wide recreational trail throughout this segment as part of Tomahawk Creek Greenway connector trail and Tomahawk Park Existing park development and parking at Tomahawk Park could offer opportunity for a national historic trail trailhead, including a themed playground or other trail amenities RELATIOSHIP TO THE HISTORIC ROUTE: Segments 23 24 in Leawood and 24 29 through Overland Park are as much as 2 miles northwest of the historic route of the trails in this area. They have been included as an existing complete greenway network that parallels the historic route and provides opportunities for loops when connecting to segments 31 32 in Leawood, 34 37 in Overland Park, and associated segments in Olathe. This route was also included because it may offer an enjoyable park-like off-road experience for trail users. Access trail from at into Tomahawk Park, looking west. Photo: Vireo Tomahawk Creek Greenway in Tomahawk Park, looking southwest. Photo: Vireo - other segments Adjacent segment number Tomahawk Creek Greenway in Tomahawk Park, looking southwest. Photo: PS Trail alignments: Leawood 69

Leawood: Segment 24 25 all Ave all Ave TRAILHEAD: I-LA PARK I-Lan Park OVERLAD PARK town center plaza Hawthorne Valley Park Tomahawk Creek Tomahawk Creek Greenway - other segments Pkwy Roe Ave Adjacent segment number Tomahawk Park 23 1.68 miles. Tomahawk Creek Greenway from edge of Tomahawk Park through Hawthorne Valley Park to all Avenue at I-Lan Park, south along east side of all to existing pedestrian bridge and underpass. Distance from historic route (approximately 1 mile) CORRIDOR COECTIOS: Multi-use path on west side of all Avenue connects north to public transit at West 119th Street OPPORTUITIES: Existing 10 foot wide recreational trail throughout this segment as part of Tomahawk Creek Greenway, including pedestrian underpasses on major roads (Roe and all Avenues, and West 127th Street) Multiple parks adjacent to corridor are opportunities for minor trailheads Opportunity at I-Lan Park for a small kiosk, interpretive signage or other HT trailhead development (Level I, page 162) Trail maintenance is shared by Leawood and Overland Park in this segment (Leawood from Tomahawk Park to Roe Avenue, Overland Park from Roe to I-Lan Park, Leawood in I-Lan Park) and is listed in both cities' sections RELATIOSHIP TO THE HISTORIC ROUTE: Segments 23 24 in Leawood and 24 29 through Overland Park are as much as 2 miles northwest of the historic route of the trails in this area. They have been included as an existing complete greenway network that parallels the historic route and provides opportunities for loops when connecting to segments 31 32 in Leawood, 34 37 in Overland Park, and associated segments in Olathe. This route was also included because it may offer an enjoyable parklike off-road experience for trail users. Tomahawk Creek Greenway at Hawthorne Valley Park, looking southwest. Photo: Vireo P. 162 Tomahawk Creek Greenway looking southwest near I-Lan Park. Photo: Vireo 70 Trail alignments: Leawood

Leawood: Segment 31 W 124th St 23 22 1.33. Along Mission Road from West 123rd Street to West 133rd Street. This segment currently has sidewalks, and bike lanes are planned, but there are no plans for development of a multi-use side path Country Club of Leawood CORRIDOR COECTIOS: Connects to Tomahawk Creek Greenway via connector trail (segment 23) Connects to Mission Trail Elementary Connects to Gezer Park OPPORTUITIES: Mission Trail Elementary or Gezer Park have been identified as potential locations for interpretive development and/or trailhead access RELATIOSHIP TO THE HISTORIC ROUTE: This segment crosses the historic route. Due to the nature of residential development in the area, is the closest available route to the historic route in this area. Glenfield Rd MAP A at W 132nd St, looking north. Photo: PS south of, looking south. Photo: PS MAP A MAP B W 132nd St MAP B 32 Mission Trail Elementary W 132nd St TRAILHEAD: GEZER PARK OR MISSIO TRAIL ELEMETARY Gezer Park W 133rd St - other segments Adjacent segment number Trail alignments 71

Leawood: Segment 32 all Ave all Ave 34 33 OVERLAD PARK W 133rd St W 135rd St W 137th St Briar St Roe Ave - other segments W 132nd St Mission Trail Elementary TRAILHEAD: GEZER PARK OR MISSIO TRAIL ELEMETARY Adjacent segment number 31 1.03 miles. West 133rd Street from Mission Road to all Avenue. o transit access in area CORRIDOR COECTIOS: Multi-use path on west side of all Avenue connects north to public transit at West 119th Street Connects to side path on Roe Avenue, and via Roe to extended side path along West 137th Street Connects to Mission Trail Elementary Connects to Gezer Park OPPORTUITIES: Existing 10 foot wide side path on north side of West 133rd Street throughout this segment Shared responsibility with Overland Park west of Briar Street RELATIOSHIP TO THE HISTORIC ROUTE: This segment crosses the historic route. Due to the nature of residential development in the area, is the closest available route to the historic route in this area. Side path on W 133rd St in front of Gezer Park, looking west toward. Photo: PS 72 Trail alignments: Leawood

This page intentionally left blank Trail alignments 73