Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure

Similar documents
November 21, 2012 Barbara Kelleher, (954)

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Pedestrian Safety Review Spadina Avenue

Route 29 Solutions Projects

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

October 31, 2014 Chuck McGinness, (954)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

FDOT Treasure Coast Traffic Impact Report

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

PROGRESS PARK CONNECTOR

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County


Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Report through

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

FDOT Treasure Coast Traffic Impact Report

College Avenue Campus Mettler, Stonier, and Tinsley Residence Halls General Instructions: Note: From New Jersey Turnpike (North or South) NOTE:

Ohio Department of Transportation Construction Update

4. Safety Concerns Potential Short and Medium-Term Improvements

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Palm Beach County Traffic Report July 13 through July 20, 2012

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,


District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

A. CONCLUSIONS OF THE FGEIS

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Important Lane Closures, April 3 9, 2011

Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer

2 Construction Program

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

RAILROAD QUIET ZONE PROJECT

Road Safety Audit Review State Route 245 (LM 2.13) Intersection of Southport Road Maury County Description of Project and Background This project invo

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

5.1 Traffic and Transportation

Fairfax County Parkway Widening Fairfax County

Culpeper District. Albemarle County Monthly Report December 2011

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

SAN RAFAEL City Council January 20, 2015

TRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Guide to. Road Construction Projects

Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011

Penny for Pasco Renewal. FY2014/15 thru FY2024/25

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

ELECTION SIGN GUIDELINES

Transportation TRANSPORTATION PROJECTS

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

22-23 Pavement Marking Items. (Pages 7 & 8 removed)

RW Bruhn Bridge and Approaches Project

Culpeper District. Albemarle County Monthly Report. September 2012

US 19 Sunset Point Rd to Countryside Blvd.

Progress Report for Projects of Regional Significance

Appendix 4.1 L. No-Build Project Descriptions

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Springettsbury Township. Road Improvement Projects

1.2 Corridor History and Current Characteristics

Monthly Traffic Update

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

Road Construction Ahead January-April 2015 NORTHWEST REGION

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

State Route 8 Corridor. Northern Summit County s Path to Success

Lake Erie Commerce Center Traffic Analysis

Work in 2015 and Annual Mobility- Management Plan

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Transcription:

Ramp Removed By Others Roadway Improvements By Others Ramp Improvements By Others Install ew Sign Structure Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Close Entrance Install Additional Left Turn Lane Roadway Improvements By Others Add Supplemental Up Arrow Panel (M6-3) to JCT 95 Interstate Route Marker 1' 2' SHEET 1 OF 11 12:34 I-95 of-ramp Route 3 (PlankRoad) I-95 on-ram p - Install additional left turn lane on eastbound Route 3 at Gateway Blvd - Adjust lane assignments (pavement markings and signal heads) for eastbound Route 3 at Gateway Blvd, converting outside lane from right turn only to shared through / right - Adjust lane assignments (pavement markings and signal heads) for northbound Gateway Blvd, converting middle lane from shared through / left to left turn only and converting outside lane from right turn only to shared through / right JAUARY 217 ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF Gateway Blvd M ATCHLIE SHEET 2 Gateway Blvd (Extended)

12:34 Close Entrances Close Entrance Install ew Mast Arm Add Right Turn Lane Install Stop Bar and Stop Sign (R1-1) Closer to Roadway; 1' 2' Convert Existing Right Turn Lane into Shared Through / Right Lane (Eradicate Existing Gore and Arrow Markings) SHEET 2 OF 11 Altoona Drive M ATCHLIE SHEET 1 Route 3 (PlankRoad) M ahone Street - Eradicate Existing Gore and Arrow pavement markings on westbound Route 3 approaching Mahone Street to convert outside lane into shared through / right turn lane - Install new right turn lane (1' storage length) on westbound Route 3 approaching Mahone Street - Install new mast arm with signal heads on westbound Route 3 Route 3 (Wiliam Street) Close Entrance Replace Channelizing Island JAUARY 217 ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF M ATCHLIE SHEET 3

12:34 Close Entrance Install Channelizing to only allow westbound Route 3 Left Turn movement Install o Left Turn sign (R3-2) and Stop sign (R1-1) Install Through Movement Prohibition lane control sign (R3-27) Install Signal Ahead sign (W3-3) per MUTCD Close Entrance Upgrade intersection street name sign blades (W3-3) with Flashers Install Street ame signs at Intersection Install Signal Ahead sign (W3-3) per MUTCD Remove Ahead sign and Install ew Signal Ahead sign 1' 2' SHEET 3 OF 11 W estm ont Drive M ATCHLIE SHEET 2 - Install channelizing median at Westwood Village Shopping Center to only allow westbound Route 3 left turn movement - Convert Lane Assignments on Woodlyn Drive and Huntington Hills Lane to Left Turn and Right Turn Only (no Through movements allowed); Add Lane Control signage and pavement markings Huntington Hils Lane Route 3 (Wiliam Street) W oodlyn Drive JAUARY 217 ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF M ATCHLIE SHEET 4 W estwood Drive

12:34 Trim Vegetation Install Stop Ahead sign (W3-1) per MUTCD Install Stop sign (R1-1) Install Stop sign (R1-1) 1' 2' SHEET 4 OF 11 M ATCHLIE SHEET 3 - Upgrade southbound Route 1 off-ramp curvature (meet AASHTO and VDOT road design requirements) onto westbound Route 3; Install westbound Route 3 merge lane - Convert both eastbound and westbound Route 3 off-ramps onto Route 1 from yield controlled to stop controlled movements Route 3 (Wiliam Street) JAUARY 217 ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF Route 1 On-Ramp Route 1 (Jeferson Davis Hwy) M ATCHLIE SHEET 5 Route 1 On-Ram p

Route 1 On-Ram p M ATCHLIE SHEET 4 Route 1 On-Ramp Route 3 (Wiliam Street) Upgrade turn lane markings Install Stop Ahead sign (W3-1) per MUTCD - Extend outer right turn lane on southbound William Street to 315' storage - Extend raised median along William Street through the Spotsylvania Avenue intersection; Install channelized median on Spotsylvania Avenue for right in / right out movements Greenbrier Drive Spotsylvania Avenue Install stop bar and Stop sign (R1-1) Install Advance Intersection Lane Control sign (mod R3-8) Refresh pavement markings JAUARY 217 1' 2' ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF SHEET 5 OF 11 Route 3 (Blue & Gray Parkway) M ATCHLIE SHEET 6 W iliam Street

M ATCHLIE SHEET 5 Route 3 (Blue &GrayParkway) 1' 2' JAUARY 217 ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF SHEET 6 OF 11 M ATCHLIE SHEET 7

- Extend eastbound Route 3 left turn storage length to 3' - Extend westbound Route 3 dual left turn storage length to 35' - Extend northbound Lafayete Blvd. left turn storage length to 25' - Extend raised median along Lafayete Blvd through Alum Spring Rd. intersection; Instal channelized median at Alum Spring Rd. - Instal mid-blockcrosswalkwith pedestrian crossing warning signals Install Mid-Block Crosswalk with Pedestrian Crossing Warning Signals Install Shared Use Path Outside Existing Guardrail Remove Existing Crosswalk, Ramps and Pedestrian Signal Equipment at Intersection Install Lane Reduction arrows and Lane Ends sign (W4-2) per MUTCD Install Guardrail and Shared Use Path Remove Existing Pedestrian Area Remove Existing Sidewalk, Ramps, and Crosswalk Markings JAUARY 217 1' 2' ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF SHEET 7 OF 11 Alum Spring Road M ATCHLIE SHEET 6 Route 3 (Blue & Gray Parkway) Lafaye te Blvd. M ATCHLIE SHEET 8

Summit Street M ATCHLIE SHEET 7 Extend left turn lane storage length 1' 2' - Extend westbound Route 3 dual left turn storage length to 35' at Lafayette Blvd. Route 3 (Blue &GrayParkway) JAUARY 217 ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF SHEET 8 OF 11 M ATCHLIE SHEET 9

Belman Road M ATCHLIE SHEET 8 - Extend westbound Route 3 left turn lane storage length to 225' Extend westbound Route 3 left turn lane storage length to 225' 1' 2' JAUARY 217 ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF SHEET 9 OF 11 Route 3 (Blue &GrayParkway) M ATCHLIE SHEET 1

M ATCHLIE SHEET 9 Route 3 (Blue &GrayParkway) 1' 2' M ATCHLIE SHEET 11 JAUARY 217 ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF SHEET 1 OF 11

12:36 Refresh crosswalk markings Install Added Lane sign (W4-3) Refresh crosswalk markings - Upgrade handicap ramps per VDOT standards at all crosswalk locations at interchange ramp intersections MATCHLIE SHEET 1 Route 3 (Blue & Gray Parkway) Refresh crosswalk markings 1' 2' Route 2 (Dixon Street) Refresh crosswalk markings JAUARY 217 ROUTE 3 (PLAK RD. / WILLIAM ST./ PARSOS BRICKERHOFF SHEET 11 OF 11