Second Avenue: Union Street to Lenora Street, Condominium Owners c/o Michael McQuaid 1521 Second Avenue Seattle, WA 98101

Similar documents
RECREATIONAL VEHICLE EXAMPLES

A. CONCLUSIONS OF THE FGEIS

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

4. Safety Concerns Potential Short and Medium-Term Improvements

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Madison Metro Transit System

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

Airport Planning Area

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

Treasure Island Supplemental Information Report Addendum

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

Director, Community Planning, Toronto and East York District

ITS. Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning. January 9, 2013

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area.

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

Lake Erie Commerce Center Traffic Analysis

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Grade Crossings in High Speed Rail Corridors

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Pedestrian Safety Review Spadina Avenue

CHAPTER 16 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES*

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206)

Construction Staging Area Blue Jays Way (357 King Street West)

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

McLean Citizens Association Transportation Committee Project Briefing

Site Location and Setting

STAFF REPORT FOR ACTION

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

A VISION FOR EL MIRAGE

Construction Staging Area 19 Western Battery Road

ARLINGTON COUNTY, VIRGINIA

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN

Arlington County Board Meeting Project Briefing. October 20, 2015

5.1 Traffic and Transportation

ORDINANCE NO. 418 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF MACKAY, CUSTER COUNTY, IDAHO:

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public

US 380 FEASIBILITY STUDY

City of Sydney Convenience Store Development Control Plan 2004

Provincial Railway Technical Standards

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Assessment of Travel Trends

Sheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

7:00 p.m. General meeting called to order. Paul Conte, Chair 7:05 p.m. Introductions Reminder: All JWN members should fill out and return a sign-in

IL 390 Station. Wood Dale Open House Summary 5/18/17

Non-Motorized Transportation

APPENDIX E. Urban Design

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

NOTE: YOU MAY COMPLETE THIS SURVEY ONLINE (USING THIS DOCUMENT TO VIEW MAPS AND GRAPHICS) AT:

Community Development

CITY OF SPOKANE VALLEY Request for Council Action

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

Traffic Management Plan 2018

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

FEASIBILITY CRITERIA

SAMTRANS TITLE VI STANDARDS AND POLICIES

Freymond Aggregates Quarry Bay Lake Rd., Twp. of Faraday

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Welcome to the Cross County Trail Public Input Session!

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

Public Information Meetings. October 5, 6, 7, and 15, 2015

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

related to temporary banners, flags, A-frame signs, and other temporary sign devices for commercial advertising. (Lee Plemel,

SWEDISH FIRST HILL MEDICAL CENTER

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report


Construction Staging Adelaide Street West

5 Rail demand in Western Sydney

Table of Contents TABLE OF CONTENTS. HOW THIS BY-LAW WORKS... i PART 1 - ADMINISTRATION, INTERPRETATION, ENFORCEMENT, AND DEFINITIONS

Revision of the Hunters Hill Development Control Plan (DCP) Chapter 4

From: David J. Gellner, AICP, Principal Planner, ,

Administration Policies & Procedures Section Commercial Ground Transportation Regulation


ORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

CHAPTER 4: ALTERNATIVES

Railroad Safety Trail

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Transportation Impact Assessment Paradise Shores RV Resort Development Stettler County, Alberta Progress Update February 2018 PO#

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

ARTICLE 7 MOBILE HOME AND RECREATIONAL VEHICLE PARKS AND CAMPGROUNDS

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

Transcription:

Second Avenue: Union Street to Lenora Street, Condominium Owners c/o Michael McQuaid 1521 Second Avenue Seattle, WA 98101 Subject: New Development - Cumulative Downtown Alley Traffic Congestion and Safety Impacts - First Avenue and Third Avenue in a Five Block Corridor on Second Avenue Dear Mr. McQuaid, Thank you for asking TSI to comment on the cumulative accessibility and safety impacts emerging with recent development of high rise buildings in downtown with focus on the Second Avenue corridor from Union Street to Lenora Street. We understand that you and other downtown residents are concerned that the City of Seattle Zoning Code requirement of concentrating parking, loading, and service activity on alleys is creating some unintended adverse consequences relating to vehicle access, pedestrian safety and parking. This letter summarizes our current understanding of the context and conditions, existing development activity; a summary of findings, and a statement of conclusions and recommendations. Understanding of Context and Conditions In the early 2000 s the City of Seattle adopted a policy strongly discouraging vehicular site access in new downtown developments from public streets or avenues which had been the prior acceptable practice. The policy changed, requiring garage access from alleys when a new development site abutted an alley. Further, downtown zoning encourages very high density development, creating a concentration of activity along the alleys. Existing 16 foot wide alleys with protrusion of building fixtures into the alleys (downspouts, water connections, air conditioners, etc.), the need for trucks serving existing businesses to use the alley for deliveries; and the lack of off-alley storage of trash receptacles for existing businesses reduces the effective alley width to less than 12 feet in many locations. The City standard calls for widening the alleys to a full 20 feet by requiring new developments to dedicate two (2) feet of private property on the development side of the alley. Existing established buildings (especially in the subject area with many viable and/or historic buildings) makes full widening along the entire length of most alleys unlikely to occur for many years, if ever. The combination of these characteristics limits two-way traffic circulation (and even one-way circulation) and precipitates a number of access and safety problems that were not apparently envisioned when the Zoning Code revisions were drafted. Accordingly, this study is intended to document the character of development that is occurring as a result of the zoning changes; document the physical characteristics of the alleys on both sides of Second Avenue between Union and Lenora Streets; summarize

Page 2 of 8 observations of the effects relating to these newer zoning provisions; and offer some suggestions for mitigating these conditions. Development Activity and Alley Inventory in the Study Area To understand the intensity of development we have utilized publicly available project descriptions and the Transportation Impact Analyses of several projects in order to illustrate the cumulative effect of allowable development density along this five block corridor of Second Avenue and the alleys east and west of this Second Avenue corridor. This summary is presented in Table 1 below. Table 1. Development and Parking Stall/Access Summary Parking Stalls Development Without With Address Residential (Units) Hotel (Rooms) Office Area (SF) Retail Area (SF) Alley Access Alley Access Existing 1401-14152 nd Avenue 194 102,000 353 20001 st Avenue 80 7,000 101 15212 nd Avenue 143 2,800 298 119 Pine Street 25,500 5,000 24 19152 nd Avenue 249 3,220 244 101 Stewart Street 100,000 32 Under Construction 204 Pine Street 398 4,300 246 16082 nd Avenue 230 114 20152 nd Avenue 314 7,854 304 19001 st Avenue 75 110 13,170 325 14302 nd Avenue 290 389 Under Review 19312 nd Avenue 205 51 16132 nd Avenue 177 2,800 145 15162 nd Avenue 150,000 30,000 130 This shows the zoning is permitting over 1920 new multifamily units, 545 hotel rooms, 275,500 sf of office space and 177,000 sf of retail space. In addition there will be 2300 parking spaces. This is occurring in only ten blocks within the downtown. Development in other sections of downtown along the Third, Fourth and Fifth Avenue corridors add to this extraordinary level of development. Eighty-five percent (85%) of the parking, all of the delivery, and all of the service activity associated with these buildings are exclusively reliant on the alleys for these functions. An inventory of alley conditions was made within the study area. This inventory is summarized on Table 2 below.

Page 3 of 8 Table 2. Alley Conditions Normal Percent Width Width Of Block Limitations Effective Width From To West of 2 nd Avenue Union Street Pike Street 18 ft 100% GB, C, D & V 15 ½ - 17 ft. Pike Street Pine Street 16 ft 60% GB, C, D, V & B 13 ½ - 15 ½ ft. 18 ft 40% GB, C, D & V 15 ½ - 17 ½ ft. Pine Street Stewart Street 18 ft 38% C, D, V & B 16 ½ ft. 16 ft 62% GB 13 ½ ft. Stewart Street Virginia Street 20 ft 50% F & G 18 ½ ft. 18 ft 50% GB, C, D & V 15 ½ ft. Virginia Street Lenora Street 20 ft 80% B 18 ½ ft. 18 ft 10% B 16 ½ ft. 16 ft 10% GB, C, D, V & B 13 ½ - 15 ½ ft. East of 2 nd Avenue Union Street Pike Street 18 ft 50% C, D, V & B 17 17 ½ ft. 16 ft 50% GB, C, D, V & B 13 ½ ft. Pike Street Pine Street 16 ft GB, C, D, V, B, F & G 11 15 ½ ft. Pine Street Stewart Street 18 ft 100% 18 ft. Stewart Street Virginia Street 16 ft 100% C, D, V, F & G 14 ½ - 15 ½ ft. Virginia Street Lenora Street 16 ft 34% C, D & V 15 ½ ft. 18 ft 66% B 17 ft. GB garbage bins; C, D & V conduit, downspouts, ventilation ducts; B bollards and building corner protection; F & G fire valves or gas meter. This shows that only 15% of the 10 alley blocks parallel to the Second Avenue corridor will have 20 foot alley widths for the foreseeable future. It is not likely that many of the existing building sites will be redeveloped in any reasonable time period because their current value and use does not make this feasible. Thus, the conditions observed today are not likely to improve for many years, if at all. It is essential to note that the physical width shown in this inventory is not the functional or effective width. All of the buildings, even some recently constructed structures, have downspouts, gas meters, water valves, air conditioning units and other physical improvements attached to the sides of their buildings that restrict the vehicle travel path. These extend from the building face and reduce the effective width of the alley. Further there are trash receptacles in many alleys that further reduce the effective width of these alleys. When combined, the physical width is reduced by a minimum of six (6) inches to six (6) feet in almost every alley. An estimate of the resultant effective width is shown in Table 2. Even in the best of conditions it is difficult to have two vehicles traveling in opposite directions pass each other. A study performed by TSI in a similar alley (with much less intense development than summarized above) found that a vehicle traveling one-way could not traverse a one block section of a 16 to 18 foot wide alley 40% of the day due to service/delivery vehicle blockages, trash containers, or cars parked to drop off

Page 4 of 8 passengers. It should also be noted that even in buildings with truck loading bays, delivery drivers do not want to take the time to get building managers to open the secured loading area and load/unload from the alley. With mirrors, these trucks are eight (8) feet wide making it impossible for another car to pass either way in an alley. Cars need a nominal width of 7 ½ ft. of width to clear their mirrors. Findings and Observations Based on the above, for the alleys on both sides of Second Avenue from Union to Lenora Streets, we have identified the following items and issues. We believe these issues should be addressed by Land Use Code revisions and should therefore be considered by the Design Review Boards, Seattle Department of Construction and Inspections (SDCI) and/or the Seattle Department of Transportation (SDOT) in their review of new development. If there is another car or a truck loading from the alley it more often than not is impossible for a car to enter or exit to or from the street between the blockage and the garage entry/exit. Thus the majority of traffic generated by any of the existing and listed developments will first attempt to enter/exit the particular garage via the nearest street and if passage is blocked will attempt to back out over the sidewalk. The combination of existing building users and our understanding of planned new users combined with growing trend of increased truck and delivery activity will likely generate noticeably restricted access to or from one or both ends of these alleys. These restrictions will cause drivers to back out across sidewalks and into traffic in an effort to access their garages. This not only adversely affects traffic operations but also impact both pedestrian and vehicle safety. When the City Center Connector Streetcar is constructed on Stewart Street, there will be only a single westbound lane and entering vehicles going south across the double tracks into the alleys east and west of Second Avenue will need to wait for the vehicles exiting the alley to pass. When an entering vehicle needs to wait to enter the alley the vehicle will either block the streetcar tracks, the sidewalk or the one remaining westbound traffic lane on Stewart Street before they enter the alley going south. The combination of the concentrated pedestrian volumes, the sightline restrictions, and the streetcar conflicts on all east-west streets will clearly contribute to both pedestrian and vehicle collisions at these alley/sidewalk crossings in the study area. The traffic forecasts and intersection levels of service in project specific Transportation Impact Analyses we have reviewed in this five (5) block corridor appear not to have considered the exceptional high pedestrian volumes on all eastwest streets and particularly Pike Street, Pine Street, and Stewart Street, all considered gateway pedestrian routes to and from the Pike Place Market. The pedestrian volume effect on intersection traffic levels of service has been underestimated. While it is assumed that the majority of new project occupants will

Page 5 of 8 commute by some non-automobile mode, if only a fraction of the development users use their cars, they will noticeably add to the traffic volume. Their counterparts who do use transit or walk will add to the pedestrian volumes in these corridor intersections. The mode split analysis of the individual projects Traffic Impact Analysis rely on rideshare services to offset the resident driver trip generation. In fact there will be two automobile trips for each rideshare or carpool resident drop-off (one trip dropping off the resident/visitor and another trip exiting after the resident visitor has been dropped off). While these services may reduce overall trips in the downtown and reduce parking demand, they create new trips at the point of origin/destination. A consolidated location for this type of pick-up and drop-off activity should be established. Recommendations As an overarching observation, TSI s review of projects in this Second Avenue corridor and other downtown core development proposals finds that, while permitted by the Land Use Code, the combination of very high density development and reliance on alley access as exclusive vehicle garage access and truck loading is having an adverse cumulative effect. That effect is to concentrate vehicle activity along the alleys which, even with setbacks, is often too narrow for two-way traffic flow (or often even one-way traffic flow) due to preexisting constrains. These alleys were originally designed to be the utility access for truck delivery, with alley face-of-building loading docks and external trash receptacles. These alleys are now being asked to accommodate significantly greater levels of activity by commercial drivers; increased numbers of trash and recycling containers; and new resident, employee and visitor access and loading. More significantly is that required parking garage access exclusively from an alley generates congestion and concentrates vehicle/pedestrian conflicts where the alley terminates at the sidewalk, creating an unintentional safety hazard. Mirrors, flashing beacons, and audible warning devices can reduce this risk but is that consistent with a quality downtown experience that is the objective of a vibrant downtown? We trust the effect of these unintended but real safety impacts will start to be considered more seriously by the City when conditioning major new developments. The findings of this study conclude that the existing ordinances relating to alley use and public safety, as referenced in Attachment A of this report, are not being followed. This is because of the growing development density and its almost exclusive reliance on alleys for major new garage access and the service vehicle uses in this highly pedestrian oriented neighborhood. Rather than address this issue on a development-by-development basis it may be more prudent to consider some Land Use Code changes to partially mitigate the effects of intense development exclusive reliance on the alleys for access and alley blockage generated by normal delivery and service activity. Such provisions could include the following Land Use Code changes:

Page 6 of 8 1. Require all new tower projects with alley frontage and without issued Building Permits to provide additional off-alley space within the new developments for loading, trash and recycle facilities to serve existing buildings on those alleys that do not have such off-alley spaces. This will at least allow alleys to be more available for vehicles to access existing and new garages. 2. Require garage entries be setback at least two car lengths (40 feet) from where the alleys terminate at the back of sidewalks to provide space for cars entering and exiting the alley adjacent to the pedestrian sidewalks and enhance visibility of pedestrians. 3. Require detailed sightline analysis be prepared to ensure that drivers entering and exiting alleys can be provided clear visibility of the sidewalk areas. Consider chamfering the building corners at alley/sidewalk intersections to improve sightlines for pedestrians and drivers. Even with parabolic mirrors these sightlines will be difficult with drivers focused on the narrow two-way alleys. Contrary to the view of most Design Review Board Members, these issues should not be left only to the City s SEPA review of Traffic Impact Analysis studies. This is because in urban areas, changes to the garage access and truck delivery, affect the internal functions and design of the buildings. This is key to providing pedestrian and vehicle safety in the downtown and particularly in high pedestrian volume areas with east-west streets connecting the retail core and the Pike Place Market. Likewise, a clear understanding of the cumulative background traffic volume from the many recently permitted residential and commercial buildings in the area should be updated to ensure forecasts are more reliable. I trust this review starts to demonstrate the unintended consequences associated with concentrating access and loading of high density development on the narrow downtown alleys. If you have any questions, I welcome your call. Sincerely, Transportation Solutions, Inc. David D. Markley Principal Cc. Leigh Valentine, Newmark Tower Condominium Brian Estes, Cristalla Condominium Tom McClory, One Pacific Tower Jane Cardell, 98 Union Condominium Jo Vandersnick, Market Court Condominium Nicholas Wilkens, Fisher Studio Condominium Attachment:

Page 7 of 8 Attachment A Traffic and Land-Use Code References Seattle Municipal Code, Title 11-Vehicles and Traffic 11.14.025 Alley Alley means a highway not designed for general travel and primarily used as a means of access to the rear of residences and business establishments. (RCW 46.04.020) (Ord. 108200, 2(11.14.040), 1979.) 11.58.290 Alley Backing from or to. No person shall back any vehicle into or out of any alley; Provided, that this section will not apply when backing is done under the guidance of a person whose duty is to direct the driver s movements with safety. (ord. 108200, 2(11.58.290), 1979.) 11.58.230 Emerging from alley, driveway, private property, or building. Except as directed otherwise by official traffic-control devices, the driver of a vehicle emerging from any alley, driveway, private property, or building shall stop such vehicle immediately prior to driving onto a sidewalk or onto the sidewalk area extending across any alley or driveway, or onto a public path, and shall yield the right-of-way to any pedestrian or bicyclist as may be necessary to avoid collision, and upon entering the roadway of a street shall yield the right-ofway to all vehicles approaching on the roadway. (RCW 46.61.365) (Ord. 108200, 2(11.58.230), 1979.) 11.14.040 Alley entrance. Alley entrance means that portion of the street which provides access to an alley through a curb cut or depression in the constructed curb or, when there is no constructed curb, that area in front of such alley as is well defined or as is designated by authorized signs or markings. Alley entrance shall include an alley exit for one (1) way alleys. (Ord. 108200, 2(11.14.045), 1979.) 11.14.295 Load and unload zone. Load and unload zone means a designated portion of the street or alley reserved for the use of vehicles for the purpose of expeditious pickup and loading or unloading and delivery of persons or property. (Ord. 108200, 2(11.14.495), 1979.) 11.74.010 Loading in alleys. No personal shall stop, stand or park in a commercial vehicle or a vehicle displaying a valid commercial loading permit in any alley for any purpose or length of time other than the expeditious unloading and delivery or pickup and loading of property and then in no case shall such parking for loading and unloading of property exceed thirty (30) minutes.

Page 8 of 8 (Ord. 114518 7, 1989: Ord. 108200, 2(11.74.010), 1979.) 11.72.020 Alley No person shall stand or park a vehicle except a commercial vehicle, a vehicle displaying a valid commercial loading permit, or authorized emergency vehicle in an alley. (Ord. 114518 4, 1989: Ord. 114251 5, 1988: Ord. 108200, 2(11.72.020), 1979.) 11.72.025 Alley Driveway. No personal shall stop, stand or park a vehicle within an alley in such a position as to block the entrance to any abutting property. (RCW 46.90.433(2)) (Ord. 108200, 2(11.75.025), 1979.) Land-Use Code section 23.54.035 Loading berth requirements and space standards 23.54.035.C.1 Width and Clearance. Each loading berth shall be not less than ten (10) feet in width and shall provide not less than fourteen (14) feet vertical clearance. And section C.2.c(ii) would allow a 20 foot depth. 23.54.035.C.3 For uses not listed in Table A, the Director shall determine the loading berth length requirements. Loading demand and loading requirements for similar uses shall be considered. 23.47A.032 Parking location and access D. Exceptions to parking location and access requirements. Access to off-street parking may be from a street if, due to the relationship of an alley to the street system, use of the alley for parking access would create a significant safety hazard as determined by the Director.