Fives Solios Reference Sheets Cement and minerals market Customer Date Equipment Giant Cement Harleyville St-Basile de Port-Neuf Graymont Pilot Peek ARMSTRONG CEMENT Cabot Lafarge Ravena, NY Barroso Brazil Barroso Brazil GCC Dacotah Rapid City, SD Ash Grove Cement Leamington 2018 New fabric Filter 2017 New 2016 New 2015 New 2015 Primary dust collector, followed by polishing filter for Hg capture (12) 20-15-80 (8) 20-15-80 2014 New (8) -20-22-80 -OMD 2014 New (6) -21-18-80 -OMD 2013 Replacement of reverse air baghouse to Filter 2012 Conditioning Tower
Polysius for TXI, Hunter Apasco S.A. de C.V. Hermosillo Loesche for Lafarge Ventanas Chile Loesche for Caribbean Cement Kingston Jamaica Yaqui Yaqui Loesche for Essroc Puerto Rico Polysius for TXI Oro Grande, CA 2012 SONAIR 16-76-37-OD SONAIR 15-38-27-OS 2010 New (12) -21-18-71-OMD 2009 (2) -20-65-68-OD 2009 New (2) -20-92-68-OD 2008 (2) -20-65-68-OD 2008 14 module Filter 2008 (2) 20-108-6.8 OMD 2008 (10) 21-18-7.0 OMD 2008 Gas-to-air heat exchanger (8) 21-18-6.6-OMD 2008 (2) -20-112-6.8-OD 2007 (2) -20-88-60-OD 2007 Conversion of reverse air baghouse to Filter 2007 SONAIR 16-76-37-OD SONAIR 15-38-27-OS 2007 Replacement of ESP (10) 21-17-7.0 OMD
Roanoke Cement Roanoke, VA Tamuin Loesche for National Cement Ragland, AL St-Lawrence Cement Apasco S.A. de C.V. Macuspana Cruz Azul Hidalgo Giant Cement Harleyville, SC Uniland Cementera Vallcarca Lafarge North America Sugar Creek, MO Apasco S.A. de C.V. Acapulco Gador, and Jerez, Ash Grove Cement Leamington, UT 2007 SONAIR 15-68-37-OS 2007 Replacement of gravel bed filters with gas-to-air heat exchanger and (6) 21-17-6.6-OMS 2007 Conversion of ESP to Filter 2006 (2) 20-88-6.5-OD 2006 (2) -20-88-60-OD 2006 Replacement of ESP with new (6) -21-138-7.0-OMD 2005 Conversion of ESP to Filter 2005 New preheater kiln / raw mill and clinker cooler with (8) 21-168-7.1-OMD 2005 New SONAIR 2005 New SR6-14-62-27-OS 2005 Replacement of ESP with new (4) -21-76-7.3-OMD 2005 Replacement of ESPs with new heat exchangers and new s 2004 Conversion of reverse air filter to (10) 34-240-6.4-OMD
Keystone Cement Bath, PA Lehigh Inland Cement Edmonton, AB Tepeaca Lafarge North America Harleyville, SC S.C. Alcim S.A. Alesd ROMANIA S.C. Alcim S. A. Alesd ROMANIA Uniland Cementera Barcelona Lafarge Ciments Bouskoura MOROCCO Lafarge North America Exshaw, AB St-Lawrence Cement Polysius for Lafarge Sugar Creek, MO Ciments d Origny Dannes France Lehigh Portland Cement Union Bridge, MD Hisalba Carboneras 2004 Replacement of ESP with new (6) 21-144-7.1-OMD 2004 Conversion of ESP to (10) 21-172-7.2-OMD 2004 New Filter with ducting and ID fan, turnkey 2004 Replacement of reverse air baghouse with new fabric filter (14) 20-168-7.2-OMD 2003 (6) -21-138-7.0-OMD 2003 1 heat exchanger and (4) SONAIR-S-18-80-5.0- OMS 2002 Replacement of ESP with new (6) 20-156-7.0-OMD 2002 Conversion of ESP to 21-88-6.5-OMD 2002 Replacement of ESP with new (10) 19-150-6.4-OMD 2002 Replacement of ESP with new -19-68-6.5-OS 2002 1 (10) 19-150-6.1-OMD 2002 Conversion of ESP to 21-72-7.0-OS 2001 New preheater kiln / raw mill with (1) (20) 19-300-6.4-OMD 2001 Replacement of ESP with new (8) -20-208-6.5-OMD St. Marys Cement 2000 18-48-6.1-OD
(Votorantim) Detroit, MI Uniland Cementera Los Moujos Barcelona Ciments d Origny Heming FRANCE St-Basile, QC (US) Inc. Dundee, MI St-Lawrence Cement Camden, NJ SONAIR 815-330-OS SONAIR 816-816-OS 2000 1 heat exchanger and SONAIR 150-21-3.2-OD 2000 1 SONAIR-S-18-216-5.0- OMD and 2 heat exchangers 2000 SONAIR 1214-1064-OD SONAIR 1215-240-OS 2000 2 heat exchangers 2 s SONAIR (6) 1215-285-299 2 fans with VFDs ductwork, stack dust handling equipment 2000 SONAIR 2-1215-42-OD St-Basile, QC 2001 and 1999 Conversion of four (4) chamber ESP to four (4) s SONAIR 1411-1100-OD Lafarge Corporation Richmond, BC Portland Zement Gebr. Seibel Erwitte GERMANY Holdercim Cantagalo BRAZIL Lehigh Portland Cement Glens Falls, NY St-Raymond de Portneuf, QC 1999 1 (12) 18-168-6.4-OMD 1998 Conversion of 2 ESPs to 2 s 17-39-7-OS 1998 1 SONAIR (8) 1416-256- OMD 1997 Replacement of an evaporative cooling tower 1996 Retrofit of an existing evaporative cooling tower Lafarge Corporation 1996 Replacement of 2 ESPs
Paulding, OH Spain Alcanar, Taragon Cementos Asland Niebla-Huelva INCSA Cement for Holderbank COSTA RICA Lafarge Corporation Joppa, IL Cementos Apasco Planta Orizaba Cementos Polpaïco CHILE Compagnie des Ciments Belges Gaurain, Ramecroix BELGIUM KHD for Lafarge Alpena, MI Polysius for Lafarge Alpena, MI Nevada Cement Fernley, NV Ciment St-Laurent with 2 s (5) 19-75-6.4-OMS 1996 1 reverse air Model 12-216 type 12 1996 2 forced air exchangers 2 s SONAIR 115-2L-26 1996 1 SONAIR 8-1216-336-OMD 1995 1 heat exchanger and SONAIR 12-48-40-OD 1995 1 reverse air Model 8-228 type 12 1994 1 reverse air Model 14-216 type 8 1994 (1) SONAIR 1214-476-OS (1) SONAIR 1214-238-OS 1993 1 reverse air Model 12-204 type 12 1993 1 reverse air Model 5-180 type 8 1992 Multicyclones TUBIX NHDT 1990 2 s SONAIR 1215-1830-OD 1990 3 s: SONAIR 1215-1740-OD SONAIR 1215-255-OD SONAIR 1215-720-OD 1989 1 reverse air Model 8-180 type 8 1988 SONAIR 1010-440-OS (4 units)
Ciment St-Laurent Ciment St-Laurent Joliette, QC 1983 1 SONAIR (4 units) 1983 1 SONAIR (4 units)