Flight Efficiency Plan 2012

Similar documents
In cover a detail of new night/ week end shortest routes for overflying Sardinia Area

PBN Implementation inside Italian Airspace Status update Summer 2013

FLIGHT EFFICIENCY PLAN

PBN Implementation inside Italian Airspace

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

FLIGHT EFFICIENCY PLAN ANNUAL REPORT

CUSTOMER EDITORIAL SURVEY SUMMARY OPERATIONS: IMPLEMENTATION UPDATES OPERATIONS: 4OUR PERFORMANCES 8ACKNOWLEDGEMENT

TWELFTH AIR NAVIGATION CONFERENCE

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL

A-CDM Implementation: Burden or Blessing for ANSPs?

INFORMATION CIRCULAR TERMINAL CHARGES IN ITALY

INFORMATION CIRCULAR TERMINAL CHARGES IN ITALY

TWELFTH AIR NAVIGATION CONFERENCE

PBN Implementation Plan Italy. Version 1

Air Navigation Bureau ICAO Headquarters, Montreal

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

European Joint Industry CDA Action Plan

2012 Performance Framework AFI

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

The SESAR Airport Concept

Measurement of environmental benefits from the implementation of operational improvements

ATC Global 2014 航空运输业的可持续发展. The Sustainable Development of the Air Transport Industry. Robin Deransy

Airport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World

Continuous Improvement of the Global Air Traffic Management System

ENAV experience on LPV implementation

DMAN-SMAN-AMAN Optimisation at Milano Linate Airport

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Russian Federation ATM modernization program

Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Atlantic Interoperability Initiative to Reduce Emissions AIRE

ICAO framework for LPV

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Home LIST OF ACRONYMS

Making the World A better place to live SFO

Cooperative traffic management

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

AIP ITALIA Servizio Informazioni Aeronautiche

An Industry Proposal for the Italian National Airspace Strategy

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

The support of an European ANSP

Leveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group

Colombian PBN implementation: El Dorado case study

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

IATA Fuel Efficiency Program

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

NEFAB Project Feasibility Study Report Operational Concept

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY

ENAV S.p.A. is the Company to which the Italian State delegates the management and control of civilian air traffic in Italy. ENAV S.p.A.

UK Implementation of PBN

Framework Brief. Edinburgh SIDs

PBN Airspace Concept. ATS requirements

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Operations Control Centre perspective. Future of airline operations

Efficiency and Automation

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

Packaging Tomorrow s Aviation System

PBN IMPLEMENTATION IN INDONESIA

(Presented by the United States)

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

PROGRAMME GUIDE MERIDIANA CLUB BE IN EFFECT FROM 16 MAY 2017 TO 15 MAY 2019

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

CDA Continuous Descent Approach

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

SESAR Solutions. Display Options

MID Region Air Navigation Strategy

Case study London Heathrow & London Heathrow-Amsterdam

Regional air navigation planning and implementation performance framework: Review of programmes and projects

Flight Efficiency Initiative

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWELFTH AIR NAVIGATION CONFERENCE

ENVIRONMENT ACTION PLAN

ENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU

CANSO view on A-CDM. Case study on A-CDM at HKIA. Change management & human factors

FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS

ATFM Update - EUROCONTROL Day 1-16h45

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

FAA Surface CDM. Collaborative Decision Making and Airport Operations. Date: September 25-27, 2017

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

Network Manager Adding value to the Network 29 September 2011

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

IMPLEMENTATION OF ADS-B BY NAV CANADA

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

Ground movement safety systems and procedures - an overview

Air Transportation Optimization. Information Sharing for Global Benefits

and the Environment Speaker: Guy Viselé External Communication Advisor ABC User Committee, February 2 nd 2009

CEM: KPIs used for the joint work between Traffic control, Airports and Airline companies

Transcription:

Flight Efficiency Plan 2012 Foreword... 2 Targets and Outcomes... 3 En-route Airspace Design and Network Availability... 5 Design and Use of Terminal Areas... 8 Airport Operations... 11 Operational staff awareness... 12 This document has been realised by Operations Directorate 1

FOREWORD One of the main goals of the ATM optimisation consists in providing to the aviation community an adequate contribution to the reduction of environmental impact through the improvement of flight efficiency. In 2008 CANSO, IATA and EUROCONTROL identified five action points that the international aviation community is called to share and implement with the cooperation of each stakeholder. The air traffic control plays a key role in this context in a close partnership with airlines and airports. ENAV has always studied and prepared solutions that contribute to fly safely and efficiently and since 2009, in accordance with the international guidelines, it publishes ENAV s Flight Efficiency Plan with the aim to contribute both in lowering operating costs and environmental impact for airspace users and to deliver in the Italian airspace an air navigation system at the leading edge. The reported outcomes are estimated through a monitoring which is carried out both for the annual performance and for the cumulative one. The cumulative results take into account the FEP structural interventions; in about four years the FEP actions have led up to cumulative savings of miles and time. Despite the air traffic figure swinging trend between 2008 and 2011 has affected the performance achieved year by year, the outcomes proved to be better than expected although distributed differently compared to the forecast. ENAV has put in place structured initiatives with the users channeled through the Customer Care activity for cooperation and sharing of operational suggestions. The information exchange with the users through regular meetings with Airlines and their follow-up gave an important feedback over the preparation of ENAV s annual FEP. This fourth edition of ENAV s Flight Efficiency Plan is strictly linked to the Performance Based Navigation Plan prepared in 2011. The implementation of the PBN plan in Italy will bring improvements to the ATS route network and should grant benefits over the global efficiency of ATM. 2

TARGETS AND OUTCOMES ENAV s FEP aims to describe, in a concise and prompt way, the planned activities to improve flight efficiency for the three-year period 2012-2014. Willing to achieve the objectives of rationalization and improvement, this plan includes actions which are clustered in four main areas: 1) En-Route - Airspace design and network availability 2) TMA - Design and use 3) Airport operations 4) ATCOs awareness as regards to flight efficiency FEP 2012 targets Most of the planned implementations are designed according to the principles of performance based navigation. While this plan is being published, the criterion for the estimate of efficiency is still under test thus unlike previous editions of the ENAV s Flight Efficiency Plan this year we chose not to report quantitative targets. Outcomes 2008-2011 ENAV has a Flight Efficiency Plan since the end of 2008. During about three and a half years the implementation of efficiency measures allowed considerable savings in terms of fuel consumption and GHG emissions. The measures almost all structural improvements have been progressively created since 2008 thus producing their effects year after year for about 310.000T (cumulative) of CO 2 savings. 400 CO 2 Savings - Cumulative outcomes 40 350 35 300 30 250 25 MKg 200 20 MKm 150 15 CO2 KM 100 10 50 5-2008 2009 2010 2011-3

Hereunder are the savings that followed the FEP 2011 implementations: Km Kg Fuel Kg CO 2 FEP 2011 Targets 1.340.000 9.400.000 29.610.250 FEP 2011 Outcomes 1.025.000 11.025.000 34.728.000 The reduction of kilometres is lower than expected since the Italian airspace has undergone a reduction in traffic due to the 2011 war in North Africa. In spite of this, the estimate of fuel reduction has proved beyond expectations thanks to the raising of the plannable flight levels on some rather busy city-pairs. MKg 30 CO 2 Savings - 2011 Implementations 25 20 15 CO2 Target CO2 Outcome 10 5 0 Airspace & network TMA Airports 4

EN-ROUTE AIRSPACE DESIGN AND NETWORK AVAILABILITY Since 2008, the Italian airspace has been undergone a number of reorganizations and rationalizations of its route system. Hand in hand, the Route Availability Document (RAD) and Profile Tuning Restrictions (PTRs),, have been updated on a regular basis with the aim to both optimize the network and to better balance capacity and efficiency. In 2011, experimental solutions have been developed and then tested before their permanent implementation in order to facilitate the reduction of operational restrictions on the network. In order to present the results achieved and the interventions planned for the en-route portion of flight, the action points 1 and 2 of the previous editions have been merged into a single paragraph to reflect the built-in relation between the airspace structure and its use. The main actions addressed are summarizes hereinafter. 2008-2011 achieved 2008 / 2010 Implementation of new routes, extensions, realignments: 34 implementations Reorganization of route network portion over ALG area and Verona area Raising 2000ft of level capping for city-pairs: LIM* to LIEA/EO LIM* to LIRN LIML to LIRF LIRF to LIML LIP* to LIR*, to LIM*, to LS*(except LSZA)& LFL*; LIR* to LIM*, to LIP* LS*(except LSZA)& LFL* to LIP* LIRN to LIM* LIM* to LIEE/ED/ET User preferred flight level for bidirectional domestic city-pairs (Removal of Level Capping): LIB* to/fm LIP*; LIB* to/fm LIE* and LIM* to/fm LIB* Implementation of dedicated direct routings, night-time (2200-0400 UTC) or H24 availability: 51 DCTs 2011 Doubling ATS route L5/UL5 Realignment of ATS route N/UN737 Implementation of ATS route U58 segment to serve LICC/LICZ Network optimization on the basis of traffic demand Conversion of 19 DCT into direct routes and time extension of their availability Raising 2000ft of Level Capping for bidirectional domestic city-pairs: LIB* to/fm LIC (except LICG/LICD)*, to/fm LIR*, to/fm LIBP LIE*to/fm LIC (except LICG/LICD)*; LIR*(except LIR/RP)to/fm LIC (except LICG/LICD) Zagreb ACC to LIRA/LIRF/LIRN 5

Implementations initialy planned by 2012, but delivered in 2011 2011 User preferred flight level for domestic city-pairs (Removal of Level Capping): LIRN to LIMC/MF Raising further 2000ft of level capping for city-pair LIRF to LIML via U704/U703 Reduction of three hours of route availability restrictions in winter All of the abovementioned solutions have been implemented over the past years to improve the flight planning of routes also in accordance to the airspace users expectations. In particular, some early implementations raised the estimate of fuel and CO2 savings compared to the foreseen ones. Moreover it is estimated that the cumulative 2008-2011 fuel savings are close to 53.000 tons. Km Kg Fuel Kg CO 2 FEP 2011 Targets 1.125.000 3.650.000 11.497.500 FEP 2011 Outcomes 918.000 8.554.000 26.950.000 6

2012/2014 planned ENAV s PBN Plan for Italy will bring improvements to the Route system with the enforcement of new route segments based on RNAV capability. These interventions will also facilitate the application of CDO/CCO as well as match the needs of TMA development. The foreseen simplifications and rationalizations are shown hereunder and are mostly also included in the Blue Med FAB framework. Spring/Summer 2012 Reorganization of route network portion over BZO area first phase Reorganization of route network for Milan and Rome U/FIRs Streamlining routes ACC Rome area Reduction of two hours of route availability restrictions in summer. 2012 Restrictions on seasonal base: cancellation of some restrictions in winter Citypairs Italy to/from Tunisia, Spain, France: Improvements in flight profile for some selected city pairs Removal of Level Capping LIR* to/from LICC Free - Route during night time Spring 2013 18 interventions, including new routes and new route segments, class Blue Med interface Reorganization of route network portion over BZO area second phase 2013 Conversion of 5 DCTs into ATS route Further network optimization on the basis of traffic demand Reorganization of route network portion over FRZ area Free - Route during night time 7

DESIGN AND USE OF TERMINAL AREAS In the terminal areas the optimization of the air traffic management and the reduction of flight distance and time are reached through a rational and efficient use of airspace by means of introduction and/or modification of the new SIDs/STARs and of the reorganisation of the CTRs. In 2011 the Precision Area NAVigation was introduced in the Italian airspace and an ad hoc AIC was published resulting in the enforcement of the first SID/STAR PRNAV procedures. Whenever feasible, the new approach procedures are designed with the aim to reduce miles and in line with the Continuous Descent Operations concept. CDOs procedures will be gradually phased in being performed in the first implementation stage only during the night. The charts below report both the results achieved in the previous years and the main projects planned up to 2014 willing to improve flight efficiency in the terminal areas. 8

2008 2011 achieved 2008 2009 2010 2011 Reorganization of Palermo CTR and related linked procedures, including RNAV STARs Reorganization of the Ancona CTR Reorganization of Bologna, Bergamo, and Napoli CTRs, including RNAV STARs Implementation of RNAV approach procedures for Alghero Reorganization of Parma and Venezia Initial Climb Procedures and SIDs Cuneo Airport Implementation of new SIDs Reorganization of SIDs for Fiumicino and Palermo New STAR and/or SID for Parma, Pescara and Ancona New IAC for Bari For the years 2008-2011 all of the implemented solutions have helped traffic to save up to 8.200.000 kilometres in the terminal area. The gap between target and outcome for fuel savings is mainly due to the lack of implementation of CDOs procedures originally scheduled for 2011 and then postponed for a better integration with the PBN plan. FEP 2011 Targets FEP 2011 Outcomes Km Kg Fuel Kg CO 2 240.000 700.000 2.100.000 107.000 285.000 900.000 9

2012-2014 planned 2012 Implementations of P-RNAV SIDs/STARs in: Bergamo Bologna Olbia Venezia Verona 2012 Continuous Descent Operations Publication of an ad hoc AIC Dedicated procedures for Milano Linate 2012/2013 Implementations of P-RNAV SIDs/STARs in: Roma TMA Milano TMA 10

FEP 2012 AIRPORT OPERATIONS The Airport Collaborative Decision Making (A-CDM) is the key activity to improve the airport operations efficiency allowing to optimize the departure sequence times and taxi times (-in and -out). In the major airports managed by ENAV a system of automatic data exchange is already available and it represents an enabling factor for the reduction of apron and taxiway congestion - especially during air traffic peak hours - still guaranteeing the traffic flows and the AOs needs. ENAV s goal is to contribute to the reduction of an average of one minute taxi time per movement, calculated on all the movements starting from 2008 up to 2011. Hereunder is the list of main actions undertaken in the period 2008-2011 and those that progressively will be introduced in the years 2012-2014. 2008-2011 achieved Optimization and automation of the Apron Management Service of Milano Malpensa, Milano Linate, Bergamo, Torino, Bologna, Venezia, Napoli and Palermo. Extension of the automation of the Apron Management Service at Alghero, Genova, Firenze, Olbia, Bari, Catania and Lamezia. 2012-2014 planned Implementation of A-CDM with SW support for automatic data exchanging among ATC, AOP, Airlines, and related operational procedures for Roma Fiumicino, Milano Malpensa, Milano Linate, Venezia. Extension of the automation of the Apron Management Service for Cagliari and Trieste. The complexity of monitoring taxi time reductions for all the airports run by ENAV led to focus on 9 airports in 2008/9, on 11 airports in 2010 and on 14 in 2011. Monitoring is going on to progressively include other airports. Taxi-out time savings for the 14 airports considered, 2011 compared to 2010, have recorded an average of about 8 seconds per movement. Since 2008 the sole taxi time saving can be estimated in 757.000 minutes. With reference to the initial 9 airports, where the monitoring started in 2008, the performance is still improved in 2011 compared to 2010. In these airports the average reduction is increased from 31 to 48 seconds on the 2008 baseline. Taxi time-out minutes Kg fuel kg CO 2 2011 vs 2012 outcomes 14 airports monitored 163.000 2.185.000 6.884.000 11

OPERATIONAL STAFF AWARENESS One of the five cornerstones of this plan is to raise air traffic controllers awareness since they can give a mighty contribution for fuel savings both to in flight and on ground operations. The principles of flight efficiency and their environmental implications were planned to be part of all the trainings and updating for ATCOs ever since ENAV s first FEP in 2009. Currently they are included in both the training plans and report cards of ab-initio and advanced courses of the ATCOs students of ENAV s Academy as well as in the ATCOs continuation training courses. Flight efficiency principles have been presented also during managerial workshops. 2009-2011 achieved 328 ab initio ATCOs students and 187 advanced ones have followed a module on flight efficiency. In 2010 and 2011, 2920 hours on flight efficiency were given to the ATCO during continuous training. 2012-2013 planned 2012/2013-230 ab initio ATCOs students and 96 advanced ones will follow a module on flight efficiency (404 instructive occurrences). 2012 ATCOs continuation training will include 1500 hours focused on flight efficiency. 12

ENAV S.p.A. - Via Salaria, 716-00138 - Roma - Tel. +39.06.81.66.1 Released by Operational Directorate Created by Communication / Image and Web Communication Printed in February 2012