Wentworth Avenue Reconstruction Project Delaware Avenue to Humboldt Avenue

Similar documents
City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Palm Beach County Traffic Report July 13 through July 20, 2012

2009 Regional Solicitation Selected Projects*

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Construction Staging Adelaide Street West

26 APPLICATION FOR APPROVAL TO EXPROPRIATE WIDENING AND RECONSTRUCTION OF ST. JOHN'S SIDEROAD PROJECT 97100, TOWN OF AURORA

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Palm Beach County Traffic Report August 24 through August 31, 2012

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Basic Project Information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

November 21, 2012 Barbara Kelleher, (954)

Community Development Committee

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

Public Information Center August 12, 2010

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Fuller/Fuller Heights Road Improvements

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

Forest Hill Blvd. at Kirk Road Widening Project FM#:

State Route 8 Corridor. Northern Summit County s Path to Success

Long water shutdown scheduled for Tuesday, September 18

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

SR 934 Project Development And Environment (PD&E) Study

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

Construction Staging Area Blue Jays Way (357 King Street West)

State Project Reconstruction I-84

Non-Motorized Transportation

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

Business Item No

1.2 Corridor History and Current Characteristics

3529 Souris River Flood Plan (Phase MI-1)

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

FINCH HYDRO CORRIDOR TRAIL PROJECT

C O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION

Appendix 4.1 L. No-Build Project Descriptions

Participant Responses April 19, 2017 Open House Meeting

Design Meeting Presentation

Route 29 Solutions Projects

Memorandum / Letter of Intent

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

Runway Safety Margin Enhancement Project. Ann Arbor Municipal Airport Matt Kulhanek Director-Facilities Management

66th Street. Portland Ave

Clackamas County Development Agency

A Message from the Director

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

University Region Non-Motorized Plan 2015

Grove Field Airport Environmental Assessment

County of Elgin Tourism Signage Policy Addendum A

MORGAN CREEK GREENWAY Final Report APPENDICES

Major Projects Overview

ORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ELECTION SIGN GUIDELINES

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Site Location and Setting

C O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION

Northeast Corridor Transportation Update

US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD

FDOT Treasure Coast Traffic Impact Report

New Jersey Department of Transportation

Executive Summary. Need for the Study FINAL REPORT

CITY COUNCIL AGENDA MEMORANDUM

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Quiet Zone along FEC Corridor. Paul Calvaresi Regional Transportation Planner

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

FDOT Treasure Coast Traffic Report through

SAFETY IMPROVEMENT OF A DANGEROUS FOUR-LEG, STOP CONTROLLED INTERSECTION IN AFRAGOLA, ITALY

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

NOTICE OF PUBLIC HEARING.

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Construction Staging Area 197 Redpath Avenue

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

Welcome to the Cross County Trail Public Input Session!

Provincial Railway Technical Standards

October 31, 2014 Chuck McGinness, (954)

COMMENT PERIOD INTRODUCTION

The 20 mile WMRRT is planned through the Hennepin County

Springettsbury Township. Road Improvement Projects

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

US 19 Sunset Point Rd to Countryside Blvd.

Steven Bauer, Policy Advisory Committee Chairperson, Presiding

APPENDIX F List of Commitments

Construction Staging Area 19 Western Battery Road

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

2016 Development Cost Charges (DCC) UPDATE

RESIDENT AND BUSINESS NOTIFICATION TEMPORARY CHANGED TRAFFIC CONDITIONS FINANCIAL REVIEW CORPORATE CYCLING CHALLENGE SUNDAY 04 DECEMBER 2011

Transcription:

entworth Avenue Reconstruction Project Project Purpose & Need This project will improve safety, operations, and pavement quality. Existin rural roadway Proposed urban roadway Existin Issues: Poor pavement condition Lackin pedestrian/bike facilities Poor drainae Proposed Improvements: Curb and utter Adequate shoulder width Continuous trail or sidewalk system Drainae and utility improvements entworth Avenue provides: An important east-west roadway in northern Dakota County Connections between Robert Street, Mendota Heihts, and South St. Paul Access to residential and commercial properties, City Hall, and the Sports Dome CSAH 8 (entworth Avenue) Project Considerations Map Dakota County March, 2017 BELLOS ST ENTORTH AVE ENTORTH AVE E ENTORTH AVE LA Fitness SMITH AVE S T AS NE MI MARTHALER PARK LIVINSTON AVE OLIVIA T DODE NATURE CENTER MINEA ST Sports Dome S O LL ST Project Area etland Lakes/Ponds Park Existin Sidewalks/Trails Municipal Boundary eststpaul Municipal, Police&Fire Buildin BE É Leend Cedarwood The est est Apartments Apartments ALLEN CT ALLEN CT City of est St. Paul Cityof MendotaHeihts ALL-AY ROBERT ST S CHARLTON ST entworthcenter Manaement entworth Apartments 35 FOOOD LN AVE St. Stephen s Lutheran Church illwerscheidfuneral Home CRAFORD DR DT CARMEL AVE Marathon Fuel Station ENTORTH AVE E M O TH ESCHCKE PARK CROLEY CIR N O PS E AV BOL RUNE LN Somerset CountryClub THOMPSON HILL HUM ALVIN AVE É BETTY LN ALLEN AVE ALLEN AVE BETTY LN ú S THOMPSON AVE CHARLTON ST DELAARE AVE THOMPSON AVE KRAFT RD KRAFT RD LOTHENBACH AVE ARLOUH PARK Dakota County IS KRAFT RD E Dakota County IS

entworth Avenue Reconstruction Project Alternative A - Base Desin P R O 100 Benefits: 8-foot shoulder accommodates parked/stalled vehicles 8-foot boulevard separates traffic from trail users and provides snow storae 10-foot trails on each side provides a continuous connection throuhout the corridor Potential turn lanes at key intersections 10 10 Impacts: reatest amount of permanent riht-of-way acquisition reatest impact to wetlands and trees reatest impact to residential driveways Hihest Cost Option Existin E R O A 60 (V ) 0 - Elements: Existin 60-foot riht-of-way 12-foot drive lanes 2-foot shoulders 8-foot trail (Bellows to Charlton) 12-foot boulevard (at trail) Lackin continuous pedestrian/bike facilities

entworth Avenue Reconstruction Project Alternative B - Suburban Desin P R O 74 Benefits: 8-foot shoulder accommodates parked/stalled vehicles 5-foot boulevard separates traffic from trail/sidewalk users but provides less snow storae 8-foot trail provides a continuous connection throuhout the corridor 6-foot sidewalk (Humboldt to Charlton) on the south side of the corridor provides a connection to key destinations on the south side of the corridor Potential turn lanes at key intersections 0-6 Impacts: Reduced permanent riht-of-way acquisition Increased temporary impact to private property Reduced impact to wetlands and trees Requires retainin wall construction Reduced impact to residential driveways Reduced cost option Existin E R O A 60 (V ) 0 - Elements: Existin 60-foot riht-of-way 12-foot drive lanes 2-foot shoulders 8-foot trail (Bellows to Charlton) 12-foot boulevard (at trail) Lackin continuous pedestrian/bike facilities

entworth Avenue Reconstruction Project Alternative C - Urban Desin P R O 60 B L Benefits: 6-foot shoulder is a safety uprade from existin conditions 5-foot boulevard separates traffic from trail users but provides less snow storae 8-foot trail provides a continuous connection throuhout the corridor Potential turn lanes at key intersections 6 6 Impacts: No pedestrian accommodations on south side of the road Least permanent riht-of-way acquisition reatest temporary impact to private property Reduced impact to wetlands and trees Requires retainin wall construction Reduced impact to residential driveways Lowest cost option Existin E R O A 60 (V ) 0 - Elements: Existin 60-foot riht-of-way 12-foot drive lanes 2-foot shoulders 8-foot trail (Bellows to Charlton) 12-foot boulevard (at trail) Lackin continuous pedestrian/bike facilities

entworth Avenue Reconstruction Project Project Schedule & Fundin 2018 Final Desin & City of est St. Paul 45% Federal Fundin Local Fundin Street Assessments Sanitary Assessments Column1 Project Construction Dakota County 55% Riht-of-ay Acquisition Construction Cost Federal Fundin Local Fundin Assessment Notifications Assessment Public Hearin May - Nov 2019 Tentative Open House #2 2017 2018 2019 N D J F M A M J J A S O N D J F M A M J J A S O N D Project Desin Construction Jacob Rezac Dakota County Jacob.Rezac@co.dakota.mn.us 952-891-7981 Project Contacts Ross Beckwith City of est St. Paul RBeckwith@wspmn.ov 651-552-4130 Aaron arford Bolton & Menk aaronwa@bolton-menk.com 952-890-0509 Project ebsite: www.dakotacounty.us (search County Road 8)

entworth Avenue Reconstruction Project Sanitary Sewer Improvements