Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT

Similar documents
Ditch flows slowly to the north

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

APPENDIX F List of Commitments

Northern Rail Extension, Phase One

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY

MORGAN CREEK GREENWAY Final Report APPENDICES

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Attachment G STREAM IMPACTS. Ridge Road Extension Alternatives Analysis

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

FEASIBILITY CRITERIA

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

IOWA ORNITHOLOGISTS' UNION - Birding Sites in Dallas County

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Staff s Recommended PAC Action:

Bear Creek Habitat Improvement Project

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

KP Lasnaya 1 River

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

RIVER ACCESS STRATEGY

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

TRAILS. RM10_Cultural Resources Survey Report_ Stephen R. Braund & Associates

Lawrence Loop SWOT Analysis

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

Presentation Overview

Marilla Reservoir to Chestnut Ridge via Marilla Trails and Bullis Hollow Trail east to west

Northeast Quadrant Distinctive Features

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

1.0 Purpose and Organization of the Community Impact Assessment Addendum

RAILS WITH TRAILS ALBANY TO CORVALLIS PEDESTRIAN AND BICYCLE PATH FEASIBILITY STUDY

FDOT Treasure Coast Traffic Impact Report

Trail Assessment Report

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

November 21, 2012 Barbara Kelleher, (954)

Culpeper District. Albemarle County Monthly Report. September 2012

Stephens State Park Trails

1.2 Corridor History and Current Characteristics

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

Calgary River Access Strategy Priority Sites and Proposed Funding

PennDOT Interstate Work next week March 30-April 3:

4.0 FACILITIES INVENTORY

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

Guide to. Suffolk. Walking. Trails. Lake Meade Park

Springettsbury Township. Road Improvement Projects

Appendix C. Past and Current Management of Selected Tidal Wetland Sites

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands

Segment 2: La Crescent to Miller s Corner

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

Route #2) Mt. Massive - Southwest Slopes

Preliminary Site Evaluation

Lena Beach Recreation Area Renovation. Dear National Forest User:

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY

General Highway System SHEET 1 HILTON HEAD ISLAND URBAN AREA

Public Comment Report Greenways + Blueways 2020 Plan 30 Day Comment Period

Railroad Safety Trail

NOTICE OF PREPARATION/NOTICE OF PUBLIC SCOPING MEETING

Level IV Ecoregions of the Northeast Glacial Lakes Watershed Project Area

Briarhill Neighborhood Polecat Priority List. Exhibit D-4

National Recreation Trail Update Form

Town of Oakfield Agricultural and Farmland Protection Plan

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

Trails Technical Committee

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

Onondaga Lake Loop the Lake Trail

Stage 2 - November 2017 Survey and Map Comments (verbatim)

DRAFT. Dorabelle Campground Rehabilitation

PUBLIC DRAF MISSION TRAILS REGIONAL PARK Mission Gorge 5-27

State Route 8 Corridor. Northern Summit County s Path to Success

Tiger Mountain State Forest:

North San Luis Obispo County Coastal Trail Master Plan

APPENDIX K: BUILT HERITAGE AND CULTURAL HERITAGE LANDSCAPES

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

14.0 NORTHERN CALIFORNIA COAST NORTHERN FOCUS AREA Description of Area The Land

Route #1) Mt. of the Holy Cross - North Ridge

Community Development

CITY COUNCIL AGENDA MEMORANDUM

Southwest Quadrant Distinctive Features

Figure 1: Little Dry Creek Trail Crossing

Section 4(f) and Section 6(f) Technical Analysis

II. THE BOULDER CREEK DRAINAGE BASIN

Directions. IBM Recovery Center One Evertrust Plaza Jersey City, NJ From World Trade Center site (Downtown New York City):

Rating: 5.0 (scale of 1-10)

Baltimore County Nature Quest NEW TRAILS 2014

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Transcription:

01051-09004 Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT DRAFT: June 30, 2010 Applicant: City of Arcata 736 F Street Arcata, CA 95521 Phone (707) 825-2154 Prepared by: Winzler & Kelly 633 Third Street Eureka, CA 95501 (707) 443-8326

PHOTO LOG Photo 1: Vegetation between Skate Park and Tennis Courts/City Park. (see Jacobs) Photo 2: Photo along railroad, new Foster Avenue alignment and trail location would be upslope to right of photo. Photo log E-1 Winzler & Kelly

Photo 3: Entrance to Shay park from new Foster Avenue alignment, would need to be widened to allow for proposed trail. Photo 4 (View west): Beginning of potential high school path ( Secondary Alignment ) at Sunset Avenue, existing 12 foot wide gravel road with additional 2 foot shoulder each side would allow for trail installation without disturbing wetland ditch to north (left). Photo log E-2 Winzler & Kelly

Photo 5 (view north): Wetland drainage ditches on either side of road at end of football field, area adjacent to bend in existing High School football field access road where the Secondary Alignment option is considered. Photo 6 (view north): Photo at top of hill for Secondary Alignment option. Photo log E-3 Winzler & Kelly

Photo 7 (view south): At parking lot behind high school, slope at area proposed as Secondary Alignment, steep drop off would require special trail design in this area so as not to reduce size of parking lot. Photo 8: At fence behind high school building Photo log E-4 Winzler & Kelly

Photo 9: Shay Park along railroad alignment, trail would cut through park from right and join along railroad alignment. Photo 10: Riparian vegetation within Shay Park, existing pedestrian trail would be expanded. Photo log E-5 Winzler & Kelly

Photo 11 (view south): Exiting Shay Park/railroad alignment at Alliance Avenue, east side of Alliance Road (left), looking downstream to culvert. Photo 12 (View south): West of Shay Park at Alliance Avenue, west side of road (right), looking downstream of culvert towards Stonehenge Photo log E-6 Winzler & Kelly

Photo 13: East side of Alliance Avenue at pedestrian refuge island Photo 14: West side of Alliance Avenue in Stonehenge near pedestrian refuge island Photo 15: (view southwest) Alliance Avenue at L Street, showing isolated wetland area on compacted nonnative soil. Photo log E-7 Winzler & Kelly

Photo 16: (View north) Wetland ditch at north end of L Street at Storage units. Photo 17: (view south) L Street Photo log E-8 Winzler & Kelly

Photo 18: (view south) L Street extension just north of intersection with Samoa Boulevard. Photo 19 (view towards north): Wetlands south of Samoa Boulevard along rail road tracks Photo log E-9 Winzler & Kelly

Photo 20 (view to east): From northern end (at bend) of berm, looking east towards railroad tracks across area to be bridged over to return to the railroad alignment. (Section 5.1 5.2) Photo 21 (view north): along upland birm, existing trail with City of Arcata manmade wetland pond to west (left) and freshwater marsh to east (right) between berm and railroad alignment. Photo 22: Crossing I Street Photo log E-10 Winzler & Kelly

Photo 23: Existing crushed gravel trail along WWTP pond and riparian. Photos 24a and b: Along existing marsh trail that will be widened into adjacent ditch/wetlands near mount trashmore. Photo log E-11 Winzler & Kelly

Photo 25: (view north) Existing Butcher Slough crossing at Arcata Marsh. Photo 26: (looking northwest) South of WWTP along South G Street, patches of riparian visible to west (left). Photo log E-12 Winzler & Kelly

Photo 27: (looking north) Riparian patches along railroad alignment Photo 28: Representative salt marsh to west of railroad alignment Photo log E-13 Winzler & Kelly

Photo 29 (view south): Existing railroad crossing of Gannon Slough Photo 30 (view southwest): Jacoby Creek crossing Photo 31: Representative brackish portion of highway ditch. Photo 32: Representative freshwater emergent portion of highway ditch. Photo log E-14 Winzler & Kelly

Photo 33: Old Jacoby Creek tidegate. Photo 34: Rocky Gulch tidegate. Photo log E-15 Winzler & Kelly

Photo 35: Shorebird observed roosting on boulders at bay margin and adjacent to rail road bed, as well as old piles. Photo 36: Trail terminus at Bracut driveway. Photo log E-16 Winzler & Kelly