Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Similar documents
1.2 Corridor History and Current Characteristics

Table 1. TOTAL FOUR-YEAR PROGRAM SUMMARY AMATS FFY PC Approved(November 19, 2009)

Capital Improvement Program Department Summary by Year

Capital Improvement Program Department Summary by Year

2018 Capital Improvement Budget Department Summary by Funding Source

2015 Capital Improvement Budget Department Summary by Funding Source

Gulf Coast MPO Obligated Projects

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Lanie Fleischer Chester Creek Trail Improvements Public Meeting #2. February 4, 2014

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

FY Transportation Improvement Program Basic Project List (in Thousands)

2014 ALL WAY STOP LOCATIONS AND OTHER TRAFFIC CONTROLS

July Service Change UPDATED 4/6/18

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Additional Economic Development Strategy submissions- Klickitat County

Route 29 Solutions Projects

2014 Capital Improvement Budget Parks and Recreation Department

July 2nd Service Change. Updated 5/31/18

November 21, 2012 Barbara Kelleher, (954)

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Palm Beach County Traffic Report July 13 through July 20, 2012

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

2018 Neighborhood Traffic Calming Program - Qualified Streets List

US 19 Sunset Point Rd to Countryside Blvd.

Culpeper District. Albemarle County Monthly Report December 2011

CAPITAL IMPROVEMENT PLAN

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

Guide to. Road Construction Projects

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

SAN RAFAEL City Council January 20, 2015

NEW JERSEY DEPARTMENT OF TRANSPORTATION

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

OR MISSION TRAIL ELEMENTARY

Canada and Alberta announce 33 new infrastructure projects

Public Open House. Chief Peguis Trail Project

2013 Construction Accomplishments

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Non-Motorized Transportation

State Route 8 Corridor. Northern Summit County s Path to Success

Fuller/Fuller Heights Road Improvements

AGENCY NAME TRANSPORTATION

FDOT Treasure Coast Traffic Impact Report

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

CHAPTER FOUR: TRANSPORTATION

FDOT Treasure Coast Traffic Impact Report

Changes in TIP projects Draft vs. Final Draft

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

University Region Non-Motorized Plan 2015

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

Wichita Falls MPO - MTP Project List 1 of 6

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN

PFC Quarterly Status Report September 30, 2016

2009 Regional Solicitation Selected Projects*

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Construction Update. Local Officials Briefing March 2016

SR 934 Project Development And Environment (PD&E) Study

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

TRANSPORTATION ELEMENT

LOCATION. A. Setting West Anchorage District Plan

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Highways: Interstate. Highways: State Highways

Municipality of Anchorage

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

Site Location and Setting

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Springettsbury Township. Road Improvement Projects

B10. Agate Beach State Recreation Site

Blue River Trail Master Plan JSA to Town Hall June 2004

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

Basic Project Information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Montgomery Citizens Advisory Committee Meeting Minutes

Transportation TRANSPORTATION PROJECTS

Projected Advertisement Date

Community Development Committee

APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

Palm Beach County Traffic Report August 24 through August 31, 2012

FFY Development. Transportation Improvement Program (TIP) March 11, 2016 Cape Cod Joint Transportation Committee

Transcription:

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly: Section 6, Seats J & K, 23-L: Taku, 24-L: Oceanview, Community: Abbott Loop, Community: Mid-Hillside End Date October 2020 Reconstruct minor arterial to urban standards. Improvements are expected to include pavement, curb and gutter, storm drainage, street lighting, and pedestrian facilities. Preliminary engineering and design efforts have been funded. Final design, utility and construction phases are estimated at $25.7 million. 9,500 - - - - - 9,500 Total (in thousands) 9,500 - - - - - 9,500 SOA - 1

Anchorage Area Principal Arterial Pavement Resurfacing and ADA Compliance Project ID SOA2013019 Department State of Alaska Project Type Rehabilitation Start Date October 2013 Location End Date December 9999 The State of Alaska Department of Transportation is systematically resurfacing the principal arterials in AMATS. Comments This is an on going AMATS funded program. 9,150 9,150 - - - - 18,300 Total (in thousands) 9,150 9,150 - - - - 18,300 SOA - 2

Anchorage Bicycle Plan Project Implementation Project ID SOA09888 Department State of Alaska Project Type Improvement Start Date March 2009 Location Assembly: Areawide, HD 50: Anchorage Areawide, Community: Areawide End Date October 2026 This project will sign, stripe, and mark bike lanes or shoulders on existing roadways within the AMATS boundary area to create a safe, connected network of bicycle facilities as identified in the Anchorage Bicycle Plan. Project funding is programmed through AMATS. Comments The Anchorage Bicycle Plan has been completed. This funding is being requested to begin the implementation of the recommendations from the plan. The grant funding may be used for design, utilities, easement acquisition, construction, and any other activity related to implementing the Anchorage Bicycle Plan. 700 - - - - - 700 Total (in thousands) 700 - - - - - 700 SOA - 3

Benson Blvd Multi-use Path - Lois Dr to Minnesota Dr Project ID SOA2015009 Department State of Alaska Project Type New Start Date July 2017 Location End Date October 2022 1,000 - - - - - 1,000 Total (in thousands) 1,000 - - - - - 1,000 SOA - 4

Bike Plan Signage Project ID SOA2015011 Department State of Alaska Project Type New Start Date July 2017 Location End Date October 2021 200 1,000 - - - - 1,200 Total (in thousands) 200 1,000 - - - - 1,200 SOA - 5

Birch Rd Rehabilitation - Huffman Rd to Abbott Rd Project ID PW2014070 Department State of Alaska Project Type Rehabilitation Start Date October 2017 Location Assembly: Section 6, Seats J & K, 26-M: Huffman, Community: Huffman/O'Malley, Community: Mid- Hillside End Date October 2022 The project will rehabilitate pavement, including adjoining multi-use pathway and fix subsurface issues. Comments Because this is a state-owned road, project management and construction are being managed by the Alaska DOT. Net Assets 1,000 1,000 - - - - 2,000 Total (in thousands) 1,000 1,000 - - - - 2,000 SOA - 6

East Dowling Rd Pedestrian Overpass at Elmore Road Project ID SOA10890 Department State of Alaska Project Type Improvement Start Date October 2019 Location Assembly: Section 4, Seats F & G, 17-I: University, 25-M: Abbott, Community: Abbott Loop, Community: Campbell Park End Date October 2024 This project will construct a pedestrian overpass over East Dowling Road to link the existing multi-use trail on either side. Comments DOWL has completed the design as part of the State's East Dowling project. Construction funding is proposed as a state grant. The trail along the new Elmore Road connection from 48th Avenue to 64th Avenue is drawing a high number of users. Since vehicle traffic going southbound on Elmore Road is not required to stop before turning right onto Dowling Road, the at-grade pedestrian crossing is not the best alternative. DOWL designed the pedestrian overpass to meet the need but it was not constructed as part of the DOT project. The grant funding may be used for planning, design, utility work, obtaining rights of way and easements, construction, and any work associated with the improvements described above or associated amenities. SOA Grant -Direct - - 1,500 - - - 1,500 Total (in thousands) - - 1,500 - - - 1,500 SOA - 7

Glenn Highway Integrated Corridor Management Study (ICM) Project ID PW2014067 Department State of Alaska Project Type Improvement Start Date October 2017 Location Assembly: Section 1, Seat B, Assembly: Section 2, Seats A & C, Assembly: Section 5, Seats H & I, 16-H: College Gate, 19-J: Mountainview, 12-F: Chugiak/Gateway, 13-G: Fort Richardson/North Eagle River, 14-G: Eagle River/Chugach State Park, Community: Airport Heights, Community: Birchwood, Community: Chugiak, Community: Eklutna Valley, Community: Eagle River, Community: Mountain View, Community: Northeast, Community: Russian Jack Park, Community: South Fork (E.R.), 15-H: Elmendorf End Date October 2022 Project will produce a final Concept of Operations for a comprehensive ICM approach to the Glenn Highway operations, to address traffic congestion, including congestion caused by crashes. Comments Because this is a state-owned road, project management and construction are being managed by the Alaska DOT. 200 - - - - - 200 Total (in thousands) 200 - - - - - 200 SOA - 8

Glenn Hwy Integrated Corridor Management Study [ICM] Project ID SOA2015008 Department State of Alaska Project Type Improvement Start Date July 2017 Location End Date October 2019 200 - - - - - 200 Total (in thousands) 200 - - - - - 200 SOA - 9

HSIP: CR Traffic Safety Corridor Left Turn Lanes Project ID SOA2015004 Department State of Alaska Project Type Improvement Start Date July 2017 Location End Date October 2020 3,516 - - - - - 3,516 Total (in thousands) 3,516 - - - - - 3,516 SOA - 10

HSIP: Jewel Lake Rd - 88th Ave to Strawberry Rd Project ID SOA2015003 Department State of Alaska Project Type Improvement Start Date July 2017 Location End Date October 2020 SOA Grant -Direct - 4,225 - - - - 4,225 Total (in thousands) - 4,225 - - - - 4,225 SOA - 11

HSIP: Lighting Improvements - Minnesota, Seward Hwy, Tudor, Muldoon Project ID SOA2015005 Department State of Alaska Project Type Improvement Start Date July 2017 Location End Date October 2020 5,564 - - - - - 5,564 Total (in thousands) 5,564 - - - - - 5,564 SOA - 12

Ingra Gambell Couplet Extension Reconnaissance Study Project ID PW2014068 Department State of Alaska Project Type Improvement Start Date October 2017 Location Assembly: Section 1, Seat B, 20-J: Downtown Anchorage, Community: Downtown, Community: Fairview, Community: Government Hill End Date October 2022 Project will look at extension of Ingra and Gambell Streets to Ship Creek Avenue and Whitney Road. Project will study project area emphasizing implementation actions related to access, circulation and freight mobility. Comments Because this is a state-owned road, project management and construction are being managed by the Alaska DOT. 200 - - - - - 200 Total (in thousands) 200 - - - - - 200 SOA - 13

O'Malley Rd Multi-use Path - Old Seward to C St Project ID SOA2015010 Department State of Alaska Project Type New Start Date July 2017 Location End Date October 2021 200 1,000 - - - - 1,200 Total (in thousands) 200 1,000 - - - - 1,200 SOA - 14

O'Malley Rd Reconstruction Phase II - Lake Otis Pkwy to Hillside Dr Project ID SOA2015006 Department State of Alaska Project Type Upgrade Start Date July 2018 Location End Date October 2021 SOA Grant -Direct - 10,000 - - - - 10,000 Total (in thousands) - 10,000 - - - - 10,000 SOA - 15

Pavement Replacement Program Project ID SOA08739 Department State of Alaska Project Type Rehabilitation Start Date July 2009 Location Assembly: Areawide, HD-SD: Community-wide, Community: Areawide End Date October 2021 This program would fund priority pavement rehab on state routes. Improvements are expected to include rut repair, pavement overlay, and/or pavement replacement. Priority routes under consideration for funding include: Potter Dr - Arctic Blvd to Franklin St O'Malley Rd - Old Seward Hwy to Upper O'Malley Rd Dimond Blvd - Jewel Lake Rd to Old Seward Hwy Fireweed Ln - Spenard Rd to New Seward Hwy Birch Rd - Abbott to Huffman Northern Lights Blvd - Minnesota Dr to Wisconsin St A/C Streets - 15th Ave to International Airport Rd Upper Huffman Rd - Hillside Dr to east end Eagle River Rd - Old Glenn Hwy to M.P. 5.3 Comments Project funding is programmed in the AMATS TIP. Design and construction on these states routes to be by the Alaska DOT. Several state owned arterial and collector routes have deteriorated and are in need of rehabilitation. 519 11,044 - - - - 11,563 Total (in thousands) 519 11,044 - - - - 11,563 SOA - 16

Pedestrian Plan Project Implementation Project ID SOA09889 Department State of Alaska Project Type Improvement Start Date March 2009 Location Assembly: Areawide, HD 50: Anchorage Areawide, Community: Areawide End Date October 2023 This project will improve pedestrian safety and construct missing links as identified in the 2007 Anchorage Pedestrian Plan. ing is programmed in the AMATS TIP. 700 - - - - - 700 Total (in thousands) 700 - - - - - 700 SOA - 17

Rabbit Creek Rd Reconstruction - Seward Hwy to Golden View Dr Project ID PW2014069 Department State of Alaska Project Type Reconstruction Start Date October 2018 Location Assembly: Section 6, Seats J & K, Community: Rabbit Creek, 28-N: South End Date October 2028 Project will construct center lane, sidewalk, and pathway to increase capacity. Comments Because this is a state-owned road, project management and construction are being managed by the Alaska DOT. Total estimated cost for project is $15M in federal funding after 2020. - 1,000 - - - - 1,000 Total (in thousands) - 1,000 - - - - 1,000 SOA - 18

Safety Improvement Program (Traffic Count Support) Project ID SOA07020 Department State of Alaska Project Type Improvement Start Date May 2007 Location Assembly: Areawide, HD 50: Anchorage Areawide, Community: Areawide End Date October 2021 Collect traffic data within the AMATS area completed by the ADOT&PF Central Region Highway Data Section and MOA Traffic Department Data Section. ing is proposed annually in the AMATS TIP. 555 560 - - - - 1,115 Total (in thousands) 555 560 - - - - 1,115 SOA - 19

Spenard Rd Rehabilitation - Minnesota Dr to Benson Blvd Project ID SOA2015007 Department State of Alaska Project Type Upgrade Start Date July 2017 Location End Date October 2027 2,500 - - - - - 2,500 Total (in thousands) 2,500 - - - - - 2,500 SOA - 20