FDOT Treasure Coast Traffic Impact Report

Similar documents
FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

November 21, 2012 Barbara Kelleher, (954)

October 31, 2014 Chuck McGinness, (954)

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Palm Beach County Traffic Report July 13 through July 20, 2012

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

Palm Beach County Traffic Report August 24 through August 31, 2012

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

Florida Department of Transportation MIKE DEW SECRETARY

Guide to. Road Construction Projects

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

Palm Beach County Traffic Report. Aug. 25 through Sept. 1, 2017

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Ohio Department of Transportation Construction Update

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

State Route 8 Corridor. Northern Summit County s Path to Success

US 19 Sunset Point Rd to Countryside Blvd.

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

Important Lane Closures, April 3 9, 2011

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

El Dorado County / Tahoe Roadwork Schedule

Weekly East Tennessee Construction Report for May 31-June 6, 2018

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

Springettsbury Township. Road Improvement Projects

5.1 Traffic and Transportation

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Weekly construction update

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

2 Construction Program

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

All closures this week happen at night, including full closures of Mesa and I-10

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Major Projects Overview

PennDOT Interstate Work next week March 30-April 3:

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Road Construction Ahead January-April 2015 NORTHWEST REGION

4. Safety Concerns Potential Short and Medium-Term Improvements

PROGRESS PARK CONNECTOR

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

PRIORITIES COMMITTEE MEETING

Monthly Traffic Update

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO

Route 29 Solutions Projects

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

OFFICE OF THE CITY MANAGER

Important Lane Closures March 1 5, 2010

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

Public Information Center August 12, 2010

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

SAN RAFAEL City Council January 20, 2015

2400 NW Via Della Court Port St. Lucie, FL f FORT PIERCE HUTCHINSON ISLAND PORT ST. LUCIE JENSEN BEACH

5.7 Local road upgrades

Hospital Link Project Project Update Winter 2018

TRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Northeast Corridor Transportation Update

Transcription:

July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane closures on state highways in Martin, St. Lucie and Indian River counties are expected during the week of July 22 through July 29. Weather permitting, work will be done at the following locations throughout the Treasure Coast. For updated lane closure information, please refer to www.d4fdot.com. Follow us on Twitter @ MyFDOT_SEFL. CONSTRUCTION PROJECTS MARTIN COUNTY 1. State Road 710 / Warfield Boulevard from east of the Florida East Coast Railway Crossing to east of SW Fox Brown Road Description: This 10-mile design/build project consists of widening the existing two-lane roadway to add two 1.5-mile passing lane segments, one in each direction. Other improvements include milling and resurfacing of the existing lanes and construction of new shoulders, guardrail installation, and drainage modifications. Cost/Completion: $6.92 million. Completion in summer 2016.

Intermittent lane closures on SR 710 may occur between 7 a.m. Monday and 8 p.m. Saturday. A flag crew will maintain two-way traffic. 2. Danford Creek Bridge / State Road 714 Repair Project Description: The Danforth Creek Bridge repair project on State Road 714 is expected to begin August 1. Work on this project includes providing slope protection/channel lining to prevent further erosion, repairing the bridge slabs to prevent rotational movements, and repairing the existing sidewalk on the south side of the bridge. Cost/Completion: $1.18 million. Completion in early 2017. All lanes are open through Friday, July 29. ** See attached flyer 3. I-95 Interchange at Kanner Highway / State Road 76 (Exit 101) Description: This 0.745-mile project includes widening Kanner Highway (SR 76) at the I-95 interchange, reconstructing the I-95 entrance and exit ramps, drainage, milling and resurfacing, signing & pavement markings, and signalization. If you need additional information about the project, please contact Bobby Byrd at (772) 221-2300 or bobbyb@martin.fl.us. Cost/Completion: $5.79 million. Completion in early 2017. One westbound lane of Kanner Highway will be closed intermittently Sunday through Thursday between 7 p.m. and 6 a.m. for widening. 4. NE Causeway Boulevard from Indian River Drive to State Road A1A in Jensen Beach The sidewalk along the north side of NW Causeway Boulevard is closed through spring 2017. Pedestrians should use the sidewalk on the south side of the roadway.

5. U.S. 1 at NW Eugenia Street, SE Summerfield Way and SE Pettway Street One lane in either direction of U.S. 1 at NW Eugenia Street, SE Summerfield Way and SE Pettway Street will be closed intermittently Monday through Friday between 8 a.m. and 3:30 p.m. for signal rehabilitation. This work is expected to be complete by mid-august. 6. State Road A1A from MacArthur Boulevard to Doubloon Drive in Stuart The northbound lane of A1A will be closed Monday through Friday between 9 a.m. and 4 p.m. for utility work. A flag crew will maintain two-way traffic. This work is expected to be complete by September. 7. U.S. 1 from Tressler Drive to Central Parkway in Stuart Two southbound lanes of U.S. 1 will be closed Monday through Friday between 12:01 a.m. and 6 a.m. for utility work. One southbound lane of U.S. 1 may be closed Monday through Friday between 9 a.m. and 2 p.m. for utility work. 8. Kanner Highway west of Monterey Road in Stuart One eastbound lane of Kanner Highway will be closed Tuesday and Wednesday between 9 a.m. and 4 p.m. to install a driveway approach. 9. Kanner Highway from west of Indian Street to Gaines Avenue in Stuart

One lane in each direction on Kanner Highway will be closed Monday morning between 12:01 a.m. and 6 a.m. and Monday through Thursday between 9 p.m. and 6 a.m. for utility work. 10. U.S. 1 from Eugenia Street to Westmoreland Boulevard in Jensen Beach One lane in either direction on U.S. 1 will be closed Monday through Friday between 9 a.m. and 2:30 p.m. for bus shelter work. ST. LUCIE COUNTY 11. State Road A1A Bridge Rehabilitation over the FPL Discharge Canal in Jensen Beach Description: This 0.085-mile-long project includes replacing the existing concrete bridge deck and approach slabs, milling and resurfacing the roadway at the approach slabs, concrete spall repairs of the piles and pile caps, and installing a corrosion protection system to the piles and pile caps. Cost/Completion: $1.8 million. Completion in fall 2016. The speed limit has been reduced from 45 mph to 35 mph at the bridge until fall 2016. One lane in either direction of A1A at the FPL discharge canal may be closed intermittently Monday through Friday between 7 a.m. and 3:30 p.m. A flag crew will maintain two-way traffic. The sidewalk along A1A will be closed intermittently Monday through Friday between 7 a.m. and 3:30 p.m.

12. State Road 70 / Okeechobee Road and Jenkins Road Intersection in Fort Pierce Description: Work on this.549-mile project includes widening the SR 70 and Jenkins Road intersection to provide additional through lanes and turning lanes, box culvert extension and installation work, drainage improvements, and lighting and signalization upgrades. Cost/Completion: $5.46 million. Completion in spring 2017. The inside lane in either direction of Okeechobee Road from Jenkins Road to the Walmart entrance will be closed intermittently Monday through Friday between 7:30 a.m. and 4 p.m. for median work. Only one lane in each direction will be closed at the same time. One lane in either direction of Okeechobee Road from I-95 to Kerr Street may be closed intermittently Sunday through Friday between 9 p.m. and 6 a.m. and Monday through Friday between 9 a.m. and 4 p.m. One lane in either direction of Jenkins Road to the north and south of the Okeechobee Road intersection may be closed intermittently Sunday through Friday between 9 p.m. and 6 a.m. and Monday through Friday between 9 a.m. and 4 p.m. A flag crew will maintain two-way traffic. The sidewalk on the south side of Okeechobee Road from Jenkins Road east to Roylat Street is closed through summer 2016. Pedestrians may cross at the signalized intersections at Jenkins Road and McNeil Road. The sidewalk on the north side of Okeechobee Road from Jenkins Road west to the RaceTrac / Home Depot driveway entrance is closed through summer 2016. Pedestrians may cross at the signalized intersections at Jenkins Road and Peters Road / Crossroads Parkway. 13. Indrio Road from west of I-95 to east of State Road 607 / Emerson Avenue in Fort Pierce Description: Indrio Road is being widened from west of the I-95 interchange to east of Emerson Avenue (State Road 607). This 2.7-mile project includes: reconstructing the existing two-lane Indrio Road to a four-lane, divided highway with a raised median; constructing a 6-foot sidewalk along the south side and a 12-foot-wide multi-purpose trail along the north side of Indrio Road; realigning Spanish Lakes Boulevard to connect with Koblegard Road; reconstructing Koblegard Road from Indrio Road north approximately.5 mile; and installing new highway lighting, signage and signalization.

Cost/Completion: $23.9 million. Completion in spring 2019. The speed limit on Indrio Road between the I-95 interchange and Emerson Avenue has been reduced from 55 mph to 45 mph. The speed limit will remain at 45 mph after the project completion. One lane in each direction of Indrio Road from I-95 to east of Koblegard Road is closed around-the-clock to accommodate roadway construction on the north side of Indrio Road. One lane in either direction of Indrio Road will be closed Monday through Friday between 7 a.m. and 4:30 p.m. for barrier wall installation. A flag crew will maintain two-way traffic. Westbound traffic on Indrio Road from Spanish Lakes Boulevard to east of Koblegard Road is shifted south to an existing eastbound lane. Both eastbound and westbound traffic are reduced to one lane in each direction. o As part of the westbound traffic shift, the left turn lane from Spanish Lakes Fairways to Indrio Road is closed and all motorists must turn right onto Indrio Road. Motorists wanting to head east on Indrio Road should go west and make a U-turn at the median opening after the I-95 overpass. **See attached flyer 14. I-95 Bridge Deck Replacement Project at Gatlin Boulevard and Midway Road Description: Work on this project includes removing & replacing the bridge decks on I-95 over Gatlin Boulevard and CR-712/Midway Road, milling and resurfacing approaches to bridge decks, and re-striping approaches to bridge decks. Cost/Completion: $8.2 million. Completion in fall 2017. The inside lane in each direction of I-95 at the Gatlin Boulevard and Midway Road overpasses is closed around-the-clock through August. Two lanes are open in each direction at the overpasses. The outside lane in each direction of I-95 at the Midway Road overpass will be closed Wednesday night between 8 p.m. and 6 a.m. for surveying. Only one lane will be open in each direction at this overpass.

The outside lane in each direction of I-95 at the Gatlin Boulevard overpass will be closed Thursday night between 9 p.m. and 5 a.m. for surveying. Only one lane will be open in each direction at this overpass. One inside lane in each direction of Midway Road at I-95 will be closed Monday through Friday between 7 a.m. and 5 p.m. for work on the overhead bridge deck. 15. 25 th Street / State Road 615 at Edwards Road in Ft. Pierce One northbound lane of 25 th Street will be closed Tuesday and Wednesday between 9 a.m. and 4 p.m. INDIAN RIVER COUNTY 16. I-95 (SR 9) from just north of State Road 60 (Osceola Boulevard/Exit 147) at Vero Beach to the Indian River/Brevard County Line Description: I-95 is being widened from just north of State Road 60 to the Indian River/Brevard County line. Improvements in this 12.5-mile-long project include: adding one lane on I-95 in each direction; milling and resurfacing the existing lanes; signalization and lighting improvements; Intelligent Transportation System (ITS) improvements, including closed-circuit television cameras, Dynamic Message Signs and vehicle detectors; removal/replacement of the existing bridges over CR 512 (Fellsmere Road); construction of a noise barrier wall adjacent to the Encore Sunshine Travel RV Resort; and reconstruction of the interchange at CR 512, including the ramps and turn lanes. The design/build contract started in May 2013. For information on this project, contact the Public Information Office at (772) 834-1298 or I95projectinfo@gbfinc.net. Cost/Completion: $50.6 million. Completion in late 2016. Motorists should be alert for slow moving construction vehicles entering and exiting the travel lanes.

The speed limit has been reduced to 60 mph in the work zone. One lane in each direction of I-95 will be closed intermittently Sunday through Thursday between 9 p.m. and 6 a.m. for construction. Southbound traffic on I-95 from south County Road 512 to north of State Road 60 is shifted to temporary lanes along northbound I-95. Northbound traffic on I-95 from north of County Road 512 to the Indian River / Brevard County line is shifted to temporary lanes along southbound I-95. ** See attached flyer 17. State Road A1A south of Bahia Mar Road in Vero Beach The southbound or northbound lane of A1A will be shifted to the middle turn lane Monday through Friday between 9 a.m. and 4 p.m. through mid-august for utility work. www.dot.state.fl.us Innovative, Efficient, Exceptional