CITY OF EDINBURGH COUNCIL (PORTOBELLO PARK) BILL PPAG RESPONSE TO THE PROMOTER S WRITTEN RESPONSE TO CONVENER S LETTER DATED 11 OCTOBER 2013

Size: px
Start display at page:

Download "CITY OF EDINBURGH COUNCIL (PORTOBELLO PARK) BILL PPAG RESPONSE TO THE PROMOTER S WRITTEN RESPONSE TO CONVENER S LETTER DATED 11 OCTOBER 2013"

Transcription

1 CITY OF EDINBURGH COUNCIL (PORTOBELLO PARK) BILL PPAG RESPONSE TO THE PROMOTER S WRITTEN RESPONSE TO CONVENER S LETTER DATED 11 OCTOBER 2013 We are writing to clarify some points made in the above letter from the City of Edinburgh Council to the committee. 1. Height of the proposed school building The Council s letter claims that: The Section Key also shows the north-south cross section through Milton Road, illustrating that the school building would be lower than all the houses and the existing tree line on Milton Road. The council has previously given the height of the school as being at the ridge line of the houses in Milton Road, as shown on the attached drawing (top image, from planning application), and this does not take into account any installation of plant on the roof of the building. This is why we have repeatedly challenged the drawing on the consultation leaflet looking along Milton Road as a misrepresentation of the relative height of the buildings. The drawing included with the Council s letter appears to be a new one, the school building appears to be set lower down but it is difficult to ascertain this as no datum levels are provided. On the new drawing supplied by the Council the section line DD is taken at the most advantageous point for the Council s attempt to minimise the height of the school in relation to surrounding homes, as in reality the bulk of the school would be higher than shown. This can be clearly seen from our attached drawing from the planning application. 2. Access to football pitches We would make the following points: The Council states that: notwithstanding the need for the school to have exclusive use of the pitches at certain times, the pitches would still enable much greater use than is made of the existing pitches on the park. The new pitches could be used all year round and, because the land would be levelled out, would not suffer from the sloping terrain that affects the existing pitches. No use is currently made of the existing pitches since the Council evicted the football teams and ploughed up the pitches, so of course installing new pitches would increase usage from the current zero position. They say that the new pitches could be used all year round, but so could the existing pitches had they been properly constructed and maintained (the Ironside Farrar report, referred to in our letter of 17 October made it clear that they were poorly constructed and maintained). In addition the goal posts were removed at the end of every football season, which prevented usage during the summer holidays. What the Council is offering is two pitches but if the park was left intact there is room for two full-sized pitches and two pop-up pitches, (particularly attractive for use by local primary schools and U10 teams) enabling four matches to be played concurrently, as has been the case in the past. If the park s pitches were also levelled off and properly constructed this would allow far greater usage than what is proposed if the school is built on the park. 1

2 The definition of the local area given by the Council is by and large the catchment area for the school, not just Portobello. The system of free access described by the Council is unworkable, for example, there is nothing to stop a resident of the area from booking the pitches free of charge for a friend or relative who lives outside the area. Moreover, with 25% of pupils coming from outside of the catchment area, will these children be denied use of the school s facilities outside of school hours, despite the fact that they attend the school? What if a pitch is booked, the lessees are late arriving and the pitch is casually accessed via the catflap by others? Who will be on site to manage such situations? Normally, if school facilities are used outside school hours there are janitorial costs to be factored in, along with floodlighting costs, and it is usually these costs that make the use of school facilities unaffordable. The Council should explain whether janitors will be needed for out of hours access, how much this will cost and how it is to be paid for. If this is viable why is it not available for ALL school pitches across Edinburgh? It is highly likely that there would be complaints of unequal treatment from other school communities about the apparently special treatment afforded to residents of the Portobello High School catchment area. The Council has been talking about this supposedly free access for at least a year now and yet still cannot give any clear detail on how it would work. There is no indication in the Council s response about how long such an arrangement would be likely to endure and a future administration are not likely to retain arrangements put in place previously, especially if budgets are tight. As most school premises are locked up after a certain time it is not clear how security on the site will work or how the car park would be accessed to allow use of the pitches. Interestingly, on a visit to Castlebrae High School on Saturday 13 November 2010, which is supposed to operate a similar system of access via catflaps, we found padlocked gates preventing access. Please see the photograph on page 33 of our letter of objection to the planning application for the school, which was submitted in June as document 15 with our objection to the private bill. 3 Alternative approaches The Council claims that the Private Bill process requires significant consultation and notification of interested parties and yet, by its own admission, its notification process was problematic. It also says it is considerably easier and cheaper to object to and participate in, yet the private bill process is unknown to most people and has not been easy or clear to follow, even for people who are used to participating in the planning process. A 20 charge for objecting is hardly cheap to many people and actually put numerous people off objecting. The Council implies that it chose this process for these reasons rather than a court -based process but the reality is that there was no prospect of success for the other legal remedies, otherwise the Council would have had no hesitation in following them. We understand that the project sponsor was keen on an appeal to the Supreme Court but was strongly advised against it on legal grounds. The claim is made that in estimating the likely timescales for the Private Bill process it took into account the high degree of existing awareness of this matter among those most directly affected by it. The high degree of awareness relates to the issue of the plan to build to the school on the park, not of the private bill process itself. As we have previously 2

3 mentioned, many people we spoke to during the consultation process were unaware of the private bill and thought that because of the Court of Session ruling that the park was safe. In the paragraph commencing: we assume that the Committee s reference to timescales for public bills... the Council seems to be asking to be made a special case, yet the report to the City of Edinburgh Council meeting on 14 March 2013 at which the decision to promote the bill was taken states on page 54, appendix 3, paragraph that: "The decision of the Inner House of the Court of Session leaves this Council, and other local authorities in Scotland, with a legal anomaly". This indicates that there is a belief by the Council that legislation change is needed. The Council claims that Professor Robert Rennie did not identify any other alternative courses of action that were reasonably open to the Council but in his evidence he says in paragraph 6.1 (f) that: I am myself of the view that given the decision of the Inner House the current legislation will require to be examined and changed. This is a course of action that is open to the Council, as it acknowledges, although a wider-ranging and longer term one. In any case, if legislation change is needed then a piecemeal approach should not be undertaken via a private bill. Andrew Ferguson also makes the following points in his evidence: 8.5 My only comment on the alternative approaches would concern the other legislative routes and, in particular, the proposal that appropriate legislative measures could be included in the Scottish Ministers draft Community Empowerment and Renewal Bill. And Although the issue of common good has been raised as part of the consultation paper, it may well be that the Scottish Ministers consider that reform of common good law itself is a matter for separate, if related, legislation. The Council states that it is important to stress that the Council is not pursuing the Private Bill as a means to reform the general law of Common Good nor to establish any sort of precedent that could be used in respect of any other inalienable Common Good land. At no time has it been suggested that the Council intends to set a precedent but there is strong evidence that a precedent will be set for other inalienable common good land, regardless of the Council s intentions. This has been made clear by the legal opinion of Roy Martin QC. Also, Sue Bruce in her letter of 9 October 2012 (enclosed with our letter of 24 October), says: For these reasons we would wish to explore whether there is Ministerial support for legislative change that will enable our project, and others of similar value, to be taken forward. She goes on to say in the last paragraph on the same page that: Whilst this request is being made on behalf of the City of Edinburgh Council, we are sure that this matter will be of interest to other local authorities. (Our highlighting in bold). This makes it clear that the Portobello Park decision would not be one made in isolation; it would be one which would have wider repercussions throughout Scotland. Andrew Ferguson also recognises that this is not a one-off issue in paragraph 9.1 of his evidence. However, I do think that the issue confronted by the City of Edinburgh Council in Portobello is one which has even more general application. Also in paragraph 9.4: I do therefore think that the circumstances which led up to the bill, and the issue confronted by the City of Edinburgh Council, is likely to be a relatively frequent issue in some parts of Scotland over the coming decades. 3

4 He also made it clear in his evidence on 11 September that he could not say with any certainty that if the private bill was passed that it would not be used as a test case by other local authorities. The paragraph commencing: Relying on a Public Bill being taken forward... goes on to say that it would result in several years of further delay and Portobello High School needs to be replaced sooner than that would be likely to allow. The Council has been saying the school needs urgent replacement since 2006 yet they delayed its delivery by not addressing the legal issues sooner. Moreover there is a complete failure to recognise that the Council has identified two suitable alternative sites for the school, which would deliver the same standard of educational facilities and could be progressed far sooner than public legislation would allow. There are other options for the Council to achieve its objectives but it appears to be asking the Scottish Parliament to ignore its own guidance and rules for private bills. 4 Traffic management issues and planning permission The Council does not give any adequate explanation of how traffic problems are to be mitigated, merely referring the committee to the planning portal. There is a contradictory statement with reference to Hope Lane where it says this matter was raised and reviewed fully with the Council Highway Department who re-iterated the view that the conditions in the originally approved proposal remain sufficient but then goes on to say however the project team... will, if the bill is enacted, keep this issue under review with the Council Highways Department... We believe that the Council s failure to address fully the many traffic and road safety concerns that have been raised will lead to money from other traffic budgets being used to rectify the problems that will be caused by siting the school on the park. This represents another potential and hidden cost of this project. We enclose a copy of a summary of Traffic and Road Safety issues by a qualified and experienced Transport Engineer. These were raised at a local residents meeting in Portobello High School in August 2010 and were not addressed by CEC when they awarded themselves planning permission in February At a pre planning application meeting on 15 May 2013 in Portobello Town Hall, these road safety and traffic issues were raised both by supporters and objectors to the new school. Scott Castle, a member of the project team, was embarrassed with the lack of action on these issues as was former Deputy Chief Constable of Lothian and Borders Police who chaired the meeting. These road safety and traffic issues have not been addressed by CEC. With regard to the the current renewal of planning permission for the school, we would point out that the Council is attempting to award itself planning permission for a site on which it is illegal to build and we would question whether it is within their power to do so. Please do not hesitate to contact me if you require any further information or clarification on these issues. 11 November

5 PORTOBELLO HIGH SCHOOL SUMMARY OF TRAFFIC AND ROAD SAFETY ISSUES 1. A199 Milton Road is a Greenway & District Distributer Road (DDR) and is the strategic route for all users into and out of the city from east Edinburgh, East Lothian, Midlothian and the south (A1, A68). 2. Milton Road is a 4 lane carriageway, however it acts as a single carriageway when the bus lanes are in operation. During the AM peak (around hours) the westbound (city) traffic is constantly queued back east of the proposed new access to the school to the pedestrian crossing at Hope Lane and often to the Milton Link from the Milton Road/Duddingston Park traffic signals. 3. This currently results in frustration for drivers and causes a significant number of drivers taking the following evasive actions (photographs in report) Abusing the bus lane rat-running down Hope Lane or Park Avenue rat-running through Magdelene past the primary school 4. The proposed development of Portobello High School for 1400 pupils with a direct vehicular access and pedestrian access onto Milton Road would generate significant additional car and pedestrian trips. These turning movements and pedestrian crossing delays would occur at the peak morning traffic flows and would cause further queues and delays on Milton Road and would cause queues on a daily basis back to Milton Link. 5. As a result this will cause traffic chaos in the morning peak for the traffic including buses from the east and south heading into the city centre and north Edinburgh. It would also result in devaluing the multimillion pound public transport corridor funded by CEC and Scottish Ministers. 6. It would also encourage drivers to take further evasive action as stated in 3 above and this will result in a severe accident risk for pupils walking and being dropped off for school, local residents and other vulnerable road users on Milton Road, Hope Lane, Park Avenue and Magdalene Drive. 7. Major Developments with complex traffic movements require traffic models to demonstrate that the traffic with the new road layout will operate effectively and efficiently after a development is constructed. A traffic model has not been developed for Portobello High School. 8. In addition a road safety audit should be carried out on all proposed major developments where there will be a significant change to the road layout. A road safety audit has not been carried out for the proposed Portobello High School. Significant road safety risks would exist at a number of locations including Milton Road/Duddingston Crescent pupils/pedestrians, car accessing and egressing properties on Duddingston Crescent Milton Road/Duddingston Crescent pupils/pedestrians walking on narrow south footpath, crossing road at new vehicular/ pedestrian access 5

6 Milton Road pupils/pedestrians, walking on narrow (less than 1.5 metres) north footpath between Duddingston Park and Park Avenue Milton Road lack of refuge/harbour areas at crossing points for pupils, pedestrians and the disabled Hope Lane pupils/ pedestrians being dropped off/picked up on narrow road which is unsuitable for predicted traffic Park Avenue - pupils/ pedestrians being dropped off/picked up on narrow road which is unsuitable for predicted traffic Park Avenue at new secondary access which is unsuitable for goods vehicle traffic 9. I have spoken to the Road Safety Officer and the Road Policing Unit at Lothian and Borders Police. I was advised that the Police had not been consulted on this application. When I described the direct access onto Milton Road they were very concerned not least as the Police have had to resolve a number of road safety issues on recent new schools in Edinburgh. The Police were keen to know whether a road safety audit had been carried out. 10. A recent planning application to turn a house into a nursery at 26 Duddingston Crescent was correctly refused in my opinion on road safety grounds however the road safety issues associated with the proposed new Portobello High School are major and far more serious in road safety terms and should be refused. 11. The Transport Assessment was clearly not carried out by engineers who understood the traffic movements in the vicinity of the proposed school. Examples of this are Harry Lauder Road is the main connector between Milton Road and Portobello 7.7.The assessment indicates that the Park Avenue/Milton Road junction operates well within normal acceptable limits during the weekday AM and School peak periods. In the morning peak there is a 400 metre westbound queue! The issue of the queues through the new access in the morning and evening are not discussed Statements like that question the credibility and competency of the authors. In addition many of the issues listed above were discussed with the CEC Project Manager and Transport Consultant at a meeting in Portobello School in August

7 7

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

Proposed Housing Developments In Great Horkesley

Proposed Housing Developments In Great Horkesley Proposed Housing Developments In Great Horkesley Introduction Colchester Borough Council is producing a plan the purpose of which is to guide development in the Borough through to the year 2033. The Local

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Report on the Crafthole Traffic Light Project 3 rd July th September 2017 Report on the Crafthole Traffic Light Project 3 rd July 2017 4 th September 2017 Brief History The village of Crafthole sits on the B3247 road, one of the 2 Gateways to the Rame Peninsula, the other being

More information

Revalidation: Recommendations from the Task and Finish Group

Revalidation: Recommendations from the Task and Finish Group Council meeting 12 January 2012 01.12/C/03 Public business Revalidation: Recommendations from the Task and Finish Group Purpose This paper provides a report on the work of the Revalidation Task and Finish

More information

A final follow up on the report into the accessibility of police complaint handling in Scotland

A final follow up on the report into the accessibility of police complaint handling in Scotland A final follow up on the report into the accessibility of police complaint handling in Scotland published April 2012 A final follow up on the report into the accessibility of police complaint handling

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

Written response to the recommendations from Lothian Buses

Written response to the recommendations from Lothian Buses Written response to the recommendations from Lothian Buses Thank you for your letter of 13 September 2007 to Neil Renilson regarding the Scottish Parliament's Equal Opportunities Committee report entitled

More information

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin

Appendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin Transport and Works Act 1992 The Network Rail (Felixstowe Branch Line Improvements Level Crossing Closure) Order Trimley St Martin Parish Council Statement of Case The statement of Case of the Parish Council

More information

Monifieth Out Of School Care Club (Seaview) Day Care of Children Seaview Primary School Victoria Street Monifieth Dundee DD5 4HL Telephone: 01382

Monifieth Out Of School Care Club (Seaview) Day Care of Children Seaview Primary School Victoria Street Monifieth Dundee DD5 4HL Telephone: 01382 Monifieth Out Of School Care Club (Seaview) Day Care of Children Seaview Primary School Victoria Street Monifieth Dundee DD5 4HL Telephone: 01382 530497 Inspected by: Timothy Taylor Type of inspection:

More information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1 Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)

More information

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager 4(3)(i) 12/570 Alterations and replacement windows at Milnathort Town Hall, 1

More information

THAMES GATEWAY BRIDGE INQUIRY ENDS

THAMES GATEWAY BRIDGE INQUIRY ENDS Media Briefing May 2006 THAMES GATEWAY BRIDGE INQUIRY ENDS The public inquiry into controversial plans by Transport for London (TfL), to build a 6-lane road bridge across the Thames between east and south

More information

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board, JOINT TRANSPORTATION BOARD 10 June 2008 Subject: Director/Head of Service: Decision Issues: Decision: CCC Ward/KCC Division: Summary: To Resolve: Southern Gas Networks Gas Main Replacement Scheme - Broad

More information

PORTABLE LIGHT SIGNALS

PORTABLE LIGHT SIGNALS ROADS AUTHORITIES & UTILITIES COMMITTEE (SCOTLAND) ADVICE NOTE 8 PORTABLE LIGHT SIGNALS Version 1.20 December 2006 VERSION HISTORY Version Date Notes PORTABLE LIGHT SIGNALS 1.00 Mar 05 Approved by RAUC(S)

More information

Kent Pedestrian Guard Railing Assessment

Kent Pedestrian Guard Railing Assessment Kent Pedestrian Guard Railing Assessment Canterbury Final Report for JTB March 2012 Project Number B1649000 Jacobs Eng UK Ltd, Miller House, Lower Stone Street, Maidstone, Kent ME15 6GB Document control

More information

PARKING PRACTICE NOTES September Parking Issues for People with Disabilities

PARKING PRACTICE NOTES September Parking Issues for People with Disabilities PARKING PRACTICE NOTES September 2012 Parking Issues for People with Disabilities Contents Introduction... 3 Parking on-street... 3 What are the issues?...3 What can you do?...3 How do you do it?...4 What

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure Boxley Parish Council www.boxleyparishcouncil.org.uk Chairman: Bob Hinder Clerk: Pauline Bowdery Assistant Clerk: Melanie Fooks 28 November 2017 Boxley Parish Council Highway Issues Briefing Note M2 junction

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 TO BE READ IN CONJUNCTION WITH THE CPA MODEL CONDITIONS FOR THE HIRING OF PLANT (2011) EXPLANATORY NOTE: The purpose of these Supplementary Conditions

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

BRIEF TO THE ROYAL COMMISSION ON ABORIGINAL PEOPLES THE NUNAVIK CONSTITUTIONAL COMMITTEE

BRIEF TO THE ROYAL COMMISSION ON ABORIGINAL PEOPLES THE NUNAVIK CONSTITUTIONAL COMMITTEE BRIEF TO THE ROYAL COMMISSION ON ABORIGINAL PEOPLES THE NUNAVIK CONSTITUTIONAL COMMITTEE MAY, 1993 EXECUTIVE SUMMARY - This brief is submitted by the Nunavik Constitutional Committee. The Committee was

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

IMO RECYCLING OF SHIPS

IMO RECYCLING OF SHIPS INTERNATIONAL MARITIME ORGANIZATION E IMO MARINE ENVIRONMENT PROTECTION COMMITTEE 49th session Agenda item 3 MEPC 49/3/2 9 May 2003 Original: ENGLISH RECYCLING OF SHIPS Comments on the Report of the Correspondence

More information

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard Australian/New Zealand Standard AS/NZS 1158.4:2015 Lighting for roads and public spaces Part 4: Lighting of pedestrian crossings Superseding AS/NZS 1158.4:2009 AS/NZS 1158.4:2015 AS/NZS 1158.4:2015 This

More information

Methwold Parish Council Planning Committee meeting Thursday 10 th December pm Fenton Room St George s Hall Methwold.

Methwold Parish Council Planning Committee meeting Thursday 10 th December pm Fenton Room St George s Hall Methwold. Methwold Parish Council Planning Committee meeting Thursday 10 th 6.30pm Fenton Room St George s Hall Methwold. Present: Mr J Marriage, Mr P Ashman, Mrs S Stones, Mr P Crawley, Mr D Thomas, Mrs S Ramsay

More information

Open Report on behalf of Richard Wills, Executive Director for Environment & Economy. Nettleham Village Centre - Proposed Parking Restrictions

Open Report on behalf of Richard Wills, Executive Director for Environment & Economy. Nettleham Village Centre - Proposed Parking Restrictions Agenda Item 4.3 Regulatory and Other Committee Open Report on behalf of Richard Wills, Executive Director for Environment & Economy Report to: Planning & Regulation Committee Date: 16 February 2015 Subject:

More information

PERTH-ADELAIDE CORRIDOR STRATEGY

PERTH-ADELAIDE CORRIDOR STRATEGY INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South

More information

LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE This paper invites the Committee to consider for the third time the following Petition:

LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE This paper invites the Committee to consider for the third time the following Petition: LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE 568 Introduction 1. This paper invites the Committee to consider for the third time the following Petition: PE 568 by the Scottish Accessible Transport

More information

Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement

Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne Statement of Community Involvement Prepared by WYG Environment Planning Transport Ltd on behalf of the

More information

Planning Committee. Thursday, 26 May 2016

Planning Committee. Thursday, 26 May 2016 Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

SEIGHFORD PARISH COUNCIL

SEIGHFORD PARISH COUNCIL SEIGHFORD PARISH COUNCIL Minutes of the Parish Council meeting held on Monday 18 th November 2013 at Great Bridgeford Village Hall. Those present; Parish Councillors-Mrs G Cox[chair]; Mr P Eveson [deputy

More information

Summary Proof of Evidence Traffic

Summary Proof of Evidence Traffic Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND October 2017 Version 2 1. BACKGROUND 1.1 Article 14.5 of Council Regulation (EEC) No 95/93, as amended by Regulation (EC) No

More information

Office of Public Engagement United States Citizenship and Immigration Services 20 Massachusetts Ave. NW Washington, DC 20529

Office of Public Engagement United States Citizenship and Immigration Services 20 Massachusetts Ave. NW Washington, DC 20529 February 14, 2012 Office of Public Engagement United States Citizenship and Immigration Services 20 Massachusetts Ave. NW Washington, DC 20529 Via e-mail: public.engagement@dhs.gov RE: Comments on USCIS

More information

Kent Pedestrian Guard Railing Assessment

Kent Pedestrian Guard Railing Assessment Kent Pedestrian Guard Railing Assessment Canterbury - Consultation Report November 2010 Project Number B1555300 Jacobs Eng UK Ltd, Miller House, Lower Stone Street, Maidstone, Kent ME15 6GB Document control

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Local Development Scheme

Local Development Scheme Local Development Scheme August 2014 Local Development Scheme (August 2014) / Page 2 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation

More information

DHS does not define compelling circumstances but provides 4 examples: - Serious illness and disabilities;

DHS does not define compelling circumstances but provides 4 examples: - Serious illness and disabilities; The beneficiary of an approved I-140 petition may retain his or her priority date for purposes of subsequent petitions, unless USCIS revokes approval of the petition due to: - Fraud or willful misrepresentation

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

Movement Strategy. November On behalf of Barton Oxford LLP

Movement Strategy. November On behalf of Barton Oxford LLP Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date

More information

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT Committee Date: 07/03/2013 Application Number: 2012/07986/PA Accepted: 29/11/2012 Application Type: Variation of Condition Target Date: 24/01/2013 Ward: Handsworth Wood Old Limberlost Sports Club, Butlers

More information

PERTH AND KINROSS COUNCIL 1 OCTOBER 2008 ADULT SUPPORT AND PROTECTION. Report by the Executive Director (Housing & Community Care)

PERTH AND KINROSS COUNCIL 1 OCTOBER 2008 ADULT SUPPORT AND PROTECTION. Report by the Executive Director (Housing & Community Care) PERTH AND KINROSS COUNCIL 1 OCTOBER 2008 10 08/508 ABSTRACT ADULT SUPPORT AND PROTECTION Report by the Executive Director (Housing & Community Care) To inform the Council of the progress towards the implementation

More information

CAA consultation on its Environmental Programme

CAA consultation on its Environmental Programme CAA consultation on its Environmental Programme Response from the Aviation Environment Federation 15.4.14 The Aviation Environment Federation (AEF) is the principal UK NGO concerned exclusively with the

More information

Ms J Delouche Sea View Cottage Cliff Road Margrave-on-Sea MUDHOLE ML20 7AX 15 October 2015

Ms J Delouche Sea View Cottage Cliff Road Margrave-on-Sea MUDHOLE ML20 7AX 15 October 2015 Hazy Beacon District Council Chief Executive s Department Town Hall St Nicholas Street Mudhole ML16 3BY Ms J Delouche Sea View Cottage Cliff Road Margrave-on-Sea MUDHOLE ML20 7AX 15 October 2015 Dear Mr

More information

TAXI AND PHC TRADE MEETING

TAXI AND PHC TRADE MEETING TAXI AND PHC TRADE MEETING The meeting took place on Thursday 23 rd February 2016 West Lothian Room, Lothian Chambers Councillor Gavin Barrie GB Convenor Regulatory Committee Andrew Mitchell AM CEC Regulatory

More information

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT 7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: HEAD OF ECONOMIC PROMOTION AND PLANNING Contact Officer: Nathan Spilsted, Senior Planning Officer Email: nathan.splistead@midsussex.gov.uk

More information

Traffic Calming Special Authorisations

Traffic Calming Special Authorisations Traffic Advisory Leaflet 3/93 May 1993 Traffic Calming Special Authorisations Introduction Legislation is now available to allow a wide range of traffic calming measures to be used on public roads. Some

More information

WEYMOUTH & PORTLAND ACCESS GROUP MINUTES for MEETING 111 Held at 2pm on Monday 12th November 2012 at Acorns Centre, Grosvenor Road, Weymouth

WEYMOUTH & PORTLAND ACCESS GROUP MINUTES for MEETING 111 Held at 2pm on Monday 12th November 2012 at Acorns Centre, Grosvenor Road, Weymouth WEYMOUTH & PORTLAND ACCESS GROUP MINUTES for MEETING 111 Held at 2pm on Monday 12th November 2012 at Acorns Centre, Grosvenor Road, Weymouth 1 Introduction of those present Mike Kelly (President), John

More information

Bowers Gifford & North Benfleet Parish Council 27 th November 2013

Bowers Gifford & North Benfleet Parish Council 27 th November 2013 Present: MINUTES OF THE BOWERS GIFFORD AND NORTH BENFLEET PARISH COUNCIL MEETING HELD AT THE BENBOW CLUB BOWERS GIFFORD ON WEDNESDAY 27 NOVEMBER 2013 AT 7.30 PM. Councillors: Officer: Members of the Public:

More information

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options. Welcome Welcome to the Highways England A27 Arundel Bypass public consultation. Thank you for coming. Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

Report to Partnership Meeting 8 November 2013 RESEARCH AND STRATEGY DELIVERY. Regional Air Service Development Study

Report to Partnership Meeting 8 November 2013 RESEARCH AND STRATEGY DELIVERY. Regional Air Service Development Study Item: 11 Report to Partnership Meeting 8 November 2013 RESEARCH AND STRATEGY DELIVERY Regional Air Service Development Study PURPOSE OF REPORT To introduce the draft Executive Summary of the Regional Air

More information

Proposed M9 Spur Extension. Kirkliston

Proposed M9 Spur Extension. Kirkliston Forth Road Bridge N Queensferry Proposed Scotstoun Interchange Proposed Humbie Flyover Proposed M9 Spur Extension M9 Motorway Kirkliston A720 Edinburgh City Bypass M8 Motorway This drawing has been reproduced

More information

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089 Safety & Airspace Regulation Group Code of Practice Issue 13, August 2013 Civil Aviation Authority 2013 All rights reserved. Copies of this publication may be reproduced for personal use, or for use within

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Seat Belts on School Transport (Scotland) Bill [AS PASSED]

Seat Belts on School Transport (Scotland) Bill [AS PASSED] Seat Belts on School Transport (Scotland) Bill [AS PASSED] CONTENTS Section 1 Duty to ensure seat belts fitted on dedicated school transport services 2 Meaning of dedicated school transport service 3 Meaning

More information

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011 STATUTORY INSTRUMENTS 2011 No. 1040 ROAD TRAFFIC The Traffic Signs (Amendment) Regulations and General Directions 2011 Made - - - - 30th March 2011 Laid before Parliament 6th April 2011 Coming into force

More information

GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED

GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED 1601214 Table of Contents 1. Introduction... 1 2. Observation 1: How has the GSC Draft

More information

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC ICAO Universal Safety Oversight Audit Programme ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC (Vientiane, 22 to 30 April 1999) INTERNATIONAL CIVIL

More information

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it WELSH GOVERNMENT RESPONSE P-05-710 Ensure Disabled People can Access Public Transport As and When They Need it The petition submitted by Whizz Kidz seeking action to ensure that disabled people can access

More information

Powys Local Development Plan. Position Statement - Gypsy and Traveller Accommodation. Incorporating an action statement and implications for the LDP

Powys Local Development Plan. Position Statement - Gypsy and Traveller Accommodation. Incorporating an action statement and implications for the LDP Powys Local Development Plan Position Statement - Gypsy and Traveller Accommodation Incorporating an action statement and implications for the LDP September 2016 Powys LDP, Position Statement Gypsy and

More information

HEATHROW AIRSPACE AND FUTURE OPERATIONS CONSULTATION

HEATHROW AIRSPACE AND FUTURE OPERATIONS CONSULTATION HEATHROW AIRSPACE AND FUTURE OPERATIONS CONSULTATION 1a. Do you support our proposals for a noise objective? Yes/ No/ I don t know No. 1b. Please provide any comments you have on our proposals for a noise

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Perth and Kinross Council Development Management Committee 24 May 2017 Enforcement Report by Interim Head of Planning

Perth and Kinross Council Development Management Committee 24 May 2017 Enforcement Report by Interim Head of Planning Perth and Kinross Council Development Management Committee 24 May 2017 Enforcement Report by Interim Head of Planning 5(1)(i) 17/184 Formation of five permanent gypsy/travellers pitches at Crookmoss, Crook

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ)

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) Directorate of Airspace Policy NATMAC Representatives DAP/STNTMZ 23 July 2009 NATMAC INFORMATIVE Dear Colleagues INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) INTRODUCTION 1.1 NATS issued a

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

Camberwell Community Council Licensing Meeting

Camberwell Community Council Licensing Meeting Camberwell Community Council Licensing Meeting Minutes of Meeting 2 February 2005 Southwark Town Hall, Peckham Road, London SE5 PRESENT Councillors Veronica Ward (Chair), John Friary, Tony Ritchie, Ian

More information

YOUR REGULATORY COMPLIANCE GUIDE.

YOUR REGULATORY COMPLIANCE GUIDE. FOR DEALER USE ONLY YOUR REGULATORY COMPLIANCE GUIDE. Version 3.0 2 Your Regulatory Compliance Guide Contents Keeping conduct and service high p 3 Minimum requirements for Premier Partners p 4 Supplying

More information

Finchley and Golders Green Area Committee 27 April 2017

Finchley and Golders Green Area Committee 27 April 2017 Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning

More information

Environment Committee 24 September 2015

Environment Committee 24 September 2015 Environment Committee 24 September 2015 Title Enforcement of Single Yellow Lines on Bank Holidays Report of Commissioning Director - Environment Wards All Status Public Urgent No Enclosures Key No Appendix

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager 4(3)(ii) 13/138 Erection of a Structure for Floral Display in the Public Park,

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

P R E S E N T : Mr Peter Mullen (in the Chair) IN ATTENDANCE

P R E S E N T : Mr Peter Mullen (in the Chair) IN ATTENDANCE SMG(M) 05/02 Minutes: 18-26 NHS GREATER GLASGOW Minutes of the Meeting of the Greater Glasgow Acute Services South Glasgow Monitoring Group held at 2.00 p.m. on Friday, 2 nd December 2005 in Floor E Conference,

More information

European Aviation Safety Agency 1 Sep 2008 OPINION NO 03/2008. of 1 September 2008

European Aviation Safety Agency 1 Sep 2008 OPINION NO 03/2008. of 1 September 2008 European Aviation Safety Agency 1 Sep 2008 OPINION NO 03/2008 OF THE EUROPEAN AVIATION SAFETY AGENCY of 1 September 2008 for a Commission Regulation amending Regulation (EC) No 216/2008 of the European

More information

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament. Major Transport Infrastructure Projects Forth Replacement Crossing Principal Contract Project Office King Malcolm Drive, Rosyth KY11 2DY Steve Farrell Clerk to the Rural Economy and Connectivity Committee

More information

Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport. Consultation paper by BAA Gatwick

Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport. Consultation paper by BAA Gatwick Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport Consultation paper by BAA Gatwick Introduction 1. This paper seeks the views of interested parties

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

Cammachmore. Community Action Plan Prepared by Newtonhill, Muchalls & Cammachmore Community Council

Cammachmore. Community Action Plan Prepared by Newtonhill, Muchalls & Cammachmore Community Council Cammachmore Community Action Plan 2012 Prepared by Newtonhill, Muchalls & Cammachmore Community Council Map of Cammachmore obtained from Google maps Introduction In March 2012 Newtonhill, Muchalls & Cammachmore

More information

Edinburgh Airport Limited Consultation: A Draft Response Template.

Edinburgh Airport Limited Consultation: A Draft Response Template. Edinburgh Airport Limited Consultation: A Draft Response Template. This is the question which Edinburgh Airport Limited (EAL) has asked: What local factors should be taken into account when determining

More information

Code of Practice for filming in East Lothian

Code of Practice for filming in East Lothian Code of Practice for filming in East Lothian Film Edinburgh Part of Marketing Edinburgh Ltd Tel +44 (0)131 622 7337 Email: info@filmedinburgh.org Web: www.filmedinburgh.org filmedinburgh.org In order to

More information

SUBJECT: Integration of Health & Social Care Update from H&SC North Lanarkshire

SUBJECT: Integration of Health & Social Care Update from H&SC North Lanarkshire Meeting of Lanarkshire NHS Board: 30 th March 2016 Lanarkshire NHS Board Kirklands Fallside Road Bothwell G71 8BB Telephone: 01698 855500 www.nhslanarkshire.org.uk SUBJECT: Integration of Health & Social

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Puffins at Junctions Design & Modelling Implications. JCT Symposium Paper 18 September 2003

Puffins at Junctions Design & Modelling Implications. JCT Symposium Paper 18 September 2003 Puffins at Junctions Design & Modelling Implications JT Symposium Paper 18 September 2003 y rian F Simmonite Director JT onsultancy Ltd JT onsultancy Ltd Unit 4, 22 The Green Nettleham Lincoln LN2 2NR

More information

Report. on an investigation into complaint no 06/B/15306 against Plymouth City Council. 21 January 2008

Report. on an investigation into complaint no 06/B/15306 against Plymouth City Council. 21 January 2008 Report on an investigation into complaint no against Plymouth City Council 21 January 2008 The Oaks No 2, Westwood Way, Westwood Business Park, Coventry CV4 8JB Investigation into complaint no against

More information

Southwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock

Southwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock Southwest Scotland Transport Mitigation Forum 5 May 2015 Dumfries Arms Hotel, Cumnock In attendance David Elliot (Cumnock Community Council) Beth Griffin (Ochiltree Community Council) Alex Baird (Ochiltree

More information

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL Jackie Davies, Senior Technical Officer (UTC), Bristol City Council Traffic Signals Synopsis Bristol City Council has received

More information

EXETER AIRSPACE CHANGE PROPOSAL FAILURE OF ADHERENCE TO THE CONSULTATION PROCESS (CAP 725)

EXETER AIRSPACE CHANGE PROPOSAL FAILURE OF ADHERENCE TO THE CONSULTATION PROCESS (CAP 725) Airspace Regulator (Coordination) Devon and Somerset Gliding Club Ltd Airspace, ATM and Aerodromes North Hill Airfield Safety and Airspace Regulation Group Sheldon CAA House Honiton 45-59 Kingsway Devon

More information

Seat Belts on School Transport (Scotland) Bill [AS INTRODUCED]

Seat Belts on School Transport (Scotland) Bill [AS INTRODUCED] Seat Belts on School Transport (Scotland) Bill [AS INTRODUCED] CONTENTS Section 1 Duty to ensure seat belts fitted on dedicated school transport services 2 Meaning of dedicated school transport service

More information

Planning application for minor changes to extension, internal modifications and 1 off-street disabled parking space to Dublin City Council

Planning application for minor changes to extension, internal modifications and 1 off-street disabled parking space to Dublin City Council Senior Executive Officer, Planning Department, Dublin City Council, Civic Offices, Wood Quay, Dublin 8. 25 th February 2016 BY HAND Re: No 6 St. Mary s Road, Ballsbridge Dublin 4 Planning application for

More information

BEFORE THE DEPARTMENT OF TRANSPORTATION OFFICE OF AVIATION ENFORCEMENT AND PROCEEDINGS WASHINGTON, D.C.

BEFORE THE DEPARTMENT OF TRANSPORTATION OFFICE OF AVIATION ENFORCEMENT AND PROCEEDINGS WASHINGTON, D.C. BEFORE THE DEPARTMENT OF TRANSPORTATION OFFICE OF AVIATION ENFORCEMENT AND PROCEEDINGS WASHINGTON, D.C. ------------------------------------------------------, third-party complainant v. Docket DOT-OST-2015-

More information