::2:: 7. A copy of this order is available on internet and can be accessed at
|
|
- Carol Carroll
- 5 years ago
- Views:
Transcription
1 GOVERNMENT OF ANDHRA PRADESH ABSTRACT PRED MRR Proposals WORKS COSTING Rs Lakh for Providing BT Renewal Adinistrative sanction Accorded Orders Issued PANCHAYAT RAJ & RURAL DEVELOPMENT (PROGS.I) DEPARTMENT G.O.Rt DATED: Read the following: 1) Fro the ENC, Hyderabad Lr. W1/DEE1/BTR/12, dt ) Fro the ENC, Hyderabad Lr. W1//B.T.Renewals/2012 dt ***** O R D E R: In the reference 2 nd read above the Engineer-in-Chief, PR, Hyderabad has subitted proposals for BT renewals for 609 road works i.e. 309 works for Roads and 300 works for Non Roads for a total aount of Rs lakh for the period under Maintenance of Rural Roads Grant which were copleted under and Non. 2. The proposals have been exained and Governent hereby accord adinistrative sanction for an aount of Rs lakh for the period for 609 works as annexed to this order under MRR Grant under the following Head of Account. MJH 3054 Roads & Buildings MH 04 District & Other Roads. GH 196 Assistance to Zilla Parishads. SH (12) Assistance to Panchayat Raj Institutions for Maintenance of Rural Roads. 270 Minor works. 272 Maintenance. 3. The Engineer-in-Chief, PR, Hyderabad is directed to take up Maintenance of the roads by providing BT Renewals so as to not only protect the BT road assets already created but also to extend their life. It is further instructed to ensure durable and good riding surface with the presently sanctioned Maintenance works duly having necessary quantitative and qualitative checks and executing the works confiring relevant technical specifications. Propose aintenance of CD works wherever necessary. Reoval of High bers and jungle on the road argins ust be attended. Reoval of encroachents etc, in the road argins in towns and villages, which obstruct flow of rain water wherever necessary ay be attended. 4. The Engineer-in-Chief, PR should see that the works are executed within the adinistrative sanction aounts and no revision of estiated cost exceeding adinistrative sanction will be allowed. 5. The Superintending Engineer, PR, concerned should check and verify that the works sanctioned in Para 2 above is not already sanctioned/grounded/sei finished under any other grants. Any discrepancy noticed is to be brought to the notice of the higher authority iediately who will infor to Governent for further necessary action. The above instructions shall be followed scrupulously. If such works as sanctioned in this GO are already grounded etc., it ay deeed to have been cancelled autoatically and the sae ay be infored to Governent iediately for taking further necessary action. The technical estiate ust be verified by the concerned Executive Engineer, before grounding the work. Alternate sanctions will not be entertained. 6. The Engineer-in-Chief PR, Hyderabad shall take necessary action in the atter accordingly and subit the utilization Certificates to Governent soon after copletion of the works in the stipulated tie. P.T.O.
2 ::2:: 7. A copy of this order is available on internet and can be accessed at (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH) C.R. BISWAL PRINCIPAL SECRETARY TO GOVERNMENT To The Engineer-in-Chief, PR, Hyderabad. Copy to The Chief Engineer, PR, Hyderabad The Superintending Engineer, PR Concerned (Through Chief Engineer (PR), Hyd) The District Treasury Officer, Concerned. The Director of works and Accounts, Hyderabad The Accountant General, AP, Hyderabad The PS to Hon ble Min. (PR&RWS) The PS to Principal Secretary (PR). Sc/sf. //FORWARDED::BY ORDER// SECTION OFFICER
3 ANNEXURE TO THE G.O.RT. NO. 1840, PR&RD (PROGS.I) DEPT., DT: BT Renewals for & Non- Roads Under MRR Grant for Year Aount in District Constituency Nae of the work 1 Adilabad Asifabad BT Renewal to R/F PWD Road to Govindapur. 2 Adilabad Khanapur BT Renewal to R/F PWD road to Rapur 3 Adilabad Khanapur BT Renewal to R/F Kaval to Kothapet Adilabad Adilabad BT Renewal to R&B Road to Jaini via Laxipur BT Renewal to Road fro R&B Road to Adilabad Asifabad Jada Adilabad Asifabad BT Renewal to Road fro Tadihatnoor to Gunjala 4 Adilabad Bellapally BT Renewal to Bellapally Budha Guest house to Chandravelly Adilabad Bellapally BT Renewal to PWD road to Bugga Teple via Kannal 6 BT Renewal to R/F PWD Road to Adilabad Boath Mahaduguda (In K 0/0 to 3/5) Adilabad Chennur BT Renewal to Road fro PWD Road to Raakrishnapur Via Kyathanpalli MPP Mandaarri 8 Adilabad Chennur BT Renewal to Road fro Chennur to Arjungutta MPP Kotapally 9 BT Renewal to R/F Khanapur to Adilabad Khanapur Tharlapad 10 Adilabad Mancherial BT Renewal to PWD Road to Dwaraka, Via.Naspur. 11 Adilabad Mudhole BT Renewal to Kallur to Gollaadugu via kuntala 12 Adilabad Niral BT Renewal to PWD road to Dilawarpur Adilabad Niral BT Renewal to PWD road to Mujgi via Chityal BT Renewal to R/F. Peddabanda to Adilabad Sirpur(T) Jabuga Adilabad Sirpur(T) BT Renewal to R/F Nazrulnagar Counity Hall to Cap Non Adilabad Total 1 Anantapur Dharavara BT Renewal to Dharavara totadiarri via Thuala 2 Anantapur Guntakal BT Renewal to Devarapalli to Hanupalli 3 Anantapur Hinudpur BT Renewal to HB Road to Kirikera Weavers Colony 4 Anantapur Hinudpur BT Renewal to KA Road to Tualakunta 5 Anantapur Kadiri BT Renewal to AP Road to K.Pulakunta
4 Aount in District Constituency Nae of the work 6 Anantapur Kalyandurg BT Renewal to Setturu to Chintarlapalli Anantapur Kalyandurg BT Renewal to Approach road to Buddaiahdoddi & Gantaiahdoddi 8 Anantapur Penukonda BT Renewal to Rodda to Dodagatta Anantapur Puttaparthy BT Renewal to Approach road to Kandukurivandlapalli 10 Anantapur Singanaala BT Renewal to Approach road to Niluvurai 11 Anantapur Tadipatri BT Renewal to Yadiki to Bayareddypalli via Chinthalayapalli 12 Anantapur Tadipatri BT Renewal to Muchukota to Naanakapalli Anantapur Dharavara BT Renewal to Dhadithota to Chillavaripalli upto andal liits. 2 Anantapur Guntakal BT Renewal to Gooty to Nagasaudra road 3 Anantapur Kalyandurg BT Renewal to Kalyandrug to Mallipalli via Mudigallu 4 Anantapur Kalyandurg BT Renewal to Kabadur to Kotagudda 5 Anantapur Puttaparthy BT Renewal to Dharavara-Kodur Road to Iragapalli 6 Anantapur Rapthadu BT Renewal to C.K. Palli to Nyaaddala 7 Anantapur Rapthadu BT Renewal to Atakur to Peruru in K /0 to 35/0 8 Anantapur Singanaala BT Renewal to Kotanka to Garladinne- Penakacherla road in K 14/0 to 19/ Anantapur Singanaala BT Renewal to Gugudu to Maddipalli in K 4/0 to 14/0 10 Anantapur Tadipatri BT Renewal to R&B road to Varadayapalli 11 Anantapur Uravakonda BT Renewal to Golla to Beluguppa Non Anantapur Total 1 Chittoor Chandragiri BT Renewal to P.N road to Cherlopalle Chittoor Chandragiri BT Renewal to Pudi to Mundlapudi Chittoor Chandragiri BT Renewal to P.N road to Settipalle village road 4 Chittoor Chandragiri BT Renewal to Karakabadi road to Mangala 5 Chittoor Chandragiri BT Renewal to Rayalacheruvu road to Papireddilu via Chiguruvada 6 Chittoor Chittoor BT Renewal to Settinthangal to Naragallu
5 District Constituency Nae of the work 7 Chittoor Kuppa BT Renewal to Kuppa Vijalapura to Battuvaripalli 8 Chittoor Kuppa BT Renewal to KP road to Bandasettipalle 9 Chittoor Kuppa BT Renewal to Soniganipalle road to Yanaasanapalle 10 Chittoor Kuppa BT Renewal to Kuppa patchuru road to Mulakalapalle 11 Chittoor Madanapalle BT Renewal to MPL-NPL road to Mustoor 12 Chittoor Palaaner BT Renewal to Dandapalle road to Nagireddipalle 13 Chittoor Piler BT Renewal to VGG Road to Cherlopalli in KM 0/0-2/0 14 Chittoor Piler BT Renewal to VGG Road to Cherlopalli in KM 2/0-10/0 15 Chittoor Punganur BT Renewal to Soda Nanjapeta road to Pachariakula via Yerrathivaripalli and Buragaanda 16 Chittoor Puthalapattu BT Renewal to Diguvaogha to Nallpareddipalle 17 Chittoor Puthalapattu BT Renewal to Thubakuppa to Peruallapalle 18 Chittoor Satyavedu BT Renewal to Nagalaura Vebakaroad to Koltakadu 19 Chittoor Srikalahasthi BT Renewal to KT Road tothangellapale 20 Chittoor Srikalahasthi BT Renewal to P.N road to Subbanaidugunta 21 Chittoor Srikalahasthi BT Renewal to PN road to Annaswapalle 22 Chittoor Srikalahasthi BT Renewal to P.N road to Guthivari Palle 23 Chittoor Srikalahasthi BT Renewal to P.N. road to Vedullacheruvu 24 Chittoor Thaballapalle BT Renewal to PTM Kandukuru road to Gollapalle 1 Chittoor Chandragiri BT Renewal to Nennuru Kaapalli Road to Kandulavaripalli (via) Kotha Nennuru 2 Chittoor Chandragiri BT Renewal to C.Raapura to KKV Pura (via) Diguva Raapura 3 Chittoor Chittoor BT Renewal to Chittoor-Tiruttani Road to eet MCB Road (via) 197 Raapura 4 Chittoor G.D.Nellore BT Renewal to Chittoor Penuur road to Meet Nendragunta Penuur road via Adavipalli and Bandakindapalli 5 Chittoor Kuppa BT Renewal to Kuppa - Patchuru road to Vasanadu via Mnakaladoddi Aount in
6 District Constituency Nae of the work 6 Chittoor Kuppa BT Renewal to Road fro KP road to Peddaboanapalli 7 Chittoor Kuppa BT Renewal to KP road to Seegalapalli via Saaguttapalli 8 Chittoor Kuppa BT Renewal to Pandyalaadugu - Chakalakuppa Via Goriviakulapalli 9 BT Renewal to Tirupathi road to Chittoor Madanapalle Pothapolu road via Buchipalle 10 Chittoor Madanapalle BT Renewal to Bangalore road to Ponnetipale 11 Chittoor Nagari BT Renewal to The road fro Kosalanara to Patha Arcot road in Vijayapura Mandal 12 Chittoor Nagari BT Renewal to Road fro Vengalathuru road to Ururupeta via Mangalagiri Kandriga in Nindra andal 13 Chittoor Nagari BT Renewal to Road fro Thadukupeta to Vinayakapura road via Melapattu,Tharani in in Nagari andal 14 BT Renewal to MBT Road to Kotur via Chittoor Palaaner Meloi&Gundl Palle 15 Chittoor Piler BT Renewal to Providing B.T.S to the road fro VG road to Gollapalle 16 Chittoor Piler BT Renewal to K.V Palli road to Vangialluvaripalli (via) Chinthaakulapalli 17 Chittoor Piler BT Renewal to Ellaanda road to eet Elladna road via Kotapalle 18 Chittoor Piler BT Renewal to Agrahar-soda R & B road to Kaaittapalle 19 BT Renewal to MBT road to Chittoor Punganur Chandraakulapalle 20 Chittoor Punganur BT Renewal to R/F Thuduvaripalle to Venkayalavaripalle of Pulicherla Mandal Aount in Chittoor Punganur BT Renewal to PPC road to Chukkavandlapalle K 0/0 to 3/ Chittoor Satyavedu BT Renewal to KP road to Katrapalli 8.40 Y/C 23 Chittoor Satyavedu BT Renewal to P.V.Road to Endrapeta Chittoor Srikalahasthi BT Renewal to RPK Road to Madibaka Chittoor Srikalahasthi BT Renewal to Muchivolu road to Akkurthi 26 BT Renewal to Peddaandya road to Chittoor Thaballapalle Kayalaallu of Kotala Non
7 District Constituency Nae of the work Chittoor Total 1 East Godavari Aalapura BT Renewal to AY Road to KNF Road (via) A.Veavarappadu. 2 East Godavari Aalapura BT Renewal to Nadipudi to Varrepale of Nallacheruvu (via) Khabapadu. 3 East Godavari Aalapura BT Renewal to Srira Nagar Colony of Nadipudi to Kaba padu of Palagui 4 East Godavari anaparthy BT Renewal to Kuthukuluru to Pulagurtha 5 East Godavari Jaggapeta BT Renewal to Approach road to Yerrapale 6 East Godavari Kothapeta BT Renewal to Palivela-Pallipale R&B road to Sarepale 7 East Godavari Kothapeta BT Renewal to Rajavara-Podalada R&B road to Pujaripale 8 East Godavari Kothapeta BT Renewal to Rajavara-Podalada R&B road to Jithugapadu 9 East Godavari P.Gannavara BT Renewal to B.T Renewals to the Road fro Pappulavaripale to Kundalapalli 10 East Godavari P.Gannavara BT Renewal to B.T Renewals to the Road fro Z.P.Road to Chinnavaripeta of Irusuanda 11 East Godavari Peddapura BT Renewal to Tirupathi to Thatiparthi via Chandraapalli 12 East Godavari Pithapura BT Renewal to Jalluru to eet Saalkota-Uppada R&B road via Malla Govindarajupale 13 East Godavari Pithapura BT Renewal to Malla to eet Pithapura Kolanka ZP Road Via Virawada 14 East Godavari Prathipadu BT Renewal to -do- L.R.Pale N.N.Patna 15 East Godavari Rajanagara BT Renewal to Undeswarapura to 16 East Godavari Raachandrapu ra Butchapeta BT Renewal to Kolanka to Pallipale road to Corangi canal (Via) Naavaripale, Dugguduru, TR Pale (Proposed fro Kolanka to Naavaripale) BT Renewal to R/f Busigude to Tadepalli 17 East Godavari Rapa chodavara 1 East Godavari Aalapura BT Renewal to Road fro R & B road to Allavara to Maidithota SC colony 2 East Godavari Aalapura BT Renewal to Road fro R&B road to Settipeta of Bhathanavalli Aount in
8 Aount in District Constituency Nae of the work 3 East Godavari Aalapura BT Renewal to Munipalli to N Kothapalli East Godavari anaparthy BT Renewal to R&B road to L.N.Pura East Godavari anaparthy BT Renewal to R/f LN Pura to Kapavara 6 East Godavari Jaggapeta BT Renewal to Gandepalli to Kanupuru East Godavari Jaggapeta BT Renewal to 29/8 of R& B Gokavara to R.Yerrapale 8 East Godavari Kakinada BT Renewal to Ganganapalli Village Road 9 East Godavari Kakinada BT Renewal to Panduru to Naa road East Godavari Mandapeta BT Renewal to R&B to Nalluru East Godavari Muidivara BT Renewal to KM 81/4 of NH 214 to Krapa chintalapudi 12 East Godavari P.Gannavara BT Renewal to Road fro Bellapudi to Narendrapura (via) Adiulavaripoale 13 East Godavari Rajahundry BT Renewal to Kadia to Burrilanka Via Venkayaapeta 14 East Godavari Raachandrapu BT Renewal to Road fro Korangi cato ra Ithalapudi. 15 East Godavari Razole BT Renewal to BT Road fro Malikipura to Visweswarayapura via andal office 16 East Godavari Razole BT Renewal to R&B road to Gollavaripeta in Sakhinetipalli Lanka(V)Sakhinetipalli(M) BT Renewal to Tuni Pentakota R & B East Godavari Tuni road to Kavalapadu Non East Godavari Total Guntur Bapatla BT Renewal to NH 216 to Bhavanavaripale (Via) Chowdipale 2 Guntur Bapatla BT Renewal to MN R&B road to Nattalavaripale 3 Guntur Macherla BT Renewal to Veeranjaneyapura 7th Mile to Kothur, Macherla (M) 4 Guntur Narasaraopet BT Renewal to Satuluru to Dondapadu Guntur Narasaraopet BT Renewal to Chilakaluripet Major to Nallagarlapadu 6 Guntur Narasaraopet BT Renewal to Kesanapalli to P.Turakapale 7 Guntur Pedakurapadu BT Renewal to Thaavara to Podapadu
9 Aount in District Constituency Nae of the work 8 Guntur Prathipadu BT Renewal to Chinalingayapale to Kondabalavaripale 9 Guntur Sattenapalli BT Renewal to Road fro SAP-NRT road to Paludevaralapadu 10 Guntur Tadikonda BT Renewal to R/f Veuluripadu to Aeenabad 11 Guntur Tadikonda BT Renewal to R/f MG R&B road to Lingayapale 12 Guntur Tadikonda BT Renewal to R/f MR R&B road to uddandarayunipale road to Uddandarayudupale 13 Guntur Tenali BT Renewal to R&B Road to South Dalithawada of Nandivelugu 14 Guntur Veuru BT Renewal to Tenali-Cherukupalli R&B to yelavarru 15 Guntur Vinukonda BT Renewal to R&B road to Brahanapalli 16 Guntur Vinukonda BT Renewal to Bandlaotu to Malapadu Guntur Bapatla BT Renewal to NH 216 to Ranagar (Via) Putchakurthivaripale 2 Guntur Bapatla BT Renewal to Khajipale - P.V.pale R&B road to Kothapale (via) Parisavaripale 3 Guntur Chilakaluripet BT Renewal to Solasa to Sankuratripadu 4 Guntur Mangalagiri BT Renewal to TM R & B road at K /8 to Kolakaluru(via)Manchikalapudi,KR Konduru 5 Guntur Narasaraopet BT Renewal to Ropicherla Muppalla R&B Road to Raireddypale 6 Guntur Narasaraopet BT Renewal to Nrt- Ropicherla R&B 5.00 Road to Thungapadu 7 Guntur Pedakurapadu BT Renewal to R/f Pedakurapadu to Kannegnadla via Lagadapadu 8 Guntur Pedakurapadu BT Renewal to Velpur-Madipadu R&B Road to Zattupalli thanda 9 Guntur Ponnur BT Renewal to Ponnur - Chnadolu R & B road at K 2/8 to Koali via Jadavalli 10 Guntur Prathipadu BT Renewal to R/f GBC Road to PV Road 11 Guntur Repalle BT Renewal to Road fro PV Pale - Nizapatna R&B Road to Gattuvaripale (via) Satyanarayanapura,Pedapalli & Srinagar in Nagara(M) 12 Guntur Repalle BT Renewal to Road fro 4/7 Gullapalli- Nagara R&B road to Pudiwada
10 Aount in District Constituency Nae of the work 13 Guntur Sattenapalli BT Renewal to Mupulla to Narnepadu (via) L.Kurapadu 14 Guntur Sattenapalli BT Renewal to Road fro Golllapadu ot Dondapadu (via) K.V.Pale 15 Guntur Tadikonda BT Renewal to GNT - NRT R&B Road K 26/8 to Kandrika 16 Guntur Tadikonda BT Renewal to R/F Nudurupadu to Kandriga, Phirangipura Mandal 17 Guntur Tenali BT Renewal to Road fro Athota to Yadavapale 18 Guntur Tenali BT Renewal to G.H road to G.H road (via) Ganganaa teple in Khajipet 19 Guntur Veuru BT Renewal to Tenali-Vellaturu R&B to Penaarru via Ravikapadu Non Guntur Total Kadapa Badvel BT Renewal to NBB road to C Boyanapalli 2 Kadapa Badvel BT Renewal to NBB Road to Kothacheruvu 3 Kadapa J.Madugu BT Renewal to Providing BT to the road fro NBB road to Thorriveula of Mylavara Mandal 4 Kadapa Kaalapura BT Renewal to CT road to Venkateswarapura 5 Kadapa Kaalapura BT Renewal to C.P. road to Machunur via Konayapalli Chennarajupalli 6 Kadapa Mydukur BT Renewal to Road fro Bhooayapalli to Thiayapalli via Krishnapura 7 Kadapa Rajapet BT Renewal to BT road fro Mandapalli to Adavirachapalli 8 Kadapa Rayachoty BT Renewal to RV road to Kurnoothala (Via) Kakulavara 5/0 to 11/0 9 Kadapa Rayachoty BT Renewal to Chinnaande Kalibanda road to Chinna Nerusupalli Kadapa Badvel BT Renewal to CP Road to Bhakrapeta Kadapa Kaalapura BT Renewal to Bayanapalli to Balasinganapalli 3 Kadapa Kaalapura BT Renewal to CK road to Sugar factory Kadapa Kaalapura BT Renewal to CT road to Thollaganganapalli 5 BT Renewal to P.C.Road to Kadapa Kodur Ketharajupalli 6 Kadapa Kodur BT Renewal to C.K.Road to Thiayapale
11 Aount in District Constituency Nae of the work 7 Kadapa Mydukur BT Renewal to Sunkesula to Miduthur Kadapa Proddatur BT Renewal to Proddatur-Yerraguntla ain road to Nanganurpalli 9 Kadapa Pulivendula BT Renewal to R.V.Road to Varikuntapalli, Chakrayapeta (M) 10 Kadapa Rajapet BT Renewal to Providing BT to the road fro Nararajupalli to Mandanapalli in K 0/0 to 2/6 of Rajapet (M) Non Kadapa Total Karinagar Choppadandi Road fro Vilasagar to PR Road Veulawada Boinpally Via Desaipally, Ratnapet, Raannapet ( i.e. Desaipally to ZP Road liits ) 2 Karinagar Dharapuri BT Renewal to Road fro Ayacut road to Bathikepally 3 Karinagar Husnabad BT Renewal to Road fro Ghanpur to Aknoor. 4 Karinagar Karinagar BT Renewal to PWD road to Nagnoor Karinagar Manakondur BT Renewal to 8/0 K of T02 to Devapally 6 Karinagar Manakondur BT Renewal to R/F PWD road Maddikunta, Kalleda 7 Karinagar Manthani BT Renewal to R/F PWD T02 to Brahanpally, M.P.Mahadevpur 8 Karinagar Manthani BT Renewal to R/F T02 to Besthapally, M.P.Manthani 9 Karinagar Manthani BT Renewal to R/F PWD Road Yaanpally T01 to Konapet via Muthara, M.P.Mahadevpur 10 Karinagar Manthani BT Renewal to R/F PWD Road to 7.50 Raakistapur ZP Road via Madipally, M.P.Manthani 11 Karinagar Manthani BT Renewal to R/F Siripura to 5.00 Besthapally, M.P.Manthani 12 Karinagar Sircilla BT Renewal to R/F Kothapalli to Sirigadha 13 Karinagar Veulawada BT Renewal to R/F Approach Road to Ootupalli-M.P.Kathalapur 14 Karinagar Veulawada BT Renewal to R/F ZP Road to Kondapur-M.P.Konaraopet 15 Karinagar Veulawada BT Renewal to R/F Rudarangi to 7.50 Harizanawada-M.P.Chandurthy Karinagar Choppadandi Boinpally to Veulawada Karinagar Husnabad BT Renewal to ZP Road Akunur to Sarvaipet via Perkapalli
12 Aount in District Constituency Nae of the work 3 Karinagar Husnabad BT Renewal to R/F Kurella to Koheda Karinagar Husnabad BT Renewal to R/F R&B road to Mustafapoor vai Gollapally, Bheeadevarapalli 5 Karinagar Huzurabad BT Renewal to Jaikunta to Uppal (via) Bheepali 6 Karinagar Huzurabad BT Renewal to Kothapalli to kaalapur Karinagar Jagtial BT Renewal to R&B Road to BB Rao Palli (via) Jabithapur, 8 Karinagar Karinagar BT Renewal to PWD road to PWD road via Gopalpur 9 Karinagar Korutla BT Renewal to Mogilpet to Mallapur Karinagar Manakondur BT Renewal to Molangur CADA road to Rajapur 11 Karinagar Manthani BT Renewal to R/F Keshanpalli to Edulapur via Mydabanda, Machupet, Lakkara, Sarvara, M.P.Muthra (MNT) 12 Karinagar Peddapalli BT Renewal to R/F PWD Road Nittoor to Kodurpaka, M.P.Peddapalli 13 Karinagar Raagunda BT Renewal to Road fro Kukkalagudur to Potyal BT Renewal to R/F PWD Road to Karinagar Sircilla Chandrapet, M.P.Sircilla Karinagar Sircilla BT Renewal to Alaspur to Gollapalli BT Renewal to R/F Veulawada to Karinagar Veulawada Laxipur, M.P.Laxipur 17 Karinagar Veulawada BT Renewal to PWD Road to Rudrara Non Karinagar Total 1 Khaa Aswaraopeta BT Renewal to R/F Aswaraopeta to Naravarigude 2 Khaa Bhaddrachala BT Renewal to R/F Cherukuru to Peruru Khaa Kothagude BT Renewal to R/F Yanabile to Prabathnagar 4 Khaa Kothagude BT Renewal to R/F PWD road to Rapura 5 Khaa Madhira BT Renewal to R/F Nagulavancha to patharlapadu 6 Khaa Madhira BT Renewal to R/F Pandillapalli to Ananthasagar 7 Khaa Palair BT Renewal to R/F R&B road to Kasnathanda 8 Khaa Pinapaka BT Renewal to R/F PWD road to Raachandrapura
13 District Constituency Nae of the work 9 Khaa Sathupalli BT Renewal to R/F PWD road to Ganeshpadu 10 Khaa Sathupalli BT Renewal to R/F Kuppenakuntla to Janakipura 1 Khaa Khaa BT Renewal to R/F R&B road to Koduuru via Rudrakota & Puttakota 2 Khaa Khaa BT Renewal to Approach road to Manchukonda 3 Khaa Madhira BT Renewal to R/F Yerrupale Rly. Station to Jayanthi 4 Khaa Palair BT Renewal to R/F R&B road to Beerole via Kakaravai, Erragadda and Thallachervu 5 Khaa Pinapaka BT Renewal to R/F Krishnasagar Jr. College to ST Colony 6 Khaa Wyra BT Renewal to R/F Relakayalapalli to Tekulapalli 7 Khaa Yellandu BT Renewal to R/F Satyanarayanapura R & B Road to Chinna Krishnapura, Garla () Non- Khaa Total 1 Krishna Avanigadda BT Renewal to Road fro Narapala to Pittalanka 2 Krishna Gudivada BT Renewal to Link road to Pedalingala to Chinalingala fro MNK road 3 Krishna Jaggaiahpeta BT Renewal to Road fro Chittela to Singavara 4 Krishna Jaggaiahpeta BT Renewal to R/C NH9 to Katchavara(via) Takkellapadu. 5 Krishna Kaikaluru BT Renewal to Atapaka to Varahapatna 6 Krishna Machilipatna BT Renewal to M.E Road to Borrapathupale 7 Krishna Mylavara BT Renewal to Road fro NH9 to Tualapale. 8 Krishna Mylavara BT Renewal to Road fro MNK VV road to Patha Naguliuru 9 Krishna Mylavara BT Renewal to R/F I.T.road to Gurrajupale 10 Krishna Nandigaa BT Renewal to Road fro NH 9 Kesara to S.Aaravara 11 Krishna Nandigaa BT Renewal to Road fro CAD R&B Road to Munnaluru 12 Krishna Nandigaa BT Renewal to Road fro Gudietla to Krishna river Aount in
14 Aount in District Constituency Nae of the work 13 Krishna Paarru BT Renewal to Veeranki Lock to Peanaakuru bridge 14 Krishna Pedana BT Renewal to Kaza R & B road to Mutrasipale 15 Krishna Pedana BT Renewal to V.S R&B road to 9.00 Guruvindagunta 16 Krishna Pedana BT Renewal to PBG(R & B) road to Atchayyavaripale 17 Krishna Pedana BT Renewal to PBG Road to 9.90 Nageswararaopeta 18 Krishna Pedana BT Renewal to PBG Road to Manieswara 19 Krishna Pedana BT Renewal to Garsipudi R&B road to Chandala Dolagondi 20 Krishna Tiruvuru BT Renewal to MNK road to Jeellakunta Krishna Tiruvuru BT Renewal to Meduru to Kotha Arlapadu Krishna Gannavara BT Renewal to Kalavapaula to Veanda 2 Krishna Machilipatna BT Renewal to R&B Road to Tavisapudi Krishna Machilipatna BT Renewal to Machilipatna to Chittipale road 4 Krishna Nuzvidu BT Renewal to Gogulapadu to East Digavalli 5 Krishna Paarru BT Renewal to R&B Road to Matlaalapalli 6 Krishna Paarru BT Renewal to R&B Raod to Veulaadaalapalli 7 Krishna Penaaluru BT Renewal to Penaaluru to Vanukuru Krishna Penaaluru BT Renewal to Vuyyuru - Valluru road to Vuyyuru H/w 9 Krishna Penaaluru BT Renewal to Iproveents to the BT road fro KM 53/0 of VM road to Ventrapragada (via) Jabarlapudi and Mudunuru Non Krishna Total Kurnool Alur BT Renewal to Providing BT surface to the road fro Karidigudda to Muddanageri 2 Kurnool Banaganapalli BT Renewal to Yerragudi to Hussainapura. 3 Kurnool Koduur BT Renewal to Providing BT surface to road fro Varkur to Kallaparri 4 Kurnool Mantralaya BT Renewal to Providing BT surface approach road to Raapura
15 District Constituency Nae of the work 5 Kurnool Mantralaya BT Renewal to Providing BT surface approach road to Arlabanda 0/0 to 1/6 6 Kurnool Nandikotkur BT Renewal to Providing BT surface to the road fro Kaduur to Chowtkur 7 Kurnool Panya BT Renewal to Providing BT surface approach road to Durvesi. 8 Kurnool Pathikonda BT Renewal to Providing BT surface to the road fro Pagidiroy to Raalingayapalli 9 Kurnool Srisaila BT Renewal to Providing BT surface road fro Ernapadu to G. Singavara Aount in Kurnool Srisaila BT Renewal to BT road fro KG road to Indereswara. 11 Kurnool Srisaila BT Renewal to Seetharaapura to Mothkulapalli. 12 Kurnool Srisaila BT Renewal to O.N. road to 7.90 Nandipalli. 13 Kurnool Yeiganur BT Renewal to Providing BT surface to the road fro Parlapalli to Guvvaladoddi Kurnool Yeiganur BT Renewal to Providing BT surface to the road fro R&B road to Bapura Kurnool Adoni BT Renewal to GPA road to Sadapura Kurnool Allagadda BT Renewal to R/F Chagalaarri to Mundrallapalli in K 0/0 to 1/1 of Chagalaarri Mandal 3 Kurnool Alur BT Renewal to Chippagiri to Yerur Kurnool Banaganapalli BT Renewal to Road fro Perusoala to Peddaventurla via Kaavaripalli in K 0/0 to 5/0 upto Kadapa district border 5 Kurnool Dhone BT Renewal to Kurnool Bethacherla R&B road to Seetharapura 6 Kurnool Nandikotkur BT Renewal to KG road to P.Lingapura via., Tharigopula 7 Kurnool Nandyal BT Renewal to Road fro Pasurupadu to Jillella in K 0/0 to 4/9 8 Kurnool Panya BT Renewal to R/f Gadiveula to Regadiguduru road in Gadiveula(M) 9 Kurnool Pathikonda BT Renewal to Jonnagiri to Peapuly Non Kurnool Total
16 Aount in District Constituency Nae of the work 1 Mahabubnagar Alapur BT Renewal to Narayanpur to Pedda Audalapad 2 Mahabubnagar Alapur BT Renewal to R&B Road to Konkal Mahabubnagar Alapur BT Renewal to R&B Road to Pedda Dhanwada via Tanagala Mandoddi 4 Mahabubnagar Devarkadra BT Renewal to PWD road to Fareedpur Mahabubnagar Devarkadra BT Renewal to ZP Road to Thatikonda Mahabubnagar Kalwakurthy BT Renewal to PWD road to Kotra (V.R) Mahabubnagar Kalwakurthy BT Renewal to PWD Road to Charikonda (via) Mudvin 8 Mahabubnagar Kodangal BT Renewal to R/F. PWD road to Angadiraichur (via) Chitlapally 9 Mahabubnagar Kollapur BT Renewal to R/F PWD road Singota to Korlakunta (via) Badugadinne Mahabubnagar Kollapur BT Renewal to Tellarallapalli to Rajapoor 11 Mahabubnagar Mahabubnagar BT Renewal to ZP.Road to Gundyal Mahabubnagar Makthal BT Renewal to R/F. Maganoor to Warkoor 13 Mahabubnagar Makthal BT Renewal to R/F. Nerediga to Neredigadoddi 14 Mahabubnagar Nagarkurnool BT Renewal to R/F PWD road to Polepally 15 Mahabubnagar Nagarkurnool BT Renewal to R/F Chinnauddanur to Karvanga via Thallapally 16 Mahabubnagar Narayanpet BT Renewal to R/F. PWD road to Gunukla to Yeronipally 17 Mahabubnagar Wanaparthy BT Renewal to R/F Nagapur to Bandaraipakula 1 Mahabubnagar Achapet BT Renewal to Polishetty Palli PWD road to Golagunda (via)chennur,kondaredypally 2 Mahabubnagar Gadwal BT Renewal to R&B Road to Penchikalpad, Ghattu(M) 3 Mahabubnagar Gadwal BT Renewal to R&B Road to Palvai, Dharur(M) 4 Mahabubnagar Gadwal BT Renewal to R&B Road to Sindhanoor (via) Induvasi 5 Mahabubnagar Jadcherla BT Renewal to Road fro PWD Road at Boinpally to Mudhara via Mallapur,Gudiganipally 6 Mahabubnagar Mahabubnagar BT Renewal to R/F Hanwada to Kothlabad via Vepur 7 Mahabubnagar Makthal BT Renewal to PWD Road to Motlapally Atakur(M)
17 Aount in District Constituency Nae of the work 8 Mahabubnagar Makthal BT Renewal to PWD Road to Kollur Mahabubnagar Narayanpet BT Renewal to PWD road to Putpak via Eklaspur Narayanpet(M) 10 Mahabubnagar Narayanpet BT Renewal to PWD Road to Kollapally, Narayanpet(M) 11 Mahabubnagar Narayanpet BT Renewal to PWD Road to Gadapah via Vitalapur, Daargidda(M) Mahabubnagar Shadnagar BT Renewal to R/F Shadnagar to 1 J.P.Darga (via) Dooskal Non Mahabubnaga r Total Medak Andole BT Renewal to PWD road Uppariguda. 2 Medak Andole BT Renewal to Shivapet PWD road to Chakriyal. 3 Medak Andole BT Renewal to PWD road to Masanpally. 4 Medak Dubbak BT Renewal to R/F Makthaasanpally to Begupet via.bangla Venkatapur,Yelkal (2/0-4/0K) 5 Medak Dubbak BT Renewal to R/F Dubbak to Dupalapally (0/0-1/0K) 6 Medak Medak BT Renewal to R/F Nagsanpally PWD road to Yedupayal teple (0/0-1/2 k) Medak Narsapur BT Renewal to PWD road to Kistapur Medak Patancheru BT Renewal to R/F PWD road to Chennapur via Nallavally, Kothapally 9 Medak Sangareddy BT Renewal to SNT PWD road to Kulabgoor. 10 Medak Siddipet BT Renewal to R/F PWD road to Cherlankireddipally 11 Medak Siddipet BT Renewal to R/F PWD road to Ensanpally 1 BT Renewal to PWD road to Medak Andole Mansapally 2 Medak Andole BT Renewal to Khaapally to Chinnacheleda 3 Medak Andole BT Renewal to Neredigunta to Makthagude 4 BT Renewal to R&B road to R&B road Medak Dubbak via Khangal 5 Medak Dubbak BT Renewal to R&B road Yellareddipet to Thadkapally via Peddaasanpally (M)
18 6 District Constituency Nae of the work Medak Gajwel BT Renewal to BT Renewal on R/F Duddeda Road to Ankireddypally in MP Kondapak 7 Medak Gajwel BT Renewal to R/F Gajwel to Rajiv Rahadari via Muthrajpalli in MP Gajwel 8 Medak Gajwel BT Renewal to R/F Mulugu to Narsapalli in MP Mulugu 9 Medak Gajwel BT Renewal to R/F Meenajipet to Thunki Khalsa MP Wargal 10 Medak Medak BT Renewal to R/F PWD road to SC Colony, Kothapally 11 Medak Narayankhed BT Renewal to R/F. PWD road to Magdoopoor via Panchagaon, Ranapur, Thunur 12 BT Renewal to road fro Pothara to Medak Narsapur Palata 13 Medak Narsapur BT Renewal to PWD Road at Asanpally to Kulchara 14 Medak Narsapur BT renewals road fro SNT PWD road to Chinnaguttiukkala to Sinkindalapur 15 Medak Narsapur BT renewals SNT PWD road to Pothulabogada X road of Yeldurthy road 16 Medak Patancheru BT Renewal to Road fro Kodakanchi to Indresha 17 Medak Sangareddy BT Renewal to R/F Isailkhanpet NH9 to Erdanur 18 Medak Sangareddy BT Renewal to Ananthasagar PWD road to Sadasivapet via.rejinthal 19 Medak Sangareddy BT Renewal to Iproveents of BT road fro Nizapur to pottipally via Kollkur(Kolkur Liits)Nizapur to Kolkur Aount in Medak Siddipet BT Renewal to R/F Naretta to Nangnoor (via) Rachandrapur 21 Medak Siddipet BT Renewal to R/F PWD road to Konaipally (via) Velkatur 22 Medak Zaheerabad BT Renewal to NH-9 to Edakulapally Medak Zaheerabad BT Renewal to PWD road to Rathirth via Husselly 24 Medak Zaheerabad BT Renewal to Arjun naik Thanda to anegunta Non Medak Total Nalgonda Alair R/F Raigiri - Mothkur Road to Athakur Village 2 Nalgonda Devarakonda BT Renewal to R/F Devarakonda to Kaepally via Thatikole Telugupally 3 Nalgonda Huzurnagar BT Renewal to R/F PWD road to Sarvara via Abbireddygude
19 Aount in District Constituency Nae of the work 4 Nalgonda Huzurnagar BT Renewal to R/F Palakeedu to Sajjapura Thanda 5 Nalgonda Huzurnagar BT Renewal to R/F Nakkagude to Kistapura 6 Nalgonda Huzurnagar BT Renewal to R/F LB Nagar to Raachandrapura via Kondandara Pura 7 Nalgonda Kodad BT Renewal to R/F Bethole to Acharyulagude 8 Nalgonda Kodad BT Renewal to R/F Madjara (NH9) to Nelaarry 9 Nalgonda Kodad BT Renewal to R/f Hussainabad to Burkacherla Thanda 10 Nalgonda Miryalaguda BT Renewal to R/F Miryalaguda to Iylapur (via) Nandipahad 11 Nalgonda Munugod BT Renewal to R/F Kondapur to Neratte 12 Nalgonda Munugod BT Renewal to R/F NH 9 to Dharojigude 13 Nalgonda Munugod BT Renewal to PWD Road to Udthalapally 14 Nalgonda Nagarjuna Sagar BT Renewal to R/F Borraipale R&B Road to Thiapura (via) Harijathanda,kanyathanda 15 Nalgonda Nagarjuna Sagar BT Renewal to R/F Chepur to Theratigude 16 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kannekal to Dharapura 17 Nalgonda Nakrekal BT Renewal to R/F NH9 to Kuruarthy via Chervuannara 18 Nalgonda Nakrekal BT Renewal to R/F Narketpally to Mandra 19 Nalgonda Nakrekal NH9 to Pittapally Nalgonda Nakrekal R/F Uruadla to Nereda Nalgonda Nalgonda BT Renewal to Addanki road to Dachara 22 Nalgonda Nalgonda BT Renewal to R/F PWD road to Cherlagowrara via Darveshpur 23 Nalgonda Nalgonda BT Renewal to R/F PWD road to Anneparthy 24 Nalgonda Nalgonda Sagar PWD Road to Chinnaadara via Chetlachennara Nalgonda Suryapet BT Renewal to Dupahad to Mukundapur Nalgonda Suryapet BT Renewal to R/F shanti Nagar to Kusuavarigude via Dasaigude, Kesara 27 Nalgonda Thungathruthy PWD road to Monsingtanda via Thallasingara,Sola tanda 28 Nalgonda Thungathruthy PWD road to Uyyalawada
20 Aount in District Constituency Nae of the work 29 Nalgonda Thungathruthy BT Renewal to Donabanda x road to Shaligowrara zp road 30 Nalgonda Thungathruthy BT Renewal to BT R/F R&B Road to Itukalapahad Nalgonda Alair BT Renewal to R/F Alair to Aanabole road to Motakondur via Dilawarpur 2 Nalgonda Alair BT Renewal to R/F RM Road at Athakur to Ananthara via Koratikal 3 Nalgonda Bhongir BT Renewal to Ananthara to Hanuapura (balance work) 4 Nalgonda Bhongir BT Renewal to NH 9 to Saibrindavana (via) Deshukh 5 Nalgonda Devarakonda BT Renewal to R/f Devarakonda Mahaboob Nagar PWD road to Seripally road 6 Nalgonda Huzurnagar BT Renewal to R/F Merlllacheruvu to Vepala Madhara 7 Nalgonda Huzurnagar BT Renewal to R/F PWD Road to Karakkayalagude via Madhavarayanigude 8 Nalgonda Miryalaguda BT Renewal to R/F Miryalaguda to Dilawarpur (via) Chinthapally 9 Nalgonda Munugod BT Renewal to R/F Nagara PWD Road to Nagara (via) Turupugude 10 Nalgonda Munugod BT Renewal to R/F Donipaula to Thualapalli (via) Thiareddygude 11 Nalgonda Nagarjuna Sagar BT Renewal to B/W R/F pulicherla to Peddaguada (via) Geyanaik thanda 12 Nalgonda Nagarjuna Sagar BT Renewal to R/F Nagarjunasagar PWD Road to Marlagadda (via) Puliaidi 13 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kopally PWD road to Yellapura 14 Nalgonda Nagarjuna Sagar BT Renewal to R/F PWD road to 3.00 Pale 15 Nalgonda Nagarjuna Sagar BT Renewal to R/F Thiapur to Kachavarigude 16 Nalgonda Nagarjuna Sagar BT Renewal to R/F MLG DVK PWD road to Anuula 17 Nalgonda Nagarjuna Sagar BT Renewal to R/F LNG MBNR PWD road to Pittalagude 18 Nalgonda Nagarjuna Sagar BT Renewal to R/F Tripurara to Bejjikal 19 Nalgonda Nagarjuna Sagar BT Renewal to R/F Velagude to Sirsangandla via Basireddypally 20 Nalgonda Nagarjuna Sagar BT Renewal to R/F Pothunur to Pulicherla 18
21 District Constituency Nae of the work 21 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kanekal PWD road to Yerraballi 22 Nalgonda Nagarjuna Sagar BT Renewal to R/F Nagarjuna Sagar PWD road to Chintalapale 23 Nalgonda Nalgonda BT Renewal to Constn. Of Cause way across Kanagal Vagu at Thiannguda Aount in Non Nalgonda Total 1 Nizaabad Aroor BT Renewal to Baduguna to Ch Kondoor Crosing 2 Nizaabad Aroor BT Renewal to ROAD FROM PIPRI TO MANTHANIUPGRADATION 3 Nizaabad Balkonda BT Renewal to Manal togairigutta thanda 4 Nizaabad Banswada BT Renewal to PWD Road to Borla Near Bus depot 5 Nizaabad Banswada BT Renewal to R/F Birkur Pothangal road to Barengedgi 6 Nizaabad Bodhan BT Renewal to R/F: PWD Road to Bagepally vai Kunepally 7 Nizaabad Bodhan BT Renewal to Approach Road to 5.00 Jaala 8 Nizaabad Bodhan BT Renewal to PWD road to Posani Kunta Ootpalli 9 Nizaabad Jukkal BT Renewal to PWD road to Koa lancha 10 Nizaabad Jukkal BT Renewal to SNA PWD road to Rajula Via Bich kunda 11 Nizaabad Kaareddy BT Renewal to N.H.7 to Jangapally Nizaabad Kaareddy BT Renewal to Janaga Marry to Mohaada poor 13 Nizaabad Kaareddy BT Renewal to N.H. Way 7 to Kyasapally 14 Nizaabad Kaareddy BT Renewal to PWD road to Bhagirthpally 15 Nizaabad Nizaabad BT Renewal to PWD Road to Mallapur Rural 16 Nizaabad Nizaabad BT Renewal to PWD Road to Lola Rural (via) Yellareddypalli 17 Nizaabad Nizaabad BT Renewal to R/f Mailara to Rural Chintaloor 18 Nizaabad Nizaabad BT Renewal to PWD Road to Rural Ansanaplly 19 Nizaabad Yellareddy BT Renewal to Yellareddy to Soarpet Nizaabad Yellareddy BT Renewal to PWD road to Pothangal Kalan 21 Nizaabad Yellareddy BT Renewal to ZP road to Mathu Sange
22 Aount in District Constituency Nae of the work Nizaabad Aroor BT Renewal to Ch.Kondur to Badguna Nizaabad Balkonda BT Renewal to Konasaudra X Road to Aeernagar via Daannapet and Narsapur 3 Nizaabad Banswada BT Renewal to R/F:Strengthening R/F Bakarfar to Sunkini road via Digu Far 4 Nizaabad Bodhan BT Renewal to Balance work Road fro Nizapoor to Naleshwer 5 Nizaabad Bodhan BT Renewal to Approach Road Bodhan to Mosra Road via Anil Talkies Nizaabad Bodhan BT Renewal to PWD Road to Pandu For via Achenpally 7 Nizaabad Bodhan BT Renewal to R/F: Bandarpally X Road Chinna Mavandi via Pedda Mavandi Nizaabad Kaareddy BT Renewal to NH - 44 to Anthapally 9 Nizaabad Nizaabad BT Renewal to PWD road to Kulaspoor Rural thanda 10 Nizaabad Nizaabad BT Renewal to ZP road Gundara to Rural Sastrinagar 11 Nizaabad Nizaabad BT Renewal to Approach road to 8.00 Rural Tanakurd 12 Nizaabad Yellareddy BT Renewal to NH-7 to Thiranpally via Markal Non Nizaabad Total 1 Prakasa Addanki BT Renewal to Uppuagulur to Soavarappadu. 2 Prakasa Darsi BT Renewal to Rajapalli East Gayavara R&B Road to T.S.Pura 3 Prakasa Darsi BT Renewal to R&B Road to Polavara 4 Prakasa Kondepi BT Renewal to R/f Ankarlapudi to Mupparajupale 5 Prakasa Markapur BT Renewal to Road fro Rayavara to Kethagudipi (via) Goguladinne 6 Prakasa Ongole BT Renewal to Road fro Vengaukkapale - Konijedu (via) Survereddypale. 7 Prakasa Parchur BT Renewal to Eddanapudi to Vinjanapadu. 8 Prakasa Parchur BT Renewal to NH5 to Ananthavara Prakasa S.N.padu BT Renewal to Road fro Aanabrolu to Paidipadu (Oivara to old Madras Road). 20
23 Aount in District Constituency Nae of the work Prakasa Addanki BT Renewal to Sajjapura to Karuanchi (via) Elchuru 2 Prakasa Darsi BT Renewal to Talluru to Kunkupadu Prakasa Darsi BT Renewal to Dosakayalapadu to Lakkavara 4 Prakasa Giddaluru BT Renewal to Koorole to Chintalapally (via) Purushothapalli, K.Bonthapally 5 Prakasa Kandukur BT Renewal to Road fro Gudlur to RC Agrahara 6 Prakasa Kanigiri BT Renewal to OV road to Rangapeta R&B road 7 Prakasa Kondepi BT Renewal to R/f Konijedu to Ponduru Prakasa Markapur BT Renewal to Markapura to Gajjalakona Via Naidu pally 9 Prakasa S.N.padu BT Renewal to OK road to Busarapalli Prakasa Y.Pale BT Renewal to Yerragonda Pale R&B Road to Pullalacheruvu Non Prakasa Total 1 Ranga Reddy Chevella BT Renewal to R/M & BT on R/F PWD Road to Yetla Erravelly 2 Ranga Reddy Maheshwara BT Renewal to R/F Aeerpet to Manikyaguda,Maheswara (M) Ranga Reddy Chevella BT Renewal to R/F Shankerpally PWD Road to Tangutur 2 Ranga Reddy Chevella BT Renewal to R/F PWD Road to Yellakonda (Via) Lingapally 3 Ranga Reddy Chevella BT Renewal to R/F PWD Road to Gopulara 4 Ranga Reddy Ibrahipatna BT Renewal to R/F Mangalpally Patelguda to Sahebguda 5 Ranga Reddy Ibrahipatna BT Renewal to R/F Nerapally to Majeedpur 6 Ranga Reddy Ibrahipatna BT Renewal to R/f Polkapalli to Dhandiyalara (via) Narapally of Ibrahipatna andal 7 Ranga Reddy Ibrahipatna BT Renewal to Peddaaberpet to Pasuanula of Hayatnagar Mandal 8 Ranga Reddy Ibrahipatna BT Renewal to Adibatla to Nadergul Ranga Reddy Maheshwara BT Renewal to R/F Kandukur X Road to Meerkhanpet
24 District Constituency Nae of the work 10 Ranga Reddy Maheshwara BT Renewal to R/F PWD Road to Gudur 11 Ranga Reddy Maheshwara BT Renewal to R/F PWD Road to Jalpally, Saroornagar (M) 12 Ranga Reddy Maheshwara BT Renewal to Agaliyaguda to Thiapur road, Kandukur (M) 13 Ranga Reddy Maheshwara BT Renewal to Maheswara to Kavalanibavithanda, Maheswara (M) 14 Ranga Reddy Medchal BT Renewal to S/R to R/F CRPF Gate-II to ZP Road at Jawaharnagar of Shaeerpet andal 15 Ranga Reddy Pargi BT Renewal to R/F PWD Road to Enkepally 16 Ranga Reddy Pargi BT Renewal to R/F PWD Road to Kankal via Pedda Uental 17 Ranga Reddy Pargi BT Renewal to PWD Road to Dharapura 18 ranga Reddy Pargi BT Renewal to Mahaadabad PWD Road to Raalaya 19 Ranga Reddy Quthbullapur BT Renewal to R/F Dulapally to Jeedietla Industrial Area 20 Ranga Reddy Quthbullapur BT Renewal to R/F Narsapur PWD Road to Nuthankal PWD Road via D.P. Pally, Dundigal, Nagloore 21 Ranga Reddy Rajendranagar BT Renewal to R/F PWD Road to Sultanpally 22 Ranga Reddy Rajendranagar BT Renewal to R/F PWD Road Faaish Hotel to Hydershakote janda X Road Aount in Ranga Reddy Tandur BT Renewal to Renewal BT on R/F Peddeul to Siddana adugu tanda up to Nagulapally for 3.50 laid in the Year 2001 fro 0/0-2/8&3/9-4/6s 24 Ranga Reddy Vikarabad BT Renewal to Renewal BT on R/F 1 PWD Road Kerelly to Nagara via Zaidpally Tharigoppula Non Ranga Reddy Total 1 SPSR Nellore Atkur BT Renewal to NB road to Thikkavara SPSR Nellore Atkur BT Renewal to R&B road to Pallipale 9.00 of Annareddypale 3 SPSR Nellore Gudur BT Renewal to Road fro MC Road tod G-Y Road (Via) Potupale 4 SPSR Nellore Kavali BT Renewal to RI Road to Allur Galidibbalu 5 SPSR Nellore Sullurupeta BT Renewal to N.D Road to Nellorepalli
25 Aount in District Constituency Nae of the work 6 SPSR Nellore Survepalli BT Renewal to Venkatachala Kasuuru road to N.P road via kandalapadu, Pullatheegalapadu and Siddavarappadu 7 SPSR Nellore Survepalli BT Renewal to MC Road to Pidur SPSR Nellore Udayagiri BT Renewal to Chinannalur to Krishnareddy pale (via) Thoguru vanaipale T.Malapale 9 SPSR Nellore Udayagiri BT Renewal to KU road to Lakshipura (via) Kaavari pale SPSR Nellore Venkatagiri BT Renewal to V-R road to Chapalapalli SPSR Nellore Kovur BT Renewal to Providing B.T.Renewal road fro Chowkacherla to Pallipale in Vidavalur Mandal. 2 SPSR Nellore Nellore Rural BT Renewal to Nellore to Mutkur road (via) Rajupale, Chintareddypale & Vaviletipadu 3 SPSR Nellore Sullurupeta BT Renewal to Road fro M-M road to IT road (via) Manganellore and SM Tageli 4 SPSR Nellore Survepalli BT Renewal to Providing B.T. Renewal road fro Macherlavaripale branch road in T.P.Gudur Mandal SPSR Nellore Survepalli BT Renewal to Providing B.T.Renewal to Koverapale branch road in T.P.Gudur (M) 6 SPSR Nellore Survepalli BT Renewal to Providing B.T.Renewal to Kothapale branch road (via) Potlapudi in T.P.Gudur (M) 7 SPSR Nellore Venkatagiri BT Renewal to Utukur to Peruallapadu Non SRSP Nellore Total 1 Srikakula Aadalavalasa BT Renewal to Kintali to Kajipeta Srikakula Ichapura BT Renewal to Road fro Innisupeta to Rajapura 3 Srikakula Palakonda BT Renewal to A.B.Road to Keesari Srikakula Pathapatna BT Renewal to P.T.Road to Thapa 5 Srikakula Pathapatna BT Renewal to T.G.Road to Karajada Srikakula Pathapatna BT Renewal to A B Road to Miriapalli via Turakapeta 7 Srikakula Pathapatna BT Renewal to A.B.Road to Irapadu Srikakula Raja BT Renewal to VP Road to AV Pura via Sirla
26 Aount in District Constituency Nae of the work 9 Srikakula Raja BT Renewal to U/G to the road fro M.S. pura to Peddipeta (Via) Kopparavalasa and Polinaiduvalasa. (VR) 10 Srikakula Srikakula BT Renewal to Mittannapeta to Balarapura 11 Srikakula Srikakula BT Renewal to C.S.P road to NH5 (via) Gude,Chapura 12 Srikakula Tekkali BT Renewal to NH5 to Badaga Srikakula Aadalavalasa BT Renewal to Road fro CSP road to Dusi R&B road via Vanjangi and Vanjagipeta 2 Srikakula Etcherla BT Renewal to NH5 to Kuppili Road Srikakula Ichapura BT Renewal to NH5 to Jagati Silaga road via Dasariputtuga silaga 4 Srikakula Narasannapeta BT Renewal to NH5 to Potayyavalasa 5 Srikakula Palasa BT Renewal to BT road Yerraukka to Ratti via Marripadu 6 Srikakula Srikakula BT Renewal to Road fro Killipale to Kunduvanipeta Non Srikakula Total 1 Visakhapatna Anakapalli BT Renewal to Providing BT road to Rajupale to Gorlevanipale via. Valluru 2 Visakhapatna Anakapalli BT Renewal to Atcherla to Gokivanipale 3 Visakhapatna Anakapalli BT Renewal to Tupala to AKP-CDM road via Dibbapale 4 Visakhapatna ArakuVally BT Renewal to R/f Bakuru to Patigaruvu Visakhapatna ArakuVally BT Renewal to R & B road to Kilagada Visakhapatna Bheeili BT Renewal to R/f NH5 to Kuaripale via. Yathapeta 7 Visakhapatna Bheeili BT Renewal to Vijayanagara-Sontya road to Buddivalasa(Nerallvalasa) 8 Visakhapatna 9 Visakhapatna 10 Visakhapatna 11 Visakhapatna 12 Visakhapatna Chodavara Chodavara Madugula Madugula Narsipatna BT Renewal to Chodavara to Daanapalli BT Renewal to R.E.C. Road to P.Bheeavara BT Renewal to K.Kotapadu to Medicharla BT Renewal to Jaithavara to Dibbapale BT Renewal to NRPM- Tuni road to Manyapu-ratla
27 District Constituency Nae of the work 13 Visakhapatna Narsipatna BT Renewal to Makavarapale R&B road to PP Agrahara & Adduruwada Aount in Visakhapatna 15 Visakhapatna 16 Visakhapatna Narsipatna Narsipatna Narsipatna BT Renewal to Narsipatnarevupolavara R& B road to Dharasagara BT Renewal to Narsipatna-Tuni R&B road to MB Patna BT Renewal to Narsipatna-Tuni R&B road toanyapuratal( Balance reach) Visakhapatna Paderu BT Renewal to R&B road to Gopavara Visakhapatna Paderu BT Renewal to PL Road to Vanjari Visakhapatna Payakaraopeta BT Renewal to Approach road to Veagiri 20 Visakhapatna Pendurthi BT Renewal to R/f AKP-SBM to Iruwada Visakhapatna Pendurthi BT Renewal to R/f SBM Venkannapale road to Pedayathapale via. A.Sirasapalli 22 Visakhapatna Yellaanchili BT Renewal to Kattubolu to Murakada 23 Visakhapatna 1 Visakhapatna Yellaanchili Anakapalli BT Renewal to R/f AKP-Pudiadaka road to Arabupale BT Renewal to Providing BT to the road fro Nh-5 to Valluru via Rajupale (Balance length other than ) Visakhapatna Bheeili BT Renewal to BN road to Kothavalasa via Raavara BD Pale Visakhapatna Paderu BT Renewal to Koyyuru to Revalla Visakhapatna Paderu BT Renewal to Pentapadu to 8.00 Daanapalli 5 Visakhapatna Payakaraopeta BT Renewal to NH-5 to Devavara Visakhapatna Pendurthi BT Renewal to BN road to Sabbavara AKP road via Nallaregulapale, Balijapale & Aulapale 7 Visakhapatna Yellaanchili BT Renewal to PNR Peta to Mulakalapalli, Etikoppaka ring road Non Visakhapatna Total 1 Vizianagara Bobbili BT Renewal to NH43 to Kottakki 25
28 District Constituency Nae of the work 2 Vizianagara Cheepurupalli BT Renewal to GB road to Sivaraparla road (via) Devada and Nadipenapeta 3 Vizianagara Cheepurupalli BT Renewal to GG road to Ippalavalasa 4 Vizianagara Cheepurupalli BT Renewal to Garividi Garbha road to Pedabantupalli via Routhupeta (MP) 5 Vizianagara Cheepurupalli BT Renewal to R/f Alugolu to Konuru via Ragolu (MP) 6 Vizianagara Cheepurupalli BT Renewal to Puthikapeta to Chintalapeta 7 Vizianagara Cheepurupalli BT Renewal to G.G.Road to Chinabantupalli 8 Vizianagara Gajapathinagara BT Renewal to NH43 to Kerata (via) Billalavalasa (2/0 to 4/0) 9 Vizianagara Nellierla BT Renewal to Nelliarla-Moida R&B road to Garikivalasa (via) Kondagupa 10 Vizianagara Parvathipura BT Renewal to Road fro SH 36 to Yegotivalasa 11 Vizianagara Salur BT Renewal to Kothavalsa to Mirthivalasa 12 Vizianagara Vizianagara BT Renewal to V.K.road to Pedaveali Jn (via) Korukonda & Korukondapale Aount in Vizianagara Cheepurupalli BT Renewal to CPP Laveru road to Ardivalasa 2 Vizianagara Gajapathinagara BT Renewal to V.B.road to PSR pura (via) Korla 3 Vizianagara Gajapathinagara BT Renewal to NH43 to Donkinavalasa (via) Chowdantivalasa 4 Vizianagara Kurupa BT Renewal to DL Pura to Jubiri Vizianagara Nellierla BT Renewal to Munginapalli to Nelliarla (via) Saripalli 6 Vizianagara Salur BT Renewal to NH43 to Gadivalasa Non Vizianagara Total 1 Warangal Bhupalpally BT Renewal to Chinnakodepaka to Gollapalli via Balaiahpalli 2 Warangal Bhupalpally BT Renewal to R&B Road to Vellapally 3 Warangal Ghanpur (Stn) BT Renewal to Raghunathpally to Veldi Warangal Jangaon BT Renewal to Thallathanda to Machupahad
Office Pinciode Status A.K.Nagar SO Addanki SO Adilabad HO HO adoni HO Akividu SO Akkayyapalem SO SO
Office Pinciode Status A.K.Nagar 524004 SO Addanki 523201 SO Adilabad HO 504001 HO adoni 518301 HO Akividu 534235 SO Akkayyapalem SO 530016 SO Allagadda MDG S.O 518543 SO Amadalavalasa 532185 HO Amadalavalasa
More informationREADERSHIP IRS DATA -2014
READERSHIP IRS DATA -2014 READERSHIP OF IRS 2014 FOR BOTH ANDHRA PRADESH AND TELANGANA STATES AP+TS Andhra Pradesh Telangana IRS 2014 IRS 2013 inc/dec IRS 2014 IRS 2013 inc/dec IRS 2014 IRS 2013 inc/dec
More informationDate: No.of Calendar No.of Diary 20. Min Code. Address 39 THE GENERAL MANAGER INDIA GOVT.MINT HYDERABAD ANDHRA PRADESH
Page State Code: 3 State: 39 THE GENERAL MANAGER INDIA GOVT.MINT HYDERABAD-0000 Date: 6-03-0 0 8 DY.DIRECTOR GENERAL DTE. FIELD PUBLICITY MINISTRY OF I & B KENDRIYA SADAN GROUND FLOOR SULTAN BAZAR,KOTI
More informationELECTRONIC MANUFACTURING CLUSTER - II
ELECTRONIC MANUFACTURING CLUSTER - II at Vikruthamala (V), Yerpedu (M), Chittoor (D) APIIC Limited - Implementing Agency Babu A, IAS Vice Chairman & Managing Director T: 0866-2428301 E: vcmd.ap.apiic@nic.in
More informationBVSR Constructions Pvt. Ltd. ANDHRA PRADESH STATE-WISE ACTIVITIES OF BVSR AT A GLANCE:
ABOUT US BVSR Constructions Pvt. Ltd is one of the leading and fast growing ISO 9001-2008 Construction Company in India having established a strong reputation at National level in executing medium to large
More informationROADS & BUILDINGS DEPARTMENT. Lr.No.3042/AP second Highway Report/2005, dated:
ROADS & BUILDINGS DEPARTMENT From : Sri M.Venugopala Rao M.Tech. Superintending Engineer (R&B) Seethammadhara, 530 013, e-mail : serbvizag@gmail.com Fax : 0891-2553265 To The Chief Engineer, (R&B), M.D.,
More informationDEPARTMENT OF INFORMATION AND PUBLIC RELATIONS, GOVT.OF A.P., HYD. RELEASE ORDER REGISTER
3138/CL/ADVT/1/1/2012-13 14443 05/11/2012 02-11-2012 Ammendments 3 X 2 06/11/2012 Ref. No : T1/Tenders/10 to 14/2012-13, Dt.30.10.2012 of Supdtg. NEETI DINA PATRIKA SURYKARIMNAGAR 24 5,832 Engineer, Panchayat
More informationProf. V.S.R.K.Prasad, Principal, ANITS, Sangivalasa, Bheemunipatnam, Visakhapatnam
Present : The following members were present: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Prof. V.S.R.K.Prasad, Principal, ANITS, Sangivalasa, Bheemunipatnam, Visakhapatnam Prof. Prameela Rani Avula, Principal and
More informationRESUME. Ar. SWAYAMPAKULA JANAKI RAMA MURTHY PRINCIPAL -Acharya Nagarjuna University College of Architecture and Planning,Nagarjuna Nagar,GUNTUR-
1 RESUME Ar. SWAYAMPAKULA JANAKI RAMA MURTHY PRINCIPAL -Acharya Nagarjuna University College of Architecture and Planning,Nagarjuna Nagar,GUNTUR- B. Arch,.PGD in Ecology and Environment and PGD in Jyothir
More information2 NEW INDIAN EXPRESS Per Square Centimeter B&W
GOVERNMENT OF ANDHRA PRADESH DEPARTMENT OF INFORMATION & PUBLIC RELATIONS 2nd Floor, Samachar Bhavan, A.C. Guards, Hyderabad - 500 028. MASTER COPY (01.06.2011) (BIG NEWSPAPERS) Latest advertisement rates
More information11 th Annual Conference Road Development in India Telangana State Initiatives
11 th Annual Conference Road Development in India Telangana State Initiatives 24 th August 2016 New Delhi Bikshapathi Kondai Engineer in Chief R&B, Telangana State New Telangana State - Infrastructure
More informationProf. Yechuri. Venkateswara Rao, Professor, Department of Botany College of Sciences and Technology, Andhra University, Visakhapatnam
Present : The following members were present: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Prof. V.S.R.K.Prasad, Principal, ANITS, Sangivalasa, Bheemunipatnam, Visakhapatnam Prof. Yechuri. Venkateswara Rao, Professor,
More informationVideo Coverage s by Information and Public Relations Department, For the Month of DECEMBER 2017.
S. No Date 1 01.12.2017 Video Coverage s by Information and Public Relations Department, For the Month of DECEMBER 2017. Description of the Programe Political leaders from Allagadda & S.Kota (Vizainagaram
More informationMINUTES OF THE 75 th MEETING OF STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (SEIAA), ANDHRA PRADESH HELD ON , AT HYDERABAD.
MINUTES OF THE 75 th MEETING OF STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (SEIAA), ANDHRA PRADESH HELD ON 03.12.2015, AT HYDERABAD. 1 Present : The following members were present: 1. Sri S. Balasubramnayam
More informationTATA AIG as on 15-May Page 1
http://www.tataaiginsurance.in/ Total No of Network 4343 No of Ayurvedic s 21 No of s Empanelled in 7 this week No of s De-empanelled in 10 this week State City Area Pincode Name Address Contact Person
More informationS.NO REGION STORE NAME ADDRESS /6,NEWTOWN MAIN ROAD, BESIDE ANDHRABANK ATM, MAHABOOBNAGAR,TELANGANA, AP 1 A. HYD & TEL MAHABOOBNAGAR
S.NO REGION STORE NAME ADDRESS 1 A. HYD & TEL MAHABOOBNAGAR 1-5-35/6,NEWTOWN MAIN ROAD, BESIDE ANDHRABANK ATM, MAHABOOBNAGAR,TELANGANA, AP 2 A. HYD & TEL METTUGUDA - MAHABOOBANAGAR - 2 3 A. HYD & TEL KALWAKURTHY
More informationDISTRICT-WISE NEWSPAPERS LIST EMPANELLED IN I&PR DEPT. AS ON
DISTRICT-WISE NEWSPAPERS LIST EMPANELLED IN I&PR DEPT. AS ON 16.1.2010 Srikakulam District 1 Kalingaseema Srikakulam 2 People's Vision Srikakulam 3 Satyam Srikakulam 4 Visesha Varthala Janasri Surya Srikakulam
More informationISO 9001 : 2008, ISO : 2004 OHSAS : 2007 Certified Company AVENUES PVT. LTD. w w w. p r a k r u t i a v e n u e s.
ISO 9001 : 2008, ISO 14001 : 2004 OHSAS 18001 : 2007 Certified Company Prakruti AVENUES PVT. LTD. w w w. p r a k r u t i a v e n u e s. c o m SYMBOL OF Prakruti Prakruti... The smart way to invest for
More information26 TELANGANA HYDERABAD ECIL X ROADS REGULAR SHOP NO 5, MCH NO. B1 EC,ECIL X ROAD,HYDERABAD, AP
OFFER Upto 20% off on various products applicable at Offline Store visit & Online Store of Apollo For offline - Apollo Pharmacy Store Visit:- 10% off on Medicines (Excluding DPCO Drugs) 5% off on FMCG
More informationIndia - State-wise Wastelands Distribution (Percentage to total geographical area)
WASTELAND MAP 25-6 INDIA Figure. 1 Gullied/ Ravine land-medium ravine Gullied/Ravine land-deep/ very deep ravine Scrubland - Land with dense scrub Scrubland - Land with open scrub Waterlogged and marshy
More informationProf. Yechuri. Venkateswara Rao, Professor, Department of Botany College of Sciences and Technology, Andhra University, Visakhapatnam
Present : The following members were present: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Prof. V.S.R.K.Prasad, Principal, ANITS, Sangivalasa, Bheemunipatnam, Visakhapatnam Prof. Yechuri. Venkateswara Rao,
More informationINDUSTRY REPORT AEROSPACE AND DEFENCE 2018
INDUSTRY REPORT AEROSPACE AND DEFENCE 2018 Compiled for Knowledge partner November 2018 INDEX Overview of Aerospace & Defence Industry in India 03 Why Telangana & Andhra Pradesh? 04 Demand Drivers Existing
More informationPhase-1 & 2 For happy lives
Approved Layouts LP No. 9/LO/PLG/HMDA/9 LP No.9/LO/PLG/HMDA/SHZ/2012 at NH-7 Hyderabad - Bangalore 6 tracks Express Highway Nandigama (V), Kothur (M) Near DLF Garden City Phase-1 & 2 About Us... Phase-1
More informationMERCHANT STORE ADDRESS CITY STATE_NAME
MERCHANT STORE ADDRESS CITY STATE_NAME Sirimalle Square, Plot No. 8,9,10,Survey no. 523/B,Pillar No.160,Attapur,R N Mandal HYDERABAD Sirimalle Square, Plot No. 8,9,10,Survey no. 523/B,Pillar No.160,Attapur,R
More informationINDUSTRY-ACADEMIA PARTNERSHIP
SIDDHARTH INSTITUTE OF ENGINEERING & TECHNOLOGY INDUSTRY-ACADEMIA PARTNERSHIP Industry academia programme is a new generation of professional education system in science and Engineering.Siddharth Institutions
More informationDomestic Travel Policy CMS
Page 1 of 10 Domestic Travel Policy CMS Policy Manual: Version 2/2013 Page 1 of 10 Page 2 of 10 1.0 Objective: To reimburse the traveling expenses incurred by Management Staff on work. 2.0 Effective Date:
More informationFigure 5.1: Sub-Services Sector contribution to Services GVA in (AE) Other services 15% Trade, Repair, Hotels and Restaurants 23%
Chapter5 SERVICES SECTOR As incomes continue to rise, people s needs become less material and they begin to demand more services -in health, education, entertainment, and many other areas. The World Bank
More informationANDHRA PRAGATHI GRAMEENA BANK HEAD OFFICE : KADAPA. Cir No BC-ITD Date:
ANDHRA PRAGATHI GRAMEENA BANK HEAD OFFICE : KADAPA Cir No. 182-2010-BC-ITD Date: 27-08-2010 Creation of Product Code and parameters in TBM for Pragathi Ujvala Deposit Attention of the Branches/ECs/Regional
More informationMPN index of coliform Bacteria. Residual Chlorine Mg/1. per 100 ml. Exact Location Remarks. 0.5 Nil satisfactory. 1 Nil satisfactory
Residual Chlorine Mg/1 MPN index of coliform Bacteria per 100 ml Nature of coliform Bacteria isolated Date of Collection Lab Ref No Resudial Chlorine mg/1 MPN index coliform Bacteria per 100 ml Nature
More informationDETAILS OF COCO OUTLETS- UPDATED AS ON 03 APR 2017
DETAILS OF COCO OUTLETS- UPDATED AS ON 03 APR 2017 S.NO COMPANY NAME LOCATION BANK GUARANTEE LAST DATE OIL COMPANY 1 IOCL BHAGAT KI KOTHI, JODHPUR, RAJASTHAN 21.5 LACS 2/4/2017 EXTN 02 MAY 17 2 BPCL NO
More informationVAMSADHARA AND EAST FLOWING RIVERS BETWEEN
S. No CONTENTS Page MAHI BASIN 1-8 1 Agreement between Rajasthan and Gujarat for the expolitation of Mahi river. 2 Agreement between Rajasthan and Gujarat, supplemental to the agreement arrived at in 1966
More informationGovt ITI Govt District Level Training Centre / ITI Vikarabad, Hyderabad(Ranga Reddy) - 501101 1 Carpenter 2 Electrician 4 Machinist 5 Mechanic (Motor Vehicle) 6 Mechanic Radio and Television 7 Turner Siva
More informationAdvertisement rates of newspapers in the media list of Information & Public Relations Dept. (SMALL & MEDIUM NEWSPAPERS (as on 21.4.
DEPARTMENT OF INFORMATION & PUBLIC RELATIONS 2nd Floor, Samachar Bhavan, A.C. Guards, Hyderabad - 500 028. Advertisement rates of newspapers in the media list of Information & Public Relations Dept. (SMALL
More informationAIRPORTS AUTHORITY OF INDIA
AIRPORTS AUTHORITY OF INDIA Tender id:- 2018_AAI_15216_1 NOTICE INVITING OF FINANCIAL BIDS UNDER EOI (EXPRESSION OF INTEREST) FROM EMPANELLED CA/CMA FIRMS OF SOUTHERN REGION FOR APPOINTMENT OF INDEPENDENT
More informationANALOG IAS INSTITUTE 2nd Floor, /32, Indira Park 'X' Roads, Domalguda, Hyderabad
ANALOG IAS INSTITUTE 2nd Floor, 1-2-288/32, Indira Park 'X' Roads, Domalguda, Hyderabad 500029 Ph. No: 040-64590440, 9912441137 www.analogeducation.in VISAKHAPATNAM(VIZAG) Visakhapatnam is a coastal, port
More informationNOVEMBER 2016 For updated information, please visit
Executive Summary... 3 Re-organisation Act, 2014....5 Advantage State..7 Andhra Pradesh An Introduction.. 8 Infrastructure Status..23 Business Opportunities... 41 Doing Business in Andhra Pradesh.. 65
More information15-18 May 2018 Proposal for Government of Andhra Pradesh to participate in GES 2018
15-18 May 2018 Proposal for Government of Andhra Pradesh to participate in GES 2018 Bombay Exhibition Centre - NSE complex, Goregaon (E) Mumbai Global platform for increased trade in services Table of
More informationANDHRA PRADESH AUGUST 2015 THE RICE GRANARY OF INDIA. For updated information, please visit
Executive Summary... 3 Re-organisation Act, 2014....5 Advantage State..7 Andhra Pradesh An Introduction.. 8 Infrastructure Status..22 Business Opportunities... 36 Doing Business in Andhra Pradesh.. 52
More informationLIST OF FINAL TEST REPORT(S)
SOUTHERN REGION FARM MACHINERY TRAINING & TESTING INSTITUTE, GARLADINNE, DIST. ANANTAPUR 515731 (A.P.) 1. NUMBER OF FINAL TEST REPORTS RELEASED DURING THE YEAR 2014-2015 = 52 2. THIS IS THE HIGHEST NUMBER
More informationMINUTES OF THE FIRST GENERAL BODY MEETING OF MS & PC HELD ON AT HOTEL SIDDARTHA, ABIDS, HYDERABAD.
MINUTES OF THE FIRST GENERAL BODY MEETING OF MS & PC- 2018 HELD ON 04.09.2017 AT HOTEL SIDDARTHA, ABIDS, HYDERABAD. Shri M. Kanaka Babu, Sr.Manager (Geology) welcomed the gathering and invited the following
More informationNARAYANAVANA CTR SVU 50 PVT
CODE NAME PLACE DIST AFFLNSEATS TY AMLH A M LINGANNA COLLEGE OF HINDUPUR ATP SKU 50 PVT BALJ SRI BALAJI COLLEGE OF KOTHACHERUVU ATP SKU 100 PVT BLCA BALAJI COLLEGE OF ANANTAPURAMU ATP SKU 100 PVT CRAN
More informationHALLMARK LIVING OF HYDERABAD
Complementing HALLMARK LIVING OF HYDERABAD With The GreenestTownship Affordable Residential Plots At Haridaspally, Near ECIL, Hyderabad Hyderabad Ranks No. Amongst The Best Cities To Live In India (As
More informationNOTICE TO MEMBERS No February 5, 2003
NOTICE TO MEMBERS No. 2003-008 February 5, 2003 NEW EQUITY OPTION CLASSES Bourse de Montréal Inc.(The Bourse) and (CDCC) hereby inform you that at the opening of trading on Monday, February 10, 2003 the
More informationSubj: DRYDOCK STANDARDS FOR MSC SHIP AVAILABILITIES
DEPARTMENT OF THE NAVY COMMANDER MILITARY SEALIFT COMMAND REFER TO: 914 CHARLES MORRIS CT SE WASHINGTON NAVY YARD DC 203985440 COMSCINST 9997.1A N7 16 March 2005 COMSC INSTRUCTION 9997.1A Subj: DRYDOCK
More informationMunicipality / Town / Village/ Exact location
GOVERNMENT OF ANDHRA PRADESH Name of Laboratory : Water Quality Monitoring Laboratory-Vijayawada (DIRECTORATE OF INSTITUTE OF PREVENTIVE MEDICINE, PH LABS, FOOD (HEALTH) ADMIN, NARAYANAGUDA, HYDERABAD)
More informationLucknow ( Uttar Pradesh)
Lucknow ( Uttar Pradesh) Regional Level Mega Programe of International Day of Yoga, 21 st June, 2016 Other Dignitaries Uttar Pradesh K.D. Babu Singh Stadium, Lucknow Shri Raj Nath Singh, Hon'ble Home Minister,
More informationRevenue Sadassulu Schedule. Shaligowraram Mandal. 1 Shaligowraram Takkella Pahad AM to 5.00 PM Gram Panchayat Office
Village Shaligowraram 1 Shaligowraram Takkella Pahad 12.03.2013 8.00 AM to 5.00 PM 2 Shaligowraram Vaddi Pamula 14.03.2013 8.00 AM to 1.00 PM Grama Chawadi 3 Shaligowraram Barauvni Banda 15.03.2013 8.00
More informationAtma Namaste, Please use this offline map for reaching the Ashram, For any guidance please contact : / m. 3.
Mumbai, Maharashtra to Prana Yoga Ashram Drive 1,219 km, 18 h 28 min Atma Namaste, Please use this offline map for reaching the Ashram, For any guidance please contact : 8772241000 / 8772241001 Map data
More informationMAKE ANDHRA PRADESH YOUR BUSINESS
MAKE ANDHRA PRADESH YOUR BUSINESS India is one of the fastest growing major economies ~ $8.42 Tn GDP (PPP) 1st largest democracy in the world 1st fastest growing major economy 3rd largest economy in PPP
More information141305BP Whistlers Bar Menu 2017_Layout 1 16/05/ :11 Page 1 FOOD
141305BP Wh B Mu 2017_Lu 1 16/05/2017 16:11 Pg 1 12.30 m C FOOD 141305BP Wh B Mu 2017_Lu 1 16/05/2017 16:11 Pg 2 S STARTERS Su Su f f h h D D 4.95 (50-100 C) 4.95 Fh O Su 5.15 Fh P M Su Rh bf fvu mmé wh
More information8. Karnataka Cooperative Consumers Federation Ltd. No. 4, Pampamahakavi Road, Chamarajpet, Bangalore (Karnataka)
List of terminated Member Institutions of NCUI 1 Kerala Urban Coop. Banks Federation Ltd. P.B.No. 115, M.G. Road, Thiruvananthapuram (Kerala) 2 Haryana State Urban Coop. Banks & Credit Societies Federation
More information2015 June Non-Ad Valorem Recap 5/27/2015
BL BELMONT LAKES CDD $ 4,200.00 42 42 $ 176,400.00 - - 42 42 1 BROWARD COUNTY GARBAGE $ 270.00 183 192 $ 51,840.00 - - 183 192 4 BROWARD COUNTY GARBAGE $ 270.00 665 869 $ 234,630.00 2-667 869 5 BROWARD
More informationPROFILE. Diploma in Civil Engineering with first division in the year 1992 & B.A (maths)
PROFILE PERSONNEL: EDUCATION: Diploma in Civil Engineering with first division in the year 1992 & B.A (maths) LANGUAGES KNOWN: Telugu,Hindi & English. EXPERIENCE SUMMARY: About FOUR years of experience
More informationP W BCA. BC(F ) LAC SEBC Prov.Remarks OBC OBC (A) (B) Hospital Name Address State Speciality Others OBC. Kothapet, Guntur Andhra Pradesh
Name Address State Speciality Others OBC Lalitha Super Specialty (P) Ltd. Kothapet, Guntur- 522001 Andhra Pradesh Andhra Pradesh logy 1 OBC OBC (A) (B) SC ST P W D RBA MBC BCA BC(F ) LAC SEBC Prov.Remarks
More informationCOMPREHENSIVE PROJECT REPORT FOR PROPOSED DIVERSION OF KONDAPALLI RF ( Ha) IN APCRDA REGION
COMPREHENSIVE PROJECT REPORT FOR PROPOSED DIVERSION OF KONDAPALLI RF (890.43 Ha) IN APCRDA REGION Submitted to ANDHRA PRADESH CAPITAL REGION DEVELOPMENT AUTHORITY Government of Andhra Pradesh Prepared
More information2008 Manchester Flats Cancelling Machine
2008 Manchester Flats Cancelling Machine A NEC (Nippon Electric Company) Flats Cancelling Machine was introduced at Manchester Mail Centre in late November 2008. Its purpose was to cancel all Flat items
More informationANDHRA PRADESH THE RICE GRANARY OF INDIA
ANDHRA PRADESH THE RICE GRANARY OF INDIA September 2017 Table of Content Executive Summary...3 Re-organisation Act, 2014...5 Advantage State....8 An Introduction..9 Infrastructure Status... 24 Business
More informationDate: Dear Sirs,
Date: 03.09.2014 Dear Sirs, Sub: Invitation requesting Participation by way of stalls for Two Day Seminar & Two Day Exhibition of Indian Society of Lighting Engineers at Hyderabad on 11,12, November 2014
More information2015 Proposed Non-Ad Valorem Recap 08/05/15
BL BELMONT LAKES CDD $ 4,200.00 42 42 $ 176,400.00 - - 42 42 1 BROWARD COUNTY GARBAGE $ 270.00 184 193 $ 52,110.00 - - 184 193 4 BROWARD COUNTY GARBAGE $ 270.00 665 871 $ 235,170.00 2-667 871 5 BROWARD
More informationEDITORS PROF. K. VIJAYA BABU JAYAPRAKASHNARAYANA. G
TOURISM IN INDIA EDITORS PROF. K. VIJAYA BABU JAYAPRAKASHNARAYANA. G Disclaimer Zenon Academic Publishing, 2014 All rights reserved. No part of this publication may be reproduced or transmitted, in any
More informationBlues. Low strength blue with a green face and red flop. A blue used when increased mixing accuracy is desired. Phthalo Greenish Blue
Bs C Bs C p Phh B 1010053 B wh fc fp. A sh b h vs fc s fp ffc cs sh s cs. Tsp B 1011054 Lw sh b wh fc fp. A b s wh cs mx cccy s s. Phh sh B 1010055 B wh fc fp. A sh b h vs fc shy fp ffc cs sh s cs. Sb
More informationTELANGANA AUGUST THE 29th STATE OF INDIA. For updated information, please visit
1 Executive Summary... 3 Advantage State......... 4 Telangana Vision....... 5 Telangana An Introduction..... 6 Budget 2015-16..17 Infrastructure Status....18 Business Opportunities.....34 Doing Business
More informationREALTY CITYSCAPE. Hyderabad September
REALTY CITYSCAPE Hyderabad September-2016 http://www.quikr.com/homes Executive Summary Foreword Indian real estate is standing at a crossroad today. The euphoria of double digit return on investment overnight
More informationTOP 100 SWAYAM-NPTEL LOCAL CHAPTERS (July - October 2018) By default, Top 100 Local Chapters will be considered as ACTIVE Local Chapters
1 189 By default, Top 100 Chapters will be considered as ACTIVE Chapters MADANAPALLE INSTITUTE OF & SCIENCE MADANAPALLE ANDHRA PRADESH 2544 2535 2457 13 1190 1254 78 61 AAA 2 239 R V OF BENGALURU KARNATAKA
More informationDETAILS OF CONTRACTS CONCLUDED DURING JANUARY, 2018
DETAILS OF CONTRACTS CONCLUDED DURING JANUARY, 2018 Name of Region Tender No. Item/ Nature of work Mode of tender enquiry Date of publicat ion of NIT Type of Bidding (single/ two bid system) Last date
More informationBirmingham City Centre Vision for Movement
Birmingham City Centre Vision for Movement Wes Sedman - Centro Commissioning Team Laying the foundations for a vibrant and liveable global city Birmingham Big City Plan - A City Centre Masterplan A vision
More informationHealth-Care Centre Location Address
Health-Care Centre Location Address The Apollo Clinic One World Impex Pvt. Ltd The Emerald, Plot No Beside Neel Siddhi Towers, APOLLO CLINIC MUMBAI Vashi, Navi Mumbai 400 703. (022 ) 2788 1322/3/4 (022
More informationCentre for Innovations in Public Systems (CIPS), Hyderabad (An Organization Established with Funding from Government of India)
Centre for Innovations in Public Systes (CIPS), Hyderabad (An Organization Established with Funding fr Governent of India) In collaboration with IT, Electronics & Cunications Departent, Govt. of Organized
More informationARMED FORCES TRIBUNAL, REGIONAL BENCH, CHENNAI
ARMED FORCES TRIBUNAL, REGIONAL BENCH, CHENNAI CIRCUIT BENCH AT HYDERABAD The Hon ble Bench will commence sitting at 10. 30. A. M. in the premises of 1EME Centre, Bolarum, Secunderabad on 08.12.2016 (Thursday)
More informationFor additional questions, please visit our stores or call Province Municipality Forward Sortation Area AB Acadia Valley T0J
Furniture Shipments to Canada Pottery Barn now offers shipping to Canada on most Furniture and oversized items. Our current delivery areas are listed below by postal code. For additional questions, please
More informationOut-of-District Placement December Extraordinary Services ESY
Initials Classification Placement Cost ESY Cost School Year DD Bridgewater Raritan (350555005) $ 14,427.00 Extraordinary Services ESY Extraordinary Services School Year Related Services Cost COMMENTS AJ
More informationIDOL OF NANDI IN LEPAKI, ANDHRA PRADESH ANDHRA PRADESH THE RICE GRANARY OF INDIA
IDOL OF NANDI IN LEPAKI, ANDHRA PRADESH ANDHRA PRADESH THE RICE GRANARY OF INDIA April 2018 Table of Content Executive Summary...3 Re-organisation Act, 2014...5 Advantage State....8 An Introduction..9
More informationRelevantWorkExperience Engineering Design Consulting Services for 4 laning of Nagpur-Betul Section of NH-69 (Total Kms 176) in the state of Madhya Pradesh and Maharashtra under NHDP Phase IV on DBFOT (Annuity)
More informationRelay. Sub Stations S.No Circle Vol From To Duration Cause of Breakdown Alternate Supply Arranged Feeder. Indication
TPDCL - LMRC / Corporate office Date: 25.05.2016 Name of 132/33KV Name of 33 KV Sub Stations Effected 1 MBNR Makthal Jaklair 33KV Mahabubnagar 05.55 09.55 04.00 O/L Cross Arm Problem Rectified Jaklair,Bijwar
More informationTELANGANA. THE 29th STATE OF INDIA
THE 29th STATE OF INDIA July 2017 Table of Content Executive Summary....3 Advantage State......4 Telangana Vision.5 Telangana An Introduction..6 Budget 2016 17..... 18 Infrastructure Status...19 Business
More informationTELANGANA PHARMACEUTICAL HUB OF INDIA
PHARMACEUTICAL HUB OF INDIA February 2018 Table of Content Executive Summary....3 Advantage State......4 Telangana Vision.5 Telangana An Introduction..6 Budget 2017-18..... 18 Infrastructure Status...19
More informationLd. Counsel Mr. M.N. Manohar is appearing for A/B. P/A by Call on PO 10. OA 345/
1. OA 46/12 3.2.17 Ld. Counsel Mr. Rupesh kumar is appearing for A/B. Ld. Counsel Mr. K.S.Suresh kumar for Defendant. IA 652/16, impleading petition pending. Counter and W/S of D1 & D3 not filed before
More informationDirectorate General of Civil Aviation Application for Type Certificate (TC)/ Restricted Type Certificate (RTC)
1 Directorate General of Civil Aviation Application for Type Certificate (TC)/ Restricted Type Certificate (RTC) 1. Applicant 1.1 Applicant s Reference (if applicable) 1.2 Name 1.3 Address (registered
More informationTELANGANA THE 29 th STATE OF INDIA
(As of 23 June 2017) 1 Executive Summary... 3 Advantage State......... 4 Telangana Vision....... 5 Telangana An Introduction..... 6 Budget 2016-17.. 18 Infrastructure Status.... 19 Business Opportunities..
More informationJewellers Association, Hedgers
Details of Progras sponsored by / IPF Sr. No. Date Tie Place State Topic Sponsored by Target Group Key Speaker Contact Person Contact No. E-ail 1 04-May-17 6.00 p Hotel Centre Park, Bhawanipatna, Odisha
More informationUNIVERSITY CAMPUSES IRRIGATION CANALS PLAYING A KEY ROLE IN INFRASTRUCTURE DEVELOPMENT
HIGHWAYS IRRIGATION CANALS LAYOUTS PLAYING A KEY ROLE IN INFRASTRUCTURE DEVELOPMENT BUILDINGS UNIVERSITY CAMPUSES BUS TERMINALS CORPORATE PROFILE BSR Infratech India Ltd is a growing and leading Construction
More informationMinistry of Environment, Forest & Climate Change, Govt. of India CHAPTER-11 TOURISM
CHAPTER-11 TOURISM Weather can ruin a holiday, but climate change can ruin a destination. - Daniel Scott, Second International Conference on Tourism and Climate Change, Davos, Switzerland (2007) This chapter
More informationMANUAL ON POOLING OF CENTRAL AND STATE SAMPLE DATA
क न द र य और र ज य प रत दर श समक क एक करण क प स त क र प र स 66 व द र MANUAL ON POOLING OF CENTRAL AND STATE SAMPLE DATA NSS 66 th Round प ररव ररक उपभ क व यय HOUSEHOLD CONSUMER EXPENDITURE सम क ववध यन प
More informationTELANGANA PHARMACEUTICAL HUB OF INDIA
GOLKONDA FORT NEAR HYDERABAD, PHARMACEUTICAL HUB OF INDIA April 2018 Table of Content Executive Summary....3 Advantage State......4 Telangana Vision.5 Telangana An Introduction..6 Budget 2018-19..... 16
More informationIndia Post - Leveraging the power of Rural Post Office Network for EBT & DBT
SaiRamVenkatesha India Post - Leveraging the power of Rural Post Office Network for EBT & DBT Presentation by S.V.Rao, I.Po.S. Asst. Postmaster General (FS & BD), O/o Chief Postmaster General, Andhra Pradesh
More informationSpecification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE
Specification Details: DLA Land and Maritime - VQ Date: 2/4/2015 Specification: MIL-DTL-28803 Title: Display, Optoelectronic, Readouts, Backlighted Segmented Federal Supply Class (FSC): 5980 Conventional:
More informationA LUXURY PLOTTED DEVELOPMENT
274 Kavuri Hills, Opposite Mercedes Benz, Madhapur, Hyderabad - 81 040-2311 2311 contact@onedevelopers.in ONEDEVELOPERS.IN DEVELOPERS A LUXURY PLOTTED DEVELOPMENT YOUR here Investment starts START THE
More informationA G E N D A MEETING CITY COUNCIL THIRD FLOOR ANNEX CHAMBERS. TUESDAY, September 27, :45 PM
A G E N D A MEETING CITY COUNCIL THIRD FLOOR ANNEX CHAMBERS TUESDAY, Septeber 27, 2016 5:45 PM Pledge of Allegiance Moent of Silence Roll Call Minutes Mayor s Report/City Council Sub-Coittee Reports City
More informationGMR Infrastructure Limited, Q1-FY 11 Performance Highlights. Financial Highlights for Q (Rs. Cr.)
Press release Bangalore, 08 th Aug, 2010 GMR Infrastructure Limited, Q1-FY 11 Performance Highlights Financial Highlights for Q1 2010-11 (Rs. Cr.) Particulars 30th June 10 30th June 09 % change 31st March
More informationthe total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA STARRED QUESTION NO.334 TO BE ANSWERED ON 09.08.2017 DOUBLING AND ELECTRIFICATION OF RAILWAY LINES *334. SHRI B.S. YEDIYURAPPA: Will the Minister of RAILWAYS
More informationStatus and Challenges of Individual Forest Rights Titleholders (in context of Andhra Pradesh) Gargi Das Introduction: After independence several
Status and Challenges of Individual Forest Rights Titleholders (in context of Andhra Pradesh) Gargi Das Introduction: After independence several acts, laws and rules made by the state and the principle
More informationNature of coliform Bacteria isolated. MPN of E.coli. Lab Ref No. R.C mg/lit. Date of Collection. Sl. No. Remarks
GOVERNMENT OF ANDHRA PRADESH DIRECTORATE OF INSTITUTE OF PREVENTIVE MEDICINE, PH LABS, FOOD (HEALTH) ADMIN, NARAYANAGUDA, HYDERABAD. REPORT OF BACTERIOLOGIGAL ANALYSIS OF WATER SAMPLES OF HMWS & SB (SAMPLES
More informationCITY STORE STORE ADDRESS. PAI INTERNATIONAL Main Roadnew Gajuwaka
CITY STORE STORE ADDRESS VIJAYAWADA BAJAJ ELECTRONICS SURYARAO PET MEENAKSHI TOWERSDOOR NO 29 37 22REVENUE WARD 9 MUNICIPAL WARD 25 SURYARAO PET 9516 DIGITAL Gr Flr Stilt-II Module No6 Block.D,Cyber Gateway
More information18 19 March Dr Erica Reineke. AVA NSW, QLD and VIC present... East Coast Conference Roadshow Exhibitor prospectus.
AVA NSW, QLD and VIC present... East Coast Conference Roadshow 2017 18 19 March 2017 HELP! EMERGENCY MEDICINE FOR EVERYDAY PRACTICE Dr Erica Reineke Keynote speaker Exhibitor prospectus Newcastle Exhibition
More informationSTUDYIQ.COM
DR GAURAV GARG STUDYIQ.COM 7291059476 95-8004-8004 TIRELESSSOUL Telangana has signed a memorandum of understanding with the Clean Authority of Tokyo for solid waste management. The two sides will exchange
More informationBEYOND THE ETHER 2018 EAST COAST ROADSHOW VICTORIA SPONSORSHIP PROSPECTUS
SPONSORSHIP PROSPECTUS 2018 EAST COAST ROADSHOW VICTORIA BEYOND THE ETHER International speaker Dr Linda Barter Associate Professor of Anaesthesiology University of California, Davis Friday Manningha Function
More informationIndian Economic Association (IEA) is the
THE INDIAN ECONOMIC ASSOCIATION Indian Economic Association (IEA) is the oldest, the largest and the only national association of professional economists in India. Established in 1917 by Prof. C. J. Hamilton
More informationProposed industrial corridor. Vizag among top five ports in India. Power surplus state. FDI investment scattered across state
Proposed industrial corridor The proposed Visakhapatnam-Chennai industrial corridor is expected to attract investment to the tune of US$ 16.7 billion and will create more than 50,000 jobs. Vizag among
More informationis transferred with immediate effect and posted until further orders as Principal Secretary to Government,
Kamataka Government Secretariat, Vidhana Soudha, Bangalore, dated 13 th May, 2011. I. Sri Subir Hari Singh, IAS (KN 76), Additional Chief Secretary to Government, Urban Development Department, Bangalore
More informationAUGUST Andhra Pradesh THE RICE GRANARY OF INDIA. For updated information, please visit
1 Contents Andhra Pradesh An Introduction Infrastructure Status Business Opportunities Doing Business in Andhra Pradesh State Acts & Policies 2 Andhra Pradesh Factfile Visakhapatnam, Vijayawada, Tirupati,
More information