Application by BAA plc and Stansted Airport Limited for Stansted Airport Generation 1. Public Inquiry 30 May 2007

Size: px
Start display at page:

Download "Application by BAA plc and Stansted Airport Limited for Stansted Airport Generation 1. Public Inquiry 30 May 2007"

Transcription

1 ECC/1/H Application by BAA plc and Stansted Airport Limited for Stansted Airport Generation 1 Public Inquiry 30 May 2007 Supplementary Evidence on Surface Access Transport Terry Wang BSc, MSc (Soils), MSc (Transport) CEng, MICE, FCILT Appendices

2 LIST OF APPENDICES Appendix A: Modelling Concerns in Transport Assessment Addendum Update Appendix B: Concerns in SRTM version 2 Model Appendix C: Comparison of Road Traffic Flows From TA, TAA and TAAU Appendix D: Uncertainties Inherent in the BAA Surface Access Forecasts Appendix E: Employment and Household Growth Changes in the Transport Assessment Addendum Update Appendix F: A Letter of 26 July from Essex and Hertfordshire County Councils and Uttlesford District Council to DfT Rail Seeking Further Clarification On Rail Issues

3 Appendix A: Modelling Concerns in Transport Assessment Addendum Update

4 Appendix A Concerns Arising from the Revised Forecasts Presented in the TA Addendum Update. Forecasts for the A120 between the M11 and A10 are lower and at Little Hadham are predicted to be less than 2003 observed flows (Discussed by Mr Humby of HCC). Increased use of the B1004 between Ware and Bishops Stortford (Discussed by Mr Humby of HCC). Traffic flow variations in Bishops Stortford (Discussed by Mr Humby of HCC). The validation of the 2004 observed flows, in the vicinity of the Airport, compared to the modelled flows from the SRTMv2 highway models for the AM, Inter-peak and PM peak hours. This does suggests that ECC is right to have concerns about the forecasting capability of the SRTMv2 model in the light of the model being not even able to produce valid flows for one year (i.e. 2004) into the future around the Stansted Airport area (see Appendix B). In general, the differences between the original TA 2014 forecast flows and those from the TAA Update are greater than the forecast differences at This will compound the County Council concerns as the 2014 forecasts (which reveals greater uncertainties) will be used for negotiation of scheme contributions required from BAA. In the case of Harlow area, for the mppa (enhanced) scenario (see Table 3.8 of TAA Update, page 17), the employee mode share by rail is 384 trips (i.e. 26%) which is higher than expected as the Harlow train station is 1 km north of the town centre, albeit many buses access the station however most of the buses do take circuitous route via

5 residential areas and take around 20 minutes to get to the station from the town centre. Anomalies in the percentages of HGV s assigned to roads between the regional and local traffic models. For example in the 2003 base year the EERM flows contain 10% HGV s whereas the SRTM only contains 3% on the A120 east of the M11 Junction 8.

6 Appendix B: Concerns of SRTM version 2 Model

7 Appendix B Concerns in SRTM version 2 Model 1.1 The County Councils consider that the local 2003 base year SRTMv2 highway model did meet the various model convergence statistics (as set out in the Design manual for Roads and Bridges (DMRB), Volume 12, Section 2, Part 1, Table 4.1, page 4/25). By having a converged model, the same model outputs could be repetitively reproduced. However, meeting the DMRB (model convergence) criteria does not demonstrate the reliability of the model outputs. 1.2 We understand from BAA/Halcrow s Model Validation Report (MVR, dated June 2007) that the update of the local SRTMv2 to 2003 base year (for AM peak, PM peak and Inter-peak hour) was limited to the use of the matrix estimation technique. The technique involves the adjustment of the trip matrix trip ends using the most up-to-date observed counts together with older trip patterns in order to ensure that the best match between the observed data and modelled data can be achieved. Although the matrix estimation technique can help to update the trip matrices, the technique cannot account for the changes in trip patterns from out-of-date origin-destination data. 1.3 By way of further re-inforcement of the need to incorporate more update origin-destination data, there has been a major new scheme i.e. the A120 (T) road to the east of the M11J8, next to the Stansted Airport which open in In accordance with the DMRB, Volume 12, Section 1, Part 1, Para the objectives of validating traffic models are: (a) to check that the calibration of the models are valid; and (b) to assess the quality of the information provided by the models.

8 As such, the validation stage in the development of the base year models is paramount and if either not undertaken or poorly undertaken would significantly compromise the robustness of the forecasts which are pivoted around the base year model. 1.5 The validation and the calibration of the 2003 base year models in the core area does generally meet the DMRB criteria (as set out in DMRB, Volume 12, Section 2, Part 1, Table 4.2, page 4/29). 1.6 The validation in 2004 as reported in Tables 7.20 to 7.22 in the MVR, page 84 to 86 show the number of individual links that have a Geoff Haver s (GEH) statistic of more than or less than 5. It can be seen that in the AM peak, twenty-four out of thirty-two links has a GEH of less than 5. This is only 75% not 85% of individual link flows and fails to meet the DMRB criterion (i.e. 85% of individual links have a GEH of less than 5). In the case of the Inter-peak hour, twenty-five out of thirtytwo links has a GEH of less than 5. This is only 78% not 85% of individual link flows and fails to meet the DMRB criterion. Also, in the PM peak hour, eighteen out of thirty-two links has a GEH of less than 5. This is only 56% not 85% of individual link flows and fails to meet the DMRB criterion. Therefore, the DMRB Para guideline does not assist BAA for all the AM, Inter-peak and PM peak hour. This does suggests that ECC is right to have concerns about the forecasting capability of the 2003 base year model in the light of the model being not even able to produce valid flows for one year (i.e. 2004) into the future around the Stansted Airport area. Moreover, the robustness and reliability of the forecast flows for 2014 and 2023 assessment years derived from this SRTMv base year model must be highly questionable and should be treated with caution. 1.7 The County Councils have raised the above matter with BAA/Halcrow at the meeting on 14 August 2007 and it is unclear how this has been resolved.

9 Appendix C: Comparison of Road Traffic Flows From TA, TAA and TAAU

10 Figure C1: Indicative Location of Selected Sites

11 Table C1: 2- Way Link Flow Variation by Source Report - Flows are in Vehicles AM Peak 2-way Flows PM Peak 2-way Flows AM Peak 2-way Flows PM Peak 2-way Flows Link No Link Name Source TA TAA TAAU TA TAA TAAU TA TAA TAAU TA TAA TAAU Flow no data no data M11 North of Junction 8 Diff wrt TA Flow no data no data -810 % Diff wrt to TA Flow 0% -10% -4% 0% -13% -8% 0% no data -7% 0% no data -13% Flow no data no data M11 South of Junction 8 Diff wrt TA Flow no data no data % Diff wrt to TA Flow 0% -8% -3% 0% -11% -4% 0% no data -10% 0% no data -12% Flow no data no data A120 ('new') East of M11 J8 Diff wrt TA Flow no data no data % Diff wrt to TA Flow 0% -9% -9% 0% -15% -15% 0% no data -20% 0% no data -23% Flow no data no data 2120 A120 West of M11 J8 Northwest of Bishop's Storford 4 (i.e. btween A120/B1383 j'ctn & A120/A1250 j'ctn) Diff wrt TA Flow no data no data -30 % Diff wrt to TA Flow 0% -4% -2% 0% -8% -1% 0% no data -2% 0% no data -1% Flow no data no data B1256 East of B183/B1256 junction Diff wrt TA Flow no data no data -220 % Diff wrt to TA Flow 0% -35% -32% 0% -23% -20% 0% no data -29% 0% no data -21% Flow no data no data B1256 West of B183/B1256 junction Diff wrt TA Flow no data no data -30 % Diff wrt to TA Flow 0% -17% -12% 0% 19% 30% 0% no data -6% 0% no data -8% Flow no data no data B183 South of B183/B1256 junction Diff wrt TA Flow no data 0 0 no data -20 % Diff wrt to TA Flow 0% -13% -8% 0% -19% -20% 0% no data 0% 0% no data -2% Flow no data no data B1383 North of Stansted Mountfitchet Diff wrt TA Flow no data no data 10 % Diff wrt to TA Flow 0% 3% 10% 0% -10% -4% 0% no data 10% 0% no data 1% Source Report Definition TA - TA Flows TAA - TA Addendum Flows TAAU - TA Addendum Update Flows Flow Difference & % Flow Difference measured with respect to TA flow

12 Table C2: 2- Way Link Flow Variation by Source Report - Flows are in Vehicles AM Peak 2-way Flows PM Peak 2-way Flows AM Peak 2-way Flows PM Peak 2-way Flows Link No Link Name TA TAA TAAU TA TAA TAAU TA TAA TAAU TA TAA TAAU 1 M11 North of Junction no data no data M11 South of Junction no data no data A120 ('new') East of M11 J no data no data 4030 A120 West of M11 J8 Northwest of Bishop's Storford (i.e. 4 btween A120/B1383 j'ctn & A120/A1250 j'ctn) no data no data B1256 East of B183/B1256 junction no data no data B1256 West of B183/B1256 junction no data no data B183 South of B183/B1256 junction no data no data B1383 North of Stansted Mountfitchet no data no data 1290 Source Report TA - TA Flows TAA - TA Addendum Flows TAAU - TA Addendum Update Flows AM Peak 2-way Flows PM Peak 2-way Flows AM Peak 2-way Flows PM Peak 2-way Flows Link No Link Name TA TAA TAAU TA TAA TAAU TA TAA TAAU TA TAA TAAU 1 M11 North of Junction % -4% 0% -13% -8% 0 no data -7% 0 no data -13% 2 M11 South of Junction 8 0-8% -3% 0% -11% -4% 0 no data 10% 0 no data -12% 3 A120 ('new') East of M11 J8 0-9% -9% 0% -15% -15% 0 no data -10% 0 no data -23% A120 West of M11 J8 Northwest of Bishop's Storford (i.e. 4 btween A120/B1383 j'ctn & A120/A1250 j'ctn) 0-4% -2% 0% -8% -1% 0 no data -2% 0 no data -1% 5 B1256 East of B183/B1256 junction 0-35% -32% 0% -23% -20% 0 no data -29% 0 no data -21% 6 B1256 West of B183/B1256 junction 0-17% -12% 0% 19% 30% 0 no data -6% 0 no data -8% 7 B183 South of B183/B1256 junction 0-13% -8% 0% -19% -20% 0 no data 0% 0 no data -2% 8 B1383 North of Stansted Mountfitchet 0 3% 10% 0% -10% -4% 0 no data 10% 0 no data 1% Source Report TA - TA Flows TAA - TA Addendum Flows TAAU - TA Addendum Update Flows

13 Appendix D: Uncertainties Inherent in the BAA Surface Access Forecasts

14 Appendix D Uncertainties Inherent in the BAA Surface Access Forecasts The complicated nature of the BAA transport modelling suite and the uncertainty surrounding future planning data and major transport scheme programmes contribute to ECC and HCC concerns on the surface access forecasts that have been submitted to-date. There are a large number of factors that impact on the future year surface access forecasts including: (a) The funding and timing of major transport schemes in the region including the M25 widening between J23 and J30, widening of the M11 between J6 and J14, widening of the A12 between the M25 and Colchester and the A120 Braintree to Marks Tey dual carriageway, albeit these schemes are based on advice by GoEast and could change again in the future. (b) Differences in the planning data inputs associated with the development of the East of England Plan. This includes various assumptions on the total and spatial distribution of housing and employment provision to the end of the 2021 plan period and varying estimations of the volume and location of development completed by 2014, which could be subject to further changes following the new Prime Minister s recent announcement on the marked increase in housing provisions in the South East by (c) The incremental approach for transferring growth forecasts from the regional highway models (RHRM and EERM) down to the more detailed Stansted Road Traffic Model (SRTM). This method relies upon a reasonable correlation between the regional and local models in the 2003 base year and ECC and HCC are currently not fully satisfied with the model correlation around the Stansted area. (d) The numerous assumptions and data inputs required within the 6 complex models of the BAA transport modelling suite which interact to produce the forecasts reported in the TA and subsequent Addenda and Errata. Examples of the assumptions and data inputs which can change in the future and affect the resultant forecasts include:

15 - The relative costs of using bus and coach/ rail / tax/ private car - Future car parking charges - The number, location and nature of employee car parking - The percentage of transfer passengers - The number, home location, work location and reporting pattern of employees - Mode share proportions for employees - The nature and number of flights using the runway - Runway and terminal throughputs in any hour - Changes to the rail timetable - The distribution of passengers and employees over the working day. - The impact of increased security on transit times - Vehicle occupancy rates 1

16 Appendix E: Employment and Household Growth Changes in the Transport Assessment Addendum Update

17 Employment and household growth changes in TAAU (see Tables 2.1, 2.2 of TAAU, page 8) Appendix E Employment growth changes Region TA Revised Abs Diff % Diff Cambs Essex Herts SE EoE Household growth changes Region TA Revised Abs Diff % Diff Cambs Essex Herts SE EoE

18 Appendix F: A Letter of 26 July from Essex and Hertfordshire County Councils and Uttlesford District Council to DfT Rail Seeking Further Clarification On Rail Issues

19 Our Ref: G1/MC Your Ref: SKB ECC Let1 Date: 26 July 2007 Mr Stuart Baker Divisional Manager (National) DfT Rail Projects Zone 5/23 Great Minster House 76 Marsham Street London SW1P 4DR Tony Ciaburro Director for Development, Highways Transportation Essex County Council County Hall Chelmsford Essex CM1 1QH Dear Stuart Provision of additional Rail Capacity for Stansted G1 Thank you for your letter of 23 April 2007, which I received in electronic form on 16 May 2007, sent in response to a number of queries that I previously raised on behalf of the Local Authorities affected by the Stansted Airport expansion proposals. This letter is again written on behalf of Essex County Council, Hertfordshire County Council and Uttlesford District Council. The Stansted Generation 1 Public Inquiry commenced at the end of May Consideration of surface access issues has been deferred towards the end of September to allow the Local Authorities time to consider the implications of an Addendum to the BAA Transport Assessment (TA) which was submitted in April The differences between the forecasts traffic published in the TA and the TA Addendum are so significant that the Local Authorities are, in effect, now considering the implications of a completely new Transport Assessment for the Stansted Generation 1 planning application. The Local Authorities have been heavily engaged in attempts to comprehend BAA s revised transport forecasts but also need to use the deferral period to clarify all outstanding transport concerns before surface access issues are considered at the Public Inquiry. My reason for writing is to seek further clarification on a number of rail provision issues relating to the Stansted Generation 1 expansion. Present Level of Usage. There appears to be general agreement that the Stansted Express (STEX) passenger survey conducted by One Railway in 2006 indicates that there is already overcrowding on some STEX trains in the busiest morning and evening peak hours. I understand that the 2006 survey was based on a one day count but it would appear

20 to accord with my on-board STEX train observations of overcrowding on evening peak STEX services leaving Liverpool Street earlier this year. The County Council s initial evidence to the Public Inquiry draws on the 2006 survey data reported in the draft Greater Anglia Route Utilisation Study (RUS). Table 3.9 of the draft RUS states that STEX carried 2012 and 1604 passengers, in the peak direction, in the busiest morning and evening peak hours respectively. Considering these flows with the 438 second class STEX seating capacity, which BAA have used in their TA, results in 2006 passenger to seating capacity ratios of 115% and 92% in the busiest morning and evening peak hours. Your letter indicates that the 2006 survey indicated that the ratio of STEX passengers to seats in the busiest morning and evening peak hours was 102% and 90% respectively. This suggests that you may have adopted slightly different passenger count or seating capacity figures, but this does not detract from the general conclusion that there is already overcrowding on some morning and evening peak hour trains. In order to avoid unnecessary discussions at the Public Inquiry I would be grateful if you could confirm the passenger numbers and seating capacities used in your calculations and the extent of up to date survey work available to you. Loading Specification Thank you for confirming that the G1 and G2 rail strategies are based on the principle of providing one seat per passenger for the morning and evening peak hours. The airport rail strategies are based upon serving the 95% busiest airport hour in the year. For the avoidance of any doubt it would be helpful if you could confirm that the loading specification refers to all passengers and not just airport related rail passengers. Monitoring and Delivery Measures in Place. All parties would appear to agree that STEX usage needs to be regularly monitored to ensure that measures to prevent overcrowding can be implemented in good time. There does however, appear to be a difference of opinion on when it will be necessary to develop and implement the capacity improvements to STEX that will be required to prevent continued and worsening overcrowding. The Local Authorities are concerned that DfT Rail s position on this matter has been unduly influenced by BAA s forecasts that suggest the need to consider selective lengthening of STEX to 12 cars as the airport throughput approaches 35 mppa in During recent discussions with BAA on the TA Addendum their consultants Halcrow have agreed, in light of the 2006 STEX passenger survey, that the PLANET rail model appears to be underestimating the current level of non-airport passengers

21 using STEX. The fact that the 2014 BAA PLANET forecasts for STEX appear to be lower than 2006 counts would appear to cast serious doubts over the accuracy of this model. In your letter you state In terms of timescales, we expect to have to lengthen to 12-car trains as standard towards the middle of the next decade.. I would be grateful if you could clarify if this statement was meant to refer to the provision of 12- car STEX trains throughout the day or throughout the morning and evening peaks. During our meeting back in March I recall that you said that the DfT would ask the train operators to suggest possible solutions for addressing overcapacity problems. At that time it was believed that the early evening peak represented a potential Worst Case scenario and that it might be possible to initially introduce an additional relief train before considering 12-car trains. The 2006 surveys indicate that the current STEX overcrowding is even worse in the morning peak. I understand that there are no free peak hour train paths to Liverpool Street in the morning peak which suggests that peak hour 12-car trains will need to be provided far earlier than the 2014 forecast previously suggested by BAA. Changes to the Current Franchise. The fact that overcrowding on STEX is already being experienced in the morning and evening peak hours suggests that measures for increasing capacity need to be initiated as soon as possible. In light of the serious concerns raised by the 2006 STEX passenger survey I have to ask for further clarification on the following matters: 1. Do DfT Rail intend to carry out further surveys to confirm the findings of the 2006 surveys? 2. When do DfT Rail intend to commence discussions with the current operator of STEX to address the peak hour overcapacity problems that are observable now? 3. How quickly will additional peak hour STEX capacity be provided? 4. Can the HLOS process be expedited to provide the infrastructure required to support additional peak hour STEX capacity? Timing and Certainty of STEX Improvements. In your previous letter you indicated that is not possible to tie future governments into the precise timing of funding for measures required to serve the Stansted expansion. At present neither the Local Authorities nor BAA are able to provide the Public Inquiry Inspectors considering the Stansted G1 Inquiry with any guarantees on either when STEX capacity improvements will be provided or what they might be.

22 In the experience of the three local authorities on whose behalf I write, no other private developer (of which BAA is an example) would be entitled to a grant of planning permission without having demonstrated that proper provision has been made for addressing the surface access impacts of the proposed development. This matter must surely be seen as especially important where we are concerned to maintain the critical public transport link between London and London s third airport in a condition which is attractive and convenient not only for existing users, but also for as large a proportion as can be encouraged to use it of the additional 10mppa for which planning permission is now sought. We are aware that government funding priorities may change in the light of other circumstances and you have told us that you can offer no commitments in respect of the timing of funding on behalf of this or future governments. Against this background, we see the need for a potential Grampian condition restricting the increased throughput at STN until 12 car trains or alternative capacity improvements have been introduced to serve STEX at least in the AM and PM peak periods. We would be grateful for you comments on the above and for your response to the questions raised in this letter. Yours sincerely Martin Cooke Principal Transportation Officer Telephone: Fax: Internet: martin.cooke@essexcc.gov.uk (Please reply to Martin Cooke at the ECC address provided at the top of this letter.) cc. Jonathan Holland DfT Rail

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 8 May 2008 AUTHOR/S: Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL S RESPONSE TO UTTLESFORD

More information

Surface Access. Position Statement on behalf of Stop Stansted Expansion

Surface Access. Position Statement on behalf of Stop Stansted Expansion Doc. No. SSE/37 Case Ref. 2032278 Appeal by BAA Ltd and Stansted Airport Ltd following the refusal by Uttlesford District Council of planning application UTT/0717/06/FUL Surface Access Position Statement

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

Stansted Airport Planning Application for 43mppa. Presentation by SSE March 2018

Stansted Airport Planning Application for 43mppa. Presentation by SSE March 2018 Stansted Airport Planning Application for 43mppa Presentation by SSE March 2018 MAG Planning Application New Rapid Access Taxiway New Rapid Exit Taxiway 9 additional stands aircraft stands Unified aircraft

More information

THE IMPACT OF STANSTED EXPANSION UPON SURFACE ACCESS NETWORKS

THE IMPACT OF STANSTED EXPANSION UPON SURFACE ACCESS NETWORKS THE IMPACT OF STANSTED EXPANSION UPON SURFACE ACCESS NETWORKS Report to Stop Stansted Expansion Berkeley Hanover Consulting Suite 23 Coleridge House 4/5 Coleridge Gardens London NW6 3QH Tel: 020 7372 2600

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 13 July 2006 AUTHOR: Executive Director / Principal Planning Policy Officer (Transport) STANSTED AIRPORT GENERATION 1 CONSULTATION ON

More information

Initial Road Link Capacity Assessment Land East of Elsenham, Essex The Fairfield Partnership. 31 st July 2006

Initial Road Link Capacity Assessment Land East of Elsenham, Essex The Fairfield Partnership. 31 st July 2006 Initial Road Link Capacity Assessment Land East of Elsenham, Essex The Fairfield Partnership 31 st July 2006 Addendum 26 th September 2007 This addendum to the preliminary Link Capacity Appraisal has been

More information

East West Rail Consortium

East West Rail Consortium East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The

More information

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement The consultation Draft Airports National Policy Statement (Draft NPS) sets out Government s policy

More information

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Agenda Item 5: Rail East Midlands Rail Franchise Consultation Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by

More information

Riverside Heights, Norwich. Travel Plan

Riverside Heights, Norwich. Travel Plan RIVERSIDE HEIGHTS, NORWICH Client: Engineer: Taylor Wimpey East Anglia Create Consulting Engineers Limited Hungate House Princes Street Norwich Norfolk NR3 1AZ Tel: 08454507908 Email: enquiries@createconsultingengineers.co.uk

More information

Commissioned by: Economic Impact of Tourism. Stevenage Results. Produced by: Destination Research

Commissioned by: Economic Impact of Tourism. Stevenage Results. Produced by: Destination Research Commissioned by: Produced by: Destination Research www.destinationresearch.co.uk December 2016 Contents Page Introduction and Contextual Analysis 3 Headline Figures 5 Volume of Tourism 7 Staying Visitors

More information

Economic Impact of Tourism. Hertfordshire Results. Commissioned by: Visit Herts. Produced by:

Economic Impact of Tourism. Hertfordshire Results. Commissioned by: Visit Herts. Produced by: Commissioned by: Visit Herts Produced by: Destination Research www.destinationresearch.co.uk December 2016 Contents Page Introduction and Contextual Analysis 3 Headline Figures 5 Volume of Tourism 7 Staying

More information

CAA consultation on its Environmental Programme

CAA consultation on its Environmental Programme CAA consultation on its Environmental Programme Response from the Aviation Environment Federation 15.4.14 The Aviation Environment Federation (AEF) is the principal UK NGO concerned exclusively with the

More information

FirstGroup plc South Western

FirstGroup plc South Western FirstGroup plc South Western Rail franchise award Monday 27 March 2017 Overview Delighted to be selected by the Department for Transport (DfT) to operate the South Western franchise for at least seven

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Epping Forest - 2014 Economic Impact of Tourism Headline Figures Epping Forest - 2014 Total number of trips (day & staying)

More information

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir, East Midlands Rail Franchise Programme Office Consultation Co-ordinator c/o Buckinghamshire County Council Zone 2/21 County Hall Department for Transport Walton Street Great Minster House Aylesbury 33

More information

Submission by Heathrow Southern Railway Ltd.

Submission by Heathrow Southern Railway Ltd. Response to Consultation on core elements of the regulatory framework to support capacity expansion at Heathrow Submission by Heathrow Southern Railway Ltd. 22 nd September 2017 Contact; Steven Costello,

More information

STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED

STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED STANSTED MOUNTFITCHET PARISH COUNCIL STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 S TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED 1 INTRODUCTION 1.1 Stansted Mountfitchet Parish

More information

Local Development Scheme

Local Development Scheme Local Development Scheme August 2014 Local Development Scheme (August 2014) / Page 2 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation

More information

SUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor

SUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor Highways Inquiry Procedure Rules 1994 Doc Ref: OBJ/0125 2 For a local inquiry into: SUMMARY PROOF OF EVIDENCE Gerald Kells Transport Policy and Campaigns Advisor For Friends of the Earth Cymru / Cyfeillion

More information

Submission to NSW Koala Strategy Consultation Process. March 2017

Submission to NSW Koala Strategy Consultation Process. March 2017 Submission to NSW Koala Strategy Consultation Process March 2017 Table of contents Opening 3 Response 3 Whole-of-government NSW koala strategy 3 State Environment Planning Policy (SEPP) 44 3 The draft

More information

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan.

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan. Addendum to Guildford Borough Proposed Submission Local Plan June 2016 Strategic Highway Assessment Report: High level review of potential of key changes in the Guildford borough Proposed Submission Local

More information

TfL Planning. 1. Question 1

TfL Planning. 1. Question 1 TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February

More information

TRANSPORT UPDATE. September/October 2018

TRANSPORT UPDATE. September/October 2018 TRANSPORT UPDATE September/October 2018 TRANSPORT UPDATE Below is a list of the main local, regional and national transport projects that the Chamber is involved with, either directly or indirectly. Mention

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Oxfordshire - 2015 Economic Impact of Tourism Headline Figures Oxfordshire - 2015 Total number of trips (day & staying)

More information

Memorandum of Understanding on Highways & Transportation Infrastructure for the West Essex/East Hertfordshire Housing Market Area

Memorandum of Understanding on Highways & Transportation Infrastructure for the West Essex/East Hertfordshire Housing Market Area Memorandum of Understanding on Highways & Transportation Infrastructure for the West Essex/East Hertfordshire Housing Market Area between Essex County Council Hertfordshire County Council Highways England

More information

A POLICY CRITIQUE OF STANSTED AIRPORT S EXPANSION TO 25 MILLION PASSENGER PER ANNUM (MPPA) A Working Paper

A POLICY CRITIQUE OF STANSTED AIRPORT S EXPANSION TO 25 MILLION PASSENGER PER ANNUM (MPPA) A Working Paper A POLICY CRITIQUE OF STANSTED AIRPORT S EXPANSION TO 25 MILLION PASSENGER PER ANNUM (MPPA) A Working Paper by Dr Douglas Hart* and Professor Philip McCann# *Department of Real Estate and Planning #Department

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Oxfordshire - 2016 Economic Impact of Tourism Headline Figures Oxfordshire - 2016 number of trips (day & staying) 27,592,106

More information

LSCC London. Stansted. Cambridge.Consortium

LSCC London. Stansted. Cambridge.Consortium LSCC London. Stansted. Cambridge.Consortium Covering letter to Airports Commission We are pleased to submit a report undertaken for the London Stansted Cambridge Consortium (LSCC) on the economic impact

More information

2. Our response follows the structure of the consultation document and covers the following issues in turn:

2. Our response follows the structure of the consultation document and covers the following issues in turn: Virgin Atlantic Airways response to the CAA s consultation on Economic regulation of capacity expansion at Heathrow: policy update and consultation (CAP 1658) Introduction 1. Virgin Atlantic Airways (VAA)

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

ARRIVAL CHARACTERISTICS OF PASSENGERS INTENDING TO USE PUBLIC TRANSPORT

ARRIVAL CHARACTERISTICS OF PASSENGERS INTENDING TO USE PUBLIC TRANSPORT ARRIVAL CHARACTERISTICS OF PASSENGERS INTENDING TO USE PUBLIC TRANSPORT Tiffany Lester, Darren Walton Opus International Consultants, Central Laboratories, Lower Hutt, New Zealand ABSTRACT A public transport

More information

NOTE TO INQUIRY BACKGROUND CRASH RATE DEFINITIONS. TRUDY AUTY, BSc, ARCS FOR LAAG

NOTE TO INQUIRY BACKGROUND CRASH RATE DEFINITIONS. TRUDY AUTY, BSc, ARCS FOR LAAG TOWN AND COUNTRY PLANNING ACT 1990 - SECTION 77 AND TOWN AND COUNTRY PLANNING (INQUIRIES PROCEDURE) (ENGLAND) RULES 2000 APPLICATIONS BY LONDON ASHFORD AIRPORT LTD SITE AT LONDON ASHFORD AIRPORT LIMITED,

More information

Revised Proof of Evidence on behalf of Stop Stansted Expansion. Surface Access Issues with particular reference to roads

Revised Proof of Evidence on behalf of Stop Stansted Expansion. Surface Access Issues with particular reference to roads Doc No. SSE/13.1/a Case Ref. 2032278 (replaces SSE/13/a) Appeal by BAA Ltd and Stansted Airport Ltd following the refusal by Uttlesford District Council of planning application UTT/0717/06/FUL Revised

More information

National Rail Passenger Survey Autumn 2013 Main Report

National Rail Passenger Survey Autumn 2013 Main Report National Rail Passenger Survey Autumn 2013 Main Report What is Passenger Focus? Passenger Focus is the independent consumer watchdog for Britain s rail passengers and England s bus, coach and tram passengers

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

National Rail Passenger Survey Autumn 2015 Main Report

National Rail Passenger Survey Autumn 2015 Main Report National Rail Passenger Survey Autumn 2015 Main Report Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism North Norfolk District - 2016 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Norfolk - 2016 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors - Accommodation

More information

SAMTRANS TITLE VI STANDARDS AND POLICIES

SAMTRANS TITLE VI STANDARDS AND POLICIES SAMTRANS TITLE VI STANDARDS AND POLICIES Adopted March 13, 2013 Federal Title VI requirements of the Civil Rights Act of 1964 were recently updated by the Federal Transit Administration (FTA) and now require

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Norfolk - 2017 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors - Accommodation

More information

Movement Strategy. November On behalf of Barton Oxford LLP

Movement Strategy. November On behalf of Barton Oxford LLP Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date

More information

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, Letchworth Garden City Introduction As part of central government

More information

Draft airspace design guidance consultation

Draft airspace design guidance consultation Draft airspace design guidance consultation Annex 2: CAP 1522 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority Aviation House Gatwick Airport South West Sussex RH6 0YR You can copy

More information

Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport. Consultation paper by BAA Gatwick

Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport. Consultation paper by BAA Gatwick Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport Consultation paper by BAA Gatwick Introduction 1. This paper seeks the views of interested parties

More information

FirstGroup plc TransPennine Express

FirstGroup plc TransPennine Express FirstGroup plc TransPennine Express Rail franchise award Wednesday 9 December 2015 TransPennine Express awarded to FirstGroup FirstGroup is delighted to be selected by the Department for Transport (DfT)

More information

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018 NOISE MANAGEMENT BOARD - GATWICK AIRPORT Review of NMB/10 11 th April 2018 Synopsis This paper provides a brief review of the issues discussed at the NMB/10 meeting, which was held on 11 th April. Introduction

More information

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes Appendix 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes Introduction 12.1 This appendix examines the business case for through services to HS1,

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options. Welcome Welcome to the Highways England A27 Arundel Bypass public consultation. Thank you for coming. Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear

More information

1. Summary of key points 2

1. Summary of key points 2 Petitions Committee NEVAR petition: Cardiff Airport access road This brief sets out the history and policy background to the development of proposals for improved surface access to Cardiff Airport (CA).

More information

Revised Analysis of Ground Noise Impact at Ten Locations Around Stansted Airport

Revised Analysis of Ground Noise Impact at Ten Locations Around Stansted Airport Doc. No. SSE/12/c Case Ref. 2032278 Appeal by BAA Ltd and Stansted Airport Ltd following the refusal by Uttlesford District Council of planning application UTT/0717/06/FUL Revised Analysis of Ground Noise

More information

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Traffic Advisory Leaflet 14/99 December 1999 Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Introduction This leaflet summarises the impact of a traffic calming scheme on

More information

Strategic Transport Forum 7 th December 2018

Strategic Transport Forum 7 th December 2018 Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft

More information

Summary Proof of Evidence Traffic

Summary Proof of Evidence Traffic Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 Agenda item 6 BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 REPORT OF HEAD OF GROWTH AND INFRASTRUCTURE SAFEZONE AVERAGE SPEED CAMERA SITE ON SPRINGDALE ROAD, IN BROADSTONE, POOLE AND CORFE

More information

3. Coach Supporting Statement

3. Coach Supporting Statement 3. Coach Supporting Statement Content 1. Setting the Scene 2. Vision 3. Coaches and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7. Strategy

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Spring putting rail passengers first National Passenger Survey putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for Britain s rail

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes Chapter 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes 12.1 This chapter relates to the following questions listed by the Committee: 3.1 Business

More information

Self Catering Holidays in England Economic Impact 2015

Self Catering Holidays in England Economic Impact 2015 Self Catering Holidays in England Economic Impact 2015 An overview of the economic impact of self catering holidays in England Published by The South West Research Company Ltd March 2017 Contents Page

More information

45,000 SQ FT HEADQUARTERS BUILDING AVAILABLE TO PRE-LET

45,000 SQ FT HEADQUARTERS BUILDING AVAILABLE TO PRE-LET 45,000 SQ FT HEADQUARTERS BUILDING AVAILABLE TO PRE-LET ARE YOU CM2? CM2 IS A 44,736 SQ FT LANDMARK HEADQUARTERS BUILDING LOCATED JUST TWO MILES FROM THE HEART OF CHELMSFORD CITY CENTRE. CM2 Anderson Group

More information

45,000 sq ft headquarters building available to pre-let

45,000 sq ft headquarters building available to pre-let 45,000 sq ft headquarters building available to pre-let are you cm2? CM2 is a 44,736 sq ft landmark headquarters building located just two miles from the heart of Chelmsford city centre. CM2 Anderson Group

More information

A140 study and Major Road Network

A140 study and Major Road Network A140 study and Major Road Network Executive Summary The Government s new Transport Investment Strategy sets out a new long-term approach for government infrastructure spending. Funding will be targeted

More information

BARNSLEY METROPOLITAN BOROUGH COUNCIL

BARNSLEY METROPOLITAN BOROUGH COUNCIL BARNSLEY METROPOLITAN BOROUGH COUNCIL This matter is a Key Decision within the Council s definition and has been included in the relevant Forward Plan REPORT OF THE EXECUTIVE DIRECTOR OF PLACE TO CABINET

More information

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition March 1, 2017 Financial Reporting Center Revenue Recognition Working Draft: Time-share Revenue Recognition Implementation Issue Issue #16-6: Recognition of Revenue Management Fees Expected Overall Level

More information

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) AMOFSG/8-IP/6 23/12/09 AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) EIGHTH MEETING Melbourne, Australia, 15 to 18 February 2010 Agenda Item 5: Observing and forecasting at the

More information

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK. BUILD-TO-SUIT OPTIONS FROM 50, ,000 sq ft suffolk-park.

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK. BUILD-TO-SUIT OPTIONS FROM 50, ,000 sq ft suffolk-park. BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS BUILD-TO-SUIT OPTIONS FROM 50,000-750,000 suffolk-park.uk Suffolk Park is the only major allocated employment site in with outline planning for up

More information

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners Great Western Route Utilisation Strategy Evidence Submission June 2008 Wilder House Wilder Street Bristol BS2 8PH 0117 903 6868 www.westofengland.org 1 The West of England Partnership is the sub-regional

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY Matter 3C Easton/Costessey Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY SUBMISSION ON BEHALF OF TAYLOR WIMPEY DEVELOPMENTS AND

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 23/05/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

THAMES GATEWAY BRIDGE INQUIRY ENDS

THAMES GATEWAY BRIDGE INQUIRY ENDS Media Briefing May 2006 THAMES GATEWAY BRIDGE INQUIRY ENDS The public inquiry into controversial plans by Transport for London (TfL), to build a 6-lane road bridge across the Thames between east and south

More information

Trigger Point Justification Note 30 th August 2013

Trigger Point Justification Note 30 th August 2013 1. Introduction Trigger Point Justification Note 30 th August 2013 DCC constructed a highway assignment model of Tiverton and the surrounding area and this suggested that in pure capacity terms, up to

More information

National Rail Passenger Survey Main Report Spring 2018

National Rail Passenger Survey Main Report Spring 2018 National Rail Passenger Survey Main Report Spring 2018 Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis

More information

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:

More information

Commissioned by: Visit Kent. Economic Impact of Tourism. Dover Results. Produced by: Destination Research

Commissioned by: Visit Kent. Economic Impact of Tourism. Dover Results. Produced by: Destination Research Commissioned by: Visit Kent Produced by: Destination Research www.destinationresearch.co.uk November 2016 Contents Page Introduction and Contextual Analysis 3 Headline Figures 6 Volume of Tourism 8 Staying

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018 Suffolk Chamber Transport Board Greater Anglia 16 January 2018 Greater Anglia update GEML Taskforce NRPS Spring 2017 results Fleet reliability and refresh initiatives Timetable improvements New trains

More information

Summary of questions and discussion

Summary of questions and discussion London and South East Route Utilisation Strategy - Rail User Group Meeting Saturday 11 July 2009 Chair- Ashwin Kumar, Passenger Director, Passenger Focus Summary of questions and discussion A - Comments,

More information

Community Rail Partnership Action Plan The Bishop Line Survey of Rail Users and Non-Users August 2011 Report of Findings

Community Rail Partnership Action Plan The Bishop Line Survey of Rail Users and Non-Users August 2011 Report of Findings Community Rail Partnership Action Plan The Bishop Line Survey of Rail Users and Non-Users August 2011 Report of Findings Analysis and report NWA Social Research 1 Contents Page No. A. Summary of Main Findings...

More information

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK. BUILD-TO-SUIT OPTIONS FROM 50, ,000 sq ft suffolk-park.

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK. BUILD-TO-SUIT OPTIONS FROM 50, ,000 sq ft suffolk-park. SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK BUILD-TO-SUIT OPTIONS FROM 50,000 750,000 suffolk-park.uk Suffolk Park is the only major allocated employment site in Bury St Edmunds

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 17/11/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

Consultation Meeting regarding Merger of Southern and Gatwick Express

Consultation Meeting regarding Merger of Southern and Gatwick Express Stephen McHale William Sheils Anne Shippam Richard Constable Ray Cowell Phil Freeman Terry Wicks Adrian Walsh Malcolm Chisholm Dean Langman Roy Luxford Kevin Eade John Doyle Ian Harding Mark Stanbridge

More information

York Aviation STANSTED AIRLINES CONSULTATIVE COMMITTEE

York Aviation STANSTED AIRLINES CONSULTATIVE COMMITTEE 2032278 ACC/22 York Aviation STANSTED AIRLINES CONSULTATIVE COMMITTEE Appeal by BAA Ltd and Stansted Airport Ltd against the Refusal of an application for Planning Permission pursuant to Section 73 of

More information

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time. PREFACE The Florida Department of Transportation (FDOT) has embarked upon a statewide evaluation of transit system performance. The outcome of this evaluation is a benchmark of transit performance that

More information

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada Evaluation of Transport Canada s Program of Payments to Other Government or International Agencies for the Operation and Maintenance of Airports, Air Navigation, and Airways Facilities (Also known as the

More information