ICT LIBRARY UPDATE. Contents. - Articles - Pages (Subject wise alphabetically indexed) Addition of Books - 5.
|
|
- Vincent Baldwin
- 5 years ago
- Views:
Transcription
1 1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly March April 2015 Vol. 13 : No. 2 Contents - Articles - Pages (Subject wise alphabetically indexed) Addition of Books Reports Prepared by : Neeru Saini Librarian
2 2 Articles Architecture 1 Solution : Architectural lighting from K-Lite : (NBM&CW : April 2015). 2 Interplay of steel and glass : (Architecture + Design : March 2015) Aviation 1 Airport express traffic improves : (Urban Railways : May 2015) 2 Airport cleaning equipment : (Master Builder : March 2015) Building 1 Progressive collapse analysis of RC buildings subjected to seismic loads.. : (ICJ-May 2015) Concrete 1 Computation of fundamental time period of concrete gravity dam-a parametric study : (ICJ: May 2015) 2 A study on deterioration of reinforced cement concrete structures in Mumbai : (ICJ: May 2015). 3 Concrete : Exploring the chemical properties and performance results of sustainable olidia cement and solidia concrete.. (Master Builder : March 2015) Energy 1 Topsy-turvy road ahead for saffron revolution (Energy Next : March 2015) Earthquake 1 Revival of traditional earthquake resistant technique in Kashmir Valley, replacing timber with bamboo in dhajji.. : (International Journal of SEWC : Feb. 2015) Equipment 1 Overview : Increasing awareness drives demand for safety equipment. (Indian Infrastructure : March 2015).
3 3 General 1 Sewage farming ban triggers debate : (Down to Earth , Feb. 2015) 2 Money speaks : (Down to Earth 16-28, Feb. 2015) Human Resource 1 Employee engagement what is your benchmark : (Human Capital Feb. 2015). 2 The expanding role of mobility in the workplace : (Human Capital Feb. 2015). 3 Maternity benefits : Who s doing what : (Human Capital - Feb. 2015). Project Briefs 1 Infra Development : (NBM&CW : April 2015) 2 Roads and highway projects : (NBM&CW : April 2015) 3 Port projects : (NBM&CW : April 2015) 4 Metro & Rail projects : (NBM&CW : April 2015) 5 Airport projects : (NBM&CW : April 2015) 6 Power projects : (NBM&CW : April 2015) Roads and Bridges 1 Road recycling : New asphalt milling machines are coming to market, recycle.(world Highways : Jan. Feb. 2015). 2 Parking and Access Control : (ITS International : Jan. Feb. 2015). 3 Roads & Bridges : Set in motion : Karnataka s road sector to offer huge PPP opportunity. (Indian Infrastructure : March 2015) 4 In the right direction : India desperately requires world class road infrastructure (Indian Infrastructure : March 2015). 5 Road Transport & Highways (Master builder : March 2015) Structures 1 City bus services: Intercity and intra-city connections in Odisha : (Indian Infrastructure : March 2015).
4 4 Steel 1 Steel reinforcement bars : Maintaining the Ductility requirement of the steel reinforcement bars : (Master Builder : March 2015). 2 Interplay of steel and glass : (Architecture + Design : April 2015). Survey 1 Laser scanning sheds light on road surveying : (World Highways : Jan.- Feb. 2015). Water 1 Industrial water and wastewater treatment using membrane technologies : (Water Today : March 2015) 2 Membrane bioreactor process and its relevance as a technology for water recycling and re-use (Water Today : March 2015) 3 Stability investigation of Buoyancy Moment in the Water treatment Concrete structures : (International Journal of SEWS : Feb. 2015). 4 Water proofing solutions : (NBM&CW : April 2015).
5 5 ADDITIONAL OF BOOKS Acc. No. Title BS 1924 (1) : 1990 stabilized material for civil engineering purpose Highways engineering pavements, materials and control of quality 18362, 18363, Theory and analysis of structures Vol. I Theory and analysis of structures Vol. II U.P. Soils map (Set of 1 to 6) R.C.C. Design (reinforced concrete structures) Handbook of central Govt. Staff Guide to pavement technology part 5 : Pavement evaluation and treatment design Irrigation engineering and hydraulic structures
6 6 Project Report Sl. No. 1 Projects Name Acc. No. Title of the Report (Hard Copy) NH-8 (SD) : Six laning of Surat Dahisar section of NH-8 from km to km Operation and maintenance report : Feb Soft Copy Year NH-8 (D) : Independent engineering services for the four laning of Jetpur Somnath section from.. NH-8 (Gomti): Independent engineering services for development and operation of Beawar- Gomti section of.. NH-22 (Punjab) : Independent consultancy services for 4/6 laning of Zirakpur Oarwanoo section of.. MP (2736) : Construction of ADB assisted with highway corridors under ADB Loan no NH-4 (TC) : Six laning of Tumkur Chitradurga section of NH-4 from km to.. NH-15 (PA) : Independent engineer for 4 laning of Pathankot - Amritsar section from.. NH-54 (AS-1) : 4 laning of silchar to balachera section of NH- 54 from NH-58/72 : Independent engineering services for 4 laning of Haridwar Dehradun section from km to Maintenance Manual MPR No. 40 : Feb MIR No.63 : Jan QIR No. 21 : Jan MIR : No. 64 : Feb MIR No. 64 : Feb O & M MPR No. 82 : Jan MPR No. 83 : Feb MPR No. 43 : Feb MPR No. 44 : March O & M Monthly Progress : Jan O & M Monthly Progress Report : O & M Inspection Report : March O & M QPR : March O & M Inspection Report Jan MIR No. 45 : Feb MPR No. 54 : Feb MPR : Feb MPR : Feb. 2015
7 7 10 NH-25/26 (JL) : NH-26 : Jhansi to Lalitpur in the state of Uttar Pradesh NSI/BOT/UP-2 11 NH-25 (EW) : North South and East West corridors Bihar (BSRDC) : Bihar state highway project PH-11 : Contract package No. 2 (SH. No. 81) Supervision consultancy of civil under Ph-II aided by ADB. NH-10 (Hary.) : Independent Engineering services for 4/6 laning of Delhi/Haryana border to Rohtak MP (2154) : Consultancy services for construction supervision of package No. 2.. ADB ( TA-8110) : Institutional development for Rural roads asset management support to the establishment of rural road network management units and rural connectivity training and research MPR : Feb QPR : Jan MPR : Jan MPR : Jan MPR : MPR : Feb Bihar (BSRDC) : MPR : Feb MPR (SH-83) : Feb MPR (SH-103) : Feb MPR : Feb (NH-103) MPR : Feb (SH-83) MPR : Feb MPR : March MPR No. 100 : Feb QPR No. 6 : March Operational manual, policies, procedures and tools.(rrnmu) Operation manual, policies, prodecures and tools, (RCTRC) M Span bridle suspension bridge at Ruchh Mahadev in district of Rudraprayaga (Bridge UID 9002) : Feb Uttarakhand (Consultancy services for design ) : Bridges works : Reconstruction of bridges under Uttarakhand disaster recovery project M Span bridge suspension bridge on Kalpganga River at Kalpeshwar in District of Chamoli (Bridge UID 9017) : Feb M Span bridle suspension bridge on Jalkur River at Piplogi in district of Tehri (Bridge UID 9037) : Feb M Span bridle suspension bridge on Gauri River at Basantkot in District of Pithoragarh : (Bridge UID 9017) : Feb. 2015
8 Appendix - 1 : Survey and investigation report for pedestrian bridge at Kalpeshwar (BR.UID 9017) Appendix - 1 : Survey and investigation report for pedestrian bridge at Benakuli (BR.UID 9019) Appendix -1 : Survey and investigation report for pedestrian bridge at Jokhnalagga Bura (BR.UID 9022) Appendix -1 : Survey and investigation report for pedestrian bridge at Pandranu (BR.UID 9034) Appendix -1 : Survey and investigation report for pedestrian bridge at Kot Village (BR. UID 9038) Appendix -1 : Survey and investigation report for pedestrian bridge at Basantkot (BR. UID 9053) Appendix -1 : Survey and investigation report for pedestrian bridge at Rambada (BR. UID 9059) FDPR : Vol. I : 100M Span bridle suspension bridge on pinder river at Boragad in district of Chamoli : (Bridge UID 9024) FDPR : Vol. II : 100M Span bridle suspension bridge on pinder river at Boragad in district of Chamoli : (Bridge UID 9024) FDPR : Vol. III : 100M Span bridle
9 9 suspension bridge on pinder river at Boragad in district of Chamoli : (Bridge UID 9024) FDPR : Vol. I : 60M Span bridle suspension bridge on Aglad river at Chamasari in District of Tehri (Bridge UID 9039) FDPR : Vol. II : 60M Span bridle suspension bridge on Aglad river at Chamasari in District of Tehri (Bridge UID 9039) FDPR : Vol. III : 60M Span bridle suspension bridge on Aglad river at Chamasari in District of Tehri (Bridge UID 9039) FDPR : Vol. I : 80M span bridle suspension bridge at Ratuda (Bridge UID 9005) FDPR : Vol. II : 80M span bridle suspension bridge at Ratuda (Bridge UID 9005) FDPR : Vol. III : 80M span bridle suspension bridge at Ratuda (Bridge UID 9005) FDPR : Vol. I : 80M span bridle suspension bridge on Indrawati river at Sada in District of Uttarkashi (Bridge UID 9036) FDPR : Vol. II : 80M span bridle suspension bridge on Indrawati river at Sada in District of Uttarkashi (Bridge UID 9036) FDPR : Vol. III : 80M span bridle suspension bridge on Indrawati river at Sada in District of Uttarkashi (Bridge UID 9036).
10 FDPR : Vol. I : 140M Span bridle suspension ridge on Alaknanda river at Aarudi-Patudi in Chamoli (Bridge UID 9020) FDPR : Vol. II : 140M Span bridle suspension ridge on Alaknanda river at Aarudi-Patudi in Chamoli (Bridge UID 9020) FDPR : Vol. III : 140M Span bridle suspension ridge on Alaknanda river at Aarudi-Patudi in Chamoli (Bridge UID 9020) M Span bridle suspension bridge at Ruchh Mahadev in district of Rudraprayaga (Bridge UID 9002) : Feb M Span bridge suspension bridge on Kalpganga River at Kalpeshwar in District of Chamoli (Bridge UID 9017) : Feb M Span bridle suspension bridge on Jalkur River at Piplogi in district of Tehri (Bridge UID 9037) : Feb FDPR : Vol. I : 70M Span bridle suspension bridge at Ruchh Mahadev in District of Rudraprayag (BridgeUID 9002) : March FDPR : Vol. II : 70M Span bridle suspension bridge at Ruchh Mahadev in District of Rudraprayag (BridgeUID 9002) : March Bidding Documents : Vol. III : 70M Span bridle suspension bridge at Ruchh Mahadev
11 11 in District of Rudraprayag (BridgeUID 9002) : March FDPR : Vol. I : 45M Span bridge suspension bridge at Triveni Sangam in District of Rudraprayag (Bridge UID 9003) FDPR : Vol. II : 45M Span bridge suspension bridge at Triveni Sangam in District of Rudraprayag (Bridge UID 9003) Bidding Documents : Vol. III : 45M Span bridge suspension bridge at Triveni Sangam in District of Rudraprayag (Bridge UID 9003) FDPR : Vol. I : 80M Span bridle suspension bridge over Kalpganga River at Kalpepshwar in District of Chamoli (Bridge UID 9017) : March FDPR : Vol. II: 80M Span bridle suspension bridge over Kalpganga River at Kalpepshwar in District of Chamoli (Bridge UID 9017) : March Bidding Documnts : Vol. III : 80M Span bridle suspension bridge over Kalpganga River at Kalpepshwar in District of Chamoli (Bridge UID 9017) : March FDPR : Vol. I : 80M Span bridle suspension bridge on Nandakini River at Jokhna Village in District of Chamolii (Bridge UID 9022) FDPR : Vol. II : 80M Span bridle suspension bridge on Nandakini River at Jokhna Village in District of Chamolii (Bridge UID 9022).
12 NH-28/31 (Tajpur) : Independent engineering services for the project of Development of Greenfield bridge across river Ganga and its approaches connecting. NH-45 (TK) : Independent Engineering services for two laning with paved shoulder od Dindigul theni Bidding Documents : Vol. III : 80M Span bridle suspension bridge on Nandakini River at Jokhna Village in District of Chamolii (Bridge UID 9022) FDPR : Vol. I : 60M Span bridle suspension bridge on Power River at Pundranu in District of Uttarkashi (Bridge UID 9034) : March FDPR : Vol. II : 60M Span bridle suspension bridge on Power River at Pundranu in District of Uttarkashi (Bridge UID 9034) : March Bidding Documents : Vol. III : 60M Span bridle suspension bridge on Power River at Pundranu in District of Uttarkashi (Bridge UID 9034) : March FDPR : Vol. I : 120M Span Bridle Suspension bridge on Jalkur River at Piplogi in District of Tehri (9037 Bridge UID) FDPR : Vol. II : 120M Span Bridle Suspension bridge on Jalkur River at Piplogi in District of Tehri (Bridge UID 9037) Bidding Documents : 120M Span Bridle Suspension bridge on Jalkur River at Piplogi in District of Tehri (Bridge UID 9037) MIR : Feb MIR : Feb MPR : Jan MPR : Feb NH-11/89 (Bikaner) : Independent engineer for development MPR No. 21 : Feb. 2015
13 13 20 and operation of Sikar Bikaner of MPR No. 20 : Jan NH-47(KL-3) : independent engineering services for design, construction, development, finance, operation and maintenance of 6 laning of Vadakanchery MIR No. 21 : Feb MIR No. 21 : March MIR : : Feb MPR : Feb NH-47 (Chen.) 6 laning from Chengapalli to start of Coimbatore bypass.. NH-89 (Ajmer) : Development and operation of Ajmer-Nagaur section MP (JJK) : Jhabua Jobat Kukshi road on BOT Basis in the state of MP. NH-5 (VGH) : Design consultancy for six lanning of Vijayawada-Gundugolanu section of NH-5 from km to km including 6 lane Hanuman junction bypass. NH-77(MS) : Two laning of Muzaffarapur Sonbarsa section of NH MIR : Feb QPR : Feb MPR : Feb MPR : March MPR : Feb MIR : March QPR : March MPR : March MPR : Feb Traffic survey report : Feb Bridge/structures design calculations (Part 1 of 3) flyovers) : Feb Bridge/structures design calculations (Part 2 of 3) Vehicular U) : Feb Bridge/structures design calculations (Part 1 of 3) pedestrians underpass : Feb Soil and material investigation report including pavement design report : Feb Drawing structures : Feb Drawings highways : Feb Operation and maintenance manual MPR : Jan MIR No. 42 : Feb. 2015
14 NH-77(HM) : 4 laning of Hajipur Muzaffarpur section of.. NH-21 (Punjab) : Independent consultancy services for 4 laning of Kurali Kiratpur section of. Manipur : Consultancy Services for Feasibility study and preparation of Detailed Project Report for proposed construction of Greater Imphal Ring Road and Imphal Kangchup Tamenglong Tousem Haflong road in the state of Manipur MPR : Feb QIR No. 14 : Operation and maintenance manual : April QPR No. 17 : Feb MPR : Feb MPR No. 52 : Feb Inspection Report : March MPR No. 88 : Jan MPR No. 89 : Feb Quarterly Report No. 30 : March Monthly Report No. 90 : March FDPR : Vol. I : Main Report : Package II : Feb FDPR : Vol. I (A) : Annexure to main report : Feb FDPR : Vol. II (A) : Bridge design calculation (Part -1 of 3 ) : Feb FDPR : Vol. II (A) : Bridge design calculation (Part -2 of 3 ) : Feb FDPR : Vol. II (A) : Bridge design calculation (Part -3 of 3 ) : Feb FDPR : Vol. II : Design Report : Feb FDPR : Vol. II (B) : Geotechnical investigation report : Feb FDPR : Vol. III : Traffic survey and analysis : Feb FDPR : Vol. IV : Material report : Feb FDPR : Vol. V : Technical specification : Feb FDPR : Vol. VI : Rate Analysis : Feb FDPR : Vol. VII : Cost Estimate : Feb FDPR : Vol. VIII : Bill of quantities : Feb.
15 Nippo : Nippo corporation : MSIL proving ground project rohtak. NH-54 (MN) : Four laning from km. 126/450 to km0140/700 and. 31 NH-98(AAH) : 32 Karnataka (KSRTC) : FDPR : Vol. X : Fid Documents : Feb FDPR : Vol. IX : (A) : Road Drawings : Feb FDPR : Vol. IX B) : Bridge Drawings : Feb MPR Vol. 42 : Jan MPR : Feb MPR : Jan MPR : Feb MPR : Feb Monthly Environmental Monitoring supervision report. Feb MPR : March Monthly Environmental Monitoring and supervision report Monthly Report : April Inception Report : May Monthly Report :May Quarterly Report : June Monthly Report : July Monthly Report : August Quarterly Report : Sept Monthly Report : Oct Bench Mark study report : Sept vol Monthly Report : Nov M & E Study design report : August Bench Mark study report : Sept : Vol. II Bench Mark Study Report : Sept. Vol. III.
16 Quarterly Report : Dec Monthly Report : Jan Monthly Report : Feb Quarterly Report : March Monthly Report : April Temporal study report Vol. I : May Temporal study report Vol. II : May Monthly Report : May Quarterly Report : June Monthly Report : July Monthly Report : August Quarterly Report : Sept Monthly Report : Oct Monthly Report : Nov Quarterly Report : Dec Monthly Report : Jan Temporal study report Vol. I : Feb Temporal study report Vol. II : Feb Monthly Report : Feb Quarterly Report : March Monthly Report : April Monthly Report : May Quarterly Report : June Monthly Report : July Monthly Report : August Quarterly Report : Sept Monthly Report : Oct. 2014
17 Temporal study report : Oct, 2014 : Vol. I Temporal study report : Oct : Vol. II Monthly Report : Nov Quarterly Report : Dec Monthly Report : Jan Monthly Report : Feb Temporal study report Vol. II : March Temporal study report Vol. I : March Detailed drawings of foundation highways, 33 Bangladesh toll plaza, admin, Building, (Vol. 4 of 5) : March Ethiopia (SSH) : Justification of originals design recommendation regarding 35 NH-148 (D) Cost estimate and land acquisition
ICT LIBRARY UPDATE. Articles
1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly Jan. Feb. 2015 Vol. 13 : No. 1 Contents - Articles - Pages (Subject wise alphabetically indexed) - 2-4 - Addition of Books - 5-6 - Reports - 7-14
More informationICT LIBRARY UPDATE. Bi-monthly March June 2016 Vol. 14 : No. 2 & 3. Contents
1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly March June Vol. 14 : No. 2 & 3 Contents - Articles - Pages (Subject wise alphabetically indexed) - 2-4 - Addition of Books - 5-6 - Reports - 7-17
More informationICT LIBRARY UPDATE. Contents. Prepared by : Neeru Saini Librarian. Bi-monthly July Oct Vol. X : No. 4 & 5
Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly July Oct. Vol. X : No. 4 & 5 Contents - Articles - Pages (Subject wise alphabetically indexed) - 2-5 - Addition of Books - 6-7 - Reports - 8-23 Prepared
More informationICT LIBRARY UPDATE. Bi-monthly Sept. Dec Vol. 14 : No Contents
1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly Sept. Dec. 2016 Vol. 14 : No. 5-6 Contents - Articles - Pages (Subject wise alphabetically indexed) - 2-4 - Addition of Books - 5-8 - Reports -
More informationDevelopment of Road Infrastructure in India
Development of Road Infrastructure in India By Nirmal Jit Singh Director General (Road Development & Special Secretary) Ministry of Road Transport & Highways Road Network in India Total Road Length about
More informationOutline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity
1 Outline (1) JICA and India (2) Infrastructure Development (3) Cross-Border Connectivity 2 Outline (1) JICA and India (2) Infrastructure Development (3) Cross-Border Connectivity 3 About JICA JICA is
More informationRelevantWorkExperience Engineering Design Consulting Services for 4 laning of Nagpur-Betul Section of NH-69 (Total Kms 176) in the state of Madhya Pradesh and Maharashtra under NHDP Phase IV on DBFOT (Annuity)
More informationPPP Days 2010 PPPs Lessons from the Last 18 Months
PPP Days 2010 PPPs Lessons from the Last 18 Months Rajiv B Lall March 22, 2010 1 Private Sector Participation (PSP) in India Works & Services Contracts Management Contracts Operation Concessions Build
More informationAfghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID
Gardez- Khost Road Project Afghanistan Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID LBG B& V "JV" INR 3526.00 Million
More informationRoad Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H
Road Network in India, Public Private Partnership Financing & Case Study 20.04.2018 Narendra Sharma, SE(PPP), MoRT&H Functions of Ministry of Road Transport and Highways, Govt. of India Formulation of
More informationAlternatives Study of Alignment
Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 1 of 6 Alternatives Study of Alignment 1 Objectives The following objectives were kept in view while locating the alternative bypass alignments:
More informationL&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)
National Highways Authority of India (Ministry of Shipping, Road Transport & Highways) 4 Laning of the Existing 2 Lane Section from Km. 80.050 (Jadcherla) to Km. 135.740 (end of Kothakota Bypass) On NH-44
More informationNATIONAL MISSION ON HIMALAYAN STUDIES (NMHS) HIMALAYAN RESEARCH FELLOWSHIP
NATIONAL MISSION ON HIMALAYAN STUDIES (NMHS) HIMALAYAN RESEARCH FELLOWSHIP (FORMAT FOR THE HALF YEARLY PROGRESS REPORT) [Reporting Period: from April-2016 to December-2016] Name of the Institution/ University:
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationThe Town of Fort Frances
The Town of Fort Frances First Aid Policy SECTION Health and Safety NEW: August 2004 REVIEWED:2015 Resolution No. 095 Supercedes Resolution No. 317 (consent) 08/09 Policy Number 5.7 PAGE 1 of 3 1. Purpose
More informationES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:
ES-301-1.06 Aircraft Deicing Document Identification Number ES-301-1.06 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: Aircraft deicing is the application of aircraft deicing
More informationKey Projects Carmichael Rail Line (CRL)
01 Aarvee Associates Pty Ltd is a multi-disciplinary engineering design consultancy company established in 2011 and based at Brisbane, Australia. We are an ISO 9001, ISO 14001 and ASNZS 4801 certified
More informationROAD DEVELOPMENT IN INDIA 2015
ROAD DEVELOPMENT IN INDIA 2015 Research report with weekly newsletters and monthly updates Research Report 52 Weekly Newsletters 11 Monthly Updates India Infrastructure Research www.indiainfrastructure.com
More informationReference List for Cathodic Protection of LPG Mounded Bullets using AnodeFlex
Reference List for Cathodic Protection of using AnodeFlex Cathodic Protection Projects Executed / Under Execution for 210 Nos Amounting to Total Value of Rs. 25.0 Crores (Bullet Dimensions ranging from:
More informationRoute Survey Photo Album
Route Survey Photo Album Kms Landmark and location if available 20 Road Over Bridge & Toll Tax at Jhansi. Description In case of excessive width there is facility at every toll plaza to remove cement slabs
More information1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement
Plan I. General 1. Bank s approval Date of the procurement Plan June 1, 2017 2. Date of General Notice: April 18, 2012 3. Period covered by this procurement plan: The procurement period of project covered
More informationCARLSON REZIDOR ACCELERATES GROWTH MOMENTUM WITH 12 NEW HOTEL SIGNINGS IN 2017
CARLSON REZIDOR ACCELERATES GROWTH MOMENTUM WITH 12 NEW HOTEL SIGNINGS IN 2017 *Rendering: Radisson Radisson Mumbai Andheri MIDC NEW DELHI, INDIA, NOVEMBER 27, 2017 Carlson Rezidor Hotel Group, one of
More informationPrequalified Service Provider Registry
Engineering and Operations Division and Water Management and Structures Division For Internal and External Use Managed by: Engineering Services Contract Engineer Contract Services Branch Effective: 21
More informationCity of Durango 5.8 FUNDING TRAILS DEVELOPMENT
5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4
More informationMEMO TO STATE PUBLICATION PROGRAM LIBRARIES June 2, 2005
MEMO TO STATE PUBLICATION PROGRAM LIBRARIES June 2, 2005 All expenses paid! Digital Archive Training! - We are planning a late July meeting and training session here in Santa Fe for any libraries interested
More informationDIRECT PUBLIC INVESTMENT
DIRECT PUBLIC INVESTMENT - Upgrade and Rehabilitation of Route 11 CH - Optimization of Route 41 CH - Improvement of Route E-30-F - Upgrade of Route 7 by sections - Provincial Hospital of Curicó - Calama
More informationNew Mexico State Publications Program
New Mexico State Publications Program SHIPLIST#: 2008-01 Number of Items: 136 El palacio. MUSEUM OF NEW MEXICO. OCLCNO: 1641774 CALLNO: NM F 701.91:111-3,4 Fall, Winter 2006. Vol. 111, no. 3,4 Museums
More informationIssue 10. micrometer. data as of 30 th June 2014
Issue 10 micrometer data as of 30 th June 2014 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without written permission from MFIN. However,
More informationIssue 10. micrometer. data as of 30 th June 2014
Issue 10 micrometer data as of 30 th June 2014 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without written permission from MFIN. However,
More informationMEMO TO STATE PUBLICATION PROGRAM LIBRARIES July 25, 2006
MEMO TO STATE PUBLICATION PROGRAM LIBRARIES July 25, 2006 Memo from Marci: In this shipment don t miss: The New Mexico Bluebook 2005-2006 from the Secretary of State s Office is the essential ready reference
More informationSardar Patel National Highways Modern Dharmshala
() (A Pilot Project for Coastal Districts in India) Presented by: Coastal India Development Council (CIDC India) About CIDC India: Coastal India Development Council (CIDC) is a society to develop the core
More informationIf you are looking for the ebook RCC Dams - Roller Compacted Concrete Dams: Proceedings of the IV International Symposium on Roller Compacted
RCC Dams - Roller Compacted Concrete Dams: Proceedings Of The IV International Symposium On Roller Compacted Concrete Dams, Madrid, Spain, 17-19 November 2003-2 Vol Set READ ONLINE If you are looking for
More informationRailway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways
Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.
More informationAustrade Supporting Australian Rail Industry s Global Focus. Rail Sector Lead and Trade Manager, Infrastructure
Austrade Supporting Australian Rail Industry s Global Focus Peter Ironmonger Rail Sector Lead and Trade Manager, Infrastructure Austrade s network global local knowledge and relationships Helping your
More information1. Name: Dr Ravindra K Pande. 2. Designation: Professor of Geography. 5. Research field: Geomorphology, Disaster Management, RS & GIS
ACADEMIC PROFILE 1. Name: Dr Ravindra K Pande 2. Designation: Professor of Geography 3. Experience: About 38 years 4. Qualification: PhD 5. Research field: Geomorphology, Disaster Management, RS & GIS
More informationMONITORING INFORMAL CROSS- BORDER TRADE IN STAPLE FOODS IN SOUTHERN AFRICA
MONITORING INFORMAL CROSS- BORDER TRADE IN STAPLE FOODS IN SOUTHERN AFRICA A collaborative activity between WFP and FEWS NET Presented at the FAO/University of Pretoria Workshop on Government and Private
More informationCertificate No: EW624
Certificate No: EW624 Abbey Pynford Helical Pile System Description of Product This is an assessment of a Steel Helical Pile System that can be used as a deep foundation solution instead of other foundation
More informationIMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:
IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),
More informationThe presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments.
Disclaimer The presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments. This presentation contains forward-looking statements.
More informationhttps://www.indiamart.com/atlantiscabins/
+91-8071808132 Atlantis Cabins https://www.indiamart.com/atlantiscabins/ We Atlantis Cabins are engaged in manufacturing and supplying a wide range of portable cabins,site office cabins. These cabins are
More informationArticle 13, clause no of the Concession Agreement states that:
BACKGROUND Article 13, clause no. 13.2 of the Concession Agreement states that: 13.2 Inspection During the Construction Period the Independent Engineer shall inspect the Project Highway at least once a
More informationThe winning states in each of the three award categories were as follows:
WTTCII-HVS Tourism for Tomorrow Awards India, 5 December 2013 The World Travel & Tourism Council India Initiative (WTTCII) and HVS, the world s leading hospitality consulting and services organization,
More informationProvincial Railway Technical Standards
GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements
More informationProject Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your
More informationIRONTON-RUSSELL BRIDGE REPLACEMENT
IRONTON-RUSSELL BRIDGE REPLACEMENT 2012-2016 District 9 Ohio Department of Transportation Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge Ironton-Russell Bridge Replacement Existing
More informationMonitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India
Page 1 of 1 S.No. Name of the Scheme Actual 2009-10 Expenditure in 2010-11 (Cumulative) (Rs. In Crores) Grand Total 2010-11 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1 CSI Airport Mumbai Target 570.00 982.00 1645.00
More informationFinancing of Aviation Development Projects by the Asian Development Bank. Asian Development Bank
Financing of Aviation Development Projects by the Asian Development Bank Presentation by Marcelo J. Minc Asian Development Bank ICAO and the World Bank Development Forum Maximizing Civil Aviation s s Contribution
More informationElectrical Quarterly Load Update
Electrical Quarterly Load Update Photo: Sunset Marina, Lake Chelan January 7, 2019 Andy Wendell Director of Customer Services Chad Rissman Director of Engineering & Asset Management Today s Agenda New
More informationDelhi Airport Metro Express A Case of Public Private Partnership Project
1 Delhi Airport Metro Express A Case of Public Private Partnership Project Surya Raj Acharya, PhD Visiting Professor Institute of Engineering, Tribhuvan University, Kathmandu 20 Feb 2017 Contents 2 1.
More informationEIA for Development of New Civil Enclave at Air Force Base. Annexure 2
EIA for Development of New Civil Enclave at Air Force Base at Bamrauli, Allahabad, Uttar Pradesh Public Hearing Details Annexure 2 Details of Public Hearing for Development of New Civil Enclave at Air
More informationGerald R. Ford International Airport Authority Master Plan Update A World Class Gateway
Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationAdequate infrastructure facilities are a pre requisite for industrial development. The infrastructure facilities available in Assam are as follows:
Assam Infrastructure The state Government also proposes to implement the scheme Integrated Infrastructure Development (IID) centers which is at difference stages of clearance from the authorities. The
More informationAN ECONOMIC PERSPECTIVE ON THE 5 YEARS AFTER ITS LAUNCH
AN ECONOMIC PERSPECTIVE ON THE BELT AND ROAD INITIATIVE: 5 YEARS AFTER ITS LAUNCH Presented at ECA Talks seminar at the World Bank Feb. 21, 2019 Harinder Kohli and Johannes Linn OUTLINE 1. Belt and Road
More informationSTRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003
STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION
More informationPUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT
PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationTrieste, 26 th September 2012
Experience in working with EBRD Trieste, 26 th September 2012 Sectors of Activity Roads Railways Bridges Airports Building facilities Water supply Wastewater Dams Services Design, supervision, technical
More informationPedro B. Ortiz MEGA-MUMBAI / MAHARASHTRA SOUTH ASIA S CAPITAL REGION
150525 Pedro B. Ortiz MEGA-MUMBAI / MAHARASHTRA SOUTH ASIA S CAPITAL REGION Next 20 years: From 3.5 to 5.5 b. = 2.000 m. in 20 years 300.000 every day (India: 50.000 China 30.000) 200% X 2 100% 5 % 5 10
More informationVolume Contents and Alpha-Numeric Index to the NRA Design Manual for Roads and Bridges (including Erratum No. 1 dated June 2015) Standards
Volume Contents and Alpha-Numeric Index to the Design Manual for Roads and Bridges (including Erratum No. 1 dated June 2015) GE-CON-01004 June 2015 General Standards TRANSPORT INFRASTRUCTURE IRELAND (TII)
More informationPattullo Bridge Replacement Project
Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor
More informationBY NHIDCL. 25 t h MAY, 2018
DEVELOPMENT OF ROAD INFRASTRUCTURE BY NHIDCL 25 t h MAY, 2018 NATIONAL HIGHWAYS & INFRASTRUCTURE DEVEOPMENT CORPORATION LTD. FAST PACE CONSTRUCTION OF NATIONAL HIGHWAYS AND OTHER INFRASTRUCTURE IN NE REGION
More information11 th Annual Conference Road Development in India Telangana State Initiatives
11 th Annual Conference Road Development in India Telangana State Initiatives 24 th August 2016 New Delhi Bikshapathi Kondai Engineer in Chief R&B, Telangana State New Telangana State - Infrastructure
More informationTranche 3
ANNUAL REPORT 2017 www.adb.org/ar2017 Keywords: sovereign, commitments, loans, public sector Sovereign Commitments, 2017 ($ million) Funds Grant CENTRAL AND WEST ASIA 3,470.9 598.6 498.3 479.0-773.1 79.2
More informationProvince of Prince Edward Island Canada. Part II. Index. Volume 138, Published by Authority
Province of Prince Edward Island Canada Part II Index Volume 138, 2012 Published by Authority Charlottetown, Prince Edward Island Michael Fagan, Queen's Printer 2012 ROYAL GAZETTE 1 INDEX TO PART II OF
More informationJuly 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE
ADVISORY CIRCULAR CAA-AC-OPS009A July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE This Advisory Circular (AC) specifies the objectives and content of company indoctrination curriculum segments applicable
More informationTable-1.1 SEASONS, SOWING & HARVESTING PERIOD AND PRODUCTION. Five year Average Production ( to Harvesting Period.
1 1. PRODUCTION: The major potato producing States are Uttar Pradesh, West Bengal, Bihar, Gujarat, Madhya Pradesh, Punjab, Haryana and Assam. (Table-1.3). The details regarding seasonality, harvesting
More information2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director
2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that
More information15-18 May 2018 Proposal for Government of Bihar to participate in GES 2018
15-18 May 2018 Proposal for Government of Bihar to participate in GES 2018 Bombay Exhibition Centre - NSE complex, Goregaon (E) Mumbai Global platform for increased trade in services Table of Contents
More information1 st US - Kosovo Trade Forum New York, New York
Republic of Kosova Ministry of Economy and Finance 1 st US - Kosovo Trade Forum New York, New York Presentation By Lorik Fejzullahu Head of Public Private Partnership Unit October 27 2010 Presentation
More information2. Wages and Earnings
2. Wages and Earnings A.2.1 (a) and (b) Average Daily Wage Rates for Agricultural and Non-agricultural occupations- In pursuance of the recommendations of the Technical Working Group on rural retail prices
More informationJAFA Country report Japan Air-cargo Forwarders Association. Country Report. 38 th FAPAA Executive Council Meeting.
Japan Air-cargo Forwarders Association Country Report 38 th FAPAA Executive Council Meeting Bangladesh 12 th Jun ~ 13 th Jun 2011 1 JAFA Profile 1. Office Name Japan Air-cargo Forwarders Association (
More informationChessie Trail Public Forum Minutes. December 7, :00 7:30 pm Turman Room, Preston Library, VMI
1. Welcome Chessie Trail Public Forum Minutes December 7, 2017 6:00 7:30 pm Turman Room, Preston Library, VMI a. Col Jay Williams welcomed everyone to the meeting and thanked them for their interest and
More informationWELCOME! TSPE DFW MID-CITIES. January Chapter Meeting
WELCOME! TSPE DFW MID-CITIES Check-in/Networking Announcements / Lunch Service Speaker Presentation 11:30AM 12:00PM 12:00PM 12:15PM 12:15PM 1:00PM January Chapter Meeting Thank You to Our Sponsors Interested
More information2 AGATTI Airports Authority of India, Agatti Airport Controller
ANNEXURE D APPENDIX 1 LIST OF OPERATIONAL AIRPORTS (CIVIL) IN INDIA S.No. Name of the Airport Address Designation of the Head Office Phone E-Mail Address 1 AGARTALA Airports Authority of India, Agartala
More informationConstruction of Pyongyang International Airport IP6
Construction of Pyongyang International Airport IP6 (Presented by GACA, DPR Korea) Summary The purpose of this paper is to update members regarding airport construction by outlining the successes and experiences
More informationVisit to METSO Alwar (22Mar.2014) A Brief Review
Visit to METSO Alwar (22Mar.2014) A Brief Review The Indian Institute of Metals Delhi Chapter regularly organizes visits to eminent industries in and around NCR, for benefit of its members. In this series,
More informationInvestment Opportunities DMIC UP Region
Investment Opportunities DMIC UP Region PRESENTATION TO Japanese Business Mission BY Government of Uttar Pradesh (GoUP) Monday, February 04, 2008 1 The Region comprises of Greater Noida City & Taj Expressway
More informationInfrastructure Projects in Mumbai Metropolitan Region & Maharashtra
Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra 20 th March 2013 By: SVR Srinivas (IAS), Addl Metropolitan Commissioner & MD MMRC & PRK Murthy, Chief T&C Division MMRDA & Director MMRC
More informationColorado Agriculture Bibliography 2005 A Bibliography of Primary and Secondary Material Published
Colorado Agriculture Bibliography 2005 A Bibliography of Primary and Secondary Material Published 1820-1945 Subject Areas: Railroads Type of Materials: Serials Produced by the Colorado State University
More informationRailways in India 2012
NOW AVAILABLE Report on Railways in India 2012 RAILWAYS IN INDIA 2012 Table of Contents SECTION I: MACRO ANALYSIS 1. Executive Summary.................................... 2. Sector Overview.......................................
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationA QUARTERLY UPDATE OF SATYA GROUP
JANUARY- MARCH 2015 A QUARTERLY UPDATE OF SATYA GROUP C O N T E N T S NEW PROJECT PM: 1AMENDMENT OF LAND ACQUISITION ACT Essential For Creating Rural Infrastructure 2BUDGET 2015: Govt Gives new tax benefits
More informationPROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)
DETAILED PROJECT INFORMATION GENERAL INFORMATION Project High Speed Rail Link to BtA State Karnataka Location Place of the Project Bangalore City District Bangalore Urban Sector Urban Transport Capacity
More informationAdventure Tourists in Himachal Pradesh and Uttarakhand
Volume 6, Issue 10, April 2014 Adventure Tourists in Himachal Pradesh and Uttarakhand Dr. Kashmir Singh Principal S.G.B.T College Shri Anandpur Sahib, Punjab Abstract Tourism is a lucrative source for
More informationADB s Initiatives on Promoting Transport Connectivity in South Asia
ADB s Initiatives on Promoting Transport Connectivity in South Asia Kavita Iyengar India Resident Mission Asian Development Bank November 2014 Disclaimer: In preparing any country program or strategy,
More informationDistrict Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director
District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio
More informationUS-460 CONCEPTUAL PROPOSAL
US-460 Presentation Conceptual to VDOT Independent Review Proposal Panel Presentation to VDOT Independent Review Panel December 6, 2010 Long-Term Partnership Over 150 years, the map has changed but the
More information17. Ganga-Jamuna doab is the largest doab region of India. 18. The eastern and western coastal plains meet at Kanyakumari. 19. Kerala Coast is also
GEOGRAPHY OF INDIA 1. India is the world s seventh largest Country. 2. It occupies 2.42% of the total world area. 3. The total land frontier of India is 15,200 K.M. 4. The total coastline of India is 7,516
More informationAurizon Network Public Quarterly Performance Report 2nd Quarter 2017/18 October - December 2017
Public 2nd Quarter 2017/18 October - December 2017 Version issued 10/9/2018, including correction to Performance Measure 7 data Performance Measures - Data This report is published in compliance with s
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Cusco Transport Improvement
More informationTRB 2014 Project Delivery Committee Meeting AFH15 Presentation (January 14, 2014)
TRB 2014 Project Delivery Committee Meeting AFH15 Presentation (January 14, 2014) Finnish Transport Agency Presented by Pekka Pakkala (Ramboll Finland Oy) 14.1.2014 Main Road Route 4 Järvenpää Lahti PPP
More informationPrashant Mavani, is an expert in current affairs analysis and holds a MSc in Management from University of Surrey (U.K.).
Prashant Mavani, is an expert in current affairs analysis and holds a MSc in Management from University of Surrey (U.K.). Above all he is a passionate teacher. The nation pays homage to Father of the
More informationthe total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA STARRED QUESTION NO.334 TO BE ANSWERED ON 09.08.2017 DOUBLING AND ELECTRIFICATION OF RAILWAY LINES *334. SHRI B.S. YEDIYURAPPA: Will the Minister of RAILWAYS
More informationAll Door Boarding Title VI Service Fare Analysis. Appendix P.3
All Door Boarding Title VI Service Fare Analysis Appendix P.3 Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles,
More informationNetwork Size and Growth
16.50 25.10 30.30 11.40 5.10 9.63 10.00 8.26 64.94 km 208.24 Overview Network Size and Growth At present, metro systems are operational in seven cities in India Bengaluru, Chennai, Delhi, Gurgaon, Jaipur,
More informationPartnership for Quality Infrastructure: Investment for Asia s Future (21 May 2015)
International Conference on Sustainable Development through Quality Infrastructure Japanese perspectives on Quality Infrastructure Investment - MLIT Initiative- Ministry of Land, Infrastructure, Transport
More informationDECONGESTION OF ROADS IN NAIROBI
DECONGESTION OF ROADS IN NAIROBI PRESENTED DURING THE REGIONAL WORKSHOP ON PROMOTING SUSTAINABLE TRANSPORT SOLUTIONS HELD ON 7 TH AUGUST, 2012 UNEP HEADQUARTERS NAIROBI By: ENG. M. M. NJONGE KENYA URBAN
More informationIATA FUEL EFFICIENCY CAMPAIGN
IATA FUEL EFFICIENCY CAMPAIGN Juergen Haacker Director, Operations Montreal, IATA Fuel Efficiency Campaign Jet fuel price driving airline fuel efficiency Increased 5% from 2003-2005 Industry is on track
More information