1 R/V Revelle, Alford Cruise Cruise Plan, 6/1/2010 Overview The following is the cruise plan for the Internal Waves in Straits Experiment (IWISE) pilot leg (27 at-sea days) of the IWISE/ITOP projects. Our goal is to understand internal waves in straits, so we will be working between Taiwan and the Philippines (Figure 1). Our general plan is to deploy profiling moorings for the duration of the cruise, and to work around them with a series of 36-hour-long yo-yo CTD/lowered ADCP stations while they profile. Taiwanese and Philippines clearances are pending. Figure 1: Broad view of our work area. Colors represent generation of semidiurnal internal tides; arrows represent their energy flux. Moorings and CTD/lowered ADCP stations are shown. The location of PIES 5 is (20.5N, 119E) - slightly west of the map domain. We plan to deploy a total of nine moorings at the locations shown, of which five (PIES 1-5) will be 1

2 recovered at a later date by another ship. The other moorings will be recovered at the end of our cruise. Between the deployment and the recovery, we ll conduct 36-hour yo-yo CTD stations while holding station or drifting slowly at about 15 locations, some of which are shown with purple squares. Others will be determined during the cruise. Station locations are given in Table 1. See Table 2 for a strawman timeline. Our cruise is part of a larger block of time shared by the joint IWISE program (this cruise) and the ITOP Typhoons program. If a strong typhoon comes along after Aug 20, we will return to port to allow the ITOP group to conduct a three-week survey of the typhoon wake and then collect instruments (a total of days), in which case we would return afterwards to conduct the balance of our cruise. In that event, we would likely leave the moored assets in the water during that period and recover them in the second portion of our cruise. Table 1: IWISE Stations. Note all positions are approximate, and given in decimal degrees. After deployment, please maintain 0.25 nm radius from MP-N and MP-S. Station Lat, Lon Depth Comments MP-N 20.6N, 121.3E 3663 m 135 nm to KS (13.5 h) MP-S 19.85N, E 3652 m 169 nm to KS (17 h); 61 nm to MP-N (6 h) A N, E 1200 m P N,121.30E 3679 m P N, E 3630 m P N, E 3560 m P N, E 3262 m P N, E 2730 m P N, 120.6E CTD N, 120.8E CTD stations locations nominal CTD N, 121E CTD N, 121.5E CTD N, 121.2E CTD N, 121.4E CTD N, 121.6E Loadout Timing We plan to begin loadout as soon as Graber s cruise returns. He is scheduled to return August 12, but has stated that if all goes well he would return 8-10 days early (weather dependent). We are semiconservatively assuming he will return 7 days early (Aug 5), in which case we would begin loading August 6-7. We plan to purchase air tickets leaving August 4 and arriving August 5, to be ready for loading August 6. In the week before this, we can monitor his progress, and delay our flights if needed. We plan on two days of loading (for an August 8 departure). If we leave on this date, our return date would be September 3. 2

3 To minimize overall mob and demob time, loadout will be shared between our cruise and the two subsequent ITOP cruises. Hence, we will load gear for our own cruise as well as the Rockland scientific profiler and underway CTD to be used by the ITOP group. It is possible we will also use these instruments a bit during our cruise, as described below. In addition, ITOP gliders will be loaded, but not used during our cruise. Deck Plan The deck plan is shown in Figure 2. We plan to situate the microstructure and underway CTD systems to port and starboard aft quarters, respectively. For the mooring operations, the mooring wire will be run from the SIO TSE mooring winch though a rig-up block hanging from the A-frame. The mooring winch will be situated centerline. We will bring a wire spooler, which requires 3-phase 220V AC power, to load and unload wire to/from the mooring winch. We will use this through a rig-up block hung from the A-frame to starboard of the trawl block. We like to use an air tugger mounted on the A-frame stanchion to operate a flying block hanging from the rig-up block. We plan to use the trawl wire to deploy the anchors, and either the trawl wire or the the port kunckleboom crane to launch the floats at the start of each profiling mooring deployment. Floats will be staged along the port rail, while anchors will be placed inboard of the port A-frame stanchion. Please refer to the overboarding plan for the moorings, given in a separate document, for deck and rigging details. The two 20 vans on the main deck will house glass floats for our moorings and deck storage. Near the end of our cruise we will attempt to fully load our gear into them, allowing for a quick turnaround between our cruise and the next. A third 20 van with the Lee gliders will be stored on the O1 deck during our cruise, and moved to the main deck for their cruises. If conditions permit and time allows, we will attempt to move all of our gear into the vans prior to the end of our cruise. Then, dockside after our cruise, our two vans will be offloaded and the Lee van re-situated on the main deck. Gear Profiling moorings We will deploy two profiling moorings in about 3500 m of water (Figure 1, stars), which consist of a crawler making repeated traverses of a taut vertical wire with two subsurface floats (one steel, one syntactic foam) for flotation. These are anchor last deployments. The detailed overboarding plan for these moorings was given to the restech in a separate document. Mooring diagrams for each are given in Figures 3 and 4. Inverted Echo Sounder with Pressure (PIES) moorings Six PIES moorings (Figure 5 will be deployed at the locations shown (Figure 1, red circles). These are very simple deployments. We will simply lower them over the side to the waterline and release them with a mechanical release. They then sink to the bottom, which takes about an hour. PIES moorings P1-5 will be deployed on our cruise, and recovered on another cruise. P6 will be deployed and recovered on our cruise. Pending approval of its owners, P1 will be deployed at A1 for the duration of our cruise, and then recovered, reprogrammed and redeployed at P-1. 3

4 PIES STANDS Microstructure winch FLOATS 20-ft container 20-ft container ANCHORS spooler TSE mooring winch Underway CTD air tugger on a-frame Mooring Gear Box SPOOLS + CAGES wire wire cage cage cage Figure 2: Deck plan. For these and all our acoustic commands sent to range on and release the moorings, we will bring pigtails that allow us to drive the ship s 12-KHz transducer with our decksets. This has worked well for us in the past. Acoustic Doppler Current Profiler (ADCP) mooring Mooring A-1 is a short mooring consisting of an ADCP housed in a syntactic sphere about 20 m above the bottom. The mooring will also be deployed anchor last in about 1200 m of water (Figure 1, yellow circle). The mooring diagram is given in Figure 6. As noted above, the PIES for P-1 will be deployed several hundred meters from A-1 during our cruise. CTD/lowered ADCP stations Between the mooring deployments and recoveries we plan to conduct about hour time series at the stations shown in Figure 1, as well as others to be determined based on the results of these initial ones. We may try to hold station for some of these, but we expect very strong currents (strong tides and the Kuroshio current system) and so may find better wire angles by drifting slowly. 4

5 The CTD will be fitted with a lowered ADCP system. We plan on using the ship s brackets (the restech is already aware of this) and upward and downward 300-KHz workhorse ADCP s and a battery pack to the CTD frame. We will also possibly attach a vane to allow special microstructure sensors on the package to face the flow past the cage. Jonathan Nash is discussing this with the restech. Rockland Scientific microstructure profiler This is a loosely tethered instrument typically deployed from the stern with a small winch while steaming slowly (1-2 knot). We may substitute this instrument for some of the CTD/LADCP profiles. It consists of a hydraulic winch (700 lbs; 32 x 40 ). This will be run off its own hydraulic power pack (30 x 34, 220 lbs). The system requires 208VAC, 3 phase. The profiler itself (100 lbs) is deployed from the stern with no line tension through a small line puller (24 x 24 ), and recovered via the A-frame. Initial loadout will involve simply staging the three boxes for the winch, powerpack and line puller out of the way on deck; if we use it during our cruise setup only requires 2-3 hours. Underway CTD The OceanScience underway CTD system is designed to be deployed behind the ship while steaming at 8-12 knots. It is primarily for use by the ITOP program. It will be setup and operated from the starboard aft quarter. Timeline Uncertainties in the departure date and the possibility of being interrupted make doing a timeline very difficult. In addition, we are tied to the phase of the tides which will ultimately determine which CTD stations will be done at which times. However, we will certainly want to deploy moorings MP-N, MP-S, PIES-6 and ADCP-1 as soon as possible, and pick them up as late as possible. One strawman schedule assuming we leave on August 8 and are not interrupted is given in Table 2. Table 2: Draft IWISE Timetable, assuming 28 at-sea days and no interruptions. All transit times are estimated assuming 10 kt. Day Time What Comments depart Kaohsiung, make for MP-N (135 nm; 13.5h) Take XBT as soon as deep water reached for Multibeam cal arrive MP-N Multibeam on; finalize site/depth, choose makeup pieces begin deployment should take 3-4 h; 5 hours allotted for first one complete deployment, steam to A-1 (27 nm; 2.5 h) Deploy A Complete A-1deployment, steam to P-6 4-hour transit Arrive P-6, deploy (1 hour) Depart for MP-S 4 hour transit Arrive MP-S Multibeam survey, finalize site/depth, choose makeup pieces Begin deployment, MP-S 6 hours allotted Complete MP-S deployment 2-24 LADCP/CTD stations 22 days hour stations. PIES 1-5 deployments at convenient times during CTD work recover MP-S release with plenty of light left; recover in evening finish; steam to MP-N (recover P-6 en route) recover MP-N finish; steam to A recover A begin 24-hour weather/contingency day leave MP-N for KS (13.5 h plus 2.5 h for tie-up, etc) arrive Kaohsiung 5

6 Tides Figure 8 shows tides during our cruise. Personnel Science party and affiliations are as follows listed in Table 3. Table 3: Science Personnel. Who Role Inst. Matthew Alford Chief Scientist APL/UW Andy Pickering Grad Student APL/UW Zoe Parsons Technician APL/UW Mike Carpenter Engineer APL/UW John Mickett Oceanographer APL/UW Jonathan Nash PI OSU Harper Simmons PI UAF John Pender Technician UAF Jen MacKinnon PI SIO Tamara Beitzel Grad Student SIO Mary Huey Computer Tech SIO Josh Manger Restech SIO 6

7 3596.0m Top of float (60m depth) IWISE MP-N Target: Actual: xx -xx.xxx'n xxx -xx.xxx'e Depth: 3656m Depth: m m m m m m m Event Log / Notes: m m m m m m 22.0m 16.5m 15.0m 13.4m 3.0m (1) 5/8" shackles (0.66kg) (1) 1/2 shackle (0.31kg) 1/2 Long link chain (1m; 2.26kg) (1) 5/8" shackle (0.66kg) (1) 5/8" shackles (.66kg) 3 ton swivel (3.32kg) MP stopper MP stopper (1) 1/2" shackle (.31kg) (1) 5/8 shackle (.66kg) (1) 5/8" shackle (.41kg) (1) 5/8" sling link (.66kg) (2) 1/2" shackle (.62kg) (1) 1/2" shackle (.31kg) (1) 5/8 shackle (.66kg) (1) 1/2 shackle (.31kg) (4) 1/2" shackle (1.24kg) (6) 1/2" shackle (1.86kg) (3) 5/8" shackle (1.98kg) (2) 3 links LL chain (1.4kg) Drop link chain (2.0kg) 5/8" shackle & 5" ring (1.41kg) 1/2 Long link chain (1.5m; 4.14kg) (1) 3/4" shackle (xkg) 3/4 dia. Nylon line (10m; 0.22kg) (1) 3/4" shackle (xkg) 1/2 Long link chain (2m; 5.52kg) (3) 5/8" shackle (1.98kg) (2) 3 links LL chain (1.4kg) wheel 48" Steel Float 585 kg buoyancy Chipod OSU shallow (Depth 69m; 1.0kg) SBE 37 MicroCat (Depth 73m; 2.3 kg) Start time: 5/16" 3x19 PP jacket wire rope (10m; 3.25kg) ARGOS Beacon O.M.L. model 265 / Flasher S ARGOS ID# ARGOS On Time: Flasher On Time: 45" Syntactic Foam Float 300 kg buoyancy (MA) ADCP model RDI 75Khz Long Ranger w/press. (Depth 76m) MP stopper (Depth 78m) 0.393" PP jacket cortland line (1509m; 46.9kg 1500m cut) (10) Benthos model V glass floats (25.4 kg buoy. ea.) mounted in pairs on ½" long link chain (1m; 2.76 kg) SBE39 Temp. ext. w/press.; Att. to rel. (Depth 3643m; 0.70 kg) Logging? Start time: Benthos model 865 double acoustic release (25 kg each) RX(khz): RX(khz): Pinging? Enable: Enable: Moored Profiler (s/n 103) w/chipod Profile Range: MP Set-up: MP Start Time/Date: Beep? ? Flash? ADCP model RDI 300Khz Workhorse w/press. (Depth 74m) Pinging? Cover? Line out: MP stopper (Depth 1585m) Chipod OSU deep (Depth 1596m; 1.0kg) SBE 37 MicroCat (Depth 1598m; 2.3 kg) Start time: 5/16" 3x19 PP jacket wire rope (20m; 5.38kg) ADCP model RDI 300Khz Workhorse w/press. (Depth 1606m) Pinging? Cover? 3/8" aramid line - Harper (1010m; 10.4kg 1000m cut length) DVS RDI deep (depth 2621m; 1.0kg) 5/16" 3x19 PP jacket wire rope (5m; 2.18kg) 3/8" aramid line - Harper (1010m; 10.7kg 1000m cut length) TX(khz): TX(khz): Release: Release: 1632 kg anchor plus Danforth (1420 kg in water) Start Deploy: Drop Anchor: Date: Time: Wind Dir / Spd: 7 Date: Time: Hdg / Spd: Figure 3: Mooring diagram for MP-N.

8 3539.0m Top of float (60m depth) IWISE MP-S Target: Actual: xx -xx.xxx'n xxx -xx.xxx'e Depth: 3600m Depth: m m m (1) 5/8" shackles (0.66kg) (1) 1/2 shackle (0.31kg) 1/2 Long link chain (2m; 5.52kg) (1) 5/8" shackle (0.66kg) 48" Steel Float 585 kg buoyancy SBE 37 MicroCat (Depth 67m; 2.3 kg) Start time: 5/16" 3x19 PP jacket wire rope (5m; 2.18kg) m m m m Event Log / Notes: m m m m m m 21.0m 16.5m 15.0m 13.4m 3.0m (1) 5/8" shackles (.66kg) 3 ton swivel (3.32kg) MP stopper MP stopper (4) 1/2" shackle (.31kg) (2) 1/2" shackle (.62kg) (1) 1/2" shackle (.31kg) (1) 5/8 shackle (.66kg) (1) 1/2 shackle (.31kg) (8) 1/2" shackle (2.48kg) (6) 1/2" shackle (1.86kg) (3) 5/8" shackle (1.98kg) (2) 3 links LL chain (1.4kg) Drop link chain (2.0kg) 5/8" shackle & 5" ring (1.41kg) 1/2 Long link chain (1.5m; 4.14kg) (1) 3/4" shackle (xkg) 3/4 dia. Nylon line (10m; 0.22kg) (1) 3/4" shackle (xkg) 1/2 Long link chain (2m; 5.52kg) (3) 5/8" shackle (1.98kg) (2) 3 links LL chain (1.41kg) wheel ARGOS Beacon O.M.L. model 265 / Flasher S ARGOS ID# ARGOS On Time: Flasher On Time: 45" Syntactic Foam Float 300 kg buoyancy (MA) MP stopper (Depth 74m) 0.393" PP jacket cortland line (1207m; 37.6kg 1200m cut) (10) Benthos model V glass floats (25.4 kg buoy. ea.) mounted in pairs on ½" long link chain (1m; 2.76 kg) Benthos model 865 double acoustic release (25 kg each) RX(khz): RX(khz): Enable: Enable: Moored Profiler (s/n 103) w/chipod Profile Range: MP Set-up: MP Start Time/Date: Beep? ? Flash? ADCP model RDI 300Khz Workhorse w/press. (Depth 70m) Pinging? Cover? ADCP model RDI 75Khz Long Ranger w/press. (Depth 72m) Line out: MP stopper (Depth m) (6) Benthos model V glass floats (25.4 kg buoy. ea.) mounted in pairs on ½" long link chain (1m; 2.76 kg) SBE 37 MicroCat (Depth 1284m; 2.3 kg) Start time: 3/8" aramid line - Harper (1010m; 10.4kg 1000m cut) DVS RDI deep (depth 2310m; 1.0kg) 5/16" 3x19 PP jacket wire rope (30m; 7.5kg) 3/8" aramid line - (1252m; 13.1kg 1240m cut length) [1000m + 100m + 100m (Harper) + 20m + 20m (PS)] SBE39 Temp. ext. w/press.; Att. to rel. (Depth 3588m; 0.70 kg) Logging? Start time: Pinging? ADCP model RDI 75Khz Long Ranger w/press. (Depth 1285m) Pinging? TX(khz): TX(khz): Release: Release: 1632 kg anchor plus Danforth (1420 kg in water) Start Deploy: Drop Anchor: Date: Time: Wind Dir / Spd: 8 Date: Time: Hdg / Spd: Figure 4: Mooring diagram for MP-S.

9 Figure 5: A PIES mooring ready for deployment. 9

10 IWISE JN LR1 MOORING Event Log / Notes: Target: xx -xx.xxx'n xxx -xx.xxx'e Depth:???m Actual: Depth: 45" Syntactic Foam Float 309 kg buoyancy (JN) ARGOS ID# Beep? ARGOS On Time: ? Flasher On Time: Flash? 12.0m Top of float (??m depth) ADCP model RDI 75Khz Long Ranger w/press. (Depth 573m) Pinging? 10.5m (2) 5/8" shackles 2 ton swivel (1) 5/8" shackle 8.5m 7.0m 1/2 Long link chain (2m) (3) 5/8" shackle (2) 3 links LL chain Drop link chain 5/8" shackle & 5" ring ORE Acoustic Release model 8242XS (28 kg each) Enable: Release: Disable: Int (khz): 11 Rep (khz): 12 Enable: Release: 1/2 Long link chain (3m) Disable: Int (khz): 11 Rep (khz): m 1/2 shackle 1/2 Long link chain (3m) 1.0m (3) 5/8" shackle (2) 3 links LL chain 3 wheel 1425 kg anchor plus Danforth (1218 kg in water) Start Deploy: Date: Time: Wind Dir / Spd: Drop Anchor: Date: Time: Hdg / Spd: Figure 6: Mooring diagram for A-1. 10

11 Figure 7: The underway CTD being operated at the stern Start End 40 TPXO Zonal Current Prediction /25 08/01 08/08 08/15 08/22 08/29 09/05 09/12 Date 2010 Figure 8: East-west velocity in cm/s predicted from TPXO6.2 during our cruise. 11

ITOP Cold Wake Cruise Plan.

ITOP Cold Wake Cruise Plan. ITOP Cold Wake Cruise Plan. Steven Jayne, Luc Rainville, Craig Lee, Louis St. Laurent August 10, 2010 1 Overview This document describes the operations that will take place during the ITOP (Impact of Typhoons

More information

ANTARCTIC CROSSROAD OF SLOPE STREAMS expedition aboard B.O. HESPERIDES in the southwest Atlantic Ocean January-February, 2010

ANTARCTIC CROSSROAD OF SLOPE STREAMS expedition aboard B.O. HESPERIDES in the southwest Atlantic Ocean January-February, 2010 TEXAS A&M UNIVERSITY DEPARTMENT OF OCEANOGRAPHY COLLEGE STATION, TEXAS ACROSS MOORING RECOVERY CRUISE ANTARCTIC CROSSROAD OF SLOPE STREAMS expedition aboard B.O. HESPERIDES in the southwest Atlantic Ocean

More information

R. Weller December 10, 2014 Version 1.3

R. Weller December 10, 2014 Version 1.3 1 R. Weller December 10, 2014 Version 1.3 Cruise Plan First deployment of 55 S, 90 W Global Node, RV Atlantis AT26-29, Punta Arenas, Chile February 12, 2015 to Punta Arenas, Chile March 5, 2015 Overview

More information

DF-99 ANTARCTIC PENINSULA SEDIMENT TRAP DEPLOYMENT AND WATER CHEMISTRY CRUISE R/V N.B. PALMER (MAR 28, 1999 to APR. 12, 1999) David A.

DF-99 ANTARCTIC PENINSULA SEDIMENT TRAP DEPLOYMENT AND WATER CHEMISTRY CRUISE R/V N.B. PALMER (MAR 28, 1999 to APR. 12, 1999) David A. DF-99 ANTARCTIC PENINSULA SEDIMENT TRAP DEPLOYMENT AND WATER CHEMISTRY CRUISE R/V N.B. PALMER (MAR 28, 1999 to APR. 12, 1999) by David A. Mucciarone S-072 Cruise Participant: Robert B. Dunbar and David

More information

Pre-Cruise Meeting 1400 Eastern Time (1100 Pacific), July 1, 2015

Pre-Cruise Meeting 1400 Eastern Time (1100 Pacific), July 1, 2015 Pre-Cruise Meeting 1400 Eastern Time (1100 Pacific), July 1, 2015 Cruise: AT30-02 / Craig Lee, Davis Straits. Sept 6 Sept 25, 2015. Vessel: RV Atlantis General Program Overview: 1. Scientific Objectives:

More information

REPORT ON THE DEPLOYMENT OF RAPID-WAVE B. O. CORNIDE DE SAAVEDRA RADPROF0910 CRUISE 2010 VIGO-SANTANDER, 30 AUGUST-1 SEPTEMBER 2010

REPORT ON THE DEPLOYMENT OF RAPID-WAVE B. O. CORNIDE DE SAAVEDRA RADPROF0910 CRUISE 2010 VIGO-SANTANDER, 30 AUGUST-1 SEPTEMBER 2010 REPORT ON THE DEPLOYMENT OF RAPID-WAVE MOORINGS OFF CABO MAYOR AND CABO FINISTERRE: RAPIDO B. O. CORNIDE DE SAAVEDRA RADPROF0910 CRUISE 2010 VIGO-SANTANDER, 30 AUGUST-1 SEPTEMBER 2010 MIGUEL ÁNGEL MORALES

More information

R/V NEW HORIZON Scripps Institution of Oceanography CRUISE PLAN 1 (Draft = 29 August 2004)

R/V NEW HORIZON Scripps Institution of Oceanography CRUISE PLAN 1 (Draft = 29 August 2004) R/V NEW HORIZON Scripps Institution of Oceanography CRUISE PLAN 1 (Draft = 29 August 2004) Please complete these cruise planning forms and send as an email attachment to shipsked@ucsd.edu. These forms

More information

Cruise Report for NSF OCE : R/V Endeavor Cruise 531

Cruise Report for NSF OCE : R/V Endeavor Cruise 531 I. Quick Summary Cruise Report for NSF OCE-1031050: R/V Endeavor Cruise 531 Cruise number: EN-531 Chief Scientist: Dr. Ruoying (Roy) He Port of Origin: Morehead City, NC Port of Termination: Morehead City,

More information

CRUISE REPORT. R/V Seward Johnson Cruise No. SJ RAPID/MOCHA Program September 25 October 12, 2006 Ft. Pierce to Ft. PIerce, Florida, USA

CRUISE REPORT. R/V Seward Johnson Cruise No. SJ RAPID/MOCHA Program September 25 October 12, 2006 Ft. Pierce to Ft. PIerce, Florida, USA CRUISE REPORT R/V Seward Johnson Cruise No. SJ-14-06 RAPID/MOCHA Program September 25 October 12, 2006 Ft. Pierce to Ft. PIerce, Florida, USA 1. Introduction and Objectives The RAPID/MOCHA program is a

More information

CRUISE REPORT. R/V Knorr Cruise No. KN RAPID/MOCHA Program May 2-26, 2005 St. George, Bermuda - Miami, Florida, USA

CRUISE REPORT. R/V Knorr Cruise No. KN RAPID/MOCHA Program May 2-26, 2005 St. George, Bermuda - Miami, Florida, USA CRUISE REPORT R/V Knorr Cruise No. KN182-2 RAPID/MOCHA Program May 2-26, 2005 St. George, Bermuda - Miami, Florida, USA 1. Introduction and Objectives The RAPID/MOCHA program is a joint research effort

More information

The field program has two main components: Underway Geophysics and On-site Sample collection and detailed mapping.

The field program has two main components: Underway Geophysics and On-site Sample collection and detailed mapping. AT37 Jeffrey Donnelly "Holocene Hurricanes" Pre-Cruise Meeting 5/31/16 Smith Conference Room (First Floor, Smith Lobby) Agenda Items Mission Objectives: Discovery Bay in Jamaica provides a unique opportunity

More information

LAKE TITICACA, BOLIVIA SEDIMENT TRAP DEPLOYMENT CRUISE ON LAKE TITICACA March 20-26, 2002

LAKE TITICACA, BOLIVIA SEDIMENT TRAP DEPLOYMENT CRUISE ON LAKE TITICACA March 20-26, 2002 LAKE TITICACA, BOLIVIA SEDIMENT TRAP DEPLOYMENT CRUISE ON LAKE TITICACA March 20-26, 2002 by David A. Mucciarone S-072 Cruise Participant: Robert B. Dunbar, David A. Mucciarone, and Christopher Moy all

More information

Cruise Plan Coastal Pioneer 3 Deployment Leg 2: R/V Knorr Cruise KN December 2014

Cruise Plan Coastal Pioneer 3 Deployment Leg 2: R/V Knorr Cruise KN December 2014 Cruise Plan Coastal Pioneer 3 Deployment Leg 2: R/V Knorr Cruise KN-224 10-16 December 2014 Control Number: Version: 1-02 Author: A. Plueddemann Date: November 30, 2014 Approved: Coastal and Global Scale

More information

Cruise Plan Coastal Pioneer 7 Deployment

Cruise Plan Coastal Pioneer 7 Deployment Cruise Plan Coastal Pioneer 7 Deployment Leg 1: R/V Armstrong Cruise AR-08A 27 Sep 04 Oct 2016 Leg 2: R/V Armstrong Cruise AR-08B 06 Oct - 14 Oct 2016 Control Number: Version: 1-00 Author: A. Plueddemann

More information

L-DEO Office of Marine Operations: UNOLS Council and FIC Meetings June 5-7,2012 Boston, MA

L-DEO Office of Marine Operations: UNOLS Council and FIC Meetings June 5-7,2012 Boston, MA L-DEO Office of Marine Operations: UNOLS Council and FIC Meetings June 5-7,2012 Boston, MA Langseth Overview Outline: 1. 2012 Science Schedule 2. Summary of Line Islands Coring Cruise 3. Update on Glosten

More information

Fleet Improvement Committee 7/12/2012

Fleet Improvement Committee 7/12/2012 FleetImprovementCommittee 7/12/2012 In 2009 the UNOLS Fleet Improvement Committee prepared eight debriefing questions to help determine how the unique features of the R/V Sharp have affected cruise operations

More information

A project funded by the International Joint Ventures Fund of the Canada Foundation. for Innovation

A project funded by the International Joint Ventures Fund of the Canada Foundation. for Innovation A project funded by the International Joint Ventures Fund of the Canada Foundation for Innovation in collaboration with the Department of Fisheries & Oceans-Canadian Coast Guard Canadian consortium of

More information

Short Cruise Report RV Maria S. Merian Cruise MSM 21/1A

Short Cruise Report RV Maria S. Merian Cruise MSM 21/1A Johannes Karstensen Helmholtz Centre for Ocean Research Kiel GEOMAR Düsternbrooker Weg 20 D-24105 Kiel Tel.: +49 431 600 4156 Fax.: +49 431 600 4102 email: jkarstensen@geomar.de Short Cruise Report RV

More information

Step by Step Set Up Guide

Step by Step Set Up Guide lite Step by Step Set Up Guide 1 lifting lug Secure lifting lugs to a certified lifting sling. Stand and stabilize escape system under work platform. Position module with round lunette ring facing work

More information

Mechanisms Controlling Hypoxia: Integrated Coastal Modeling Field Year 2010

Mechanisms Controlling Hypoxia: Integrated Coastal Modeling Field Year 2010 Mechanisms Controlling Hypoxia: Integrated Coastal Modeling Field Year 2010 Survey cruises on R/V Manta The cruises decribed Dates of cruises: 14 19 June 2010, one half day mobilization. 1 6 August 2010,

More information

RED SEA OUTFLOW EXPERIMENT REDSOX 2

RED SEA OUTFLOW EXPERIMENT REDSOX 2 CRUISE REPORT RED SEA OUTFLOW EXPERIMENT REDSOX 2 R/V Maurice Ewing Cruise EW-110 August 21 to September 12, 2001 1. Introduction and Objectives The Red Sea Outflow Experiment (REDSOX) is a joint effort

More information

The Past, Present, and Future of Nortek and Glider Measurements

The Past, Present, and Future of Nortek and Glider Measurements The Past, Present, and Future of Nortek and Glider Measurements Peter J. Rusello Scientist Nortek Since 2005, Nortek has collaborated with leading researchers to develop specialized acoustic Doppler current

More information

Cruise Plan Coastal Pioneer 2 Deployment R/V Knorr Cruise KN April 2014

Cruise Plan Coastal Pioneer 2 Deployment R/V Knorr Cruise KN April 2014 Cruise Plan Coastal Pioneer 2 Deployment R/V Knorr Cruise KN-217 9-11 April 2014 Control Number: Version: 0-01 Author: A. Plueddemann Date: 04/06/2014 Coastal and Global Scale Nodes Ocean Observatories

More information

BERING STRAIT NORSEMAN II 2017 MOORING CRUISE REPORT

BERING STRAIT NORSEMAN II 2017 MOORING CRUISE REPORT BERING STRAIT NORSEMAN II 2017 MOORING CRUISE REPORT Research Vessel Norseman II, Norseman Maritime Charters Nome-Nome, 7 th July to 15 th July 2017 Rebecca Woodgate, University of Washington (UW), woodgate@apl.washington.edu

More information

R/V «Dr. Fridtjof Nansen» - Fishery and oceanographic research vessel

R/V «Dr. Fridtjof Nansen» - Fishery and oceanographic research vessel Information to cruise participants on board "Dr. Fridtjof Nansen" Ref.id.: KS&SMS-3-2.13.2-06 Standard Side 1 av 7 R/V «Dr. Fridtjof Nansen» - Fishery and oceanographic research vessel Ref.id.: KS&SMS-3-2.13.2-06

More information

HOT 293: Chief Scientist Report Chief Scientist: Dan Sadler R/V Ka'Imikai-O-Kanaloa May 22-26, 2017

HOT 293: Chief Scientist Report Chief Scientist: Dan Sadler R/V Ka'Imikai-O-Kanaloa May 22-26, 2017 HOT 293: Chief Scientist Report Chief Scientist: Dan Sadler R/V Ka'Imikai-O-Kanaloa May 22-26, 2017 Cruise ID: KOK17-10 Departed: May 22, 2017 at 0750 (HST) Returned: May 26, 2017 at 0943 (HST) Vessel:

More information

Cruise Report YK10-E02

Cruise Report YK10-E02 Cruise Report YK10-E02 (R/V Yokosuka) Site Surveys for IODP expeditions in the Kumano-nada area October 17 19, 2010 Center for Deep Earth Exploration (CDEX) Japan Agency for Marine-Earth Science and Technology

More information

Ocean Gliders and the Argo float program Breck Owens WHOI. for INMARTECH Conference, Oct 06

Ocean Gliders and the Argo float program Breck Owens WHOI. for INMARTECH Conference, Oct 06 Ocean Gliders and the Argo float program Breck Owens WHOI for INMARTECH Conference, Oct 06 A brief history The Argo float program Gliders - how they work Some results from gliders The Future Glider Lineage

More information

Cruise Report No. 29. RV Ronald H. Brown Cruise RB MAR-10 APR RAPID mooring cruise report

Cruise Report No. 29. RV Ronald H. Brown Cruise RB MAR-10 APR RAPID mooring cruise report National Oceanography Centre, Southampton Cruise Report No. 29 RV Ronald H. Brown Cruise RB0701 21 MAR-10 APR 2007 RAPID mooring cruise report Principal Scientists M O Baringer & T Kanzow Editor D Rayner

More information

Cruise Plan Coastal Pioneer 6 Deployment

Cruise Plan Coastal Pioneer 6 Deployment Cruise Plan Coastal Pioneer 6 Deployment Leg 1: R/V Armstrong Cruise AR-04A 12 May 15 May 2016 Leg 2: R/V Armstrong Cruise AR-04B 17 May - 24 May 2016 Leg 3: R/V Armstrong Cruise AR-04C 26 May - 2 June

More information

Deepwater Horizon Oil Spill Principal Investigator One Year Update Workshop

Deepwater Horizon Oil Spill Principal Investigator One Year Update Workshop Deepwater Horizon Oil Spill Principal Investigator One Year Update Workshop Wave Glider Monitoring the Gulf of Mexico Graham Hine Senior Vice President of Operations Liquid Robotics, Inc. 25 October, 2011

More information

HOT 294: Chief Scientist Report Chief Scientist: Dan Sadler R/V Kilo Moana June 19-23, 2017

HOT 294: Chief Scientist Report Chief Scientist: Dan Sadler R/V Kilo Moana June 19-23, 2017 HOT 294: Chief Scientist Report Chief Scientist: Dan Sadler R/V Kilo Moana June 19-23, 2017 Cruise ID: KM 17-08 Departed: June 19, 2017 at 1000 (HST) Returned: June 23, 2017 at 0815 (HST) Vessel: R/V Kilo

More information

CORALFISH 2009 Cruise Report: CF0609. Eastern Ionian, Cephalonia and Zakynthos

CORALFISH 2009 Cruise Report: CF0609. Eastern Ionian, Cephalonia and Zakynthos CORALFISH 2009 Cruise Report: CF0609 15-25 th June 2009 Eastern Ionian, Cephalonia and Zakynthos Dr. Chris Smith & Shipboard Scientific Crew Hellenic Centre for Marine Research CoralFISH: EU Project 213144,

More information

Summary THE FRAM STRAIT TOMOGRAPHY EXPERIMENT 2008

Summary THE FRAM STRAIT TOMOGRAPHY EXPERIMENT 2008 A non-profit Research institute affiliated With the University of Bergen Thormøhlensgate 47 N-5006 Bergen, Norway http://www.nersc.no Summary THE FRAM STRAIT TOMOGRAPHY EXPERIMENT 2008 Project Leader:

More information

LAKE TITICACA, BOLIVIA/PERU HIGH RESOLUTION SINGLE CHANNEL SEISMIC SURVEY CRUISE ON LAKE TITICACA ON THE M/V YAKUZA 15 APRIL TO 29 APRIL 1996

LAKE TITICACA, BOLIVIA/PERU HIGH RESOLUTION SINGLE CHANNEL SEISMIC SURVEY CRUISE ON LAKE TITICACA ON THE M/V YAKUZA 15 APRIL TO 29 APRIL 1996 LAKE TITICACA, BOLIVIA/PERU HIGH RESOLUTION SINGLE CHANNEL SEISMIC SURVEY CRUISE ON LAKE TITICACA ON THE M/V YAKUZA 15 APRIL TO 29 APRIL 1996 Cruise participant: David A. Mucciarone from Rice University,

More information

Cruise Report. FDS Submarine Channels RV Koca Piri Reis. 9 th -26 th May 2010

Cruise Report. FDS Submarine Channels RV Koca Piri Reis. 9 th -26 th May 2010 Cruise Report FDS Submarine Channels RV Koca Piri Reis 9 th -26 th May 2010 Flow dynamics and sedimentation in an active submarine channel: a process-product approach Principal Scientist J Peakall 2012

More information

CRUISE REPORT FOR BERING STRAIT MOORING PROJECT

CRUISE REPORT FOR BERING STRAIT MOORING PROJECT CRUISE REPORT FOR BERING STRAIT MOORING PROJECT 2007 Russian Vessel SEVER ( North ) RUSALCA2007 Nome, 27 th August 2007 Nome, 5 th September 2007 Rebecca Woodgate, University of Washington (UW),woodgate@apl.washington.edu

More information

CRUISE REPORT (C.M. Young, January 8, 2014)

CRUISE REPORT (C.M. Young, January 8, 2014) CRUISE REPORT (C.M. Young, January 8, 2014) University of Oregon North Carolina State University Duke University Ship: R/V Pelican Cruise Dates: November 4-8, 2013 Scientific Party: Dr. Craig Young, Chief

More information

Project: Profiling Float Observations in the Aegean Sea

Project: Profiling Float Observations in the Aegean Sea Project: Profiling Float Observations in the Aegean Sea Cruise I CRUISE REPORT 1. Introduction and objectives The Profiling Float Observations in the Aegean Sea - Cruise I experiment is a joint effort

More information

Summary Cruise Report RV MARIA S. MERIAN Cruise MSM12-1

Summary Cruise Report RV MARIA S. MERIAN Cruise MSM12-1 Detlef Quadfasel Institut für Meereskunde KlimaCampus Universität Hamburg Bundesstr. 53 D-20146 Hamburg Tel.: +49 40 42838 5756 Fax: +49 40 42838 4644 e-mail: detlef.quadfasel@zmaw.de Summary Cruise Report

More information

HOT 292: Chief Scientist Report Chief Scientist: Dan Sadler Chief Scientist At-Sea: Tara Clemente R/V Ka'Imikai-O-Kanaloa April 24-28, 2017

HOT 292: Chief Scientist Report Chief Scientist: Dan Sadler Chief Scientist At-Sea: Tara Clemente R/V Ka'Imikai-O-Kanaloa April 24-28, 2017 HOT 292: Chief Scientist Report Chief Scientist: Dan Sadler Chief Scientist At-Sea: Tara Clemente R/V Ka'Imikai-O-Kanaloa April 24-28, 2017 Cruise ID: KOK17-07 Departed: April 24, 2017 at 0724 (HST) Returned:

More information

Bluewater Coastal Cruiser Kristannalee

Bluewater Coastal Cruiser Kristannalee Bluewater Coastal Cruiser Kristannalee Make: Model: Length: Bluewater Coastal Cruiser 48 ft Price: $ 125,000 Year: 1990 Condition: Used Location: Orange Beach, AL, United States Boat Name: Hull Material:

More information

The ship s keel has a diver-installed Multi-Beam Sonar mounting carriage located 1/3 length from the bow.

The ship s keel has a diver-installed Multi-Beam Sonar mounting carriage located 1/3 length from the bow. R/V LEEWAY ODYSSEY LEEWAY ODYSSEY R/V Leeway Odyssey is a 38 meter all aluminum Oceanographic Research Vessel with a beam of 25 feet. It is outfitted for year round coastal service with around the clock

More information

SHORT CRUISE REPORT. RV METEOR: cruise M82/2

SHORT CRUISE REPORT. RV METEOR: cruise M82/2 SHORT CRUISE REPORT RV METEOR: cruise M82/2 Prof. Dr. Monika Rhein, chief scientist Institut für Umweltphysik Abt. Ozeanographie, Universität Bremen from St. John s, Canada to Ponta. Delgada, Acores, Portugal

More information

HOT-119: Chief Scientist Report. Chief Scientist: D. HEBEL

HOT-119: Chief Scientist Report. Chief Scientist: D. HEBEL HOT-119: Chief Scientist Report Chief Scientist: D. HEBEL HOT 119 Cruise Report R/V Kaimikai O Kanaloa 16-20 Oct., 2000 HALE ALOHA Recovery (HA8B) 14-15 Oct., 2000 Personnel List HALE ALOHA Recovery JGOFS

More information

POP-UP OPTION USER HARDWARE MANUAL. EdgeTech 4 Little Brook Road West Wareham, MA _REV_B 8/29/2018

POP-UP OPTION USER HARDWARE MANUAL. EdgeTech 4 Little Brook Road West Wareham, MA _REV_B 8/29/2018 POP-UP OPTION USER HARDWARE MANUAL 0019850_REV_B 8/29/2018 EdgeTech 4 Little Brook Road West Wareham, MA 02576 Tel: (508) 291-0057 Fax: (508) 291-2491 www.edgetech.com ii The information, figures, and

More information

R/V Maurice Ewing Replacement

R/V Maurice Ewing Replacement R/V Maurice Ewing Replacement 3D Seismic Vessel Western Legend Replacement Vessel Western Legend as an Example (EWING after midlife in parenthesis) Length: 235 feet (237 feet) Beam: 56 feet (46 feet) Displacement

More information

HOT 291: Chief Scientist Report Chief Scientist: Tara M. Clemente R/V Ka'Imikai-O-Kanaloa March 27-31, 2017

HOT 291: Chief Scientist Report Chief Scientist: Tara M. Clemente R/V Ka'Imikai-O-Kanaloa March 27-31, 2017 HOT 291: Chief Scientist Report Chief Scientist: Tara M. Clemente R/V Ka'Imikai-O-Kanaloa March 27-31, 2017 Cruise ID: KOK17-05 Departed: March 27, 2017 at 0705 (HST) Returned: March 31, 2017 at 0926 (HST)

More information

Hatteras V12-71TI M/Y BLUE HORIZONS

Hatteras V12-71TI M/Y BLUE HORIZONS Hatteras V12-71TI M/Y BLUE HORIZONS Make: Model: Length: Hatteras V12-71TI 70 ft Price: $ 475,000 Year: 1983 Condition: Used Location: Charleston, SC, United States Boat Name: Hull Material: Draft: Number

More information

CRUISE REPORT FOR BERING STRAIT MOORING PROJECT 2008, RUSALCA

CRUISE REPORT FOR BERING STRAIT MOORING PROJECT 2008, RUSALCA CRUISE REPORT FOR BERING STRAIT MOORING PROJECT 2008, RUSALCA 2008 Russian Vessel Lavrentiev - Nome, 1 st October 2008 Nome,10 th October 2008 Rebecca Woodgate, University of Washington (UW),woodgate@apl.washington.edu

More information

Coordination Center German Research Vessels

Coordination Center German Research Vessels Coordination Center German Research Vessels Experiences with RV SONNE Tina Knuth University Hamburg Coordination Center German Research Vessels coordinates the worldwide activities of following research

More information

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS. Part # A7006

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS. Part # A7006 IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS Part # A7006 Parts List Wobble Stopper Body Wobble Stopper Shaft Camper Bracket Lower Bracket Assembly Upper Bracket Upper Bracket Clamp 3/8 SAE Flat

More information

(Photo by Aleksey Ostrovskiy)

(Photo by Aleksey Ostrovskiy) RUSALCA - BERING STRAIT AON 2011 MOORING CRUISE REPORT Russian Research Vessel Professor Khromov (also called Spirit of Enderby) Nome, 12 th July 2011 Nome, 23 rd July 2011 Rebecca Woodgate, University

More information

Professional Promotion Solutions

Professional Promotion Solutions Professional Promotion Solutions bigpitch.com.au about the big pitch co. Marquees professional branding solutions This is where we tell you about us, the Big Pitch Co. The Big Pitch Co. is the result of

More information

Silver Seas FOR SALE m (106'11"ft) Burger Boat Company Luxury Yacht Silver Seas

Silver Seas FOR SALE m (106'11ft) Burger Boat Company Luxury Yacht Silver Seas Silver Seas 32.61m (106'11"ft) Burger Boat Company 1998 Luxury Yacht Silver Seas SILVER SEAS is a thoughtful creation based on the needs and desires of an experienced yachtsman. Price $4,880,000 Details

More information

HOT-283 Chief Scientist Report

HOT-283 Chief Scientist Report HOT-283: Chief Scientist Report Chief Scientist: Susan Curless R/V Ka'Imikai-O-Kanaloa April 13-17, 2016 Cruise ID: KOK16-04 Departed: April 13, 2016 at 0845 (HST) Returned: April 17, 2016 at 0713 (HST)

More information

YACHT charter brokerage construction...

YACHT charter brokerage construction... YACHT charter brokerage construction... COUACH 2200 launched 2009 2 Owners only. Year-round maintained by professional skipper. Ideal family or first time yacht, easy maintenance. Excellent sea-behaviour,

More information

PBVO. For Fish. Research) survey for herring and sprat

PBVO. For Fish. Research) survey for herring and sprat NOTIFICATION OF PROPOSED RESEARCH PART A : GENERAL 1. NAME OF RESEARCH SHIP: TRIDENS CRUISE NO: wk.26-29/13 2. DATES OF CRUISE FROM 24-06-2013 TO 19-7-2013 3. OPERATING AUTHORITY J.W. Groen Head of Department

More information

POL Glider Facility (July 2009)

POL Glider Facility (July 2009) No. 192 POL Glider Facility (July 2009) Phil Knight, Chris Balfour, John Kenny and Danny McLaughlin July 2009 POL Glider Facility (July 2009) Phil Knight, Chris Balfour, John Kenny & Danny McLaughlin

More information

Gates Hose Cutter Model 6-32 For six-wire spiral and two-wire braid hose through 2" I.D. Product Number: Clean Easy Cuts Safe Operation

Gates Hose Cutter Model 6-32 For six-wire spiral and two-wire braid hose through 2 I.D. Product Number: Clean Easy Cuts Safe Operation Standard Hydraulic Hose Specialized Mining Couplings, Adapters and Accessories Specialized Mining Hose Product Information Gates Power Cutter 208 Product : 7480-6609 Effortless Straight Cuts Every Time

More information

HOT 305: Chief Scientist Report Chief Scientist: Tara M. Clemente R/V Kilo Moana September 9-13, 2018

HOT 305: Chief Scientist Report Chief Scientist: Tara M. Clemente R/V Kilo Moana September 9-13, 2018 HOT 305: Chief Scientist Report Chief Scientist: Tara M. Clemente R/V Kilo Moana September 9-13, 2018 Cruise ID: KM18-15 Departed: September 09, 2018 at 0850 (HST) Returned: September 13, 2018 at 0845

More information

CIRCUS - AZIMUT AZ 83

CIRCUS - AZIMUT AZ 83 CIRCUS - AZIMUT AZ 83 88' (27.10m) AZIMUT LOA: Beam: Min Draft: Max Draft: Speed: 88' 11" (27.10m) 20' 0" (6.09m) Min 5' 7" (1.70m) Cruising 10 knots Max 18 knots Year: Builder: Type: Price: Location:

More information

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment.

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment. Film-Tech The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment. These manuals are designed to facilitate the exchange of information related to cinema

More information

Sinking Wreckage Trajectory Study. El Faro DCA16MM001. March 20, 2016

Sinking Wreckage Trajectory Study. El Faro DCA16MM001. March 20, 2016 NATIONAL TRANSPORTATION SAFETY BOARD Office of Research and Engineering Washington, DC Sinking Wreckage Trajectory Study DCA16MM001 March 20, 2016 Crider Dennis Contents Figures... 2 1. Accident Information...

More information

Ensign Ship Brokers. Proudly Presents. NAMASTE Bering 65

Ensign Ship Brokers. Proudly Presents. NAMASTE Bering 65 Ensign Ship Brokers Proudly Presents NAMASTE Bering 65 Main dimensions Length Overall (LOA)63 3 (19.30 m) Deck Length (LOD)60 0 (18.30 m) Waterline Length (LWL)58 0 (17.70 m) Beam 20 0 (6.00 m) Bridge

More information

GREEK ARGO PROGRAMME PRESENT STATUS AND FUTURE PLANS. G. Korres and D. Kassis HCMR March, 2015

GREEK ARGO PROGRAMME PRESENT STATUS AND FUTURE PLANS. G. Korres and D. Kassis HCMR March, 2015 GREEK ARGO PROGRAMME PRESENT STATUS AND FUTURE PLANS G. Korres and D. Kassis HCMR March, 2015 1. Background and organization of GREEK ARGO activities Greece has established national contribution to the

More information

HOT-297 Chief Scientist Report

HOT-297 Chief Scientist Report Cruise ID: KM 17-17 Departed: 7 November at 0900 (HST) Returned: 11 November at 0820 Vessel: R/V Kilo Moana Master of the Vessel: Captain Gray Drewry OTG Marine Technicians: Jeff Koch, Justin Smith 1.

More information

Mollusk Restoration around Wastewater Treatment Plant (NY) # Progress Report: August 26, 2011

Mollusk Restoration around Wastewater Treatment Plant (NY) # Progress Report: August 26, 2011 To date, the project has involved numerous teleconferences, emails and permitting exercises with the goal of ribbed mussel seed collection, construction and installation of a mussel raft in the Bronx/East

More information

HIMIOFoTS - Hellenic Integrated Marine Inland water Observing, Forecasting and offshore Technology System

HIMIOFoTS - Hellenic Integrated Marine Inland water Observing, Forecasting and offshore Technology System HIMIOFoTS - Hellenic Integrated Marine Inland water Observing, Forecasting and offshore Technology System Leonidas Perivoliotis, Institute of Oceanography, Hellenic Center for Marine Research HIMIOFOTS

More information

www Littleton, 9861.horn Titan Park Circle CO etoutdoors.com BEYOND COMPARE

www Littleton, 9861.horn Titan Park Circle CO etoutdoors.com BEYOND COMPARE 9861 Titan Park Circle Littleton, CO 80125 303.408.0250 www.hornetoutdoors.com BEYOND COMPARE Cargo Bed Rack RZR 2015 RZR-900, 900-S, 900-4 Rack with removable bottom $399.95 Hornet Roof Rack Spare Tire

More information

Using Victor 6000 on board R/ V Sarmiento de Gamboa

Using Victor 6000 on board R/ V Sarmiento de Gamboa Using Victor 6000 on board R/ V Sarmiento de Gamboa A. Castellón (1), A. Massol (2), P.Simeoni (2), J.Prades (1), P. Rodríguez (1), L. Ansorena (1) (1) Marine Tecnology Unit, CSIC Spain, (2) IFREMER, France

More information

74' Sunseeker Manhattan 74

74' Sunseeker Manhattan 74 74' (22.56m) SUNSEEKER LOA: Beam: Min Draft: Max Draft: Speed: 74' 0" (22.56m) 17' 10" (5.44m) Cruising 30 knots Max 33 knots Year: Builder: Type: Price: Location: Mfg-2000 Model-2000 SUNSEEKER Motor Yacht

More information

HOT-242 Chief Scientist Report

HOT-242 Chief Scientist Report HOT-242: Chief Scientist Report Chief Scientist: Susan Curless R/V Ka'Imikai-O-Kanaloa May 29 - June 2, 2012 Cruise ID: KOK 12-05 Departed: May 29, 2012 at 0800 (HST) Returned: June 2, 2012 at 0751 (HST)

More information

Monitoring the marine environment

Monitoring the marine environment Monitoring the marine environment D. Velaoras & E. Krasakopoulou Hellenic Center for Marine Research (HCMR) Seasera Mediterranean Workshop 27-28 September 2012 Ifremer Toulon POSEIDON multi parametric

More information

Atlantic Trawler ATR66

Atlantic Trawler ATR66 Atlantic Trawler ATR66 Price: 1,100,000 ex Vat NOW SERIUSLEY REDUCED BY 75,000 EURO WITH THIS REDUCTION IN PRICE AND CURRENT EXCHANGE RATE THIS IS SHOWING A SAVING OF ALMOST 200,000 The Atlantic 66 is

More information

Capable Accommodation work Barge with helideck. Large Work Deck with 400t deck crane. Accommodation for 165 pax. Mynx. Accommodation Work Barge

Capable Accommodation work Barge with helideck. Large Work Deck with 400t deck crane. Accommodation for 165 pax. Mynx. Accommodation Work Barge Capable Accommodation work Barge with helideck Large Work Deck with 400t deck crane Accommodation for 165 pax Mynx Accommodation Work Barge hnical Drawing Proven and Capable shallow water accommodation

More information

Formulate Designer Series 10 Backwall - Kit 10

Formulate Designer Series 10 Backwall - Kit 10 Formulate Designer Series 10 Backwall - Kit 10 FMLT-DS-10-10 Formulate Designer Series 10ft displays have unique stylistic features and shapes, are portable and easy to assemble. The aluminum tube frame

More information

O'Pati FOR SALE m (129'7"ft) Golden Yachts O'Pati. O'Pati is a 40m luxurious motor yacht built in 2011 by Golden Yachts.

O'Pati FOR SALE m (129'7ft) Golden Yachts O'Pati. O'Pati is a 40m luxurious motor yacht built in 2011 by Golden Yachts. O'Pati 39.50m (129'7"ft) Golden Yachts 2011 O'Pati O'Pati is a 40m luxurious motor yacht built in 2011 by Golden Yachts. Price 9 990 000 Details correct as of 06 Mar, 2019 Cabins: 5 Guests: 12 Crew: 7

More information

Hammer, Discus, Shot Put, Javelin

Hammer, Discus, Shot Put, Javelin Hammer, Discus, Shot Put, Javelin Competition Aluminium Discus And Hammer Cage 7/10 M The competition aluminium discus and hammer cage is made from extra sturdy aluminium profiles. The profile measures

More information

NASA S SPACE GRANT MIDWEST HIGH-POWER ROCKET COMPETITION THE ROLL/ORIENTATION CHALLENGE

NASA S SPACE GRANT MIDWEST HIGH-POWER ROCKET COMPETITION THE ROLL/ORIENTATION CHALLENGE NASA S SPACE GRANT 2017-2018 MIDWEST HIGH-POWER ROCKET COMPETITION THE ROLL/ORIENTATION CHALLENGE SPRING 2018 COMPETITION LAUNCH HOSTED BY THE MN SPACE GRANT CONSORTIUM AND BY TRIPOLI MN Informational

More information

PRINCESS ANNA PRINCESS YACHTS

PRINCESS ANNA PRINCESS YACHTS PRINCESS ANNA PRINCESS YACHTS Builder: PRINCESS YACHTS Year Built: 2009 Model: Motor Yacht Price: $2,295,000 USD LOA: 85' 0" (25.91m) Beam: 12' 2" (3.71m) Max Draft: 5' 5" (1.65m) Max Speed: 28 Kts. (32

More information

PULAU SEBAROK - VOPAK TERMINAL (OSV) MAX DISPL. (tonnes) MAX LOA(m) 45, ,000 80, ,000 13,000 12, ,000 19,500 19,500

PULAU SEBAROK - VOPAK TERMINAL (OSV) MAX DISPL. (tonnes) MAX LOA(m) 45, ,000 80, ,000 13,000 12, ,000 19,500 19,500 PULAU SEBAROK - VOPAK TERMINAL (OSV) JETTY DEPTH A/S(m) APPROACH DEPTH(m) MAX LOA(m) MAX DISPL. (tonnes) REMARKS OSV2 11.7 264 45,800 OSV3 16.9 370 210,000 see para. 3 under General Information OSV4 12.9

More information

AccessPoint is a consumer product line that provides key management solutions to allow convenient access and storage inside and outside your home.

AccessPoint is a consumer product line that provides key management solutions to allow convenient access and storage inside and outside your home. Contents 1 KeySafe 1 KeySafe Original (Permanent) 1 KeySafe Original (Portable) 2 KeySafe Original (Slimline) 2 KeySafe Auto 3 KeySafe Pro 3 KeySafe Accessories 3 Key Cabinets 3 Locking Key Cabinet 4 Key

More information

Nature of MATE Internships in 2011 thru May UNOLS/USCG Interns

Nature of MATE Internships in 2011 thru May UNOLS/USCG Interns Name 1 Erik Arnesen 2 Mark Burnap Institution Sonoma State Southern Oregon Nature of MATE Internships in 2011 thru May 2014 Internship Host R/V Wecoma (six-month intern) 3 Jaclyn Chariw Kutztown R/ V Thompson

More information

Capabilities for Gliders

Capabilities for Gliders A New World of Velocity Profile Capabilities for Gliders by Eric Siegel, General Manager, Nortek USA Ocean gliders are autonomous underwater vehicles that profile the water column vertically by controlling

More information

Aquastar 33 Shalimar VI

Aquastar 33 Shalimar VI Aquastar 33 Shalimar VI Make: Model: 33 Length: Aquastar 10 m Price: GBP 49,995 Year: 1992 Condition: Used Boat Name: Hull Material: Draft: Number of Engines: 2 Fuel Type: Shalimar VI Fibreglass (GRP)

More information

Curtis Stokes & Associates - Mary Catherine Ciszewski 1323 SE 17th St, Suite168 Ft. Lauderdale, FL 33316, United States

Curtis Stokes & Associates - Mary Catherine Ciszewski 1323 SE 17th St, Suite168 Ft. Lauderdale, FL 33316, United States http://www.curtisstokes.net Curtis Stokes & Associates - Mary Catherine Ciszewski 1323 SE 17th St, Suite168 Ft. Lauderdale, FL 33316, United States Tel: (804) 815-8238 Tel: 954-684-0218 Fax: (954) 320-6942

More information

replacement SONNE status report

replacement SONNE status report replacement SONNE status report preliminary remark Preliminary remark: Tendering procedure started in 2009. For the first time the tender was for the construction as well as for the operation of the ship

More information

Annual Summary of Marine Safety Reports

Annual Summary of Marine Safety Reports 14 th February 2014 Page 1 Annual Summary of Marine Safety Reports Notes 1. Incident categories are consistent with the requirements of the MAIB and the British Port s Association s National Reporting

More information

Make Model Length Price Year Condition. Amels Custom 178 ft EUR 14,950, Used

Make Model Length Price Year Condition. Amels Custom 178 ft EUR 14,950, Used Amels Custom Make Model Length Price Year Condition Amels Custom 178 ft EUR 14,950,000 1998 Used Boat Name Hull Material Draft Number of Engines Fuel Type Location Faribana V Steel 11 ft 6 in 2 Diesel

More information

Math in Motion Idlewild & SoakZone Copyright

Math in Motion Idlewild & SoakZone Copyright STUDENT PACKET MATH IN MOTION Your visit to Idlewild & SoakZone is an opportunity to not only have fun, but learn about math and the use of technology throughout the park. Use our Outdoor Classroom to

More information

C. Area of operation: Columbia River and Columbia River Estuary between mouth of estuary and Portland, Oregon.

C. Area of operation: Columbia River and Columbia River Estuary between mouth of estuary and Portland, Oregon. R/V Barnes Cruise Plan July 2008 Cruise dates: July 7 24 Captain: Ray McQuin Lead scientist: Joseph Needoba (needobaj@stccmop.org) Funding source: NSF PI Antonio Baptista Organization: NSF Center for Coastal

More information

68' (20.73m) FERRETTI

68' (20.73m) FERRETTI 68' Ferretti 680 68' (20.73m) FERRETTI LOA: Beam: Min Draft: Max Draft: Speed: 68' 0" (20.73m) 18' 6" (5.64m) Cruising 29 knots Max 33 knots Year: Builder: Type: Price: Location: Mfg-2004 Model-2004 FERRETTI

More information

Installation guidelines street light poles from Sapa with ground piece

Installation guidelines street light poles from Sapa with ground piece This manual should be read carefully before installing poles from Sapa Preface The purpose of this manual is to provide to installers and maintenance technicians enough information to safely and properly

More information

(Left: Norseman II, from Right: Little Diomede Island, R Woodgate)

(Left: Norseman II, from   Right: Little Diomede Island, R Woodgate) BERING STRAIT NORSEMAN II 2016 MOORING CRUISE REPORT Research Vessel Norseman II, Norseman Maritime Charters Nome-Nome, 7 th July to 15 th July 2016 Rebecca Woodgate, University of Washington (UW), woodgate@apl.washington.edu

More information

Kadey Krogen Manatee Happy Clamz

Kadey Krogen Manatee Happy Clamz Kadey Krogen Manatee Happy Clamz Year: 1986 Length: Make: Model: 36 ft Kadey Krogen Manatee Price: $ 115,000 Location: Jacksonville, FL, United States Beam: 13 ft 8 in Bridge Clearance: 23 ft Hull Material:

More information

NOTIFICATION OF PROPOSED RESEARCH CRUISE

NOTIFICATION OF PROPOSED RESEARCH CRUISE NOTIFICATION OF PROPOSED RESEARCH CRUISE PART A: GENERAL 1. NAME OF RESEARCH SHIP FS POSEIDON CRUISE NO. P303 2. DATES OF CRUISE From: 11/09/2003 To: 06/10/2003 3. OPERATING AUTHORITY Institut fuer Meereskunde

More information

Mazdaspeed6 Stage 1 Location 2 OCC Kit Install guide

Mazdaspeed6 Stage 1 Location 2 OCC Kit Install guide 1 Mazdaspeed6 Stage 1 Location 2 OCC Kit Install guide WARNING: By installing this Product, you understand that: The buyer/user assumes all risk as to quality, performance and use of these products and

More information

(Photo from

(Photo from BERING STRAIT NORSEMAN II 2014 MOORING CRUISE REPORT Research Vessel Norseman II, Norseman Maritime Charters Nome-Nome, 30 th June 7 th July 2014 Rebecca Woodgate, University of Washington (UW), woodgate@apl.washington.edu

More information

Lateral Coherence and Mixing in the Coastal Ocean: Adaptive Sampling using Gliders

Lateral Coherence and Mixing in the Coastal Ocean: Adaptive Sampling using Gliders DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Lateral Coherence and Mixing in the Coastal Ocean: Adaptive Sampling using Gliders R. Kipp Shearman Jonathan D. Nash James

More information