The date, site name, report author, report recipient, and report number are presented above.
|
|
- Deborah Allen
- 5 years ago
- Views:
Transcription
1 Engineering Management Support, Inc. Memorandum To: Jesse Aviles, EPA RPM, VB/I70 Superfund Site From: Timothy C. Shangraw Date: November 21, 2017 Re: POLREP #28 - Vasquez Boulevard/Interstate 70 (VB/I70) Superfund Site, Operable Unit 2, Removal Action ======================================================================= On behalf of the City and County of Denver (Respondent), Engineering Management Support, Inc. (EMSI) is submitting this Pollution Report (POLREP #28) in accordance with Section 4.c of Appendix C to the Administrative Settlement Agreement and Order on Consent for Removal Action, for the subject Superfund Site (the Site). This report follows the outline detailed in Section 4.c of Appendix C, and contains pertinent new information specified in the Superfund Removal Procedures, Removal Response Reporting: POLREP and On-Scene Coordinator (OSC) Reports (EPA, 1994). Section I Heading The date, site name, report author, report recipient, and report number are presented above. Section II Response Information This reporting period extended from October 1 through 31, 2017 during which time, the following activities occurred: Excavation of Regulated Asbestos-Contaminated Soils (RACS) and hauling to and disposing at the Denver Arapahoe Disposal Site (DADS); Construction of the concrete box conduit, outlet wing walls, and open channel sidewall footings through the Coliseum Parking Lot (CPL); Pumping and treatment of groundwater from dewatering zones 1, 2, 3a, and 3b; Construction of the drop inlet structure and reinforced box conduits (RBCs) in dewatering zone 2 (beneath Delgany sanitary sewers); Construction of lateral drain boxes in dewatering zone 3a; On-site and off-site monitoring for air quality, dust, and odors; and Updated the groundwater flow model to reflect new hydrogeologic conditions observed during construction. The volumes of RACS excavated and managed, and the volumes of water pumped, treated, and returned to the South Platte River, are summarized in Table 1. On-site monitoring for volatile organic compounds (including methane), odor, and visible dust emissions occurred continuously during excavation and drilling activities. In addition,
2 Memorandum POLREP #27 VB/I70, OU2 removal Action November 21, 2017 Page 2 monitoring for airborne asbestos fibers proceeded in accordance with Section 5.5 of the Colorado Department of Public Health and Environment (CDPHE) Solid Waste Regulations. Due to their overall size, daily monitoring reports for volatile organic compounds, odor, dust, and asbestos are being submitted under separate cover. Off-Site monitoring by Denver for PM 10, airborne lead and arsenic at four locations within the monitoring boundary continued throughout the reporting period. Sampling from these stations occurred every sixth day throughout the month. Results were all below Occupational Safety and Health Administration 8-hour limits and National Ambient Air Quality Standards. Monthly monitoring report are posted on the Globeville Landing Outfall (GLO) project web site at: As part of the GLO project s Community Outreach program, a community hotline was operated. No complaints were received during the reporting period. The Community Advisory Group (CAG) held its ninth meeting on November 14 th. Meeting minutes are posted on the VB/I-70 Superfund Community Advisory Group web site. The next CAG meeting is scheduled for December 12 th. The following project meetings were held in October: Weekly GLO Project Status Meetings (October 5, 12, 19, and 26, 2017); and EPA monthly progress meeting (October 18, 2017). Lastly, a 3-week look-ahead Construction Schedule is attached to this POLREP. Section III Issues, Resolutions, and Planned Activities A Quality Assurance Audit was performed on Asbestos-Containing Soils Daily Reports (ACSRs) prepared by Kleinfelder during the month of September for consistency with Section 5.5 of Colorado s Solid Waste Regulations (CSWRs) and the Final Materials Management Plan (MMP) (EMSI, 2016). No deficiencies were noted. A copy of this Audit Report is attached to this POLREP. Monitoring of treated effluent from the GLO project continued during the reporting period in accordance with Discharge Permit Number CO All monitored parameters with the exception of selenium met effluent discharge limits. A potentially dissolved selenium concentration of 23.7 ug/l, compared to a permit limit of 4.6 ug/l, was reported for an effluent sample collected on October 2 nd. Because the influent sample was detected at only 3.0 ug/l, and when compared to historical influent and effluent selenium concentrations since dewatering began (see summary table attached), the reported elevated selenium concentration appears anomalous. The Certified Operator of the treatment facility has requested the laboratory to reanalyze the sample to confirm or negate this apparent anomaly. As soon as results become available, they will be reported to EPA. Meanwhile, the treatment plant operator confirmed that plant operating parameters prior to and during the sampling event were within normal operating
3 Memorandum POLREP #27 VB/I70, OU2 removal Action November 21, 2017 Page 3 ranges, and that sampling procedures, preservation, chain of custody, and delivery procedures were followed exactly as in the past. CDPHE personnel (Mr. Dave Kurz and Mr. Eric Minc) were notified of the potential exceedance and agreed with the steps being taken to address the situation. Planned activities for the next reporting period consist of: Finish construction of the concrete box conduit through the CPL; Continue construction of outlet wing walls and open channel sidewall footings through the CPL; Installation of the strengthening layer in the CPL and GLP; Continued construction of lateral drain boxes in the GLP; Continued construction of outlet structures and riprap downstream of the RBCs in the GLP; Continued dewatering in zones 1, 2, 3a and 3b; and Continued on-site and off-site monitoring of air quality. To maintain effective and transparent communication during GLO implementation, EPA and CDPHE personnel are invited to participate in weekly coordination meetings at Kiewit s RiNo office. The next two EPA Monthly Status meeting will be held on November 15 th and December 20 th at 9:00 in the Webb building. Please call Jennifer Luthi ( ) or me ( ) if you have any questions. Attachments: October 2017 Summary of GLO Construction Activities 3-Week Look-Ahead Schedule QA Audit Report #6 Summary of Effluent and Influent Analytical
4 Table 1: Summary Construction Report for October 2017 Current Month QTY QTY to date Comments EXCAVATION/HAULING # of days Excavation occurred Globeville park # of days Excavation occurred Municipal Landfill 31 Volume of Racs Excavated (CY) 7,896 83,255 From Globeville Park and Coliseum Parking lot Volume of Racs hauled to DADS (CY) 7,896 83,255 From Globeville Park and Coliseum Parking lot Volume of Non-Racs Excavated (CY) 0 58,577 Volume of Non-Racs stockpiled onsite (CY) 0 12,606 Claystone from drop inlet stockpiled for reuse Volume of Non-Racs hauled to DADS (CY) 0 45,971 Volume Hauled to Clean Harbors (CY) 0 GROUT AND STONE COLUMNS number of grout columns installed this month 0 1,091 All Stone and Grout columns are complete Grout column SPT testing results 0 0 All Stone and Grout columns are complete number of stone columns installed per month All Stone and Grout columns are complete stone column test results 0 0 All Stone and Grout columns are complete REMEDIATION DEWATERING AND TREATMENT LF of underdrain/wick wells installed Volume of water transported and treated at MFEI 1,701,500 21,881,875 Volume of treated water, including dilution, discharged to S. Platte 1,717,396 22,313,800 Analytical results 0 Sept DMR submitted CONSTRUCITION DEWATERING status of permit compliance LINER INSTALLATION % complete during the month N/A QC/QA testing results N/A Issues and Resolutions N/A MODCP RESULTS Daily Methane, Odor, and Dust monitoring reports Issues and Resolutions COMMUNITY OUTREACH Summary of Calls to hotline Issues and Resolutions
5 Globeville Phase 2/Brighton Segment 2 Schedule Title Current Week Phase 2-3 week schedule Monday, November 13, 2017 Item Activity Description Work performed by Start Finish Shift Current Forecast Forecast Forecast 11/13 11/13 11/14 11/14 11/15 11/15 11/16 11/16 11/17 11/17 11/18 11/18 11/19 11/19 11/20 11/20 11/21 11/21 11/22 11/22 11/23 11/23 11/24 11/24 11/25 11/25 11/26 11/26 11/27 11/27 11/28 11/28 11/29 11/29 11/30 11/30 12/01 12/01 12/02 12/02 12/03 12/03 12/04 12/04 12/05 12/05 12/06 12/06 12/07 12/07 12/08 12/08 12/09 12/09 12/10 12/10 M T W T F Sa Su M T W T F Sa Su M T W T F Sa Su M T W T F Sa Su 1 WORK BY OTHERS 2 Lower Xcel Million Volt Line?? 3 Lower Zayo line at 44th?? 4 AT&T from 40th to 44th 11/20/17 11/30/17 5 Lower JUT Comcast Manhole between 40th and 41st?? 6 LVL3/8x8 conflict at 44th?? 7 8 BRIGHTON BLVD SEGMENT 2 11 Finish Waterline Abandonments at 44th/Brighton Ames 11/14/17 11/15/17 Day 10 F/P/S SSP 37Z, 67a and 88 Ames 11/10/17 11/20/17 Day 9 Install Pipe/Backfill SSPs 36z, 67a and 88 Ames 11/27/17 11/29/17 Day 12 D/L/B MH38 to CB45 Ames 11/27/17 11/28/17 Day 13 D/L/B Box to CB43 Ames 11/28/17 11/29/17 Day 14 D/L/B 15" RCP to MH68 Ames 11/30/17 12/01/17 Day 13 D/L/B MH66 to CB86 Ames 12/04/17 12/05/17 Day 14 D/L/B MH67 to CB88 Ames 12/05/17 12/06/17 Day 15 Prep for detour paving Ames 11/29/17 12/06/17 Day 16 Pave for detour and shoo fly Ames 12/07/17 12/08/17 Day GLOBEVILLE PHASE 'x12' BOX CULVERT 20 Drive Sheets for precast boxes Ames 07/08/17 12/15/17 Night 21 Install 8x8 Precast Box Culvert ( ) Ames 11/09/17 11/30/17 Day 22 Install 8x8 Precast Box Culvert ( ) - 44TH CLOSURE Ames 11/30/17 12/04/17 Day 23 Install 8x8 Precast Box Culvert ( ) - END OF PH2 Ames 12/07/17 12/15/17 Day 23 Install 14x12 Precast Box Culvert ( ) Ames 11/06/17 12/07/17 Day 24 Install Shoring/Excavate for 40th 14x12 CIP Bend Ames 12/08/17 12/18/17 Day 25 Install 14x12 Precast Box Culvert (28+08 to 29+18) Ames 12/19/17 01/05/17 Day 26 Backfill CIP Bends/Install Basket Wall/Remove Shoring Ames 11/10/17 11/29/17 Day Note: Shoring activities will take place at night (5:00pm to 5:00am) starting 9/5/17 Closure of 44th
6 Engineering Management Support, Inc. QA Audit Report #6 To: From: cc: Matt Ceresa, Kiewit, Tim Shangraw, EMSI Jennifer Luthi, DEH; Steve Gonzales, DEH; Bret Banwart (DPW); Brian McLaren (DPW); and Patrick Riley (DPW) Date: November 14, 2017 Re: Audit of Kleinfelder CABI Notes, September 2017, Globeville Landing Outfall Project Representatives from Engineering Management Support, Inc. (EMSI) reviewed Asbestos- Containing Soils Daily Reports (ACSRs) prepared by Kleinfelder during the month of September 2017 for consistency with Section 5.5 of Colorado s Solid Waste Regulations (CSWRs) and the Final Materials Management Plan (MMP) (EMSI, 2016). Documentation of the review is presented in the attached summary table. AUDIT FINDINGS Quality Control continues to be implemented well. As shown in the attached table, all audited parameters complied with Section 5.5 of the CSWRs and the MMP. ACTION REQUIRED No corrective action is required. Denver and EMSI will continue to monitor Ames/Kleinfelder s implementation of agreed-to reporting procedures and identify any area(s) in need of improvement during monthly progress meetings and if necessary, in subsequent QA Audit Reports. Page 1
7 September 2017 QA of CABI daily logs per Colorado Regulation L (Documentation) and Final Materials Management Plan 1C 1A 1B 1D Personnel Date Grid Grid Site Description Description Description of Description Description Friability per CABI diagram description of site of equipment hand removals of types of suspect of ACMs Notes agree w including activities use including of debris materials discussed CABI location locations Tyler Godby 9/1/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/1/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/2/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/5/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/5/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/6/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/6/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/7/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/7/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/8/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/8/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/9/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/11/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/11/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/12/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/12/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/13/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/13/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/14/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/14/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/15/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/15/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/16/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/18/17 yes yes yes yes yes yes yes yes yes Mitchell Reese 9/18/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/19/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/19/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/20/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/20/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/21/17 yes yes yes yes yes yes yes yes yes Page 1
8 September 2017 QA of CABI daily logs per Colorado Regulation L (Documentation) and Final Materials Management Plan 1C 1A 1B 1D Personnel Date Grid Grid Site Description Description Description of Description Description Friability per CABI diagram description of site of equipment hand removals of types of suspect of ACMs Notes agree w including activities use including of debris materials discussed CABI location locations Lanaia Carveth 9/21/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/22/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/22/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/23/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/26/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 9/27/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/27/17 yes yes yes yes yes yes yes yes yes Tim Ponder 9/27/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/29/17 yes yes yes yes yes yes yes yes yes Mitchell Reese 9/29/17 yes yes yes yes yes yes yes yes yes Tyler Godby 9/30/17 yes yes yes yes yes yes yes yes yes Notes: 1) NVE = no visible emissions observed 2) in the table "yes" designates that documentation was completed Page 2
9 September 2017 QA of CABI daily logs per Colorado Regulation L (Documentation) and Final Materials Management Plan 2A and 2B 4 5B 1E 1F Personnel Date Bulk sampling Decontamination Spill Observations Observations Observations Photo-log / documentation visual inspection response of visible of non-earthen of other description and clearance activities emissions / material / indicators of Reponses commented soil impact Tyler Godby 9/1/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/1/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/2/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/5/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/5/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/6/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/6/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/7/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/7/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/8/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/8/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/9/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/11/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/11/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/12/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/12/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/13/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/13/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/14/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/14/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/15/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/15/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/16/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/18/17 Not conducted yes No spills NVE yes yes yes Mitchell Reese 9/18/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/19/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/19/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/20/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/20/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/21/17 Not conducted yes No spills NVE yes yes yes Page 3
10 September 2017 QA of CABI daily logs per Colorado Regulation L (Documentation) and Final Materials Management Plan 2A and 2B 4 5B 1E 1F Personnel Date Bulk sampling Decontamination Spill Observations Observations Observations Photo-log / documentation visual inspection response of visible of non-earthen of other description and clearance activities emissions / material / indicators of Reponses commented soil impact Lanaia Carveth 9/21/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/22/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/22/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/23/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/26/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 9/27/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/27/17 Not conducted yes No spills NVE yes yes yes Tim Ponder 9/27/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/29/17 Not conducted yes No spills NVE yes yes yes Mitchell Reese 9/29/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 9/30/17 Not conducted yes No spills NVE yes yes yes Page 4
11 Historical Influent and Effluent Water Quality, GLO Water Treatment Plant Parameter Unit Sample Frequency Effluent Permit Limit May-17 Jun-17 Influent* Effluent** Influent* Effluent** Influent* Effluent** Influent* Effluent** Influent* Effluent** Influent* Effluent** Flow Rate (monthly ave) gpm Continuous 100 N/R 95.5 N/R 96.8 N/R 91.2 N/R 84.5 N/R 54.6 N/R 38.5 ph standard units 3 days/wk N/R N/R N/R N/R N/R N/R Total Residual Chlorine mg/l 3 days/wk 0.5 N/R N/R N/R N/R N/R N/R Oil and Grease (visual) visual presence 3 days/wk Report N/R None N/R None N/R None N/R None N/R None N/R None Oil and Grease (lab) mg/l Contingent upon visual presence 10 N/R N/R N/R N/R N/R N/R N/R N/R N/R N/R N/R N/R Total Suspended Solids mg/l Weekly N/R <5-21 N/R 1.4J N/R <5-2.5J N/R < N/R N/R E. Coli #/100 ml Weekly N/R <1-2 N/R <1 N/R <1 N/R <1-105 N/R <1-54 N/R <1-1 BOD 5 mg/l Monthly N/R <2 N/R <1 N/R <1 N/R 1.1 N/R 2.6 N/R <1.0 Total Inorganic Nitrogen mg/l Monthly 10 N/R 8.4 N/R 8.7 N/R 8.7 N/R 8.3 N/R 5.9 N/R 6.8 Ammonia mg/l Monthly Report N/R 0.48 N/R 0.3 N/R 0.26 N/R 0.38 N/R 0.38 N/R 0.04 Arsenic, total recoverable ug/l Monthly < < Cadmium, potentially dissolved ug/l Monthly < < < < < <0.2 Copper, potentially dissolved ug/l Monthly 5,656-6, < Iron, total recoverable ug/l Monthly 253, < < Lead, total recoverable ug/l Monthly 13, < <1.0 <1.0 < <1.0 Lead, potentially dissolved ug/l Monthly 2, < <1.0 < <1.0 Mercury, total ug/l Monthly 3.5 N/R <0.2 N/R <0.2 N/R <0.1 N/R <0.1 N/R <0.1 N/R 2.0 Selenium, potentially dissolved ug/l Monthly < WET Testing LC 50 Quarterly 100 N/R N/R N/R Failed, then passed N/R N/R N/R N/R N/R N/R N/R Passsed shaded cell indicates compliance with permit limit shaded cell indicates influent exceeds discharge limit; treatment required shaded cell indicates effluent exceeds permit limit * Metals Screen required per Section 1.A.3 of GLO Discharge Permit. VOC and SVOC screens confirmed only trace detections. ** Monitored parameters required per Section 1.A.2 of GLO Discharge Permit N/R Not Required Jul-17 Aug-17 Sep-17 Oct-17
The date, site name, report author, report recipient, and report number are presented above.
Engineering Management Support, Inc. Memorandum To: Jesse Aviles, EPA RPM, VB/I70 Superfund Site From: Timothy C. Shangraw Date: October 17, 2017 Re: POLREP #27 - Vasquez Boulevard/Interstate 70 (VB/I70)
More informationThe date, site name, report author, report recipient, and report number are presented above.
Engineering Management Support, Inc. Memorandum To: Dania Zinner, EPA RPM, VB/I70 Superfund Site From: Timothy C. Shangraw Date: August 16, 2017 Re: POLREP #25 - Vasquez Boulevard/Interstate 70 (VB/I70)
More informationPermittees under Sector S are primarily engaged in the following types of activities:
S. Air Transportation 1. Authorized Stormwater Discharges The requirements in Sector S apply to stormwater discharges associated with industrial activity from air transportation facilities as identified
More informationList of Environmental Reports and Documents Regarding Hazardous Materials. August 10, 2017
List of Environmental Reports and Documents Regarding Hazardous Materials August 10, 2017 Pier 70 1999 Annual Ground Water Monitoring Report for Piers 70 and 94, Tetra Tech, Inc., February 2000. 1999 Annual
More informationPCBS DELINEATION WORK PLAN
PCBS DELINEATION WORK PLAN BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK (FORMER BLUE ISLAND LANDFILL) BLUE ISLAND, COOK COUNTY, ILLINOIS PREPARED FOR: CITY OF BLUE ISLAND 13051 SOUTH GREENWOOD AVENUE
More informationCruise Industry Perspective on OWS and Waste Management
Cruise Industry Perspective on OWS and Waste Management MAX1 OWS Studies Conference Wilmington, NC, 24 June 2015 James R. Van Langen, P.E. Environmental, Safety, Quality & Sustainability Consultant Cruise
More informationES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:
ES-301-1.06 Aircraft Deicing Document Identification Number ES-301-1.06 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: Aircraft deicing is the application of aircraft deicing
More informationReview administrative work required to accept a new SIU Work with other municipality Work with regional planning commission
Review administrative work required to accept a new SIU Work with other municipality Work with regional planning commission Work with outside design engineer Mutual private/public inspections Coordinate
More informationCITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016
CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM 2015 WATER QUALITY MONITORING REPORT CITY OF LYNDEN 300 4 TH STREET LYNDEN, WASHINGTON 98264 PHONE (360) 354-3446 MARCH 1, 2016 This document serves as an attachment
More information[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form
Form Vessel General Permit Compliance Instructions: (1) This form must be completed at least once every 12 months. Visually inspect all areas of the vessel affected by the requirements in the VGP that
More informationMather Restoration Advisory Board (RAB) Meeting Draft Summary Meeting Minutes. Mather, California. 11 March 2009
Mather Restoration Advisory Board (RAB) Meeting Draft Summary Meeting Minutes 11 March 2009 Time: Place: 6:00 PM Air Force Real Property Agency (AFRPA) Conference Room 10503 Armstrong Avenue Mather, CA
More informationManaging Hypochlorite to Reduce Chlorate Formation: A Utility Case Study
Managing Hypochlorite to Reduce Chlorate Formation: A Utility Case Study KIMBERLY GUPTA, PE PORTLAND WATER BUREAU CO- AUTHOR: YONE AKAGI, PE AWWA PNWS KENNEWICK, MAY 5, 2017 Presentation Outline Background
More informationFIGURES. Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City. CSI Job No C
FIGURES Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City CSI Job No. 9680.33 C INFERRED EXTENT OF ARSENIC IMPACTED SOIL C.A. No. 262 Additional Soil Assessment Activities 607, 609,
More informationFINAL Water Year 2012 Bacteria Sampling Report for the Klamath River Estuary
FINAL Water Year 2012 Bacteria Sampling Report for the Klamath River Estuary Prepared by: Patrick Fox Yurok Tribe Environmental Program April 2013 Acknowledgements The Yurok Tribe Environmental Program
More informationPortland Water District Sebago Lake Monitoring Programs Lower Bay Bacteria Monitoring Presenting data from 1977 to 2018 Laurel Jackson
Portland Water District Sebago Lake Monitoring Programs Lower Bay Bacteria Monitoring Presenting data from 1977 to 2018 Laurel Jackson Introduction Sebago Lake is the primary drinking water supply for
More informationAIR MONITORING REPORT
AIR MONITORING REPORT Boiler Room; Basement Pipe Chase Cleveland Middle School 1000 Walsh Street St. Paul, MN 55106 April 10 14, 2006 Nova Client No.: STPAU006/Project No: H06-0865 AIR MONITORING REPORT
More informationFigure 1. Overview map of Burrard Inlet, showing location of False Creek inlet.
Figure 1. Overview map of Burrard Inlet, showing location of False Creek inlet. 65 Figure 2. Location map of False Creek and shoreline and mid-channel monitoring sites. 66 Figure 3. Location of CSO's,
More informationHydro-Electric Schemes Compliance Report June June 2013
File Reference: 4.00212 Significance of Decision: Receives Only - No Decisions Report To: Operations, Monitoring and Regulation Committee Meeting Date: 20 June 2013 Report From: Nick Zaman, Pollution Prevention
More informationAlternative Daily Cover Evaluation
Alternative Daily Cover Evaluation ADEQ Permit No. 0198-S1-R2 AFIN 01-00117 PREPARED FOR: EMS 1784 Highway One North Wynne, AR 72396 PREPARED BY: Fields & Associates, LLC 75 Norfork Drive Maumelle, Arkansas
More informationMonash University Procedure. Cooling Tower Management Procedure. PROCEDURE STATEMENT
Procedure Title Parent Policy Cooling Tower Management Procedure n/a Date Effective June 2014 Review Date June 2017 Procedure Owner Category Manager, OH&S Operational Version Number 1.1 Content Enquiries
More informationAgenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer
Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012
More informationWhy are the underground fuel tanks being removed and replaced with above ground tanks?
AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses
More informationEX USS SHADWELL Disposal Wreck in Place
20 February 2018 EX USS SHADWELL Disposal Wreck in Place EX USS SHADWELL, a decommissioned CASA GRANDE Class Dock Landing Ship has had a long history supporting the US Navy. She was built by Newport News
More informationNINTH ORDINARY MEETING OF THE OSC 9/8/3 RAC/REMPEITC-Caribe STEERING COMMITTEE 31 May 2018
REGIONAL ACTIVITY CENTRE /REGIONAL MARINE POLLUTION EMERGENCY, INFORMATION AND TRAINING CENTRE - WIDER CARIBBEAN REGION NINTH ORDINARY MEETING OF THE OSC 9/8/3 RAC/REMPEITC-Caribe STEERING COMMITTEE 31
More informationMANASSAS REGIONAL AIRPORT
Appendix F MANASSAS REGIONAL AIRPORT Non-Commercial Self-Fueling Permit Applicant: Authorized Representative: Title: Aircraft Storage Location/Hangar Address: Aircraft to be Fueled (List Type & N number):
More information203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'
More informationMOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH April 2018
MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2018 12 April 2018 Key Points* ly sales increased 16% to 1.0 million wet metric tonnes (Mwmt), for ore sales revenue of $60 million
More information2018 Animas River Water Quality Monitoring
2018 Animas River Water Quality Monitoring Rotary Park, Durango, CO Weekly sampling in May 2018 during spring runoff Expedited lab analysis to deliver results to public as quickly as possible Please keep
More informationANNUAL REPORT DALLAS LOVE FIELD AIRPORT. April 23, 2008
ANNUAL REPORT DALLAS LOVE FIELD AIRPORT April 23, 2008 I. INTRODUCTION On August 14, 2006, the Texas Commission on Environmental Quality (TCEQ) signed and published the final version of the Texas Pollutant
More informationAMS Gas Vapor Probe Systems (GVP)
AMS Gas Vapor Probe Systems (GVP) AMS GVP systems are equipped with two different styles of 5/8in OD extensions: solid tile probe extensions, and hollow GVP rods. Extendable tile probe extensions are solid
More informationBID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.
BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway
More informationPlatte West Well Field A Protective Modeling Approach
Platte West Well Field A Protective Modeling Approach Presented to: 2007 Eastern South Dakota Water Conference / 52 nd Annual Midwest Ground Water Conference June 25, 2007 Presented by: Luca DeAngelis,
More informationADEQ - Water Division Spill/Incident Report
ADEQ - Water Division Spill/Incident Report ADEQ Incident #: 14-0135 NRC #: County: Pulaski PDS # 016774 Date and Time of Incident: 03/07/2014 @ 23:00 Date & Time Reported: 03/08/2014 @ 07:09 Responsible
More informationFACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010
FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010 Shoreline Hot Spot Area Central Portion - View North October 2009 This fact sheet provides information about
More informationINTERNATIONAL RULES AND INDUSTRY _ ISSUES OF OHS
IMPLEMENTATION OF INTERNATIONAL RULES AND STANDARDS IN SHIPBREAKING INDUSTRY _ ISSUES OF OHS AND ENVIRONMENT S. S. Gadkar E &SS, Dy. D. G.(Tech) Directorate General of Shipping BACKGROUND The international
More informationIESI Bethlehem Landfill Committee Meeting Minutes
IESI Bethlehem Landfill Committee Meeting Minutes Date: Thursday, February 15, 2018 Time: 1:10 p.m. Location: Lower Saucon Township Council Meeting Room Attendance: Hanover Engineering: Chris Taylor; Exelon:
More informationRE: PATAHA CREEK FECAL COLIFORM COMPLIANCE WITH WATER QUALITY STANDARDS
To: WRIA 35 Planning Committee Memo From: Jory Oppenheimer and Kari Vigerstol Project: WRIA 35 Level II Water Quality CC: Ben Floyd, HDR/EES; John Koreny, HDR/EES Date: March 10, 2005 Job No: 22592 RE:
More informationRequirements for acceptance of operations in Volcanic Ash Zone 2
FLUGMÁLASTJÓRN ÍSLANDS Skógarhlíð 12 105 Reykjavík Requirements for acceptance of operations in Volcanic Ash Zone 2 Applicability - All Icelandic operators with EU-OPS AOC with turbine powered aeroplanes
More informationMINUTES NAVAL WEAPONS STATION (NAVWPNSTA) SEAL BEACH RESTORATION ADVISORY BOARD (RAB) AND COMMUNITY MEETING March 8, 2005
MINUTES NAVAL WEAPONS STATION (NAVWPNSTA) SEAL BEACH RESTORATION ADVISORY BOARD (RAB) AND COMMUNITY MEETING March 8, 2005 Participants: Blake, Geoffrey Carmody, Jack Chauvel, Tim / Department of Toxic
More informationDrinking Water and Waste Management Among Members of the Temagami Lakes Association July 2014 Page 0
Drinking Water and Waste Management Among Members of the Temagami Lakes Association July 2014 Page 0 Acknowledgements The Timiskaming Health Unit would like to thank the following individuals for their
More informationWelcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority
Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority Massachusetts Water Resources Authority Presentation to the Environmental
More informationSample Identification
Analytical Report: Page 1 of 5 Attached is the analytical report for the sample(s) received for your project. Below is a list of the individual sample descriptions with the corresponding laboratory number(s).
More informationFORMER PLUM BROOK ORDNANCE WORKS Sandusky, Ohio (Currently NASA Plum Brook Station)
TM FORMER PLUM BROOK ORDNANCE WORKS Sandusky, Ohio (Currently NASA Plum Brook Station) Monthly Fact Sheet SITE DESCRIPTION - PBOW is located approximately 4 miles south of Sandusky, Ohio, and 59 miles
More informationAction Recommendation: Budget Impact:
City of Fayetteville Staff Review Form Matt Mihalevich 1/16/2019 DEVELOPMENT SERVICES (620) Submitted By 2019 0050 Legistar File ID February 5th, 2019 City Council Meeting Date Agenda Item Only N/A for
More informationPART F SECTION 2 RESPONSIBILITIES AND ACTIONS
F-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 January 2011 PART F SECTION 2 RESPONSIBILITIES AND ACTIONS 1. Overview 1.1 This section outlines the responsibilities and actions of the airport organizations
More informationFECAL COLIFORM BACTERIA SUMMARY SHEET
FECAL COLIFORM BACTERIA SUMMARY SHEET WATERBODY: Greybull River (Tributary to Big Horn River) (WYBH10080009) REACH DESCRIPTION: Confluence wi e Big Horn River upstream to Meeteetse, Wyoming. BACKGROUND:
More informationJanuary 2018 Air Traffic Activity Summary
January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279
More informationADDENDUM NO. TWO AB
ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County
More informationHENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report
HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September 2015 Title: Officer: Chock Lane Traffic Calming scheme Monitoring Report Rob Grieve, Principal Officer, Highways and Traffic,
More information2015 Annual Water Report. City of Revelstoke Engineering and Public Works Department
2015 Annual Water Report City of Revelstoke Engineering and Public Works Department P a g e 1 Table of Contents Introduction... 3 Revelstoke Water Distribution System... 3 Greeley Creek Water Treatment
More informationSan Bernardino International Airport Authority Building 795
San Bernardino International Airport Authority Building 795 Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized representative of, (Company) I (Name
More informationSUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012
CENAN-PP-H 9 Oct 12 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 1. The regularly scheduled monthly interagency coordination meeting was held on 9 Oct
More informationHOSE ASSEMBLY CLEANLINESS
November 18, 2002 HOSE ASSEMBLY CLEANLINESS Preface Hydraulic system cleanliness is a term used to describe the level of solid and liquid contamination found in hydraulic systems. Contamination may be
More informationAgenda for Regular Meeting September 5, 2012, 6:00 PM, 16 Saratoga Ave.
Village of Corinth 244 Main Street Corinth, NY 12822 Agenda for Regular Meeting September 5, 2012, 6:00 PM, 16 Saratoga Ave. 1. CALL TO ORDER, PLEDGE OF ALLEGIANCE 2. ROLL CALL 3. MOTION TO APPROVE MINUTES
More informationFECAL COLIFORM MONITORING IN GRAYS HARBOR COUNTY: SUMMARY REPORT OF MONITORING RESULTS FOR
Chehalis Basin Partnership Fecal Coliform Monitoring in Grays Harbor County: Summary Report of Monitoring Results for 2000-2003 Draft June 30, 2003 Prepared by Tetra Tech/KCM, Inc. 1917 First Avenue, Seattle,
More informationREPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan
INTERNAL AUDIT DIVISION REPORT 2014/065 Audit of air operations in the United Nations Assistance Mission in Afghanistan Overall results relating to the effective management of air operations in the United
More informationMr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No
January 15, 2016 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0328985 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas
More information*Please note special meeting location this month.
October 16, 2018 Meeting Location: 1:30 p.m. Cruis-A-Cade 2002 Cruis A Cade Place Tampa, FL 33602 Hillsborough River Interlocal Planning Board TAC Meeting AGENDA I. Call to Order II. Roll Call III. Pledge
More informationMEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM
MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham
More informationKaruah Hard Rock Quarry. Summary of Environmental Monitoring Data
Karuah Hard Rock Summary of Environmental Monitoring Data For the Period: September 2014 1. Introduction This report has been completed to meet the requirements of Section 66(6) of the Protection of the
More informationEIA for Development of New Civil Enclave at Air Force Base. Annexure 2
EIA for Development of New Civil Enclave at Air Force Base at Bamrauli, Allahabad, Uttar Pradesh Public Hearing Details Annexure 2 Details of Public Hearing for Development of New Civil Enclave at Air
More informationPlans and Design Calculations for the Alder Creek Diversion Fish Screen
TECHNICAL MEMORANDUM Plans and Design Calculations for the Alder Creek Diversion Fish Screen El Dorado Irrigation District 2890 Mosquito Road Placerville, CA 95667 Alder Creek Diversion Fish Screen Plans
More informationMayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates
Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates Glebe Heights and Loch Haven Community Outreach Meeting South River High School May 17, 2016 Agenda Mayo
More informationCity of Redding Airports
City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated
More information25 th Avenue Grade Separation. Community Meeting November 13, 2018
25 th Avenue Grade Separation Community Meeting November 13, 2018 Agenda I. Project Need II. Project Benefits III. Project Description IV. Funding V. Schedule VI. Construction VII. Next Steps 2 Project
More informationChapter 12 Protective Clothing
Protective Clothing General Information Protective clothing is worn during inspections of active asbestos removal projects to prevent asbestos exposure, reduce skin irritation, ease decontamination and
More informationAmerican Eagle Ground Deicing Manual
G. AMERICAN EAGLE DEICING AUDIT This audit form is to be utilized when accomplishing an audit of station facilities, equipment, personnel, manuals, etc. in accordance with the American Eagle Ground Deicing
More information24 RUSSIAN RIVER WATERSHED ASSOCIATION TECHNICAL WORKING GROUP SESSION
24 RUSSIAN RIVER WATERSHED ASSOCIATION TECHNICAL WORKING GROUP SESSION July 13 th, 2010, 8:30 AM 10:00 AM Windsor Town Council Chambers 9291 Redwood Road, Windsor, CA 95492 1. Greetings and Introductions
More informationEffluent Guidelines for Airport Deicing Discharges
Effluent Guidelines for Airport Deicing Discharges Airports Council International and Airlines for America s Deicing Management Conference May 23, 2012 ELG Background Effluent limitations guidelines and
More informationFormer National Guard Armory Konawa, Oklahoma Remediation Final Report
Former National Guard Armory Konawa, Oklahoma Remediation Final Report Prepared by: Department of Environmental Quality 707 North Robinson Oklahoma City, Oklahoma 73101 February 2009 The Oklahoma Department
More informationUsing Wiping Cloth Buckets USDA Professional Standards Code 2620 / 2630 Lesson Objectives Recognize that health regulations and accepted best practices require the use an accurately mixed sanitizing solution
More informationTufts University Water: Systems, Science, and Society (WSSS) Program
To: From: John Foster, Elbow Cay, the Bahamas; Friends of the Environment, Marsh Harbor, the Bahamas Alex Bedig, Amanda Garfield, Shonda Gaylord, Jack Melcher, Melissa Ng, Nathan Rawding, Kendall Webster,
More informationTechnical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular
Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular Subject: TECHNICAL GUIDANCE MATERIAL FOR RESCUE & FIRE FIGHTING SERVICES Date: 27 JULY 2011 APPLICABILITY: 1.
More informationPRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction
PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury
More informationANNUAL REPORT DALLAS LOVE FIELD AIRPORT. March 14, 2006
ANNUAL REPORT DALLAS LOVE FIELD AIRPORT March 14, 2006 I. INTRODUCTION On August 20, 2001, the Texas Commission on Environmental Quality (TCEQ) signed and published the final version of the Texas Pollutant
More informationRevised Total Coliform Rule (RTCR) Level 1 Assessments and Corrective Actions
Revised Total Coliform Rule (RTCR) Level 1 Assessments and Corrective Actions Alexander Hinz & Kasy Stinson Water Supply Division Texas Commission on Environmental Quality Environmental Trade Fair 2018
More informationAirline Industry Activity Report
Airline Industry 2010-2011 Activity Report Table of Contents Introduction... 3 Background... 3 Results and Achievements... 4 1.0 Potable water sampling on Canadian based airlines... 4 2.0 Potable Water
More informationBOBASIO/7. Preliminary RVSM Airspace Safety Assessment
BOBASIO/7 Preliminary RVSM Airspace Safety Assessment Outline Background Data used in the analysis BOBASIO RVSM Airspace Risk Hotspot in Mumbai FIR TCPs along Kolkata-Chennai FIR and Yangon-Kuala Lumpur
More informationSERVICE LETTER. This service letter applies to the models and serials that have 12,000 or more flight hours as follows
TITLE WINGS - FORWARD LOWER SPAR CAP INSPECTION EFFECTIVITY REASON This service letter applies to the models and serials that have 15,000 or more flight hours as follows MODEL SERIAL NUMBERS 401 401-0001
More informationVillage of Glenview Appearance Commission
STAFF REPORT December 5, 2012 Village of Glenview Appearance Commission TO: Chairman and Appearance Commissioners FROM: Planning and Economic Development Department CASE MANAGER: Tony Repp, Planner SUBJECT:
More informationPhotographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:
Photograph ID: 1 west View of one of the monitoring well and the large parking lot on the south side of Center Street. Photograph ID: 2 Monitoring well located in the middle of the parking lot located
More informationMemorandum City of Lawrence Public Works
Memorandum City of Lawrence Public Works TO: Diane Stoddard, Interim City Manager FROM: Charles F. Soules, Director of Public Works CC: Casey Toomay, Toni Wheeler, Bryan Kidney DATE: January 26, 2016 RE:
More information2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc.
2018 2018 Goldwedge Mines Inc. Licence of Occupation Management Plan Photo: xxxx Goldwedge Mines Inc. March 2018 TABLE OF CONTENTS TABLE OF CONTENTS... i Figures... i 1. Background... 2 Project Overview...
More information#6 Spill and Accident Procedures
Standard Operating Procedure (SOP) for filling 4L (1 gl) canisters with 1% Hydrofluoric (HF) and 1% Nitric (HNO3) acid mixture for use in the Ultrasonic bath #1 General Process Description This SOP describes
More informationTIMELINE - FISHER S DEFICIENCIES AND BREACH OF CONTRACT
DATE DEFICIENCY/BREACH/COMPLAINT NOTIFICATION 8-22-2016 Breach of Exclusivity Fisher Construction, Inc. ( Fisher ) breached its contractual commitment to work exclusively with Veolia, by working on behalf
More informationSERVICE LETTER. Conquest. WARNING: Further flight with a cracked carry through spar cap is prohibited. The carry
TITLE WINGS - FORWARD LOWER SPAR CAP INSPECTION EFFECTIVITY REASON This service letter applies to the models and serials that have 11,000 or more flight hours as follows MODEL SERIAL NUMBERS 425 425-0001
More informationJuly 31, Comments re Environmental Impact Statement & License Application For Deep Geologic Repository Project
July 31, 2012 Attention: Debra Myles, Panel Co-Manager c/o Canadian Environmental Assessment Agency 160 Elgin Street, 22nd Floor Ottawa ON K1A 0H3 Kelly McGee, Panel Co-Manager c/o Canadian Nuclear Safety
More informationAerodrome Surveys. Airside Operational Instruction 17 CONTENT:- 1. INTRODUCTION 2. PROCEDURES 3. TREATMENT OF OBSTACLES APPENDIX 2
Aerodrome Surveys Airside Operational Instruction 17 CONTENT:- 1. INTRODUCTION 2. PROCEDURES 3. TREATMENT OF OBSTACLES APPENDIX 1 APPENDIX 2 SURVEY ASSESSMENT FORM DECLARATION OF COMPLIANCE (SAMPLE FORM)
More informationSome Historical Aspects of Urban Water Systems
Some Historical Aspects of Urban Water Systems Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL 35487 Ancient springs at Delphi, Greece (site of Oracle)
More informationOff-Site Solutions. CPM Headwalls. Concrete for Life
Off-Site Solutions CPM Headwalls Concrete for Life Welcome to CPM CPM is a market leading manufacturer of concrete products with production facilities across the UK. This combined with a network of specialist
More informationWater Quality Trends for Conscience Bay
Water Quality Trends for Conscience Bay 2018 This report summarizes water quality data for fecal coliform and total coliform in Conscience Bay for the years 1998-2018. Prepared by: Brian M. McCaffrey Stormwater
More informationWaukegan Public Library Reference Document Repository Catalogue
City of Waukegan and Area of Concern (AOC) Waukegan Properties near Lake Michigan Schedule of Property Records and plot plan, properties along Lake Michigan in Waukegan Waukegan Properties near Lake Michigan
More informationLittle Venice Water Quality Monitoring 2002 Annual Report
Florida International University FIU Digital Commons SERC Research Reports Southeast Environmental Research Center 5-7-2003 Little Venice Water Quality Monitoring 2002 Annual Report Ronald Jones Southeast
More informationAQ8.1 NOTE that a fire permit is also required for all fires in rural areas (contact the Waimea rural fire authority)
guide to outdoor burning (rural) AQ8.1 NOTE that a fire permit is also required for all fires in rural areas (contact the Waimea rural fire authority) AQ8.2 Burning of vegetation, cardboard, paper and
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationWater Quality Trends for Patchogue Bay
Water Quality Trends for Patchogue Bay 2018 This report summarizes water quality data for fecal coliform and total coliform in Patchogue Bay for the years 2003-2017. Prepared by: Brian M. McCaffrey Stormwater
More informationThe Evolution of DFW Airport s Deicing Program Balancing Risks with Results MAY 20, 2015
Dallas/Fort Worth International Airport The Evolution of DFW Airport s Deicing Program Balancing Risks with Results MAY 20, 2015 DFW: Connecting The World The cities of Dallas and Fort Worth overcame politics
More informationCity and County of San Francisco
City and County of San Francisco Office of the Controller City Services Auditor RECREATION AND PARK DEPARTMENT: Concession Audit of Stow Lake Corporation March 3, 2009 CONTROLLER S OFFICE CITY SERVICES
More informationTHAT the 2016 Drinking Water Systems Summary Reports be received.
January 25, 2017 Page 1 of 9 Staff Report Meeting Date: January 25, 2017 Submitted by: Brian Lima Director, Public Works & Engineering Number: PWE-09-2017 Subject: 2016 Drinking Water Systems Summary Reports
More informationSERVICE INFORMATION NO. SI
Diamond Aircraft Industries GmbH N.A. Otto-Straße 5 A-2700 Wiener Neustadt Austria DAI SI 20-064 Page 1 of 1 17-Apr-2013 FT SERVICE INFORMATION NO. SI 20-064 NOTE: SI s are used only: 1) To distribute
More information