The date, site name, report author, report recipient, and report number are presented above.

Size: px
Start display at page:

Download "The date, site name, report author, report recipient, and report number are presented above."

Transcription

1 Engineering Management Support, Inc. Memorandum To: Jesse Aviles, EPA RPM, VB/I70 Superfund Site From: Timothy C. Shangraw Date: October 17, 2017 Re: POLREP #27 - Vasquez Boulevard/Interstate 70 (VB/I70) Superfund Site, Operable Unit 2, Removal Action ======================================================================= On behalf of the City and County of Denver (Respondent), Engineering Management Support, Inc. (EMSI) is submitting this Pollution Report (POLREP #27) in accordance with Section 4.c of Appendix C to the Administrative Settlement Agreement and Order on Consent for Removal Action, for the subject Superfund Site (the Site). This report follows the outline detailed in Section 4.c of Appendix C, and contains pertinent new information specified in the Superfund Removal Procedures, Removal Response Reporting: POLREP and On-Scene Coordinator (OSC) Reports (EPA, 1994). Section I Heading The date, site name, report author, report recipient, and report number are presented above. Section II Response Information This reporting period extended from September 1 through 30, 2017 during which time, the following activities occurred: Excavation of Regulated Asbestos-Contaminated Soils (RACS) and hauling to and disposing at the Denver Arapahoe Disposal Site (DADS); Excavation of non-regulated Asbestos-Contaminated Soils (non-racs) and stockpiling it for future use onsite or hauling to and disposing at DADS; Construction of the concrete box conduit, outlet wing walls, and open channel sidewall footings through the Coliseum Parking Lot (CPL); Pumping and treatment of groundwater from dewatering zones 1, 2, 3a, and 3b; Construction of the drop inlet structure and reinforced box conduits (RBCs) in dewatering zone 2 (beneath Delgany sanitary sewers); Construction of the lateral drain box in dewatering zone 3a; and On-site and off-site monitoring for air quality, dust, and odors. The volumes of RACS and non-racs excavated and managed, and the volumes of water pumped, treated, and returned to the South Platte River, are summarized in Table 1. On-site monitoring for volatile organic compounds (including methane), odor, and visible dust

2 Memorandum POLREP #27 VB/I70, OU2 removal Action October 17, 2017 Page 2 emissions occurred continuously during excavation and drilling activities. In addition, monitoring for airborne asbestos fibers proceeded in accordance with Section 5.5 of the Colorado Department of Public Health and Environment (CDPHE) Solid Waste Regulations. Due to their overall size, daily monitoring reports for volatile organic compounds, odor, dust, and asbestos are being submitted under separate cover. Off-Site monitoring by Denver for PM 10, airborne lead and arsenic at four locations within the monitoring boundary continued throughout the reporting period. Sampling from these stations occurred every sixth day throughout the month. Results were all below Occupational Safety and Health Administration 8-hour limits and National Ambient Air Quality Standards. Monthly monitoring report are posted on the Globeville Landing Outfall (GLO) project web site at: As part of the GLO project s Community Outreach program, a community hotline was operated. No complaints were received during the reporting period. The Community Advisory Group (CAG) held its seventh and eighth meetings on September 12 th and October 10 th, respectively. Meeting minutes are posted on the VB/I-70 Superfund Community Advisory Group web site. The next CAG meeting is scheduled for November 14 th. The following project meetings were held in September: Weekly GLO Project Status Meetings (September 7, 14, 21, and 28, 2017); and EPA monthly progress meeting (September 20, 2017). Lastly, a 3-week look-ahead Construction Schedule is attached to this POLREP. Section III Issues, Resolutions, and Planned Activities A Quality Assurance Audit was performed on Asbestos-Containing Soils Daily Reports (ACSRs) prepared by Kleinfelder during the month of August for consistency with Section 5.5 of Colorado s Solid Waste Regulations (CSWRs) and the Final Materials Management Plan (MMP) (EMSI, 2016). No deficiencies were noted. A copy of this Audit Report is attached to this POLREP. Monitoring of treated effluent from the GLO project continued during the reporting period in accordance with Discharge Permit Number CO All monitored parameters met discharge limits. The U.S.EPA and the Respondent have exchanged correspondence in agreement of updating the Remedial Investigation and Feasibility Study for the VB/I-70 Operable Unit 2 site. The agreement correspondence letters are attached to this report.

3 Memorandum POLREP #27 VB/I70, OU2 removal Action October 17, 2017 Page 3 Planned activities for the next reporting period consist of: Continued construction of the concrete box conduit, outlet wing walls, and open channel sidewall footings through the CPL; Grading and preparation of subgrade material for installation of the strengthening layer in the CPL; Continued installation of the inlet drop structure and RBC conduits in the GLP; Continued construction of lateral drain boxes in dewatering zone 3a; Continued dewatering in zones 1, 2, 3a and 3b; and Continued on-site and off-site monitoring of air quality. To maintain effective and transparent communication during GLO implementation, EPA and CDPHE personnel are invited to participate in weekly coordination meetings at Kiewit s RiNo office. The next EPA Monthly Status meeting will be held on October 18 th at 9:00 in the Webb building. Please call Jennifer Luthi ( ) or me ( ) if you have any questions. Attachments: September 2017 Summary of GLO Construction Activities 3-Week Look-Ahead Schedule QA Audit Report #5

4 Table 1: Summary Construction Report for September 2017 Current Month QTY QTY to date Comments EXCAVATION/HAULING # of days Excavation occurred Globeville park 6 76 # of days Excavation occurred Municipal Landfill 31 Volume of Racs Excavated (CY) 5,950 75,359 From Globeville Park and Coliseum Parking lot Volume of Racs hauled to DADS (CY) 5,950 75,359 From Globeville Park and Coliseum Parking lot Volume of Non-Racs Excavated (CY) 58,577 Volume of Non-Racs stockpiled onsite (CY) 12,606 Claystone from drop inlet stockpiled for reuse Volume of Non-Racs hauled to DADS (CY) 45,971 Volume Hauled to Clean Harbors (CY) 0 GROUT AND STONE COLUMNS number of grout columns installed this month 0 1,091 All Stone and Grout columns are complete Grout column SPT testing results 0 0 All Stone and Grout columns are complete number of stone columns installed per month All Stone and Grout columns are complete stone column test results 0 0 All Stone and Grout columns are complete REMEDIATION DEWATERING AND TREATMENT LF of underdrain/wick wells installed 600 Volume of water transported and treated at MFEI 2,436,900 20,180,375 Volume of treated water, including dilution, discharged to S. Platte 2,359,468 20,596,404 Analytical results 0 AUGUST DMR submitted CONSTRUCITION DEWATERING status of permit compliance LINER INSTALLATION % complete during the month N/A QC/QA testing results N/A Issues and Resolutions N/A MODCP RESULTS Daily Methane, Odor, and Dust monitoring reports Issues and Resolutions COMMUNITY OUTREACH Summary of Calls to hotline Issues and Resolutions

5 Globeville Phase 1A Schedule Title Current Week Phase 1A 3 week schedule Monday, October 02, 2017 Item Activity Description Work performed by Start Finish Shift Current Forecast Forecast Forecast Comments 10/02 10/02 10/03 10/03 10/04 10/04 10/05 10/05 10/06 10/06 10/07 10/07 10/08 10/08 10/09 10/09 10/10 10/10 10/11 10/11 10/12 10/12 10/13 10/13 10/14 10/14 10/15 10/15 10/16 10/16 10/17 10/17 10/18 10/18 10/19 10/19 10/20 10/20 10/21 10/21 10/22 10/22 10/23 10/23 10/24 10/24 10/25 10/25 10/26 10/26 10/27 10/27 10/28 10/28 10/29 10/29 M T W T F Sa Su M T W T F Sa Su M T W T F Sa Su M T W T F Sa Su 1 2 EARTHWORK (Excavation) 3 Over-Exc RACS Landscape Area Outfall ESA 09/25/17 10/05/17 day 4 Haul off RACS South of Arkins ESA 10/12/17 10/13/17 day 5 Channel Exc in Globeville Park (plug) ESA 10/06/17 10/11/17 day 6 Over-Exc Northside of landfill ESA 10/16/17 10/18/17 day 7 Locate/clean Stone columns Ames 10/09/17 10/27/17 day Install UV piping under N. Lateral Drain Box Ames 8 EARTHWORK (Backfill) 9 Rubblize Coliseum Parking lot (Southside) Ames 10/17/17 10/18/17 day 10 Place Fill (phase 2) coliseum parking lot Ames 10/04/17 10/11/17 day Place Fill (import) coliseum parking lot Ames 10/11/17 10/20/17 day 11 Backfill Coliseum conduit and Transition # 1 Ames 09/25/17 10/13/17 day 12 Embankment Transtion # 1 (phase 1 stockpile) Ames 10/05/17 10/13/17 day DROP INLET 15 F/R/P Deck With orific plates Ames 10/12/17 10/27/17 day DROP OUTLET 18 Excavate Drop Outlet CIP and Wing walls Ames 10/07/17 10/09/17 day 19 F/R/P Drop Outlet Wing wall Footings Ames 10/09/17 10/20/17 day 20 F/R/P Drop outlet CIP Box floor Ames 10/23/17 10/27/17 day S. LATERAL DRAIN BOX 24 F/R/P S. lateral Wall pour # 3 Ames 09/24/17 10/04/17 day 25 F/R/P S. lateral wall pour # 5 Ames 09/24/17 10/04/17 day 26 F/R/P S. lateral wall pour # 4 Ames 10/05/17 10/13/17 day 27 F/R/P S. lateral wall pour # 6 Ames 10/05/17 10/13/17 day EAST PARK WALL 31 F/R/P East park Wall Footing Section 4 Ames 09/27/17 10/06/17 day 32 F/R/P East park Wall Footing Section 5 Ames 09/29/17 10/11/17 day 33 F/R/P East park Wall Footing Section 6 Ames 10/02/17 10/06/17 day 34 F/R/P East Park wall section 4 Ames 10/06/17 10/12/17 day 35 F/R/P East Park wall section 6 Ames 10/06/17 10/12/17 day 36 F/R/P East Park wall section 5 Ames 10/13/17 10/19/17 day COLISEUM CONDUIT OUTLET

6 Globeville Phase 1A Schedule Title Current Week Phase 1A 3 week schedule Monday, October 02, 2017 Item Activity Description Work performed by Start Finish Shift Current Forecast Forecast Forecast Comments 10/02 10/02 10/03 10/03 10/04 10/04 10/05 10/05 10/06 10/06 10/07 10/07 10/08 10/08 10/09 10/09 10/10 10/10 10/11 10/11 10/12 10/12 10/13 10/13 10/14 10/14 10/15 10/15 10/16 10/16 10/17 10/17 10/18 10/18 10/19 10/19 10/20 10/20 10/21 10/21 10/22 10/22 10/23 10/23 10/24 10/24 10/25 10/25 10/26 10/26 10/27 10/27 10/28 10/28 10/29 10/29 M T W T F Sa Su M T W T F Sa Su M T W T F Sa Su M T W T F Sa Su 40 F/R/P Conduit Transition walls Ames 08/30/17 10/06/17 day 41 F/R/P Conduit Transition Deck Ames 10/09/17 10/20/17 day 42 headwall Ames 10/23/17 10/27/17 day N. Coliseum Wall 46 Locate/clean Stone columns Ames 10/05/17 10/09/17 day 47 Finegrade/prep for wall footings Ames 10/10/17 10/13/17 day 48 F/R/P N. Colisuem Footing Ames 10/16/17 10/27/17 day S. Coliseum Wall 52 Locate/clean Stone columns Ames 10/09/17 10/11/17 day 53 Finegrade/prep for wall footings Ames 10/12/17 10/14/17 day 54 F/R/P N. Colisuem Footing Ames 10/16/17 10/27/17 day

7 Engineering Management Support, Inc. QA Audit Report #5 To: From: cc: Matt Ceresa, Kiewit, Tim Shangraw, EMSI Jennifer Luthi, DEH; Steve Gonzales, DEH; Bret Banwart (DPW); Brian McLaren (DPW); and Patrick Riley (DPW) Date: October 9, 2017 Re: Audit of Kleinfelder CABI Notes, August 2017, Globeville Landing Outfall Project Representatives from Engineering Management Support, Inc. (EMSI) reviewed Asbestos- Containing Soils Daily Reports (ACSRs) prepared by Kleinfelder during the month of August 2017 for consistency with Section 5.5 of Colorado s Solid Waste Regulations (CSWRs) and the Final Materials Management Plan (MMP) (EMSI, 2016). Documentation of the review is presented in the attached summary table. AUDIT FINDINGS Quality Control continues to be implemented well. As shown in the attached table, all audited parameters complied with Section 5.5 of the CSWRs and the MMP. ACTION REQUIRED No corrective action is required. Denver and EMSI will continue to monitor Ames/Kleinfelder s implementation of agreed-to reporting procedures and identify any area(s) in need of improvement during weekly progress meetings and if necessary, in subsequent QA Audit Reports. Page 1

8 Aug 1st-Aug31st QA of CABI daily logs per Colorado Regulation L (Documentation) and Final Materials Management Plan Page 1 1C 1A 1B 1D Personnel Date Grid Grid Site Description Description Description of Description Description Friability per CABI diagram description of site of equipment hand removals of types of suspect of ACMs Notes agree w including activities use including of debris materials discussed CABI location locations Lanaia Carveth 8/1/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/1/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/2/17 yes yes yes yes yes yes yes yes yes Mitchell Reese 8/2/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/3/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/3/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/4/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/4/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/5/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/7/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/8/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/8/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/9/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/9/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/10/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/10/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/11/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/11/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/12/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/14/17 yes yes yes yes yes yes yes yes yes Billy Godby 8/14/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/15/17 yes yes yes yes yes yes yes yes yes Billy Godby 8/15/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/16/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/16/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/17/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/17/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/18/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/18/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/19/17 yes yes yes yes yes yes yes yes yes

9 1C 1A 1B 1D Personnel Date Grid Grid Site Description Description Description of Description Description Friability per CABI diagram description of site of equipment hand removals of types of suspect of ACMs Notes agree w including activities use including of debris materials discussed CABI location locations Lanaia Carveth 8/21/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/21/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/22/17 yes yes yes yes yes yes yes yes yes Billy Godby 8/22/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/23/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/23/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/24/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/25/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/26/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/28/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/28/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/29/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/30/17 yes yes yes yes yes yes yes yes yes Tyler Godby 8/30/17 yes yes yes yes yes yes yes yes yes Lanaia Carveth 8/31/17 yes yes yes yes yes yes yes yes yes Notes: 1) NVE = no visible emissions observed 2) in the table "yes" designates that documentation was completed

10 Aug 1st-Aug31st QA of CABI daily logs per Colorado Regulation L (Documentation) and Final Materials Management Plan Page 2 2A and 2B 4 5B 1E 1F Personnel Date Bulk sampling Decontamination Spill Observations Observations Observations Photo-log / documentation visual inspection response of visible of non-earthen of other description and clearance activities emissions / material / indicators of Reponses commented soil impact Lanaia Carveth 8/1/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/1/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/2/17 Not conducted yes No spills NVE yes yes yes Mitchell Reese 8/2/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/3/17 yes yes No spills NVE yes yes yes Tyler Godby 8/3/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/4/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/4/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/5/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/7/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/8/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/8/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/9/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/9/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/10/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/10/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/11/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/11/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/12/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/14/17 Not conducted yes No spills NVE yes yes yes Billy Godby 8/14/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/14/17 Not conducted yes No spills NVE yes yes yes Billy Godby 8/15/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/16/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/16/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/17/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/17/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/18/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/18/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/19/17 Not conducted yes No spills NVE yes yes yes

11 2A and 2B 4 5B 1E 1F Personnel Date Bulk sampling Decontamination Spill Observations Observations Observations Photo-log / documentation visual inspection response of visible of non-earthen of other description and clearance activities emissions / material / indicators of Reponses commented soil impact Lanaia Carveth 8/21/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/21/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/22/17 Not conducted yes No spills NVE yes yes yes Billy Godby 8/22/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/23/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/23/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/24/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/25/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/26/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/28/17 yes yes No spills NVE yes yes yes Tyler Godby 8/28/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/29/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/30/17 Not conducted yes No spills NVE yes yes yes Tyler Godby 8/30/17 Not conducted yes No spills NVE yes yes yes Lanaia Carveth 8/31/17 Not conducted yes No spills NVE yes yes yes

The date, site name, report author, report recipient, and report number are presented above.

The date, site name, report author, report recipient, and report number are presented above. Engineering Management Support, Inc. Memorandum To: Dania Zinner, EPA RPM, VB/I70 Superfund Site From: Timothy C. Shangraw Date: August 16, 2017 Re: POLREP #25 - Vasquez Boulevard/Interstate 70 (VB/I70)

More information

The date, site name, report author, report recipient, and report number are presented above.

The date, site name, report author, report recipient, and report number are presented above. Engineering Management Support, Inc. Memorandum To: Jesse Aviles, EPA RPM, VB/I70 Superfund Site From: Timothy C. Shangraw Date: November 21, 2017 Re: POLREP #28 - Vasquez Boulevard/Interstate 70 (VB/I70)

More information

List of Environmental Reports and Documents Regarding Hazardous Materials. August 10, 2017

List of Environmental Reports and Documents Regarding Hazardous Materials. August 10, 2017 List of Environmental Reports and Documents Regarding Hazardous Materials August 10, 2017 Pier 70 1999 Annual Ground Water Monitoring Report for Piers 70 and 94, Tetra Tech, Inc., February 2000. 1999 Annual

More information

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description: ES-301-1.06 Aircraft Deicing Document Identification Number ES-301-1.06 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: Aircraft deicing is the application of aircraft deicing

More information

Cruise Industry Perspective on OWS and Waste Management

Cruise Industry Perspective on OWS and Waste Management Cruise Industry Perspective on OWS and Waste Management MAX1 OWS Studies Conference Wilmington, NC, 24 June 2015 James R. Van Langen, P.E. Environmental, Safety, Quality & Sustainability Consultant Cruise

More information

PCBS DELINEATION WORK PLAN

PCBS DELINEATION WORK PLAN PCBS DELINEATION WORK PLAN BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK (FORMER BLUE ISLAND LANDFILL) BLUE ISLAND, COOK COUNTY, ILLINOIS PREPARED FOR: CITY OF BLUE ISLAND 13051 SOUTH GREENWOOD AVENUE

More information

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form Form Vessel General Permit Compliance Instructions: (1) This form must be completed at least once every 12 months. Visually inspect all areas of the vessel affected by the requirements in the VGP that

More information

Alternative Daily Cover Evaluation

Alternative Daily Cover Evaluation Alternative Daily Cover Evaluation ADEQ Permit No. 0198-S1-R2 AFIN 01-00117 PREPARED FOR: EMS 1784 Highway One North Wynne, AR 72396 PREPARED BY: Fields & Associates, LLC 75 Norfork Drive Maumelle, Arkansas

More information

Permittees under Sector S are primarily engaged in the following types of activities:

Permittees under Sector S are primarily engaged in the following types of activities: S. Air Transportation 1. Authorized Stormwater Discharges The requirements in Sector S apply to stormwater discharges associated with industrial activity from air transportation facilities as identified

More information

FORMER PLUM BROOK ORDNANCE WORKS Sandusky, Ohio (Currently NASA Plum Brook Station)

FORMER PLUM BROOK ORDNANCE WORKS Sandusky, Ohio (Currently NASA Plum Brook Station) TM FORMER PLUM BROOK ORDNANCE WORKS Sandusky, Ohio (Currently NASA Plum Brook Station) Monthly Fact Sheet SITE DESCRIPTION - PBOW is located approximately 4 miles south of Sandusky, Ohio, and 59 miles

More information

FIGURES. Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City. CSI Job No C

FIGURES. Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City. CSI Job No C FIGURES Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City CSI Job No. 9680.33 C INFERRED EXTENT OF ARSENIC IMPACTED SOIL C.A. No. 262 Additional Soil Assessment Activities 607, 609,

More information

Mather Restoration Advisory Board (RAB) Meeting Draft Summary Meeting Minutes. Mather, California. 11 March 2009

Mather Restoration Advisory Board (RAB) Meeting Draft Summary Meeting Minutes. Mather, California. 11 March 2009 Mather Restoration Advisory Board (RAB) Meeting Draft Summary Meeting Minutes 11 March 2009 Time: Place: 6:00 PM Air Force Real Property Agency (AFRPA) Conference Room 10503 Armstrong Avenue Mather, CA

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

MINUTES NAVAL WEAPONS STATION (NAVWPNSTA) SEAL BEACH RESTORATION ADVISORY BOARD (RAB) AND COMMUNITY MEETING March 8, 2005

MINUTES NAVAL WEAPONS STATION (NAVWPNSTA) SEAL BEACH RESTORATION ADVISORY BOARD (RAB) AND COMMUNITY MEETING March 8, 2005 MINUTES NAVAL WEAPONS STATION (NAVWPNSTA) SEAL BEACH RESTORATION ADVISORY BOARD (RAB) AND COMMUNITY MEETING March 8, 2005 Participants: Blake, Geoffrey Carmody, Jack Chauvel, Tim / Department of Toxic

More information

AIR MONITORING REPORT

AIR MONITORING REPORT AIR MONITORING REPORT Boiler Room; Basement Pipe Chase Cleveland Middle School 1000 Walsh Street St. Paul, MN 55106 April 10 14, 2006 Nova Client No.: STPAU006/Project No: H06-0865 AIR MONITORING REPORT

More information

IESI Bethlehem Landfill Committee Meeting Minutes

IESI Bethlehem Landfill Committee Meeting Minutes IESI Bethlehem Landfill Committee Meeting Minutes Date: Thursday, February 15, 2018 Time: 1:10 p.m. Location: Lower Saucon Township Council Meeting Room Attendance: Hanover Engineering: Chris Taylor; Exelon:

More information

Memorandum City of Lawrence Public Works

Memorandum City of Lawrence Public Works Memorandum City of Lawrence Public Works TO: Diane Stoddard, Interim City Manager FROM: Charles F. Soules, Director of Public Works CC: Casey Toomay, Toni Wheeler, Bryan Kidney DATE: January 26, 2016 RE:

More information

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan INTERNAL AUDIT DIVISION REPORT 2014/065 Audit of air operations in the United Nations Assistance Mission in Afghanistan Overall results relating to the effective management of air operations in the United

More information

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. April 23, 2008

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. April 23, 2008 ANNUAL REPORT DALLAS LOVE FIELD AIRPORT April 23, 2008 I. INTRODUCTION On August 14, 2006, the Texas Commission on Environmental Quality (TCEQ) signed and published the final version of the Texas Pollutant

More information

July 31, Comments re Environmental Impact Statement & License Application For Deep Geologic Repository Project

July 31, Comments re Environmental Impact Statement & License Application For Deep Geologic Repository Project July 31, 2012 Attention: Debra Myles, Panel Co-Manager c/o Canadian Environmental Assessment Agency 160 Elgin Street, 22nd Floor Ottawa ON K1A 0H3 Kelly McGee, Panel Co-Manager c/o Canadian Nuclear Safety

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

AMS Gas Vapor Probe Systems (GVP)

AMS Gas Vapor Probe Systems (GVP) AMS Gas Vapor Probe Systems (GVP) AMS GVP systems are equipped with two different styles of 5/8in OD extensions: solid tile probe extensions, and hollow GVP rods. Extendable tile probe extensions are solid

More information

Drinking Water and Waste Management Among Members of the Temagami Lakes Association July 2014 Page 0

Drinking Water and Waste Management Among Members of the Temagami Lakes Association July 2014 Page 0 Drinking Water and Waste Management Among Members of the Temagami Lakes Association July 2014 Page 0 Acknowledgements The Timiskaming Health Unit would like to thank the following individuals for their

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

City and County of San Francisco

City and County of San Francisco City and County of San Francisco Office of the Controller City Services Auditor RECREATION AND PARK DEPARTMENT: Concession Audit of Stow Lake Corporation March 3, 2009 CONTROLLER S OFFICE CITY SERVICES

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates

Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates Glebe Heights and Loch Haven Community Outreach Meeting South River High School May 17, 2016 Agenda Mayo

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 15, 2016 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0328985 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

Chapter 12 Protective Clothing

Chapter 12 Protective Clothing Protective Clothing General Information Protective clothing is worn during inspections of active asbestos removal projects to prevent asbestos exposure, reduce skin irritation, ease decontamination and

More information

Sample Estimate Reports Estimate Reports were created in XL-Pro Software

Sample Estimate Reports Estimate Reports were created in XL-Pro Software Sample Estimate Reports Estimating Pro Software Estimate Reports were created in XL-Pro Software / TIME EQUIP.. COST* AMOUNT - 1 GENERAL REQUIREMENTS 1.00 LSUM - INSURANCE - general liability 1.00 lsum

More information

Gatwick Airport Limited. Response to Airports Commission Consultation. Appendix. Helistrat - Place: Waste Report

Gatwick Airport Limited. Response to Airports Commission Consultation. Appendix. Helistrat - Place: Waste Report Gatwick Airport Limited Response to Airports Commission Consultation Appendix 19 Helistrat - Place: Waste Report Technical Report in Response to Airports Commission Consultation Module 10: Place (Waste

More information

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new

More information

FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010

FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010 FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010 Shoreline Hot Spot Area Central Portion - View North October 2009 This fact sheet provides information about

More information

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016 CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM 2015 WATER QUALITY MONITORING REPORT CITY OF LYNDEN 300 4 TH STREET LYNDEN, WASHINGTON 98264 PHONE (360) 354-3446 MARCH 1, 2016 This document serves as an attachment

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH April 2018

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH April 2018 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2018 12 April 2018 Key Points* ly sales increased 16% to 1.0 million wet metric tonnes (Mwmt), for ore sales revenue of $60 million

More information

City and County of San Francisco

City and County of San Francisco City and County of San Francisco Office of the Controller City Services Auditor AIRPORT COMMISSION: Asiana Airlines Paid All Landing Fees Due but Incurred $12,846 in Late Charges for 2010 Through 2012

More information

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 CENAN-PP-H 9 Oct 12 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 1. The regularly scheduled monthly interagency coordination meeting was held on 9 Oct

More information

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. March 14, 2006

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. March 14, 2006 ANNUAL REPORT DALLAS LOVE FIELD AIRPORT March 14, 2006 I. INTRODUCTION On August 20, 2001, the Texas Commission on Environmental Quality (TCEQ) signed and published the final version of the Texas Pollutant

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form 20190120 Legistar File ID 3/5/2019 City Council Meeting Date Agenda Item Only N/A for NonAgenda Item Tim Nyander 2/13/2019 WATER SEWER (720) Submitted By Submitted

More information

NINTH ORDINARY MEETING OF THE OSC 9/8/3 RAC/REMPEITC-Caribe STEERING COMMITTEE 31 May 2018

NINTH ORDINARY MEETING OF THE OSC 9/8/3 RAC/REMPEITC-Caribe STEERING COMMITTEE 31 May 2018 REGIONAL ACTIVITY CENTRE /REGIONAL MARINE POLLUTION EMERGENCY, INFORMATION AND TRAINING CENTRE - WIDER CARIBBEAN REGION NINTH ORDINARY MEETING OF THE OSC 9/8/3 RAC/REMPEITC-Caribe STEERING COMMITTEE 31

More information

DEVILS LAKE MUNICIPAL AIRPORT AERIAL APPLICATOR OPERATING PERMIT

DEVILS LAKE MUNICIPAL AIRPORT AERIAL APPLICATOR OPERATING PERMIT 1 DEVILS LAKE MUNICIPAL AIRPORT AERIAL APPLICATOR OPERATING PERMIT PURPOSE In order for all aerial applicators who use the Devils Lake Municipal Airport to operate under the same rules and procedures,

More information

CA AUGUST 2018 Page 1 of 5

CA AUGUST 2018 Page 1 of 5 AVIATION ENVIRONMENTAL PROTECTION, AVIATION INFRASTRUCTURE Form Number: CA 139-12 Section/department/division Telephone number: 011-545-1000 Fax Number: 011 545 1455 Physical address Ikhaya Lokundiza,

More information

ADEQ - Water Division Spill/Incident Report

ADEQ - Water Division Spill/Incident Report ADEQ - Water Division Spill/Incident Report ADEQ Incident #: 14-0135 NRC #: County: Pulaski PDS # 016774 Date and Time of Incident: 03/07/2014 @ 23:00 Date & Time Reported: 03/08/2014 @ 07:09 Responsible

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form Matt Mihalevich 1/16/2019 DEVELOPMENT SERVICES (620) Submitted By 2019 0050 Legistar File ID February 5th, 2019 City Council Meeting Date Agenda Item Only N/A for

More information

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2 EIA for Development of New Civil Enclave at Air Force Base at Bamrauli, Allahabad, Uttar Pradesh Public Hearing Details Annexure 2 Details of Public Hearing for Development of New Civil Enclave at Air

More information

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc.

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc. 2018 2018 Goldwedge Mines Inc. Licence of Occupation Management Plan Photo: xxxx Goldwedge Mines Inc. March 2018 TABLE OF CONTENTS TABLE OF CONTENTS... i Figures... i 1. Background... 2 Project Overview...

More information

Some Historical Aspects of Urban Water Systems

Some Historical Aspects of Urban Water Systems Some Historical Aspects of Urban Water Systems Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL 35487 Ancient springs at Delphi, Greece (site of Oracle)

More information

M E M O R A N D U M. Status of the Environmental Cleanup of the Shipyard

M E M O R A N D U M. Status of the Environmental Cleanup of the Shipyard ECONOMIC AND WORKFORCE DEVELOPMENT MICHAEL COHEN, DIRECTOR CITY AND COUNTY OF SAN FRANCISCO GAVIN NEWSOM, MAYOR M E M O R A N D U M TO: Members of the Health Commission FROM: Michael Cohen CC: Mitch Katz,

More information

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C. Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final

More information

Part I Approval of Dangerous Goods Training Programs Checklist. Date 17 FEB 2017 Issue 00 Page 1 of 12 Form / CAAT-DGD-310

Part I Approval of Dangerous Goods Training Programs Checklist. Date 17 FEB 2017 Issue 00 Page 1 of 12 Form / CAAT-DGD-310 Name of Operator Title of training program Prior Approval Number /Date issued (If applicable) Coordinator Name: Coordinator Name Name of operator Title of training Type of submission Initial Submission

More information

Plans and Design Calculations for the Alder Creek Diversion Fish Screen

Plans and Design Calculations for the Alder Creek Diversion Fish Screen TECHNICAL MEMORANDUM Plans and Design Calculations for the Alder Creek Diversion Fish Screen El Dorado Irrigation District 2890 Mosquito Road Placerville, CA 95667 Alder Creek Diversion Fish Screen Plans

More information

Approval of Dangerous Goods Training Programs Checklist Part I Part I Approval of Dangerous Goods Training Programs Checklist

Approval of Dangerous Goods Training Programs Checklist Part I Part I Approval of Dangerous Goods Training Programs Checklist Name of Operator Title of training program Prior Approval Number /Date issued (If applicable) Name of operator Title of training Type of submission Initial Submission Amendment Type of program Initial

More information

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION

More information

Official Journal of the European Union L 7/3

Official Journal of the European Union L 7/3 12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far

More information

Portland Water District Sebago Lake Monitoring Programs Lower Bay Bacteria Monitoring Presenting data from 1977 to 2018 Laurel Jackson

Portland Water District Sebago Lake Monitoring Programs Lower Bay Bacteria Monitoring Presenting data from 1977 to 2018 Laurel Jackson Portland Water District Sebago Lake Monitoring Programs Lower Bay Bacteria Monitoring Presenting data from 1977 to 2018 Laurel Jackson Introduction Sebago Lake is the primary drinking water supply for

More information

Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular

Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular Subject: TECHNICAL GUIDANCE MATERIAL FOR RESCUE & FIRE FIGHTING SERVICES Date: 27 JULY 2011 APPLICABILITY: 1.

More information

TIMELINE - FISHER S DEFICIENCIES AND BREACH OF CONTRACT

TIMELINE - FISHER S DEFICIENCIES AND BREACH OF CONTRACT DATE DEFICIENCY/BREACH/COMPLAINT NOTIFICATION 8-22-2016 Breach of Exclusivity Fisher Construction, Inc. ( Fisher ) breached its contractual commitment to work exclusively with Veolia, by working on behalf

More information

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance

More information

1 JAR-OPS 1 AND 3 SUB-PARTS K AND L COMPLIANCE DOCUMENT

1 JAR-OPS 1 AND 3 SUB-PARTS K AND L COMPLIANCE DOCUMENT SAFETY REGULATION FLIGHT OPERATIONS FLIGHT OPERATIONS DIRECTIVES 7/2011 Applicability: All Aeroplane and Helicopter AOC Holders 1 JAR-OPS 1 AND 3 SUB-PARTS K AND L COMPLIANCE DOCUMENT 1.1 Background 1.1.1

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Hydro-Electric Schemes Compliance Report June June 2013

Hydro-Electric Schemes Compliance Report June June 2013 File Reference: 4.00212 Significance of Decision: Receives Only - No Decisions Report To: Operations, Monitoring and Regulation Committee Meeting Date: 20 June 2013 Report From: Nick Zaman, Pollution Prevention

More information

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 141 CAA Consolidation 10 March 2017 Aviation Training Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 141 prescribes rules governing the certification

More information

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations Page 1 of 5 Title Maintain safety standards on the apron area of an airport Level 4 Credits 4 Purpose People credited with this unit standard are able to, on the apron area of an airport: identify and

More information

Seychelles Civil Aviation Authority. EU-OPS 1 and JAR-OPS 3 Subpart K and L Compliance Document

Seychelles Civil Aviation Authority. EU-OPS 1 and JAR-OPS 3 Subpart K and L Compliance Document Seychelles Civil Aviation Authority Safety Notice SAFETY NOTICE Number: OPS SN- 2014/13 Issued: 8 August 2014 EU-OPS 1 and JAR-OPS 3 Subpart K and L Compliance Document This Safety Notice contains recommendations

More information

Airworthiness Standards Department CAMO Approval Process Form. S/N Activity Started Completed Initial Remarks*

Airworthiness Standards Department CAMO Approval Process Form. S/N Activity Started Completed Initial Remarks* I Initial Enquiry (a) letter of intent (b) Liaise with the applicant and seek additional information or clarification as may be required (c) Applicant orientation to review the applicable regulations,

More information

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules Subpart B Certification Requirements 175.51 Personnel Requirements (a) Each applicant for the grant of an aeronautical information service certificate shall engage, employ or contract: (1) a senior person

More information

JUSTIN JONES CURRICULUM VITAE

JUSTIN JONES CURRICULUM VITAE JUSTIN JONES CURRICULUM VITAE ADDRESS: PO Box 499 PROSPECT TAS 7250 TELEPHONE: Mobile 0418 311 033 EMAIL ADDRESS: justin@justwaste.com.au www.justwaste.com.au LICENCES: Heavy Combination; Forklift; Wheel

More information

Welcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority

Welcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority Massachusetts Water Resources Authority Presentation to the Environmental

More information

Requirements for acceptance of operations in Volcanic Ash Zone 2

Requirements for acceptance of operations in Volcanic Ash Zone 2 FLUGMÁLASTJÓRN ÍSLANDS Skógarhlíð 12 105 Reykjavík Requirements for acceptance of operations in Volcanic Ash Zone 2 Applicability - All Icelandic operators with EU-OPS AOC with turbine powered aeroplanes

More information

RE: Complaint Investigation at the Tankersley Food Warehouse

RE: Complaint Investigation at the Tankersley Food Warehouse July 24, 2009 Mr. Thomas Moon, Vice President of Operations Tankersley Food Service 3203 Industrial Park Road Van Buren, AR 72956 RE: Complaint Investigation at the Tankersley Food Warehouse Dear Mr. Moon:

More information

FECAL COLIFORM MONITORING IN GRAYS HARBOR COUNTY: SUMMARY REPORT OF MONITORING RESULTS FOR

FECAL COLIFORM MONITORING IN GRAYS HARBOR COUNTY: SUMMARY REPORT OF MONITORING RESULTS FOR Chehalis Basin Partnership Fecal Coliform Monitoring in Grays Harbor County: Summary Report of Monitoring Results for 2000-2003 Draft June 30, 2003 Prepared by Tetra Tech/KCM, Inc. 1917 First Avenue, Seattle,

More information

Review of air navigation matters 2.3 Air navigation specific activities: Aerodromes and Ground Aids (AGA)

Review of air navigation matters 2.3 Air navigation specific activities: Aerodromes and Ground Aids (AGA) C/CAR WG/7 - WP/08 International Civil Aviation Organization 16/06/09 Revised North American, Central American and Caribbean Office (NACC) Seventh Central Caribbean Working Group Meeting (C/CAR WG/7) Mexico

More information

Contents. Part 26 Amendments 6. Subpart A General Purpose... 6

Contents. Part 26 Amendments 6. Subpart A General Purpose... 6 Contents Rule objective... 3 Extent of consultation... 3 New Zealand Transport Strategy... 4 Summary of submissions... 5 Examination of submissions... 5 Insertion of Amendments... 5 Effective date of rule...

More information

The rezoning application is recommended for consideration of approval.

The rezoning application is recommended for consideration of approval. Date: November 26, 2012 To: From: Chairperson and Members Planning and Housing Committee Ken O Brien, MCIP Manager of Planning & Information Cliff Johnston, MCIP Director of Planning Re: Department of

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

North Ridge Superfund site Legacy of Asbestos

North Ridge Superfund site Legacy of Asbestos North Ridge Superfund site Legacy of Asbestos By LACEY JARRELL H&N Staff Reporter Jul 17, 2016 (3) H&N photo by Kevin N. Hume ABOVE: Richard and Susan Gibson stand in the front yard of their home in the

More information

NZQA registered unit standard version 2 Page 1 of 9. Demonstrate flying skills for an airline transport pilot licence (aeroplane)

NZQA registered unit standard version 2 Page 1 of 9. Demonstrate flying skills for an airline transport pilot licence (aeroplane) Page 1 of 9 Title Demonstrate flying skills for an airline transport pilot licence (aeroplane) Level 6 Credits 35 Purpose People credited with this unit standard are able, for an airline transport pilot

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

Waukegan Public Library Reference Document Repository Catalogue

Waukegan Public Library Reference Document Repository Catalogue City of Waukegan and Area of Concern (AOC) Waukegan Properties near Lake Michigan Schedule of Property Records and plot plan, properties along Lake Michigan in Waukegan Waukegan Properties near Lake Michigan

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

HOSE ASSEMBLY CLEANLINESS

HOSE ASSEMBLY CLEANLINESS November 18, 2002 HOSE ASSEMBLY CLEANLINESS Preface Hydraulic system cleanliness is a term used to describe the level of solid and liquid contamination found in hydraulic systems. Contamination may be

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

Review administrative work required to accept a new SIU Work with other municipality Work with regional planning commission

Review administrative work required to accept a new SIU Work with other municipality Work with regional planning commission Review administrative work required to accept a new SIU Work with other municipality Work with regional planning commission Work with outside design engineer Mutual private/public inspections Coordinate

More information

San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project

San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized

More information

HARBOR BRIDGE PROJECT COMMUNITY ADVISORY BOARD MEETING MINUTES April 5, 2018

HARBOR BRIDGE PROJECT COMMUNITY ADVISORY BOARD MEETING MINUTES April 5, 2018 HARBOR BRIDGE PROJECT COMMUNITY ADVISORY BOARD MEETING MINUTES April 5, 2018 The following notes are the Texas Department of Transportation s (TxDOT) summary of the meeting and are not designed to be an

More information

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety Vancouver Airport Authority Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety - 2017 CSMP Contractor Expectations - 2017 i Contents Contents Contents Introduction ii

More information

The meeting began at 7:30 AM.

The meeting began at 7:30 AM. The meeting began at 7:30 AM. Bob Haag: This month we will be discussing Barry Riddle s suggestion that the committee should think about performing in situ remediation at the Cabinets site, and we want

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation

More information

Effluent Guidelines for Airport Deicing Discharges

Effluent Guidelines for Airport Deicing Discharges Effluent Guidelines for Airport Deicing Discharges Airports Council International and Airlines for America s Deicing Management Conference May 23, 2012 ELG Background Effluent limitations guidelines and

More information

PROPOSED JANUARY, 2017

PROPOSED JANUARY, 2017 PROPOSED JANUARY, 2017 TARGETED OPENING MAY, 2018 APROVAL PROCESS THE CITY WILL CONFIRM CONSISTENCY WITH MASTER PLAN AND EIR The SeaWorld Master Plan Update was approved by the California Coastal

More information

American Eagle Ground Deicing Manual

American Eagle Ground Deicing Manual G. AMERICAN EAGLE DEICING AUDIT This audit form is to be utilized when accomplishing an audit of station facilities, equipment, personnel, manuals, etc. in accordance with the American Eagle Ground Deicing

More information

Scottish Police Authority Board. Meeting. Date and Time 30 August 2018 Maryhill Burgh Hall, Glasgow

Scottish Police Authority Board. Meeting. Date and Time 30 August 2018 Maryhill Burgh Hall, Glasgow Agenda item 14.1 Meeting Scottish Police Authority Board Meeting Date and Time Location Maryhill Burgh Hall, Glasgow Title of Paper Report by SPA Interim Chief Officer Reference B 07.2018/44 Presented

More information

Monash University Procedure. Cooling Tower Management Procedure. PROCEDURE STATEMENT

Monash University Procedure. Cooling Tower Management Procedure. PROCEDURE STATEMENT Procedure Title Parent Policy Cooling Tower Management Procedure n/a Date Effective June 2014 Review Date June 2017 Procedure Owner Category Manager, OH&S Operational Version Number 1.1 Content Enquiries

More information

San Bernardino International Airport Authority Building 795

San Bernardino International Airport Authority Building 795 San Bernardino International Airport Authority Building 795 Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized representative of, (Company) I (Name

More information

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy NOTICE N 8000.353 SUBJ: Revised Guidance for Authorizing the Use of Electronic Flight Bags, Issuance of A061, Electronic

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 SEPTEMBER 4 TH - SEPTEMBER 8 T H Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

TCAA-AC-AWS007C. March 2013 CERTIFICATION OF A FOREIGN APPPOVED MAINTENANCE ORGANISATION (AMO) 1.0 PURPOSE

TCAA-AC-AWS007C. March 2013 CERTIFICATION OF A FOREIGN APPPOVED MAINTENANCE ORGANISATION (AMO) 1.0 PURPOSE Advisory Circular TCAA-AC-AWS007C March 2013 CERTIFICATION OF A FOREIGN APPPOVED MAINTENANCE ORGANISATION (AMO) 1.0 PURPOSE This Advisory Circular (AC) is issued to provide information and guidance to

More information