1a TIP Scheme List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, P=Public transport, T=Traffic S=Safety

Size: px
Start display at page:

Download "1a TIP Scheme List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, P=Public transport, T=Traffic S=Safety"

Transcription

1 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I S Milton Road, between Science ark access and Cambridge Guided Busway intersect Cycleway Improvement northbound LS + SCSC Milton Road, between junctions with S Cambridge Guided Busway and King's Hedges Road Improvement LS + SCSC Milton Road crossroad junction with King's Hedges Road and Green End Road Junction Improvement LS + SCSC Milton Road, between junctions with S King's Hedges Road and Arbury Road Improvement LS + SCSC Milton Road crossroad junction with Arbury Road and Union Lane Junction Improvement LS + SCSC Milton Road, between junctions with S Arbury Road and Elizabeth Way Improvement LS + SCSC Location Description Strategy Basis Milton Road roundabout junction with Elizabeth Way Junction Improvement LS + SCSC rogramme Milton Road Milton Road Milton Road Milton Road Milton Road Milton Road Milton Road Milton Road, between junctions with S Elizabeth Way and A1134 Victoria Road Improvement LS + SCSC 9 Cycle Link on Milton Road, between Guided Busway junction and Cowley 10 C S Road junction, outbound Cycleway Improvement SCSC + I BD Cambridge Science ark Road-Ring road Upgrade existing paths to cycleways & 12 C S around Science ark new cycleways SCSC + I BD Cambridge Regional College - Cambridge Science ark - Cambridge Business ark Employment Based Area Wide ravel lanning SCSC + I Arbury Road, between King's Hedges S Road and Mere Way Cycleway Improvement SCSC Arbury Road, between Mere Way and S Campkin Road Cycleway Improvement SCSC Arbury Road, between Campkin Road S and North Cambridge Academy Cycleway Improvement SCSC Arbury Road, between North Cambridge S Academy and Milton Road Cycleway Improvement SCSC + I BD Milton Road ravel lan lus (to end of 2016) Improvements: Arbury Road corridor Improvements: Arbury Road corridor Improvements: Arbury Road corridor S Arbury and King's Hedges Cycling and edestrian Improvements: Cycle crossing improvement between Arbury Road junctions with King's Hedges Road and St Catherine's Road; and upgraded cycle paths around and linking to King's Cycle and Cycle Crossing Hedges Recreation Ground SCSC Green End Road, between Nuffield Road S roundabout junction and Milton Road / King's Hedges Road junction Cycleway Improvement SCSC Nuffield Road, between Green End Road S and Cambridge North railway station Cycleway Improvement SCSC Arbury and King's Hedges Cycling & edestrian Improvements Improvements: Links to North Cambridge Station and the Science ark Improvements: Links to North Cambridge Station and the Science ark Ring Fort ath link, between Orchard S ark and A14 Histon Interchange Footway / Cycleway improvement SCSC ransport Delivery lan Histon Road, junction with Darwin Green (NIAB) access junction incorporating changes to the Histon Road junction with King's Hedges Road; the approach on the B1049 to the A14 Histon Interchange northbound and the A14 eastbound offslip New Junction and junction alterations SCSC BD Histon Road, between King's Hedges S Road and Blackhall Road Improvement LS + SCSC Histon Road, between junctions with S Blackhall Road and Roseford Road Improvement LS + SCSC Histon Road, between junctions with S Roseford Road and Gilbert Road Improvement LS + SCSC Histon Road Improvement Histon Road Improvement Histon Road Improvement 1 of 14

2 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I Location Description Strategy Basis Link, between Darwin Green and Histon Footway / Cycleway improvement & new S Road via Cambridge Squash Club access crossing SCSC + I BD Histon Road. between junctions with S Gilbert Road and Victoria Road Improvement LS + SCSC Histon Road, junction with Victoria Road and Huntingdon Road Junction Improvement LS + SCSC Huntingdon Road, between Oxford Road C S junction and Victoria Road/Castle Street junction, inbound Cycleway Improvement SCSC 32 Huntingdon Road, between Victoria Road/Castle Street junction and Oxford 33 C S Road junction outbound Cycleway Improvement SCSC + I BD Link, between Wellbrooke Way and 35 S Darwin Green 1 development Cycleway SCSC BD 36 S C S ath, between Darwin Green 2 development and Villa Road, Histon, and Girton arish Centre, Girton via NIAB bridge over the A14 Cycleway and Footway improvement SCSC BD Focussed on the Darwin Green site including the wider area surrounding Darwin Green Area Wide ravel lanning Measures SCSC BD Darwin Green development to key locations within Cambridge Bus Service ump rime Funding SCSC BD West Cambridge - Northwest Cambridge - Darwin Green - Orchard ark - Cambridge Regional College - Cambridge Science ark - North Cambridge Railway Station Bus Service ump rime Funding SCSC BD Cambrige North West development to key locations within Cambridge City Centre Bus Service ump rime Funding SCSC BD romotional campaign for the Guided Busway Bus romotional Campaign SCSC BD Citybound cycle lane on Girton Road, between junctions with hornton Road and Huntingdon Road, to tie into new cycleway on Huntingdon Road Cyclway Improvement SCSC BD rogramme Histon Road Improvement Histon Road Improvement Cycle City Ambition S S Cycle crossing and off-road cycleway on western side of Girton Road, to enable cyclists to access the existing toucan crossing on Huntingdon Road to the west of the junction with Girton Road Cycle improvement SCSC BD Oxford Road and Windsor Road junction, Cambridge raffic Calming SCSC ransport Delivery lan 45 S Cycle link, between Abbey-Chesterton bridge and Cambridge North Railway Station / Cambridgeshire Guided Busway / Cambridge Science ark via Moss Bank Cycleway Improvement LS + SCSC Chisholm rail Cycle S Abbey-Chesterton Cycle Bridge over River Cam, connecting Ditton Meadows with Fen Road, via the Cam owpath (Nacional Cycle Network Route 11) Foot and Cycle Bridge LS + SCSC Ditton Meadows, between Abbey- S Chesterton bridge and the Leper Chapel Cycleway Improvement LS + SCSC 48 S Under Newmarket Road, between Leper Chapel area and Barnwell Lake Foot and Cycle Underpass LS + SCSC Coldham's Common, between Newmarket Road (by Barnwell Lake) and 49 S Coldham's Lane Cycleway Improvement LS + SCSC Chisholm rail Cycle Bridge Chisholm rail Cycle Chisholm rail Cycle Chisholm rail Cycle S S Cycle link, between Coldham's Common and Network Rail land adjacent to junction of Cavendish Road / Cavendish lace (route goes via Crowmwell Road & Brampton Road & includes a link through the Ridgeons site to connect it to the Network Rail land) Cycleway Improvement LS + SCSC Cycle link, between western end of Coldham's Lane Cycle Bridge and Hooper Street (via Beehive Centre / York Street / Ainsworth Street) Cycleway Improvement LS + SCSC Chisholm rail Cycle Chisholm rail Cycle 2 of 14

3 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I S Location Description Strategy Basis Cycle links either side of the railway, between Cavendish Road and Carter Cycle Bridge on the southeastern side and Hooper Street and Carter Cycle Bridge on the northwestern side, including new ramp to the Cycle Bridge and new route through Cambridge Railway Station Cycleway Improvement and New Ramp car park to Cycle Bridge LS + SCSC Bus link, from Cambridge North Railway station to Newmarket Road New Busway LS + SCSC Coldham's Lane, between Newmarket Road junction and Brook's Road junction Improvement LS + SCSC Sainsbury's Roundabout, junction of Coldham's Lane with Barnwell Road and Brooks Road Junction Improvement LS + SCSC Brooks Road, between Coldham's Lane and Brookfields junction Improvement LS + SCSC Brookfields/erne Road/Brooks Road crossroad junction Junction Improvement LS + SCSC erne Road, between Brookfields and Cherry Hinton Road Improvement LS + SCSC Budgens Roundabout, junction of erne Road with Cherry Hinton Road and Mowbray Road Junction improvement LS + SCSC Mowbray Road, between Cherry Hinton Road and Queen Edith's Way Improvement LS + SCSC Fendon Road, between Queen Edith's Way and Hills Road Addenbrooke's roundabout Improvement LS + SCSC Hills Road Addenbrooke's roundabout, junction with Fendon Road and Babraham Road Junction Improvement LS + SCSC Hills Road, junction with Long Road and Queen Edith's Way. Hills Road, between Fendon Road and Long Road / Queen Edith's Way Junction Improvement Improvement SCSC Cherry Hinton Road, between Hills Road S and Coleridge Road / Hartington Grove crossroads Cycleway Improvement SCSC S Cherry Hinton Road, between Coleridge Road / Hartington Grove crossroad junction and erne Road / Mowbray Road roundabout junction Cycleway Improvement SCSC rogramme Chisholm rail Cycle Orbital Bus : Cambridge North Station to Newmarket Road Orbital Bus : Orbital Bus : Orbital Bus : Orbital Bus : Orbital Bus : Orbital Bus : Orbital Bus : Orbital Bus : Orbital Bus : Improvements: Hills Road and Addenbrooke's route Cycle City Ambition Cycle City Ambition 67 S Radegund Road / Davy Road, between erne Road and Rustat Road Cycleway Improvement LS + I BD 68 S Mill Road, junction with Coleridge Road edestrian crossing improvement SCSC + I BD 69 Hills Road inbound, between Addenbrooke's and Cherry Hinton Road Bus riority SCSC BD 70 Cherry Hinton Road, between erne S Road / Mowbray Road and Walpole Road Cycleway Improvement SCSC BD 3 of 14

4 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I 71 S Location Description Strategy Basis Cherry Hinton Road, between Walpole Road and Queen Edith's Way Cycleway Improvement SCSC BD rogramme 72 Cherry Hinton Road, crossroad junction with Queen Edith's Way / Fulbourn Road / High Street (Robin Hood junction) Junction Improvement SCSC ransport Delivery lan S Fulbourn Road, between Queen Edith's Way / High Street Cherry Hinton (Robin Hood junction) and Yarrow Road roundabout junction i.e. between Cherry Hinton and City boundary Cycleway Improvement SCSC 73 Cambridge Road, between Yarrow Road and Shelford Road i.e. between City 74 S boundary and Fulbourn Cycleway Improvement SCSC BD 75 Cherry Hinton and Fulbourn Station Rail Improvement LS BD S S Queen Edith's Way, between Cherry Hinton Road / High Street / Fulbourn Road junction and Fendon Road / Mowbray Road junction Cycleway Improvement SCSC Queen Edith's Way, between Fendon Road / Mowbray Road roundabout junction and Hills Road / Long Road crossroad junction Cycleway Improvement SCSC Queen Edith's Way, roundabout junction with Fendon Road and Mowbray Road Junction Improvement SCSC BD 77 ins Cycle ath, Bridge over the railway 80 S line New Cycle Bridge SCSC BD ath north of the railway line between High Street, Cherry Hinton and Yarrow 81 S Road Footway / cycleway Improvement SCSC BD Cherry Hinton to Shelfords orbital cycle 82 S route Cycleway Improvement SCSC BD C hird city centre cycle park, Cambridge Mitchams Corner / Staples Corner: oneway gyratory connecting Milton Road, Chesterton Road, Victoria Avenue and Victoria Road Four Lamps Roundabout, junction of S Victoria Avenue with Maids Causeway New High Capacity City Centre Cycle ark LS BD Junction Improvement Streetscape improvement edestrian and cycle SCSC BD edestrian and cycle crossing improvement SCSC BD Jesus Green Lock, in the vicinity existing S pedestrian bridge New Cycle Bridge SCSC BD Improvements: Fulbourn / Cherry Hinton Eastern Access ransport Delivery lan / Cycle City Ambition ransport Delivery lan / Cycle City Ambition Magdelene Street - Bridge Street, between Northampton Street/Chesterton Lane/Castle Street crossroads and Round Church Street junction Streetscape Improvement SCSC BD Bridge Street, between Round Church S Street and Jesus Lane Improvement SCSC BD Lensfield Road, between rumpington Road and Gonville lace / Hills Road / Regent Street Improvement SCSC BD Gonville lace, between Hills Road / Regent Street and Mill Road / East Road Improvement SCSC BD Junction of Gonville lace with Mill Road, East Road and arkside Junction Improvement SCSC BD Mill Road, between Gonville lace and Railway Line Improvement SCSC BD S Mill Road Railway Bridge C Widen existing bridge or new cycle bridge to north of existing railway bridge SCSC BD Mill Road - Brookfields, between Railway Line and erne Road/Brooks Road crossroad junction Improvement SCSC BD Mini roundabout junctions of rumpington Street with Fen Causeway and Lensfield Road Junction Safety Improvement SCSC ransport Delivery lan Belgrave Road, Mercer s Row, anton Street, Ross Street, Springfield Road, rafalgar Street wo-way cycling in one-way streets SCSC Chesterton Road roundabout: junction of C S Chesterton Road with Elizabeth Way and High Street, Chesterton Cycle Crossing Improvement SCSC BD Chesterton Road - Chesterton Lane, C S between its junction with Magdelene Street and Elizabeth Way Cycleway Improvement SCSC Cycle City Ambition City Deal Cycle Workshop Future Funding 4 of 14

5 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I Location Description Strategy Basis Brooklands Avenue, junction with rumpington Road and Chaucer Road Junction Improvement SCSC BD Brooklands Avenue, between S rumpington Road and Aberdeen Avenue (southern side of road) Cycleway Improvement SCSC BD S Brooklands Avenue, between and Aberdeen Avenue and Hills Road (southern side of road) edestrian / Cycleway Improvement and cycle crossing improvement SCSC BD rogramme 103 Castle Street, between junction with Mount leasant and Northampton Street / 104 S Chesterton Lane Streetscape Improvement SCSC BD 105 C Grand Arcade Cycle arking Cycle arking Extension SCSC City Council St Andrew's Street, between junction with Sidney Street and Downing Street Improvement SCSC BD Silver Street, between Queens Road and S rumpington Street Improvement SCSC BD Silver Street, junction with Queen's Road and Sidgwick Avenue Junction Improvement SCSC BD Sidgwick Avenue, between Grange Road S and Queen's Road Improvement SCSC BD Station Road, between Cambridge Railway Station and Hills Road Improvement SCSC BD Hills Road, junction with Station Road Junction Improvement SCSC BD 112 Hills Road, between Station Road and Lensfield Road / Gonville lace Improvement LS + SCSC City Deal roject Cambridge - Hills Road Regent Street, between Lensfield Road / Gonville lace and Downing Street Improvement LS + SCSC 113 Riverside Improvements hase 2, between riory Road and Stourbridge 114 S Common Streetscape Improvement SCSC BD Devonshire Road, between junction with 115 S Mill Road and enison Road raffic Calming SCSC BD Mill Road, junction with Devonshire Road 116 S and Kingston Street Cycle Crossing Improvement SCSC BD Madingley Road corridor, between Queen's Road / Northampton Street and M11 Bus Route Improvement LS + SCSC A1303 Madingley Road / St Neots Road corridor, between M11 and A428 Madingley Mulch roundabout Bus Route Improvement LS + SCSC A428 corridor, in the vicinity of the junction of the A428 with the A1303 (Madingley Mulch roundabout) New ark & Ride Site LS + SCSC A428 corridor, between A1303 Madingley Mulch roundabout and Cambourne Bus Route Improvement LS + SCSC 120 Madingley Road, between Queen's Road 121 S and M11 Cycleway Improvement SCSC BD A1303 Madingley Road / St Neots Road, between M11 and A428 Madingley Mulch 122 S roundabout Cycleway Improvement SCSC BD Along old A428 corridor, between A428 Madingley Mulch roundabout and 123 S Cambourne Cycleway Improvement SCSC BD 124 M11 capacity in Cambridge area between junctions Highway Improvement LS BD City Deal roject Cambridge - Hills Road Madingley Mulch roundabout to Cambridge Madingley Mulch roundabout to Cambridge Madingley Mulch roundabout to Cambridge City Deal Cambourne to Madingley Mulch roundabout 125 M11 capacity south of Cambridgeshire between junctions 8-11 Highway Improvement LS BD C Bus link, from junction 13 of M11 with A1303 Madingley Road to junction 11 of M11 with A10 / A1309 Hauxton Road Bus Route Improvement LS + SCSC In the vicinity of Junction 12 of M11 with A603 Barton Road New ark & Cycle Site LS + SCSC A603 Barton to chester Street / Driftway junction Cycle Route Improvement LS + SCSC Junction of Barton Road with W S chester Street / Driftway edestrian crossing improvement SCSC BD In the vicinity of Junction 12 of M11 with A603 Barton Road New ark & Ride Site LS + SCSC City Deal Western Orbital Bus City Deal Western Orbital Bus City Deal Western Orbital Bus City Deal Western Orbital Bus 5 of 14

6 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I Location Description Strategy Basis M11 Junction 11 southbound off-slip, connecting M11 to the rumpington Road ark & Ride site Bus riority Slip Road LS + SCSC A10, in vicinity of Hauxton New ark & Ride site LS + SCSC C A10 corridor, between new Hauxton ark & Ride site and rumpington ark & Ride site New Bus Link including new bridge over M11 LS + SCSC rogramme Western Orbital Bus City Deal Western Orbital Bus City Deal Western Orbital Bus Direct cycle link between Cambourne and S St Neots, alongside new dualled A428 Direct Cycle Route SCSC BD S A428 junction with A1198, Caxton Gibbet roundabout Junction Improvement LS + SCSC BD A1198, between A428 and Ermine Street S South, apworth Everard New cycleway SCSC BD S S S Grade separated crossing of the A428, between A1198 and Cambourne Road, Cambourne New Grade Seperated edestrian and Cycle Crossing SCSC BD Saint Neots Road, between junction with existing footpath that links to A1198 (Elsworth F 17) and Cambourne Road, Cambourne New shared use footway / cycleway SCSC BD B1046 New Road, Barton: between Kings Grove and bus stop to the east of Hines Close (where existing cycle path ends) New shared use footway / cycleway or traffic calming SCSC BD 139 B1046, between bus stop to the east of Hines Close, Barton and Long Road, 140 S Comberton Cycleway improvement SCSC BD Existing foopath link, between Whitwell Way, Coton and Long Road (between 141 S Hardwick and Comberton) New Cycleway SCSC BD Long Road, between footpath that links to Whitwell Way and Branch Road, 142 S Comberton New Cycleway SCSC BD 143 Existing footpath link, between Long Road and Main Street, Hardwick New Cycleway SCSC BD B1046, between Long Road, Comberton S and Comberton Village College New shared use footway / cycleway or traffic calming SCSC BD 144 B1046, between Comberton Village 145 S College and Hardwick Road, oft Cycleway improvement SCSC BD B1046, between Hardwick Road, oft and 146 S Gills Hill, Bourne New footway / cycleway SCSC BD A603 corridor, between High Street, Barton and crossroads with Harlton Road 147 S & Eversdon Road New Cycleway LS + I BD A603 corridor, between crossroads with S Harlton Road and Eversdon Road & junction with Fisher's Lane, Orwell New Cycleway LS + I BD Coton Footpath, between West S Cambridge University site and he Footpath, Coton Cycleway and Footway improvement City Deal Cycle City Deal Cycle Workshop: Allocated for Workshop Future future funding Funding Addenbrooke's / New Railway Station LS BD Babraham Road ark & Ride, or at an alternative location along the A1307 corridor between Cambridge and Linton Expanded ark & Ride LS + SCSC Babraham Road ark & Ride 153 C C S Segregated car access to ark & Ride site LS + SCSC A1307 corridor, between Babraham Road ark & Ride site and Addenbrooke's Hospital Bus riority LS + SCSC In the vicinity of Fourwentways, junction of A1307 with A11 New ark & Ride Site LS + SCSC A1307 corridor, between a ark / new ark & Ride site and Addenbrooke's Hospital Bus riority LS + SCSC Along A1307 corridor between Addenbrooke's / (CBC), Babraham Research and a ark including connection to National Cycle Network (NCN) 11 Cycle and Walking Route Improvements SCSC S Between a ark and Linton Cycle and Walking Route Improvements SCSC 159 A1307 in and around Linton Bus riority Measures SCSC 6 of 14

7 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I Location Description Strategy Basis S Between Linton and Haverhill Cycle and Walking Route Improvements SCSC A1307 corridor between Addenbrooke's S and Haverhill Bus Stop Accessibility Improvements SCSC S A1307 corridor between Addenbrooke's and Haverhill Road Safety Improvements SCSC rogramme 164 S On/off slip to/from northeast-bound A505, under A505 carriageway: connecting existing A505 cycleway with existing cycleway leading to a ark Cycleway Improvement SCSC BD 165 Cycleway, between High Street S Babraham and Newmarket Road, Little Abington via bridge over the A11 Cycleway / Footway Improvement SCSC BD 166 Newmarket Road, Little Abington: S between a ark site access roundabout and path to bridge over A11 Introduction of on-road cycle lanes SCSC BD S Along A1307, between Linton Village College and ampisford Road, Great Abington Cycleway Improvement including new crossing of the A1307 to enable commuters to safely access a ark SCSC BD 167 Across the A1307, to improve access to 168 S Linton Village College edestrian / Cycle crossing improvement SCSC BD Stapleford to Babraham Institute via 169 S Rowley Lane Cycleway / Footway Improvement SCSC BD S S A1301 Sawston Bypass western side, between Cambridge Road and Mill Lane New Cycleway SCSC BD Whittlesford to Whittlesford arkway Railway Station via Duxford Road / Station Road West Cycleway / Footway Improvement SCSC BD A505. between Royston and A1307 near Babraham Safety Improvement LS + I BD NCN Route 11 Addenbrookes to Great Shelford Cycleway, between Dame Mary Archer Way and Chaston Road, Great Shelford Cycleway Improvement LS + I BD 173 A1301 Shelford Road - Cambridge Road, between rumpington and Great Shelford 174 C S High Sreets Cycleway Improvement LS + I BD 175 Milton ark & Ride ark and Ride Expansion SCSC BD 176 S A14 Milton Interchange Interchange Improvement LS + SCSC + Final Draft SEC - NO ADOED City Deal A10 North of Cambridge A10, between Milton Interchange and C S Waterbeach Highway Capacity Improvement LS + SCSC Waterbeach Barracks New Railway Station LS + SCSC City Deal A10 North of Cambridge City Deal A10 North of Cambridge 179 S A10, in vicinity of Waterbeach New ark & Ride site LS + SCSC A10 corridor, between Waterbeach Barracks and existing CGB in North Cambridge New Busway LS + SCSC 180 Alongside A10, between Cambridge Research ark and where existing path 181 S ends just north of Denny End New Cycleway SCSC BD Alongside A10, between Cambridge 182 S Research ark and A1123, Stretham New Cycleway SCSC BD W S B1049 wenty ence Road, between Lockspit Hall Drove (Smithy Fen) and existing path opposite All Saints Church, Cottenham New Footway SCSC BD 183 Footbridge alongside Rampton Road, 184 W S between Rampton and Cottenham New footbridge SCSC BD Bannold Road, Waterbeach: northern side between Cody Road and Bannold 186 S Drove New Footway SCSC BD Cottenham to Cambridge Research ark, 187 S Waterbeach via Long Drove New Cycleway SCSC BD 188 Link between Cottenham to Landbeach S along Beach Road - Cottenham Road, between Long Drove and Green End New Cycleway SCSC BD City Deal A10 North of Cambridge City Deal A10 North of Cambridge 189 B1049 Histon Road, Cottenham: between S High Street and Appletree Close New Cycleway SCSC BD 7 of 14

8 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I S S Location Description Strategy Basis Oakington Road - Rampton Road Cottenham: between 30mph signs on Rampton Road and junction with B1049 Histon Road by village green Widening Footpath to Cycleway SCSC BD rogramme B1049 Water Lane, Histon: junction with he Green and Impington Lane Junction Improvement SCSC ransport Delivery lan B1049 Cambridge Road, Impington: at the junction with Cambridge Road or by the Coppice ath edestrian and cycle crossing improvement SCSC BD Station Road - Cambridge Road, Histon, by junction with New Road Bus riority SCSC BD M11 Junction 8 (Stansted Airport) to Junction 14 (Girton) technology A10, Foxton level crossing Highways Improvements New Grade Separated Crossing of Railway Line LS: Roads Investment Strategy LS + SCSC Bridge over the A505 (near the A505 / S A10 roundabout), alongside the A10 connecting Melbourn to Royston New cycle bridge SCSC A10 between the A505, Royston and S Back Lane, Melbourn New cycle route SCSC S ublic Right of Way Footpath 160/9, between Meldreth Railway Station and Station Road, Melbourn via underpass under the A10 Upgrade footpath to Cycleway SCSC BD 198 Southeastern side of A10, between Shepreth Road, Foxton and Foxton Level 202 S Crossing New Cycleway SCSC BD 203 W S Foxton Railway Station New Footbridge SCSC BD S S A10 Cambridge Road, between Church Street, Harston and Church Road, Hauxton Footway and Cycleway Improved crossings SCSC A10 between Harston and Hauxton capacity and access Highway Improvement LS BD Cycleway alongside line of existing Barrington Cement Works - Foxton railway line, between Haslingfield Road and Foxton Railway Station New Cycleway SCSC BD Between New Road, Haslingfield and S Burnt Close, chester, via Cantelupe Road New cycle route SCSC BD Between High Street, chester and chester Meadows, Newnham Cycle Route Improvement SCSC BD rumpington High Street, between C S Hauxton Road / Shelford Road junction and Winchmore Drive Cycleway Improvement SCSC Steps from Long Road Bridge to CGB W S cycle route edestrian Improvement LS + I BD Addenbrooke's Road / Shelford Road junction Junction Improvement SCSC BD East Road, between Mill Road and St Matthew's Street / Nelson Close Improvement SCSC BD East Road, junction with St Matthew's Street Junction Improvement SCSC BD East Road, between St Matthew's Street / Nelson Close, and Elizabeth Way / Newmarket Road Improvement SCSC BD Elizabeth Way roundabout: junction of Newmarket Road with Elizabeth Way and East Road Junction Improvement LS + SCSC Newmarket Road, between Elizabeth Way / East Road roundabout junction and Coldham's Lane Improvement LS + SCSC Newmarket Road, in vicinity of junction S with Coldham's Lane Cycle Crossing Improvement SCSC BD Newmarket Road, junction with Coldham's Lane Junction Improvement LS + SCSC Newmarket Road, between Coldham's Lane and Cheddars Lane Improvement LS + SCSC Newmarket Road, junction with Cheddars Lane Junction Improvement LS + SCSC Newmarket Road, between Cheddars Lane and Stanley Road Improvement LS + SCSC Newmarket Road, junction with Stanley Road and B&Q access Junction Improvement LS + SCSC BD Newmarket Road, between Stanley Road and Ditton Walk Improvement LS + SCSC Highways England to deliver City Deal South (Royston) to Royston Cycle Route to Royston Cycle Route Cycle City Ambition Improvements: A1309 rumpington High Street Road Road Road Road Road Road Road 8 of 14

9 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I Location Description Strategy Basis Newmarket Road, between Ditton Walk and Barnwell Road / Wadloes Road (McDonald's roundabout) Improvement LS + SCSC MacDonalds Roundabout: Newmarket Road junction with Barnwell Road and Wadloes Road Junction Improvement LS + SCSC BD Newmarket Road, between Barnwell Road / Wadloes Road (McDonald's roundabout) and B1047 Ditton Lane Improvement LS + SCSC Ditton Lane crossing for S cyclists at junction with Newmarket Road Cycle Crossing Improvement SCSC Newmarket Road, between B1047 Ditton Lane and ark & Ride access Improvement LS + SCSC Newmarket Road, between ark & Ride access and Airport Way Improvement LS + SCSC In the vicinity of the junction of Airport Way with Newmarket Road New ark & Ride site Segregated car access to new ark & Ride site BD BD S Between Stow Cum Quy and Lode New footway / cycleway SCSC + Draft SEC Ditton Lane, between Fison Road and S Fen Ditton Community rimary School Cycleway & Footway Improvement Cycle crossing rogramme Road Road Road Improvements Road Road Cycle City Ambition Improvements: Ditton Lane and Links to East Cambridge 232 SCSC 233 Longstanton ark & Ride site Expanded ark & Ride SCSC BD 234 Busway loop through Northstowe Bus riority LS + SCSC BD 235 S B1050, between Longstanton and Bar Hill New footway / cycleway SCSC ransport Delivery lan Along alignment of Longstanton Road ('Old Airfield Road') between Longstanton and Oakington New Cycleway and Footway SCSC BD 236 Along Oakington Road - Dry Drayton Road, between Dry Drayton and 237 S Oakington New footway / Cycleway SCSC BD Rampton to Northstowe, via Reynold's Drove between Rampton Road and 238 S Cuckoo Lane Upgrade footpath to Cycleway SCSC BD Longstanton Road, Over: between CGB 239 S and King Street New Cycleway SCSC BD Between Oakington and Girton via 240 C Cambridge Road - Oakington Road Cycle Route Improvement SCSC BD Ramper Road, between Longstanton and 241 S Swavesey Safety Improvements SCSC BD Rampton Road, between Willingham and 242 S Rampton Safety Improvements SCSC BD Willingham raffic Lights at Church Street 243 / B1050 / High Street junction Capacity Improvement SCSC BD 244 Safety at CGB bridgepath W S crossing between Rampton Drift and Rampton, no bridge Safety Improvements SCSC BD C Northstowe Southern Access Road (West), linking Northstowe to the B1050 New Access Road LS + SCSC B1050, between Highways England A14 works and new roundabout for Northstowe Southern Access Road (West) Highway Capacity Improvement LS + SCSC Northstowe hase 2 Works Northstowe hase 2 Works W Northstowe Southern Access Road (West), linking Northstowe to the B1050 New Access Road LS + SCSC BD Closure of Longstanton Road (Airfield Road) with pelican crossing and access junction towards Oakington raffic Management SCSC BD C Oakington crossroads (Longstanton Rd / Water Ln / Cambridge Rd / Dry Drayton Rd) signal upgrade and slight widening of junction to improve capacity. Junction Improvement SCSC BD Cambridge Rd / New Rd (south of Oakington) roundabout with cycle crossings. Junction Improvement SCSC BD Rampton to Cottenham widening of existing path alongside Church End- Rampton Road Cycleway Improvement SCSC BD Oakington to Cottenham cycle route S alongside Oakington Road New Cycleway SCSC BD 9 of 14

10 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I S Location Description Strategy Basis Rampton to Willingham cycle route alongside Rampton Road. New Cycleway SCSC BD 253 Improvements to link at Windmill Hill 254 S between CGB and Over Road. Cycleway Improvement SCSC BD Upgrade to track (Reynolds Drove) 255 S between Rampton and CGB. Cycleway Improvement SCSC BD 1.96km new bridleway links from Northstowe to Willingham, mostly 256 S upgrading of existing tracks. Cost Cycleway Improvement SCSC BD rogramme 257 S 2.31km new bridleway link avoiding road from Longstanton to Swavesey. Connecting footpath linking to Ramper Road to be raised to bridleway status. Route generally follows boundaries to avoid creating cross-field route. Cycleway Improvement SCSC BD 258 Shared use Non Motorised User (NMU) S route from Boxworth to the A14 New shared use footway / cycleway SCSC BD New alignment parallel to the B C S Shelford's Road, between A1123 Earith Bridge and layby 1 mile southeast New Road LS + I BD 261 C S Along line of B1050, between Willingham and A1123 Earith Bridge New Cycleway SCSC + I BD C hroughout Cambridge City Cycle arking SCSC C S hroughout Cambridge City Minor Cycleway Improvements SCSC Improvements Improvements Mitigation of local traffic impacts-bourn Airfield, West Cambourne, Caldecote, oft, Comberton and Barton Highways Improvements LS BD Wider Cambourne pedestrian / cycle network edestrian and Cycleway Improvements LS BD A505 capacity between the A11 and M11 in the Duxford / Whittlesford / ampisford area Highway Improvement LS BD Mitigation of local impacts-waterbeach on Horningsea, Fen Ditton, Milton and Landbeach Highways Improvements LS BD Wider Waterbeach pedestrian / cycle network linking town to Cambridge and surrounding villages edestrian and Cycleway Improvements LS BD 542 Cycle catchment area connecting employment areas in the A428 corridor 543 S including Cambourne Cycle and Walking network SCSC BD Cycle catchment area connecting transport interchanges along the A S corridor Cycle and Walking network SCSC BD 3 mile catchment area for Cambourne 545 S Village College Cycle and Walking network SCSC BD 3 mile catchment area for Comberton 546 S Village College Cycle and Walking network SCSC BD 3 mile catchment area for Gamlingay 547 S Village College Cycle and Walking network SCSC BD Along A1307 corridor between Haverhill and Cambridge New transport interchanges SCSC BD 548 Connecting transport interchanges along 549 S the A1307 corridor Cycle and Walking network SCSC BD 3 mile catchment area for Linton Village 550 S College Cycle and Walking network SCSC BD 551 Shelford Railway Station Interchange Improvement SCSC BD 552 Whittlesford arkway Railway Station Interchange Improvement SCSC BD 553 Great Chesterford Railway Station Interchange Improvement SCSC BD 554 S Between Shelford and Saffron Walden Cycle and Walking network SCSC BD Connecting Wellcome rust Genome with Babraham Research 555 S and a ark Cycle and Walking network SCSC BD 3 mile catchment area for Sawston Village 556 S College Cycle and Walking network SCSC BD 557 Waterbeach Railway Station Interchange Improvement SCSC BD 10 of 14

11 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I S Location Description Strategy Basis 3 mile catchment area for Cottenham Village College Cycle and Walking network SCSC BD mile catchment area for Impington 559 S Village College Cycle and Walking network SCSC BD 3 mile catchment area for Waterbeach 560 S Railway Station Cycle and Walking network SCSC BD 561 Foxton Railway Station Interchange Improvement SCSC BD 562 Shepreth Railway Station Interchange Improvement SCSC BD 563 Meldreth Railway Station Interchange Improvement SCSC BD 564 Ashwell and Morden Railway Station Interchange Improvement SCSC BD Between villages and Royston-Cambridge 565 S HQ corridor Cycle and Walking network SCSC BD 566 S A10, between Royston and Cambridge Off-road Cycle network SCSC BD Catchment area for Melbourn Village 567 S College Cycle and Walking network SCSC BD Catchment area for Bassingbourn Village 568 S College Cycle and Walking network SCSC BD Catchment area for employment sites in 569 Newmarket to Cambridge corridor Cycle and Walking network SCSC BD Catchment area for Newmarket Road 570 ark & Ride site Cycle and Walking network SCSC BD 571 Catchment area for Bottisham Village S College Cycle and Walking network SCSC BD Cycle catchment area for employment sites in Northstowe to Cambridge corridor Cycle and Walking network SCSC 572 BD Cycle catchment area for Swavesey 573 S Village College Cycle and Walking network SCSC BD Cycle catchment area for Cottenham 574 S Village College Cycle and Walking network SCSC BD Cycle catchment area for Impington 575 S Village College Cycle and Walking network SCSC BD Cycle catchment area for Guided Busway 576 S northern section Cycle and Walking network SCSC BD 583 Vicinity of Station Road, Cambridge Resident arking Management SCSC BD 584 Shepreth Road, Foxton Real ime Bus Information Displays SCSC BD Shepreth Road, Foxton raffic Regulation Order to extend the 30mph speed limit on Shepreth Road SCSC BD Southbound bus stop in vicinity of Mill Road, Cambridge Real ime Bus Information Display SCSC BD Residential streets in the vicinity of Arm, Fulbourn Road, Cambridge Resident arking Management SCSC BD Westbound Bus Stop, Fulbourn Road, in vicinity of Arm, eterhouse echnology ark Real ime Bus Information Display SCSC BD Westbound Bus Stop, Fulbourn Road, in vicinity of Arm, eterhouse echnology ark Bus Shelter Installation SCSC BD Southbound bus stop, Cody Road, Waterbeach Real ime Bus Information Display SCSC BD uddicombe Way Bus Stop (or other bus stop within close proximity to the development) Real ime Bus Information Display SCSC BD Link between Red Cross Lane and Robinson Way, Cambridge Upgrade Existing Footpath to Cycle ath SCSC BD Sawston: Junction of Babraham Road with Cambridge Road / New Road / Hillside Junction Improvement SCSC BD C S Junction of Hills Road with urbeck Road Cycle Safety Improvement: Introduction of Right urn Lane for cyclists at junction SCSC BD Waterbeach: Cody Road, southbound Bus Stop Improvement SCSC BD 602 Waterbeach: Cody Road, northbound Bus Stop Improvement SCSC BD Girton: Girton Road, southbound, south of junction with Wellbrook Way Bus Stop Improvement SCSC BD Girton: Girton Road, southbound & northbound, south of junction with Wellbrook Way Real ime Bus Information Displays SCSC BD M11 Highway Capacity Improvement SCSC BD rogramme 11 of 14

12 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I Location Description Strategy Basis Between Addenbrooke's Road and Babraham Road Highway Capacity Improvement SCSC BD Between Babraham Road and Cherry Hinton (Yarrow Road) Highway capacity Improvement SCSC BD Between Airport Way and the A14 Fen Ditton junction Highway capacity Improvement SCSC BD Investigate Bus tunnels a possible longer term option for addressing capacity constraint in city centre Investigate Bus tunnels a possible longer term option for addressing capacity constraint in city centre SCSC BD rogramme C Midsummer Common Cyclepath Works SCSC Cycle eam 611 Buchan Street Area edestrian and Cycle Improvements SCSC BD 612 Science ark, Histon & Milton RI Improvements SCSC BD Across Arbury Road, at its junction with Kings Hedges Road edestrian / Cycle crossing improvement SCSC Cycle eam Hills Road Bridge Steps Cycle / edestrian Improvement SCSC BD Brooklands Avenue Re-siting of bus stops / upgrade of bus stops RI SCSC BD From Cambridge to Cherry Hinton & Fulbourn (via Coldham's Lane) RI Improvements SCSC BD hroughout Cambridge City Removal of Unnecessary Street Signage SCSC BD Residential streets to the east of Hills Road & south of Cherry Hinton Road that do not currently have any parking controls are within 20 minutes walk of the riangle Site arking Management SCSC BD Residential streets within the Arcadia development, south of Brooklands Avenue arking Management SCSC BD Brooklands Avenue Real ime assenger Information Display SCSC BD 633 C Vicinity of Station Road, Cambridge Improved Cycle arking rovision SCSC BD Linton olice Station & 9-15 Cambridge Road Northern junction of Cowley Road with Milton ublication and implementation of a raffic Regulation Order to change the speed limit SCSC BD Highway improvement works to the southbound road markings comprising lane redesignation with on street car parking to be controlled with ROs along entire length of Cowley Road. SCSC BD Ickleton Road, between Hexcel site S access, Duxford and Ickleton New cyclepath SCSC BD Between Crafts Way (Bar Hill erimeter Road), Bar Hill and Oakington Road, Dry Drayton, following edge of the Golf Course New Cyclepath SCSC BD M11 Junction 13 Ramp Metering SCSC BD S Huntingdon Road, Cambridge, between A14 and Histon Road Speed Management SCSC BD Opposite Windmill Lane, on Cambridge Road, Fulbourn Real ime assenger Information Display SCSC BD Brunswick Site, Cambridge Land Rear of 93/95 enison Rd, Cambridge raffic Regulation Order to preclude onstreet parking of private vehicles by Occupants of the Development and their visitors within streets subject to resident parking restrictions SCSC BD raffic Regulation Order to exclude the residents of dwellings from being eligible for residents premits except for visitor permits SCSC BD 652 Wessex lace, 35 Magrath Avenue, Cambridge Orbital cycle route between Histon Road and Madingley Road raffic Regulation Order to remove rights of all residents of the Development to obtain any permit to park on-street within the existing Resident's arking including parking permits for visitors. SCSC BD Improvements to the cycle crossing points and facilities along the Histon Road to Madingley Road cycle route. SCSC BD Opp Howes lace, Cambridge Bus Stop Improvement: New Bus Shelter SCSC BD 656 Opp Howes lace, Cambridge Real ime assenger Information Display SCSC BD 12 of 14

13 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I 657 Location Description Strategy Basis Junction of Madingley Road with Queen's Road and Northampton Street Junction Improvement SCSC BD rogramme Residential Streets in the vicinity of University site at Northwest Cambridge Controlled arking Zone - consultation and implementation SCSC BD W M11 Underpass M11 Underpass Upgrade SCSC BD ROW 39/30: Coton Countryside Reserve Link: bridleway between Madingley Road and cycle bridge over the M11 ublic Right of Way Upgrade SCSC BD Vicinity of Devonshire Road, Cambridge raffic Regulation Order to control parking on roads in vicinity of the development SCSC BD "Horse addocks ath", west of Ditton Lane Cyclepath Improvement SCSC BD High Street and Beach Road close to W S Brenda Gautrey Way, Cottenham Upgrade of High Street crossing to a zebra crossing and to the crossing of Beach Road close to Brenda Gautrey Way SCSC BD S Vicinity of Duxford rimary School Installation of flashing warning signs SCSC Hexcel, Land off Ickleton Rd S S Each entrance to the village of Duxford on Hunts Rd, Ickleton Rd and Moorfield Rd Installation of flashing warning signs SCSC Cambridge Station Busway/Bus Interchange 2x ANR Cameras to restrict access to the Guided Busway/Bus Interchange at Cambridge Station. SCSC BD Hexcel, Land off Ickleton Rd 786 C Hybrid cycle lanes on both sides of the road. Cycling down here is not safe due to narrow width and parked cars on one side of the road. here is a very wide Queens Road/Newnham Road Cambridge. Key cycle route that could verge and grass on both sides so no excuse that a sensetively desigend benefit from cycle lanes in both directions. scheme could not be implemented here. SCSC BD C Cambridge Road, Fulbourn C Fulbourn: cycle along Cambridge Rd - new lighting Cambridge City Council South Cambridgeshire Council S Study 2015 Carter Bridge, Devonshire Rd to Rustat Rd, Cambridge architectural upgrade including cladding SCSC BD BD 792 C Swavesey Busway stop rovision of additional cycle stands Identified through Development rocess Developer to deliver 800 Shared use off road route between Queen Edith and Roman Road via Worts Causeway Natural surface for pedestrians and equestrians only, as provision for cyclists already present alongside A1307. Signage from roadside and waymarking posts required along route. Identified through Development rocess BD 801 ermissive bridleway from Glebe Farm to Hauxton Mostly along line of existing permissive footpath on land owned by rumpington Estate. Identified through Development rocess BD 802 Haslingfield to chester Non- Motorised User (NMU) bridleway link Upgrade to existing public footpath to bridleway with to surface. Identified through Development rocess BD 804 Waterbeach Greenway: Cambridge to Waterbeach 805 Horningsea Greenway: Cambridge to Horningsea 806 Swaffhams Greenway: Cambridge to the Swaffhams via Stow-cum-Quy 807 Bottisham Greenway: Cambridge to Bottisham via Stow-cum-Quy 808 Fulbourn Greenway: Cambridge to Fulbourn via Cherry Hinton 809 Linton Greenway: Cambridge to Linton via a ark and Babraham 810 Sawston Greenway: Cambridge to Sawston via Stapleford and link to Babraham 13 of 14

14 1a I List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, =ublic transport, =raffic S=Safety I Location Description Strategy Basis Melbournn Greenway: Cambridge to Melbourn Haslingfield Greenway: Cambridge to Haslingfield Barton Greenway: Cambridge to Barton, includes option via chester Comberton Greenway: Cambridge to Comberton via Coton rogramme 14 of 14

TIP Scheme List Cambridge and South Cambridgeshire

TIP Scheme List Cambridge and South Cambridgeshire C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety TIP ID C W P T S Location Description Strategy Basis 2 C W S Milton, between Science Park Cycleway LTTS + access and

More information

Dial-a-Ride Schemes Page Volunteer Car Schemes Minibus Hire Shopmobility Schemes Taxicard Schemes

Dial-a-Ride Schemes Page Volunteer Car Schemes Minibus Hire Shopmobility Schemes Taxicard Schemes 1 Dial-a-Ride Schemes Page Cambridge Dial-a-Ride - City & South Cambs parishes 3 3CT (3 Counties Transport) Haverhill & area 3 Volunteer Car Schemes Royston & District Community Transport 4 St Ives Volunteer

More information

Visit for up-to-date copies of this document and leaflets covering neighbouring districts.

Visit  for up-to-date copies of this document and leaflets covering neighbouring districts. Index: 1 Page Page Abington Pigotts 4, 8 Hatley 7 Arrington 4 Hauxton 3, 4 Babraham 3, 12 Hildersham 3 Balsham 3, 5 Hinxton 4 Bar Hill 3, 5 Histon 3 8 12 Barrington 3, 4, 5 Horningsea 11,12 Bartlow 3 Horseheath

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Draft Transport Strategy for Cambridge and South Cambridgeshire

Draft Transport Strategy for Cambridge and South Cambridgeshire Draft Transport Strategy for Cambridge and South Cambridgeshire Appendices Alex Plant Executive Director of Economy, Transport and Environment Cambridgeshire County Council Shire Hall Castle Hill Cambridge

More information

Appendix 8 Sawston Greenway Review

Appendix 8 Sawston Greenway Review Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Appendix 9 Melbourn Greenway Review

Appendix 9 Melbourn Greenway Review Appendix 9 Melbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

P/S/I/J/ F/M Type Area Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Comment/ School

P/S/I/J/ F/M Type Area Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Comment/ School School P/S/I/J/ F/M Type Area Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Comment/ Future Action Abbey College S Academy Hunts 300 300 300 300 300 180 180 180 Abbey Meadows Primary P Community

More information

CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS

CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS KEY: Organisation/Contractor Road Locality Traffic UK POWER NETWORKS EASTERN& LONDON HIGH STREET BABRAHAM TWO-WAY CAMBRIDGESHIRE SHEPRETH ROAD BARRINGTON TWO-WAY CAMBRIDGESHIRE HALL CLOSE BOURN SOME C/W

More information

CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS

CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS KEY: Organisation/Contractor Road Locality Traffic LITLINGTON ROAD ABINGTON PIGOTTS ROAD CLOSURE 07-Aug-2017 28-Aug-2017 Connections Projects:NEW INDIVIDUAL SUPPLY::350m of road& verge to install new low

More information

Busway between West Cambourne site and the junction of the A1303 / A428

Busway between West Cambourne site and the junction of the A1303 / A428 Project: A428 To: CCC Subject: Routes From: Atkins Date: 14 April 2016 cc: This note summarises the policy references to a bus link between Cambourne and Cambridge, in particular references to the route

More information

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A. Project: Cambourne to Cambridge Better Bus Journeys To: CCC Subject: Considerations for Corridor Option Plans From: Atkins Date: 1 Sep 2016 cc: 1. Introduction This note summarises considerations undertaken

More information

Directions. Cambridge Centre. Parking. Administrative Office

Directions. Cambridge Centre. Parking. Administrative Office Directions Cambridge Centre Anglia Access Centre Student Services HEL341 Anglia Ruskin University East Road Cambridge CB1 1PT For help with directions please phone: 01223 698378 Parking There is no on-site

More information

CAMBRIDGESHIRE LOCAL ACCESS FORUM

CAMBRIDGESHIRE LOCAL ACCESS FORUM CAMBRIDGESHIRE LOCAL ACCESS FORUM MEETING ON TUESDAY 12 February 2019 AT 7.00 PM Storeys Field Centre, Eddington Cambridge CB3 1AA [Directions https://tinyurl.com/y9ewkzjj] Members of the public are warmly

More information

Archant is one of the most respected and trusted names in local and regional media in the UK

Archant is one of the most respected and trusted names in local and regional media in the UK Brought to you by Archant is a 250-year-old community media company active in the fields of regional newspaper and magazine publishing, contract printing and internet communications Archant is one of the

More information

Growth Area Funding (Northstowe)

Growth Area Funding (Northstowe) Additional Report on Northstowe from Councillor John Reynolds 13 Feb 2010 Please find set out below a rather long report that was presented to the Northstowe Parish Forum. I attend these meetings and the

More information

St Andrews Road Cambridge CB4 1GS

St Andrews Road Cambridge CB4 1GS St Andrews Road Cambridge CB4 1GS Radio House offers approximately 43,388 sq ft of comprehensively refurbished office space in a self contained building over ground and first floors, situated between the

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Histon Road Local Liaison Forum (HR LLF) Minutes

Histon Road Local Liaison Forum (HR LLF) Minutes Histon Road Local Liaison Forum (HR LLF) Minutes Date: Monday 6 th November 2017 Time: 6.30pm Venue: Meadows Community Centre, Cambridge. CB4 3XJ Present: LLF Members Mike Todd-Jones, City Council Arbury

More information

A428 Cambourne to Cambridge Better Bus Journeys. Landscape & Planning Appraisal Study Area. Key. Study Area. Westwick. Oakington.

A428 Cambourne to Cambridge Better Bus Journeys. Landscape & Planning Appraisal Study Area. Key. Study Area. Westwick. Oakington. Westwick Boxworth Lower Gate Caldecote Highfields Cambridge Crow End Croft Newtown Roman Hill Harlton Source: Esri, DigitalGlobe, GeoEye, Earthstar Haslingfield Geographics, CNES/Airbus DS, USDA, USGS,

More information

Information for Visitors, Assessment Specialists and Consultants

Information for Visitors, Assessment Specialists and Consultants All under one roof Triangle brings together 11 different Assessment offices and offers many great facilities Information for Visitors, Assessment Specialists and Consultants Triangle provides Assessment

More information

LLANBEDR ACCESS IMPROVEMENTS

LLANBEDR ACCESS IMPROVEMENTS LLANBEDR ACCESS IMPROVEMENTS NON-MOTORISED USER SUPPLEMENTARY REPORT CPF: 5111 Client: Gwynedd Council Document Control Sheet Document Title: Document Author: Project Manager: Project Title: A496 Llanbedr

More information

Abbey Chesterton bridge Questions & Answers

Abbey Chesterton bridge Questions & Answers Abbey Chesterton bridge Questions & Answers Please click on links below to go to individual subjects: Bridge location and access routes Timescales Bridge details and accessibility Construction compound

More information

Map showing location of public transport projects in vicinity of railway station

Map showing location of public transport projects in vicinity of railway station Map showing location of public transport projects in vicinity of railway station Market Town Transport Strategy 2013 39 ID PT1a Specific Location Approach at Detail of Project Develop Area Master plan

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Railfuture East Anglia Whittlesford Parkway station audit

Railfuture East Anglia Whittlesford Parkway station audit Railfuture East Anglia Whittlesford Parkway station audit Introduction and summary of findings This report details the findings of a station audit carried out by members of Railfuture East Anglia Branch

More information

Centurion Way Chichester

Centurion Way Chichester Centurion Way Chichester Work book of plans to show details of the Centurion Way, its links, and potential developments and enhancements from linking to the South Downs National Park all the way to the

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

Minutes of the Cambridgeshire Local Access Forum (LAF) Meeting Held on Tuesday 17 May 2016 at 7 pm at The Monkfield Arms, Cambourne

Minutes of the Cambridgeshire Local Access Forum (LAF) Meeting Held on Tuesday 17 May 2016 at 7 pm at The Monkfield Arms, Cambourne Minutes of the Cambridgeshire Local Access Forum (LAF) Meeting Held on Tuesday 17 May 2016 at 7 pm at The Monkfield Arms, Cambourne Present: Members Roger Buisson (Chairman), Jill Tuffnell, Erika Wedgwood,

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design Next Generation Cycleway Design Improving connectivity and cycling behaviours through design Safe segregation between Place Users to offer improved safety and a defined space for each user group Elevated

More information

On the edge of a country park, discover your dream home

On the edge of a country park, discover your dream home 95007_Trump BROCHURE_New_Layout 1 26/04/2012 17:43 Page 1 On the edge of a country park, discover your dream home CLOSE TO EVERYTHING YET FAR ENOUGH AWAY Carefully designed one, two, three, four & five

More information

EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE

EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE The following report provides an update on the current position of all of the

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Member-led Review of Cycling Infrastructure

Member-led Review of Cycling Infrastructure Member-led Review of Cycling Infrastructure Survey Results: Huntingdon Road, Cambridge June 217 cambridgeshire.gov.uk Contents 1. Introduction... 3 2. About you... 3 2.1 Age... 3 2.2 What is your gender?...

More information

Member-led Review of Cycling Infrastructure

Member-led Review of Cycling Infrastructure Member-led Review of Cycling Infrastructure Survey Results: A1 Cambridge to Royston June 17 cambridgeshire.gov.uk Contents 1. Introduction... 3. About you... 3.1 Age... 3. What is your gender?... 3.3 Do

More information

216CSP offers state of the art business space and the opportunity to occupy a striking new HQ.

216CSP offers state of the art business space and the opportunity to occupy a striking new HQ. 216 Cambridge Science Park presents an opportunity to occupy a new B1 Business Use Research and Development building totalling 34,921 sq ft (3,244 sq m), presented over three levels. The property has been

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London Chapter 16 Route Window NE15 Brentwood station BRENTWOOD STATION 16 Route Window NE15 Brentwood station Introduction 16.1 The construction activities in this route window are associated with minor refurbishment

More information

Road Investment Strategy A1 East of England Strategic Road Study

Road Investment Strategy A1 East of England Strategic Road Study Road Investment Strategy 2020-2025 A1 East of England Strategic Road Study Report of the fourth meeting of the Stakeholder Reference Group March 2017 The fourth meeting of the A1 Stakeholder Reference

More information

Derry Hill and Bingley Road, Menston. Accidents waiting to happen.

Derry Hill and Bingley Road, Menston. Accidents waiting to happen. Derry Hill and Bingley Road, Menston. Accidents waiting to happen. School Bus unable to pass on Hawksworth Drive References: Derry Hill - 10/04551/MAF Bingley Road - 10/06229/MAO Bingley Road - 11/05691/OUT

More information

COLCHESTER LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS

COLCHESTER LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS COLCHESTER LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS Date: 9 April 2014 Venue: Rowan House Room G3 Apologies: Parish Cllr John Gili-Ross Item: 1. 2 3 Action: Welcome and Introductions: PRESENT: Panel Members:

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

Central Section Conditional Outputs Statement

Central Section Conditional Outputs Statement Railfuture Oxford to Cambridge (East West Rail) campaign Briefing note on the East West Rail route Central Section conditional outputs statement and benefits to Cambridgeshire Central Section Conditional

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

The Chisholm Trail. PLANNING APPLICATION Phase 1 Design & Access Statement Nov 2016

The Chisholm Trail. PLANNING APPLICATION Phase 1 Design & Access Statement Nov 2016 The Chisholm Trail A walking and cycling route from Cambridge Central Station to the planned Cambridge North Station, and a link between the Addenbrookes and the St Ives Busway cycling routes PLANNING

More information

TRUMPINGTON MEADOWS COMMUNITY MEETING (MEETING 1) held at Trumpington Meadows Primary School Meeting Room 2 on 27th November 2017, 19:30 21:00 MINUTES

TRUMPINGTON MEADOWS COMMUNITY MEETING (MEETING 1) held at Trumpington Meadows Primary School Meeting Room 2 on 27th November 2017, 19:30 21:00 MINUTES TRUMPINGTON MEADOWS COMMUNITY MEETING (MEETING 1) held at Trumpington Meadows Primary School Meeting Room 2 on 27th November 2017, 19:30 21:00 MINUTES Guests Tim Watkins Project Manager, Western Orbital,

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

Barton Parish Council Annual Parish Meeting

Barton Parish Council Annual Parish Meeting Barton Parish Council Annual Parish Meeting 25 April 2017 Your Councillors County Councillor Stephen Frost (until 4 May 2017) District Councillor Francis Burkitt Parish and District Councillors elections

More information

Ermine Street Environmental Enhancements

Ermine Street Environmental Enhancements Ermine Street Environmental Enhancements As part of Urban&Civic s commitment to minimise the impacts and maximise the benefits of the Alconbury Weald development, the design team have worked up a scheme

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY Matter 3C Easton/Costessey Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY SUBMISSION ON BEHALF OF TAYLOR WIMPEY DEVELOPMENTS AND

More information

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 Go Ultra Low City Bid Success Announced on Monday 25 January, the Department for Transport (DfT) allocated 7M to the four West of England authorities

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

Infrastructure for Growth

Infrastructure for Growth A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

Suffolk Local Access Forum s (SLAF) response to Network Rail s consultation on level crossing closures.

Suffolk Local Access Forum s (SLAF) response to Network Rail s consultation on level crossing closures. SLAF Suffolk Local Access Forum SLAF PO Box 872 Ipswich Suffolk IP1 9JW Network Rail Anglia Level Crossings Tel: 01473 264452 Fax: 01473 216877 Email: slaf@suffolk.gov.uk Web: http://publicrightsofway.onesuffolk.net/suffolk

More information

CAMBRIDGE SUMMER SCHOOL 2018

CAMBRIDGE SUMMER SCHOOL 2018 CAMBRIDGE SUMMER SCHOOL 2018 THEOLOGY TRACK: I WILL BE YOUR GOD: GOD & HUMANITY APOLOGETICS TRACK: CONTEMPORARY CHALLENGES TO CHRISTIANITY This document should contain all of the information that you need

More information

Ten Pin Bowling There is only one Tenpin facility in Cambridge, located at the Cambridge Leisure Park. Please see Appendix A for its location.

Ten Pin Bowling There is only one Tenpin facility in Cambridge, located at the Cambridge Leisure Park. Please see Appendix A for its location. Cambridge Local Plan Review- Local Leisure Facilities Survey Baseline Information Current Situation Bingo Halls Bingo used to be a bingo hall in Cambridge located on Hobson Street however it remains closed.

More information

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

UTTLESFORD DISTRICT COUNCIL LOCAL HIGHWAYS PANEL MINUTES 15 JANUARY :00 COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN

UTTLESFORD DISTRICT COUNCIL LOCAL HIGHWAYS PANEL MINUTES 15 JANUARY :00 COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN Minute Item 1 UTTLESFORD DISTRICT COUNCIL LOCAL HIGHWAYS PANEL MINUTES 15 JANUARY 2018 18:00 COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN Chairman: Panel Members: Also Present: Councillor S Walsh Councillors

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

CAMBRIDGESHIRE LOCAL ACCESS FORUM

CAMBRIDGESHIRE LOCAL ACCESS FORUM CAMBRIDGESHIRE LOCAL ACCESS FORUM MEETING ON TUESDAY 15 NOVEMBER 2016 AT 7.00 PM SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL OFFICE (Monkfield Room), CAMBOURNE, CAMBRIDGE CB23 6EA Members of the public are warmly

More information

Shopping Park. The. All open now. Biggleswade, SG18 8NE. 85% pre-let/open Last remaining units 2 x 7,500 sq ft and 1 x 5,500 sq ft

Shopping Park. The. All open now. Biggleswade, SG18 8NE. 85% pre-let/open Last remaining units 2 x 7,500 sq ft and 1 x 5,500 sq ft Biggleswade, SG1 NE LAU R A A S H LEY All open now 5% pre-let/open Last remaining units 2 x and 1 x 5,500 sq ft An exciting new retail development anchored by 263,000 sq ft with approximately 1,000 car

More information

COMMUNICATIONS. Cambridge

COMMUNICATIONS. Cambridge OFFICES TO LET Mill Court is an established office scheme comprising five buildings totalling 38,245 sq ft (3,553 sq m)* set within attractive landscaped surroundings. The buildings provide modern, open

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

East West Rail Bedford to Cambridge Route Option Consultation

East West Rail Bedford to Cambridge Route Option Consultation Bedford to Cambridge Route Option Consultation January 2019 2 way Company Ltd Contents 1. Introduction 4 2. Strategic objectives 6 3. Selecting a preferred route corridor 8 4. Evaluating route options

More information

ACCOMMODATION. Park New bike storage compound New internet connectivity New landscaping Electric car charger

ACCOMMODATION. Park New bike storage compound New internet connectivity New landscaping Electric car charger OFFICES TO LET Mill Court is an established office scheme comprising five buildings totalling 38,245 sq ft (3,553 sq m)* set within attractive landscaped surroundings. The buildings provide modern, open

More information

A428 Black Cat to Caxton Gibbet improvements Report on public consultion. February 2019

A428 Black Cat to Caxton Gibbet improvements Report on public consultion. February 2019 A428 Black Cat to Caxton Gibbet improvements Report on public consultion February 2019 Report on public consultation Date: 30 August 2017 Version: 2.0 Registered office Bridge House, 1 Walnut Tree Close,

More information

South of the Village Centre

South of the Village Centre Trumpington History Trails South of the Village Centre Changes on the South Side of Trumpington Since the 19th Century 3 Walk or cycle 3.6 miles/5.8 kms walk on pavements and footpaths; cycle on roads

More information

CALA HOMES AT GREAT KNEIGHTON CAMBRIDGE CALA HO ME S

CALA HOMES AT GREAT KNEIGHTON CAMBRIDGE CALA HO ME S CALA HOMES AT GREAT KNEIGHTON CAMBRIDGE CALA HO ME S CALA HO ME S CALA HOMES AT GREAT KNEIGHTON A GREAT CAMBRIDGE ESCAPE A mere three miles south of Cambridge city centre, the blossoming community of Great

More information

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015 Bus Priority Package Presentation to Leigh Business Forum 11 December 2015 Over 25 miles of bus routes improved What is the bus priority package? Key Strategic Benefits Shorter journey times, more punctual

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY

More information

East West Rail Bedford to Cambridge Route Option Consultation

East West Rail Bedford to Cambridge Route Option Consultation Bedford to Cambridge Route Option Consultation January 2019 2 way Company Ltd Contents Foreword 4 Introduction 5 What is? 6 What is the way Company? 8 This consultation and how we got here 10 How we will

More information

The case for a local rail station. At Great Blakenham, Suffolk.

The case for a local rail station. At Great Blakenham, Suffolk. The case for a local rail station At Great Blakenham, Suffolk. The London to Norwich (Great Eastern) main rail line passes through Great Blakenham in Suffolk, a village which adjoins Claydon and Barham.

More information

Lent 2002 Termcard. In addition to our walks this term, we look forward to seeing you at our Formal Hall at St. John's!

Lent 2002 Termcard. In addition to our walks this term, we look forward to seeing you at our Formal Hall at St. John's! Lent 2002 Termcard Welcome back to the Rambling Club! We hope you will find time to leave the city for a few hours, and enjoy the surrounding countryside with us. The pace of our walks is generally easy,

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

CHESTNUT HOMES LTD PROPOSED MIXED USE DEVELOPMENT AT THE QUADRANT, Q1, BOSTON TRANSPORT ASSESSMENT

CHESTNUT HOMES LTD PROPOSED MIXED USE DEVELOPMENT AT THE QUADRANT, Q1, BOSTON TRANSPORT ASSESSMENT CHESTNUT HOMES LTD PROPOSED MIXED USE DEVELOPMENT AT THE QUADRANT, Q, BOSTON TRANSPORT ASSESSMENT May4 apk/8/v Northern Transport Planning Ltd Suite 7, Vincent House, 6 Westgate, Wakefield, WF 9SR Tel:

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

"TOUCAN" - An unsegregated crossing for pedestrians and cyclists

TOUCAN - An unsegregated crossing for pedestrians and cyclists Traffic Advisory Leaflet 10/93 August 1993 "TOUCAN" - An unsegregated crossing for pedestrians and cyclists Summary This leaflet gives advice on the design and use of the Toucan signal controlled crossing,

More information

Planning Committee. Thursday, 26 May 2016

Planning Committee. Thursday, 26 May 2016 Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),

More information

M621. Junctions 1 to 7 Improvement scheme. Share your views

M621. Junctions 1 to 7 Improvement scheme. Share your views M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

Introduction of traffic control measures to improve congestion and air quality within the town centre

Introduction of traffic control measures to improve congestion and air quality within the town centre Objectives Introduction of traffic control measures to improve congestion and air quality within the town centre Independent of a realignment of the B4009 (new edge road) To focus on the here and now Impact

More information

Walk 1. Cotswold Water Park. Gateway Centre to Cerney Wick, railway track to Lake 6, Gateway Centre.

Walk 1. Cotswold Water Park. Gateway Centre to Cerney Wick, railway track to Lake 6, Gateway Centre. Cotswold Water ark Walk way A Swindon/ Cirencester Thomas and Severn Canal way to Cerney Wick, railway track to Lake, way. Spine Road East Hotel Time: hours (short walk km) Distance: km A level walk along

More information

Proposed Lidl Food store West Hendford, Yeovil

Proposed Lidl Food store West Hendford, Yeovil Proposed Lidl Food store West Hendford, Yeovil Lidl Travel Plan October 2015 CONTENTS Page 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Aim of Travel Plan 1 1.3 Contents 2 2.0 TRANSPORT CONTEXT 3 2.1 Site Location

More information

DRAFT MARCH MARKET TOWN TRANSPORT STRATEGY 2013 INTRODUCTION

DRAFT MARCH MARKET TOWN TRANSPORT STRATEGY 2013 INTRODUCTION DRAFT MARCH MARKET TOWN TRANSPORT STRATEGY 2013 INTRODUCTION This is the second Market Town Transport Strategy for March, replacing the strategy produced in 2002. It forms a part of the Third Cambridgeshire

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

General Meeting Minutes

General Meeting Minutes 20 th September 2017, 10:00am Town Hall, Middlesbrough General Meeting Minutes Attending: Mike Roff (Vice Chair), Councillor Carson, Mike Cherrett, Peter Clark, Christine Corbett. Guests: Andrew Casey

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a

More information

YOU SAID, WE DID You were concerned about the bus stop design we have amended the design at 22 bus stops to create additional space between the bus an

YOU SAID, WE DID You were concerned about the bus stop design we have amended the design at 22 bus stops to create additional space between the bus an You were concerned about the bus stop design we have amended the design at 22 bus stops to create additional space between the bus and the cycle lane alignment. You were concerned about people with disabilities

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of

More information

READY TO DO BUSINESS... haverhillresearchpark.com

READY TO DO BUSINESS... haverhillresearchpark.com READY TO DO BUSINESS... haverhillresearchpark.com The Park The new home for technology companies on the Suffolk, Essex and Cambridgeshire border bringing the Cambridge science park environment to Haverhill.

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

Northern Beaches Transport Action Plan

Northern Beaches Transport Action Plan Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million

More information