FOR THE THREE MONTHS ENDED 31 MARCH 2012

Size: px
Start display at page:

Download "FOR THE THREE MONTHS ENDED 31 MARCH 2012"

Transcription

1 FOR THE THREE MONTHS ENDED 31 MARCH 2012 PROMINENT HILL CONTAINED METAL PRODUCTION MARCH 2012 QUARTER TOTAL COPPER (TONNES) 27,182 TOTAL GOLD (OUNCES) 38,887 OZMINERALS.COM C1 CASH COSTS US96.9c/lb HIGHLIGHTS Strong operating performance at Prominent Hill. Production impact from rain event minimised. C1 Cash Costs affected by reduced ore mining rates, increased waste mining and a strong Australian dollar - but overall costs in line with expectations. First ore achieved from underground stoping operations. New open pit mining contract signed. Further drilling results from Carrapateena confirm and extend known mineralisation. New concentrates handling system commissioned. Completion of Cambodian asset sale scheduled for May Terry Burgess Managing Director and Chief Executive Officer 26 April 2012

2 OZ MINERALS LIMITED ABN OZ MINERALS QUARTERLY ACTIVITIES TO 31 MARCH 2012 SUMMARY In the first quarter, a strong operating performance at Prominent Hill was achieved with production of 27,182 tonnes of copper and 38,887 ounces of gold contained in concentrate and sale of 41,667 tonnes of concentrate. Over three days in late February/early March, significant rain fell at Prominent Hill, the heaviest since commencing operations in While protection systems worked effectively and no equipment was damaged, this rainfall resulted in restricted access to some areas of the pit, in particular to Stage 2, until the rain that fell in the pit was pumped out to the tailings storage facility by the end of the first week in April. As a result of the lower ore mining activity during the quarter, ore feed was maintained by drawing on ROM stockpiles. As a consequence of the lower mining rate, unit costs were increased for the period. The new mining contract signed with Thiess during the quarter will provide a range of cost and productivity benefits to OZ Minerals. The changed roster included in this contract has required additional personnel to be recruited and trained by Thiess, a process that is now largely complete. The Ankata underground mine achieved an important milestone by producing first ore from stoping at the end of quarter, thereby meeting the project schedule. A rigorous exploration program continued in the Prominent Hill near mine and regional areas with a significant geophysics program conducted in the mine corridor to locate drill targets. At Carrapateena the in-fill drill program continued with excellent results from two further holes, again extending the mineralisation of the higher grade zones. SAFETY Safety performance in the March quarter saw a continuing steady improvement. The lost time injury frequency rate per one million hours decreased to 0.85 in the quarter and the total recordable injury frequency rate per one million hours decreased to There were no lost time injuries for the quarter and two fewer recordable injuries than the previous quarter. The major improvement program to address safety performance that commenced in late 2010 continued during the quarter, with over 100 peer-on-peer behavioural safety observers now trained. OPERATIONS Significant Rain Event As part of significant rains in south eastern Australia, the region around Prominent Hill experienced heavy rain fall over a three day period and received almost its entire annual rainfall in late February and early March, with the Prominent Hill site having 150mm of rain. While the rain water bund protection systems prevented any ingress of water into the pit area, the direct rainfall resulted in approximately 40 megalitres of water collected at the bottom of the pit in Stage 2. However, no equipment was damaged as a result. Stage 2, which is the main source of ore mining under the current mine plan, was dewatered after installation over three kilometres of pipe and a two-stage pumping system, with mining operations in Stage 2 recommencing on 8 April. Mining Overall material moved in the pit was above the prior quarter. Total ore mined for the quarter of 1.94 Mt was below the previous quarter but in line with the mine plan which, as foreshadowed, has a higher strip ratio in 2012 in part associated with the north wall cutback. Waste mined was above the previous quarter s tonnage, but below plan, as priority was given to material movement in Stage 3 of the open pit. Mined grade for copper for the quarter of 1.11 percent was below that of the previous quarter, as a result of lower grade ore mined from Stage 3 compared with Stage 2 ore, which could not be accessed after the rain event. Processing The plant continued to perform well throughout the quarter with throughput of 2.46Mt of ore, being marginally above the previous quarter. With limited ore mined during the quarter, there was a lack of direct feed from the mine and the main feed to the processing plant was from ROM stocks. This marginally reduced copper recovery for the quarter as the ROM stocks included aged (oxidised) ore. The gold production was marginally above the previous quarter primarily reflecting better grades together with slightly higher ore milled. Total production for the first quarter of 27,182 tonnes of copper and 38,887 ounces of gold in concentrates is in line with 2012 guidance of 100, ,000 tonnes of copper and 130, ,000 ounces of gold. 2

3 Ankata Underground Mine First ore from stoping was achieved from the Ankata underground mine at the end of the quarter in line with expectations. The continued ramp-up to the full production rate of 1.2 million tonnes per annum is planned by the end of the third quarter of All revenue and expenses related to the Ankata underground mine will be capitalised until mine facilities and equipment are fully commissioned. The underground development remains on track and is in-line with the previously stated budget of $148 million, with approximately 75 percent of the overall project being complete at the end of the quarter. TABLE 1 PROMINENT HILL PRODUCTION STATISTICS MINED ORE (TONNES) WASTE (TONNES) DEC 11 MAR 12 2,212,157 1,945,417 14,266,345 16,102,251 MINED GRADE COPPER (%) GOLD (G/T) SILVER (G/T) ORE MILLED (TONNES) 2,442,800 2,460,397 MILLED GRADE COPPER (%) GOLD (G/T) SILVER (G/T) RECOVERY COPPER (%) GOLD (%) Costs C1 cash costs of production for the quarter were US96.9c/lb, which was higher than the previous quarter reflecting the higher drawdown of ROM stocks (ore inventory adjustment) during the quarter as more ore was milled than mined, together with a stronger Australian dollar against the US dollar. Excluding these impacts the C1 unit cost performance was largely in line with the previous quarter. The increase in mining costs in the period was mainly due to increased mining activity and associated mobilisation costs for additional mining equipment and labour as planned. The reduced ore mined for the quarter resulted in a higher strip ratio (above the life of mine strip ratio) and hence increased deferred mining costs. TABLE 2 PROMINENT HILL UNIT COST PERFORMANCE DEC '11 MAR 12 MINING COSTS DEFERRED MINING (16.0) (45.1) ORE INVENTORY ADJ (8.9) 12.4 TOTAL MINING COSTS TOTAL SITE PROCESSING COSTS TC AND TRANSPORT NET BY-PRODUCT CREDIT (INCL PROCESSING/TC/RC/TRANSPORT) (115.6) (118.5) OTHER DIRECT CASH COSTS TOTAL C1 COSTS ROYALTIES OTHER INDIRECT COSTS COPPER CONCENTRATE PRODUCED CONCENTRATE GRADE CONTAINED METAL IN CONCENTRATES PRODUCED TOTAL CONCENTRATE SOLD SILVER (%) TONNES 53,163 55,322 COPPER (%) GOLD (G/T) SILVER (G/T) COPPER (TONNES) 26,802 27,182 GOLD (OZ) 37,814 38,887 SILVER (OZ) 168, ,000 (DM TONNES) 56,450 41,677 TOTAL CASH COSTS D&A OTHER NON CASH COSTS TOTAL PRODUCTION COSTS New Mining Contract In early February, a new six-year contract was signed with Thiess Pty Ltd for the provision of mining services to OZ Minerals Prominent Hill open pit mining operations. At the same time, it was agreed that OZ Minerals would purchase certain items of mining equipment to be used by Thiess in the provision of the mining services. The total purchase price for the equipment is approximately $60 million. This arrangement is expected to result in overall cost savings for OZ Minerals. 3

4 EXPLORATION PROMINENT HILL Near Mine Exploration Surface diamond drilling continued with two to three rigs within the mining lease area. Sixteen holes for 11,520 metres were completed to test a combination of geophysical, geological and structural targets outside of the Malu-Kalaya-Ankata corridor. Widespread native copper was intersected in several recent broadly-spaced drill holes located within the southern portion of the mining lease. Follow up drilling is planned with assay data still awaited for the holes showing native copper. The mineralised zone continues south into the adjoining OZ Minerals exploration tenement. No significant assay results have been received to date for drilling in the March quarter. Exploration drilling of the gold-rich area of the Kalaya copper-gold resource from the Ankata decline continued during the quarter with one rig for a total of 1,324 metres. Significant intersections include; PH11D g/t Au from 448 metres PH11D g/t Au from 253 metres g/t Au from 300 metres Development of the Malu exploration decline back towards the east to provide drilling access beneath the open pit reached 445 metres with approximately 1,450 metres remaining. The decline is expected to be complete in Q with exploration drilling to commence on the resource beneath the Malu open pit from stockpile cuddies off this decline in the second half of Regional Exploration The regional exploration program continued with two diamond rigs drilling at Cressida, Kennedy Dam, Tahemi, Bulgunnia Fault, Bluebird South and Prominent Hill South. The prospect locations drilled are shown on page 10 of the accompanying presentation. Twelve holes for 8,430 metres were completed which includes several holes testing the southward extension of the native copper intersections referred to above. In addition, significant brecciation with haematite infill has been identified in rocks resembling the Prominent Hill mine sequence at Bluebird South, approximately 20 kilometres west of the mine. Further drilling is planned around Bluebird South. Geophysical surveys (ground gravity, induced polarisation (IP) and electromagnetic (EM)) continued during the quarter. A major seismic survey began late in the month on selected traverses to highlight major regional structures in the southern half of the project area. One traverse has been designed to pass to the immediate east of the mine. All traverses are being covered by ground gravity surveys to assist with the interpretation of the seismic data. Slide 9 shows the distribution of the geophysical surveys undertaken during the March quarter. IMX Joint Venture During the quarter seven holes for 4,730 metres were drilled with one diamond rig on the IMX joint venture ground to test geophysical anomalies at Aquila, Fyans and Brumby. The rock sequence intersected at Fyans and Brumby appears similar to that at Prominent Hill with some brecciation and haematite infill recorded. Follow-up drilling is being planned Ground gravity was undertaken across the Southern Domain area and a seismic traverse was run across the south-eastern portion of the tenement boundary to define major regional structures. CARRAPATEENA Exploration The exploration program at Carrapateena continued with focus on infill drilling to convert previously announced inferred resource to indicated resources. During the quarter, five drill holes were completed for 10,310 metres with a further four holes in progress. Most completed holes successfully targeted the inferred resource and were also designed to test for extensions to the previously defined pipe like body of mineralisation. Drilling to date has been highly encouraging with most completed holes showing mineralised extensions to the existing model. As an example, hole number 078 shown in slide 12 extended the known high grade lower bornite mineralisation by over 50 metres further to the west. Currently drilling is focussed on assessing possible extensions to the known mineralisation further to the north. 4

5 Significant results received from the third (DD11CAR077) and fourth (DD11CAR078) holes included: DD11CAR % copper and 0.59g/t gold from 668 metres Including: % copper and 0.93g/t gold from 810 metres DD11CAR % copper and 0.67g/t gold from 741 metres Including: % copper and 0.73g/t gold from metres SALES & MARKETING Shipments of Prominent Hill concentrates for the quarter totalled 41,677 tonnes, containing 20,496 tonnes copper and 30,363 ounces gold. Shipments for the quarter utilised the new containers and were offloaded at the Port of Adelaide with the newly commissioned offloading system. Approximately 2,000 tonnes of concentrate stored in Darwin prior to the Edith River incident was exported during the quarter. Exports through Darwin will not resume until after additional planned bridge repairs are completed at Edith River. CORPORATE Edith River Update As reported in the previous Quarterly Report, a mixed freight train operated by Genesee & Wyoming derailed at Edith River in late December 2011 spilling copper concentrate. Copper concentrate and material contaminated with sand has been removed from the Edith River site to Prominent Hill and a significant amount of this material is in the process of being retreated in the plant circuit. OZ Minerals conducts regular monitoring of the Edith River derailment site and will carry out further remediation work, as necessary, in the dry season. On Market Share Buy-Back OZ Minerals commenced its on-market share buy-back program on 17 August, By 11 April, 2012 the Company had bought back 13,995,774 shares at an average price of $10.41 representing $145.6 million. The designated amount for the buy-back program is up to $200 million and will end no later than 16 August, Cambodia On 20 February, OZ Minerals signed a Sale and Purchase agreement with Renaissance Minerals Limited for the sale of its Cambodian assets for $17.8 million in cash, shares and options in Renaissance, along with possible future payments of a further $22.5 million upon the achievement of certain milestones. Further details of these milestones are highlighted in the release made on 20 February SHARE REGISTRY Link Market Services Limited Level 1, 333 Collins Street, Melbourne VIC, 3000 Australia Telephone Australia: Telephone International: +61 (2) Facsimile: +61 (2) registrars@linkmarketservices.com.au CORPORATE INFORMATION ISSUED SHARE CAPITAL AT 24 APRIL 2012 ORDINARY SHARES 309,881,740 UNLISTED OPTIONS 100,000 SHARE PRICE ACTIVITY FOR THE MARCH QUARTER (CLOSING PRICE) HIGH $11.50 LOW $9.53 LAST $9.42 (24 APRIL 2012) AVERAGE DAILY VOLUME 1.46 MILLION SHARES REGISTERED OFFICE Level 10, 31 Queen Street Melbourne, VIC 3000 GPO Box 1291K, Melbourne, VIC 3001 Telephone: +61 (3) Fax: +61 (3)

6 INVESTOR AND MEDIA ENQUIRIES CONTACT INVESTORS James Deo Head of Investor Relations Telephone: +61 (3) MEDIA Rachel Eaves General Manager Public Affairs & Sustainability Telephone: +61 (3) WITHIN THIS PRESENTATION REFERENCES TO EXPLORATION RESULTS RELATING TO PROMINENT HILL AND CARRAPATEENA THIS INFORMATION HAS BEEN APPROVED FOR RELEASE IN THE FORM AND CONTEXT IN WHICH IT APPEARS BY MR JIM HODGKISON WHO IS A FULL TIME EMPLOYEE OF OZ MINERALS AND HAS SUFFICIENT EXPERIENCE WHICH IS RELEVANT TO THE STYLE OF MINERALISATION AND TYPE OF DEPOSIT UNDER CONSIDERATION AND TO THE ACTIVITY UNDERTAKEN TO QUALIFY AS A COMPETENT PERSON AS DEFINED IN THE 2004 EDITION OF THE AUSTRALASIAN CODE FOR REPORTING OF EXPLORATION RESULTS, MINERAL RESOURCES AND ORE RESERVES. WITHIN THIS STATEMENT (OR PRESENTATION) REFERENCES TO EXPLORATION RESULTS RELATING TO PROMINENT HILL ARE BASED ON INFORMATION COMPILED BY MR MARCEL VAN ECK MSC WHO IS A FULL-TIME EMPLOYEE OF OZ MINERALS, IS A MEMBER OF THE AUSTRALIAN INSTITUTE OF GEOSCIENTISTS AND HAS SUFFICIENT EXPERIENCE RELEVANT TO THE STYLE OF MINERALISATION AND TYPE OF DEPOSIT UNDER CONSIDERATION AND TO THE ACTIVITIES UNDERTAKEN TO QUALIFY AS A COMPETENT PERSON AS DEFINED BY THE JORC CODE (2004). MR VAN ECK HAS CONSENTED TO THE INCLUSION OF THE MATERIAL IN THE FORM AND CONTEXT IN WHICH IT APPEARS. ALL OTHER REFERENCES TO EXPLORATION RESULTS WITHIN THIS PRESENTATION / STATEMENT ARE BASED ON INFORMATION COMPILED BY MR A HOUSTON BSC WHO IS A FULL-TIME EMPLOYEE OF OZ MINERALS, IS A MEMBER OF THE AUSTRALIAN INSTITUTE OF GEOSCIENTISTS AND HAS SUFFICIENT EXPERIENCE RELEVANT TO THE STYLE OF MINERALISATION AND TYPE OF DEPOSIT UNDER CONSIDERATION AND TO THE ACTIVITIES UNDERTAKEN TO QUALIFY AS A COMPETENT PERSON AS DEFINED BY THE JORC CODE (2004). MR HOUSTON HAS CONSENTED TO THE INCLUSION OF THE MATERIAL IN THE FORM AND CONTEXT IN WHICH IT APPEARS WITHIN THIS PRESENTATION REFERENCES TO EXPLORATION RESULTS RELATING TO PROMINENT HILL AND CARRAPATEENA OZMINERALS.COM 6

FOR THE THREE MONTHS ENDING 30 JUNE 2011

FOR THE THREE MONTHS ENDING 30 JUNE 2011 FOR THE THREE MONTHS ENDING 30 JUNE 2011 PROMINENT HILL CONTAINED METAL PRODUCTION JUNE 2011 QUARTER YEAR TO DATE 2011 TOTAL COPPER 28,017t 53,725t TOTAL GOLD 44,219oz 86,129oz C1 CASH US56.1c/lb US62.9c/lb

More information

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March OZ MINERALS AUSTRALIAN COPPER CONFERENCE TERRY BURGESS - Managing Director & CEO 23-24 March 2011 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals

More information

For personal use only

For personal use only 5 September 2016 ABN 91 124 752 745 Drilling Underway At The Koala Gold Mine, Mt Coolon Gold Project, Qld Stage 1 drilling for 1,100 metres has commenced on schedule at the Koala Gold Mine. Drilling is

More information

OZ MINERALS US ROADSHOW

OZ MINERALS US ROADSHOW OZ MINERALS US ROADSHOW SEPTEMBER 2012 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides for a presentation

More information

For personal use only

For personal use only Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 ASX ANNOUNCEMENT 04 July 2012 Completion of Asset Sale Agreement

More information

OZ MINERALS CITI S 4 TH AUSTRALIAN INVESTMENT CONFERENCE OCTOBER

OZ MINERALS CITI S 4 TH AUSTRALIAN INVESTMENT CONFERENCE OCTOBER OZ MINERALS CITI S 4 TH AUSTRALIAN INVESTMENT CONFERENCE OCTOBER 2012 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides

More information

Quarterly Activities Report Period Ended 31 March 2018

Quarterly Activities Report Period Ended 31 March 2018 23 April 2018 Quarterly Activities Report Period Ended 31 March 2018 ASX Code: EXG Key Points During the March 2018 Quarter, Kalgoorlie North Gold Project (KNGP) activities predominantly involved resource

More information

OZ MINERALS CONTINUED INVESTMENT IN SOUTH AUSTRALIA. TERRY BURGESS - Managing Director & CEO SAREIC - 02 May 2011

OZ MINERALS CONTINUED INVESTMENT IN SOUTH AUSTRALIA. TERRY BURGESS - Managing Director & CEO SAREIC - 02 May 2011 OZ MINERALS CONTINUED INVESTMENT IN SOUTH AUSTRALIA TERRY BURGESS - Managing Director & CEO SAREIC - 02 May 2011 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 30 APRIL 2015 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS PROJECTS Over 2,000m of RC drilling planned at SA Titan Gold & IOCG Project Drilling planned to test strong EM conductor for high grade

More information

MARCH 2018 QUARTERLY ACTIVITIES REPORT

MARCH 2018 QUARTERLY ACTIVITIES REPORT X AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT 27 April 2018 MARCH 2018 QUARTERLY ACTIVITIES REPORT Syndicated prepares for new phase of drilling at Monument Gold Project drilling commences in early April

More information

Australian Mines increases Marymia ground holding

Australian Mines increases Marymia ground holding 11 June 2015 Australian Mines increases Marymia ground holding Australian Mines Limited ( Australian Mines or the Company ) is pleased to advise shareholders that it has entered into a farm-in and joint

More information

For personal use only

For personal use only ASX Release 24 April 2012 Westgold secures the High Grade Great Fingall Gold Mine Westgold Resources (ASX:WGR) is pleased to advise that it has acquired the 49% relevant interest in the Great Fingall Deeps

More information

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES ASX ANNOUNCEMENT 21 April 2015 FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES The new Four Eagles Gold Project Joint Venture with GEV and Providence has commenced after the renewal

More information

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED ASX ANNOUNCEMENT 16 MARCH 2017 CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED St Barbara Limited (SBM) commits $1.5 million placement at 50 cents per share for 5% stake Funding will allow

More information

For personal use only

For personal use only ABN 52 007 626 575 Date 23 rd May 2016 The Manager Market Announcements Office ASX Ltd 4th Floor, 20 Bridge Street Sydney NSW 2000 ASX Code: JRV JOINT VENTURE WITH AUSTRALIAN MINES LIMITED (ASX: AUZ) The

More information

OZ MINERALS AUSTRALIA & EUROPE ROADSHOW. May 2011

OZ MINERALS AUSTRALIA & EUROPE ROADSHOW. May 2011 OZ MINERALS AUSTRALIA & EUROPE ROADSHOW May 2011 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides for a

More information

Ramelius Resources Limited ASX:RMS

Ramelius Resources Limited ASX:RMS Ramelius Resources Limited ASX:RMS INVESTOR PRESENTATION March 2012 1 Forward Looking and Competent Persons Statements Forward looking statements This presentation contains certain forward looking statements

More information

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited)

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited) Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited) Key Points Operations Record quarterly gold production of 463,170oz (390,096oz). Group cash

More information

QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT QUARTERLY ACTIVITIES REPORT For the quarter ended 31 December 2010 ABN: 38 108 779 782 Silver Lake Resources Ltd ( Silver Lake or the Company ) is pleased to present this Quarterly Activities Report. Les

More information

Quarterly Activities Report Period Ended 31 December 2017

Quarterly Activities Report Period Ended 31 December 2017 24 January 2018 ASX Code: EXG Quarterly Activities Report Period Ended 31 December 2017 Key Points Successful completion of the Zoroastrian open pit ore treatment campaign. Cash balance peaks at $8.1M

More information

Highlights. Quarterly Activities Report: September Kurnalpi Project. Lindsays project

Highlights. Quarterly Activities Report: September Kurnalpi Project. Lindsays project Quarterly Activities Report: September 2018 KalNorth Gold Mines Limited Date: 31 October 2018 ASX Code: KGM Issued Capital 894.24 million Ordinary shares Current Share Price $0.006 Market tfollo Capitalisation

More information

OZ MINERALS UK ROADSHOW OCTOBER

OZ MINERALS UK ROADSHOW OCTOBER OZ MINERALS UK ROADSHOW OCTOBER 2011 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides for a presentation

More information

ROADSHOW PRESENTATION

ROADSHOW PRESENTATION OZ MINERALS ROADSHOW PRESENTATION September 2013 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides for a

More information

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT 26 October 2018 Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 Board of Directors: David Quinlivan Luke Tonkin

More information

For personal use only

For personal use only ASX Announcement 15 May 2012 ARTEMIS ACQUIRES STRATEGIC WEST PILBARA GOLD AND BASE METALS ASSETS About Artemis Resources Artemis Resources is an ASX-listed mineral exploration company with a focus on gold:

More information

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

Market Announcement ASX:NTL, NZX:NTL For Immediate Release Market Announcement ASX:NTL, NZX:NTL For Immediate Release Commodity Exposure GOLD and SILVER Board and Management Charbel Nader Chairman/Independent Director Quarterly Activities Report to 30 September

More information

For personal use only

For personal use only QUARTERLY ACTIVITIES REPORT PERIOD ENDED 30 JUNE 2015 ASX Announcement ASX Code: VXR Released: 31 July 2015 Venturex Resources Limited (ASX: VXR) is pleased to report its activities for the June 2015 Quarter.

More information

For personal use only

For personal use only INDOCHINE MINING LIMITED ACN 141 677 385 ASX: IDC 29 July 2011 Company Announcements Office Australian Securities Exchange 8 Pages Quarterly Activities Report For Quarter ended 30 June 2011 Highlights

More information

Australian Securities Exchange Notice

Australian Securities Exchange Notice Australian Securities Exchange Notice 30 January 2017 ILUKA BUSINESS REVIEW UPDATE AND THE IMPACT ON 2016 AND 2017 FINANCIAL RESULTS Iluka Resources Limited (Iluka) provides the following update relating

More information

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation Outstanding exploration and trial mining results from The Mount deposit pave way to create a 2 nd operational centre

More information

JUNE 2012 QUARTERLY REPORT

JUNE 2012 QUARTERLY REPORT 43 Outram St West Perth WA 6005 Phone: (08) 9321 8845 Fax: (03) 9321 8854 Email info@baru.com.au 26 July 2012 JUNE 2012 QUARTERLY REPORT Board of Directors Richard Anthon (Chairman) Kevin Nichol (Executive

More information

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso The Directors of D Aguilar Gold Limited (ASX Code: DGR) are pleased to draw the attention of shareholders to

More information

December 2017 Quarterly Report

December 2017 Quarterly Report ASX Announcement 31 January 2018 ASX: CRB December 2017 Quarterly Report KEY POINTS Continuation of work including final design criteria and front end engineering following Demonstration Plant test work

More information

For personal use only

For personal use only HIGHLIGHTS Mount Bundy Gold Project Drill results from Rustlers Roost shows 117m at 1.5 g/t gold including 8m at 6.9 g/t gold with other broad intercepts - Drill program highlights potential to further

More information

For personal use only

For personal use only 28 September 2018 GBM EXECUTES AGREEMENT WITH MINJAR TO ACQUIRE TWIN HILLS GOLD PROJECT IN DRUMMOND BASIN, QUEENSLAND HIGHLIGHTS Binding Sale and Purchase Agreement signed with Minjar Gold Pty Ltd 1 to

More information

Quarterly Report for the Period Ending 30 September 2014

Quarterly Report for the Period Ending 30 September 2014 For Immediate Release 17 October 2014 Quarterly Report for the Period Ending 30 September 2014 17 October 2014 ISSUED CAPITAL Ordinary Shares: DIRECTORS 468M CHAIRMAN: Robert Kennedy NON-EXECUTIVE DIRECTORS:

More information

For personal use only

For personal use only ABN: 57 126 634 606 Phone: +61 (7) 4032 3319 info@csdtin.com.au Snapshot: Current CSD Share Price: $0.10 Current LME Tin Price: $24,475 Key Points Snow Peak Mining Pty Ltd acquisition of Kagara s Central

More information

Lorena Gold Project Malachite AGM 29 November 2017

Lorena Gold Project Malachite AGM 29 November 2017 Lorena Gold Project Malachite AGM 29 November 2017 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated

More information

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA Zara Joint Venture, Eritrea (Dragon Mining Limited - 20% interest) Koka Gold Deposit Dragon Mining Limited,

More information

Quarterly Activities Report For the period ended 31 December 2017

Quarterly Activities Report For the period ended 31 December 2017 Quarterly Activities Report For the period ended 31 December 2017 About Aeris Resources (ASX: AIS) is an established copper producer and developer with multiple mines and a 1.8 Mtpa copper processing plant

More information

Recent Exploration of the Olympic Dam

Recent Exploration of the Olympic Dam Recent Exploration of the Olympic Dam Southern Orebody DAVE THOMAS Olympic Dam Development Study SA Explorers Conference 2 December 2005 BHP Billiton profile (2005) The company BHP Billiton is the world

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER October 2017

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER October 2017 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2017 20 October 2017 Key Points* Sales increased ~40% in the September quarter to 0.84 million wet metric tonnes (Mwmt) including

More information

Corporate Presentation March 2015

Corporate Presentation March 2015 Corporate Presentation March 2015 March 2015 Serabi Gold and Brazil Serabi Gold plc is dual listed (TSX:SBI, AIM:SRB), gold mining and development company with operations in Northern Brazil. The Company

More information

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT DECEMBER 2017 QUARTERLY ACTIVITIES REPORT Completion of 1.3Moz WA gold merger and $5.33m capital raising allows Spitfire to hit the ground running in 2018 Scheme of arrangement between Aphrodite Gold and

More information

December 2014 Quarterly Report

December 2014 Quarterly Report Corporate Structure Shares 35,970,000 Options 7,250,000 Perf. Rights 5,000,000 Cash $4.2m ASX Code - BBR Directors Patrick Ford Non-Executive Chairman Chris Cowan Executive Director Nelson Reynolds Non-Executive

More information

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp=== OMNR ^ååì~ä=déåéê~ä=jééíáåö OT=klsbj_bo=OMNR=== ^puw=cjp=== 2 `çêéçê~íé=pìãã~êó Board & Management Capital Structure Robert Kennedy Non-Executive Chairman A Chartered Accountant and a Director since 14

More information

For personal use only

For personal use only Iron Ore Holdings Ltd Investor Presentation July 2014 IOH - Company Status 2 Corporate Overview Background ASX listed in 2005 1.6 billion tonnes JORC Mineral Resources Iron Valley Project production in

More information

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE The world s 5 th largest gold producer, Harmony Gold Mining Company Limited ( Harmony ) and Australasia s largest gold company, Newcrest

More information

JUNE 2017 QUARTERLY ACTIVITIES REPORT

JUNE 2017 QUARTERLY ACTIVITIES REPORT ASX RELEASE 25 JULY 2017 JUNE 2017 QUARTERLY ACTIVITIES REPORT Cash flow positive result for the quarter even after significant development activities and repayment of Nullagine deferred royalties to the

More information

Kidman agrees to acquire 1Moz Mt Holland gold field in WA

Kidman agrees to acquire 1Moz Mt Holland gold field in WA December 18th, 2015 Kidman Resources Limited ABN 88 143 526 096 Corporate Details: ASX Code: KDR Issued capital: 142.3M ordinary shares Substantial Shareholders: Capri 22.7m (15.97%) Holdex Nominees 11.3m

More information

Ramelius Resources Limited ASX:RMS

Ramelius Resources Limited ASX:RMS Ramelius Resources Limited ASX:RMS Diggers & Dealers 3-5 August 2015 Ramelius Resources Limited Diggers and Dealers - August 2015 2 Forward Looking and Competent Persons Statements Forward Looking Statements

More information

Angas Zinc Mine From Prediction to Production

Angas Zinc Mine From Prediction to Production TERRAMIN AUSTRALIA LIMITED Angas Zinc Mine From Prediction to Production Bob Singer SA Explorers Conferenc ce 28 November 2008 Important information The information in this presentationn is designed as

More information

For personal use only

For personal use only 31 January 2012 DIRECTORS Michael Fry Chairman Ian Prentice Managing Director Darren Misquitta Executive Director Robert Kipp Non Executive Director Matthew Driscoll Non Executive Director Suzie Foreman

More information

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe Market Announcements Office ASX Ltd 4 th Floor, 20 Bridge Street, Sydney NSW 25 May 2015 ASX code: MUX Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe Agreement

More information

December 2018 Quarterly Production Report

December 2018 Quarterly Production Report 31 January 2019 December 2018 Quarterly Production Report Fortescue Metals Group Limited (ASX: FMG, Fortescue) Fortescue has released its December 2018 quarterly production results, reporting total shipments

More information

First Thunderbox gold now anticipated in June Quarter 2016

First Thunderbox gold now anticipated in June Quarter 2016 Corporate Details: 16th September 2015 ASX code: SAR Corporate Structure: Ordinary shares on issue: 792.8m Unvested employee performance rights: 7.3m Market Capitalisation: A$340m (share price A$0.43)

More information

Gruyere Project Development Update

Gruyere Project Development Update ASX Announcement 21 June 2017 Gruyere Project Development Update Highlights Project Capital budget revised to A$532 1 million (3.5% increase) following engineering, procurement and construction review

More information

QUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA

QUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA QUARTERLY OPERATIONS REPORT 30 JUNE 2016 Highlights: YAMARNA Geochemical blade-refusal aircore programme confirms the extent of the Jatz basement gold anomaly at over 1.5 km in strike. Multiple RC drilling

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 31 Oct 2016 Focus Minerals Ltd Activities and Cashflow Report for September Quarter 2016 Exploration Highlights During the Quarter During the September Quarter, Focus Minerals Ltd ( Focus

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)

More information

2 September The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT

2 September The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT 2 September 2014 The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT Please find following for shareholders information, an announcement

More information

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014.

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014. ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014. EXPLORATION ACTIVITIES Orion s efforts towards project growth, evaluation, and rationalisation have been the focus

More information

For personal use only

For personal use only Market Release Newcrest Mining Limited 8 February 2013 December 2012 Resources and Reserves Statement Newcrest Mining Limited has updated its Mineral Resource and Ore Reserve estimates for the twelve month

More information

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133 132 EL LIMON MINE: EMPLOYEES & CONTRACTORS 133 B2Gold Employees Direct 552 Nicaraguans 548 Expats 4 Unionized 494 Men 499 Women 53 Contractors Employees 570 Men 529 Women 41 EL LIMON MINE: NICARAGUA OPEN

More information

DECEMBER 2007 QUARTERLY REPORT

DECEMBER 2007 QUARTERLY REPORT This report summarises the Company s activities for the 3 months ended 31 December 2007. HIGHLIGHTS Gold production for the quarter of 39,320 ounces at a cash cost of A$381 per ounce. This took Equigold

More information

PanAust Quarterly Report for the three months to 31 March 2018

PanAust Quarterly Report for the three months to 31 March 2018 PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 7 3117 2000 F: +61 7 3846 4899 E:

More information

2011 Annual General Meeting. Greg Robinson Managing Director & CEO

2011 Annual General Meeting. Greg Robinson Managing Director & CEO 2011 Annual General Meeting Greg Robinson Managing Director & CEO Disclaimer Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve

More information

ON TIME AND ON BUDGET: PROCESSING PLANT OVER 90% COMPLETE AND FIRST PRODUCTION SET FOR MARCH

ON TIME AND ON BUDGET: PROCESSING PLANT OVER 90% COMPLETE AND FIRST PRODUCTION SET FOR MARCH MT MORGANS GOLD PROJECT UPDATE 11 JANUARY 2018 ON TIME AND ON BUDGET: PROCESSING PLANT OVER 90% COMPLETE AND FIRST PRODUCTION SET FOR MARCH Underground mining 873m ahead of schedule with ore intersected

More information

For personal use only

For personal use only AMEX RESOURCES LIMITED (ASX: AXZ) For personal use only 31 July 2012 QUARTERLY REPORT For the period ended 30 June 2012 The Manager Company Announcements Office Australian Securities Exchange Exchange

More information

Activities Report for Quarter ended 31 March 2018

Activities Report for Quarter ended 31 March 2018 ASX ANNOUNCEMENT 30 April 2018 Activities Report for Quarter ended 31 March 2018 HIGHLIGHTS Eastern Goldfields completes placement to raise $30.57 million Further $5.0 million raised through entitlement

More information

For personal use only

For personal use only Southern Cross Goldfields Ltd ASX Announcement 5 September 2014 Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Wonawinta Silver Project (60 M oz) to be acquired

More information

For personal use only

For personal use only Coziron Resources Limited ABN: 91 112 866 869 Level 24, 44 St George s Terrace Perth Western Australia 6000 PO Box Z5183 Perth WA 6831 Phone: +61 8 6211 5099 Facsimile:+61 8 9218 8875 Website: www.coziron.com

More information

KEY POINTS. Significant Resource increase at the Tier-1 mines:

KEY POINTS. Significant Resource increase at the Tier-1 mines: NORTHERN STAR ESTABLISHES 10-YEAR MINE LIVES AFTER RESERVES TRIPLE TO 3.5MOZ AND RESOURCES HIT 10.2MOZ Outstanding result underpins increase in production to 600,000ozpa from next year; Reserves added

More information

Quarterly Activities Report For The Period Ending 30 June 2018

Quarterly Activities Report For The Period Ending 30 June 2018 Quarterly Activities Report For The Period Ending 30 June 2018 Highlights for the quarter ending 30 June 2018 Accent Resources completed one Diamond drill hole on the Magnetite Range Project E59/875 during

More information

South America Copper Site Visit Non-ferrous overview

South America Copper Site Visit Non-ferrous overview Spence, Chile South America Copper Site Visit Non-ferrous overview Andrew Mackenzie Chief Executive Non-ferrous 26 September 2010 Disclaimer Reliance on Third Party Information The views expressed here

More information

LAS OPEÑAS DRILLING COMMENCED

LAS OPEÑAS DRILLING COMMENCED ASX Announcement 17 October 2012 LAS OPEÑAS DRILLING COMMENCED LAS OPEÑAS, ARGENTINA Diamond drilling program commenced Targeting both high-grade epithermal veins and breccia bodies CERRO VERDE, CHILE

More information

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008 DELIVERING DISCIPLINED GROWTH 1 Cautionary Statements All statements, other than statements of historical fact, contained or incorporated by reference in this presentation, including any information as

More information

Candelaria and Ojos del Salado Chile

Candelaria and Ojos del Salado Chile TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 130,000-132,000 tonnes copper Cash costs of $1.35 per lb copper after by-product credits

More information

Quarterly Activities Report For The Period Ending 31 March 2018

Quarterly Activities Report For The Period Ending 31 March 2018 Quarterly Activities Report For The Period Ending 31 March 2018 Highlights for the quarter ending 31 March 2018 Accent Resources have completed one Diamond drill hole (DD03) on the Magnetite Range Project

More information

Market Release Newcrest Mining Limited 10 February 2012

Market Release Newcrest Mining Limited 10 February 2012 Market Release Newcrest Mining Limited 10 February 2012 December 2011 Resources and Reserves Statement Newcrest Mining Limited has updated its Mineral Resource and Ore Reserve estimates for the six month

More information

AUSIMM - Technical Meeting & AGM

AUSIMM - Technical Meeting & AGM The Construction, Commissioning and Ramp-Up of the Prominent Hill Mine John Nitschke Executive General Manager Projects and Technical Services AUSIMM - Technical Meeting & AGM Tuesday 10th November 2009

More information

On The Road To Silver Mining In Mexico

On The Road To Silver Mining In Mexico On The Road To Silver Mining In Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director & CEO Corporate Overview ASX Code KEY STATISTICS AZS Share Price A$0.034 (@ 5/10/2016)

More information

BHP Billiton: A Strategy of Diversification

BHP Billiton: A Strategy of Diversification Olympic Dam, Australia BHP Billiton: A Strategy of Diversification Andrew Mackenzie Chief Executive Non-Ferrous 9 June 2010 Disclaimer Reliance on Third Party Information The views expressed here contain

More information

For personal use only

For personal use only Artemis Resources Limited ARBN: 80 107 051 749 Level 3, IBM Building, 1060 Hay Street, West Perth, WA Australia, 6006 PO Box R933 Royal Exchange NSW Australia, 1225 Phone: +61 2 9078 7670 Facsimile: +61

More information

QUARTERLY ACTIVITIES REPORT. For three months ended 31 March Highlights. 2. Operating Summary

QUARTERLY ACTIVITIES REPORT. For three months ended 31 March Highlights. 2. Operating Summary ASX & NZX Release 29 April 2015 BATHURST RESOURCES LIMITED Level 12 1 Willeston Street Wellington 6011 New Zealand Tel: +64 4 499 6830 Fax: +64 4 974 5218 RICHARD TACON Chief Executive Officer rtacon@bathurstresources.co.nz

More information

Altera Resources Ltd

Altera Resources Ltd 31 January 2011 QUARTERLY REPORT FOR THE 3 MONTHS ENDED 31 December 2010 HIGHLIGHTS Completed the acquisition of JDC and coal projects in Kalimantan, Indonesia New board and management of highly experienced

More information

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2012 (These figures are unaudited)

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2012 (These figures are unaudited) Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2012 (These figures are unaudited) Overview Production for the March 2012 quarter was 532,237 ounces of gold and 18,072 tonnes

More information

Australian Resource Reviews Gold 2016

Australian Resource Reviews Gold 2016 Australian Resource Reviews Gold 2016 Anthony Senior, Geoscience Australia Resource figures are current as at 31 December 2015. The principal uses for gold (Au) are as an investment instrument for governments,

More information

Market Release 11 March 2019

Market Release 11 March 2019 Market Release 11 March 2019 Newcrest to acquire potential Tier 1 orebody in Canada Newcrest Mining Limited (Newcrest) has entered into an agreement with TSX-listed Imperial Metals Corporation (Imperial)

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH April 2018

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH April 2018 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2018 12 April 2018 Key Points* ly sales increased 16% to 1.0 million wet metric tonnes (Mwmt), for ore sales revenue of $60 million

More information

Newcrest Mining Limited

Newcrest Mining Limited Newcrest Mining Limited Colin Moorhead Newcrest a portfolio of opportunities Disclaimer Forward Looking Statement These materials include forward looking statements. Often, but not always, forward looking

More information

Quarterly Activities Report for the period ended 30 September 2018

Quarterly Activities Report for the period ended 30 September 2018 Maroon Gold s Black Jack Gold Processing Plant which will process Agate Creek Ore Level 9, Waterfront Place, 1 Eagle St, Brisbane QLD 4000 Directors GPO Box 1164, Brisbane QLD 4001 Mr Stephen Bizzell (Chairman)

More information

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION BRIEFING PAPER BHP BILLITON SUMMARY BHP Billiton has approved development of a new iron ore mine at Mining Area

More information

Quarterly Activities Report December 2018

Quarterly Activities Report December 2018 ASX: EQE 31 January 2019 About Equus Mining: Equus Mining is an ASX listed Company focused on developing natural resource projects strategically located near existing mine and other infrastructure. Follow-up

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03) 9629 1250 Email:

More information

For personal use only

For personal use only ASX / Media Announcement 10 November 2017 Artemis Resources Limited ARBN: 80 107 051 749 Level 3, IBM Building, 1060 Hay Street, West Perth, WA Australia, 6006 PO Box R933 Royal Exchange NSW Australia,

More information

Lihir Operations PNG Mining and Petroleum Conference 24 November Peter Aitsi Country Manager, PNG

Lihir Operations PNG Mining and Petroleum Conference 24 November Peter Aitsi Country Manager, PNG Lihir Operations PNG Mining and Petroleum Conference 24 November 2015 Peter Aitsi Country Manager, PNG Disclaimer Forward Looking Statements These materials include forward looking statements. Often, but

More information

For personal use only

For personal use only RENAISSANCE URANIUM LIMITED AND SUBSIDIARIES A.B.N. 90 135 531 341 CONSOLIDATED FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2012 RENAISSANCE URANIUM LIMITED CORPORATE DIRECTORY DIRECTORS David

More information

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines. ...the best way to grow production is to construct a centralised processing facility drawing feed from nearby satellite mines. Development Projects Turner River Hub Project The Company has been conducting

More information

4th Quarter Report 2015

4th Quarter Report 2015 4th Quarter Report 2015 HIGHLIGHTS Successful visit of Algerian Delegation to China Increase and extension of Asipac debt facility Marketing Agreement for production from Bird-in-Hand Gold Project Placement

More information