1 Peachtree City Airport Authority (PCAA) Regular Minutes Thursday, June 14 th, 2018 Aviation Center, Peachtree City-Atlanta Regional Airport 7:00 p.m. Members Present: Tom Fulton Chairman, Tom Lacy Secretary/Treasurer, Bryan LaBrecque Member, Allen Morrison Member, Charles Murray Member, Michael Hill for Nathan Lee Airport Attorney, and Airport Manager Hope Macaluso, A.A.E. I. CALL THE MEETING TO ORDER Tom Fulton called the meeting to order at 7:00 p.m. II. APPROVAL OF MINUTES Allen Morrison made a motion to approve the April 2018 Meeting Minutes, seconded by Charles Murray. III. REPORTS. Finance and Capital Budgeting Tom Lacy Tom Lacy had attended the financial review early in the week. Tom said that the numbers were in order and that Hope would give a more detailed report shortly. Operations Report Mike Melton Mike Reported: Fuel (June) We are a third of the way through May and currently on track for the May budget for AvGas and ahead of budget for Jet A. WWII Heritage Days The event went fairly well with no major safety issue during the weekend. We did provide additional staff that proved to be not enough considering the event has grown year over year. We met with the CAF and tweaked the plan for next year. We have also requested that CAF reimburse the airport for only the extra staff required during that weekend moving forward. They were amenable to this request. All in all, they had a great turn out on Saturday and Sunday was not a complete wash out but the weather certainly hindered turn out.

2 During the evening event. Cars were parked at the toy box hangar and an apparent water leak was revealed. Initially we thought as a result of the cars. While a sewer cleanout was damaged by a car, further investigation revealed that the real issue at hand was an old communications cable that was the demise of the pipe. The pipe was completely replaced to the tune of about $2,000. An obvious unexpected capital expense. Sign Issue- An aircraft departing after the event took out a taxiway sign on take-off, the individual was billed and paid for the damaged sign. The cost of the sign and installation was just over $900 but the airport was reimbursed in full. Super Bowl Meeting - FAA Hope and I were invited and attended a briefing that was coordinated with the Atlanta Super Bowl Host Team and the FAA. The briefing was held in College Park at the Flight Standards District Office. Super Bowls have started to become a major event for larger corporations than they have in years past. The anticipation, based off of the last few Super Bowls, is that a considerable amount of corporate jet traffic will fill the airspace during that time. Within a 60- mile radius of Hartsfield they expect and extra 1,100 corporate jets that will need ramp or hangar space for about a 3 to 4-day span. We would safely be able to accommodate aircraft. The FAA has developed a slot system for airports within that 60-mile radius and any aircraft within this area will have to submit a scheduled departure or arrival time not only during the Temporary Flight Restriction but the days leading up to the event and the following Monday. We will have more information on this during the next meeting which will be a webinar in July. In the meantime, we have met our initial obligation to the FAA and we have submitted an aircraft parking plan as requested by the FAA. Priority Jet Arrival Priority Jet (a Jet Charter Company) who used to be based here in hangar B-3 is back. They have a much larger fleet than before with 6 aircraft, most of which are jets and will have an additional 2 jets by the end of the year if not before. This is a huge boost for the airport with jet fuel sales and we have already started to connect them with the right folks at the studios. RV Fly-In The RV Fly In was a success. Everyone worked well together but the weather did hinder attendance in the morning. The Young Eagles program flew 80 kids between 24 volunteer aircraft throughout the day. Aircraft Spruce also held their annual customer appreciate cook out and the had a very efficient and safe shuttle process worked out. All parties involved had a great preevent meeting and everyone had a well-defined plan of what everyone s roles were and contingencies.

3 Elected Officals Event (Lobby) For the last few years we have been host to the Elected Officials Event sponsored by the Fayette County Chamber of Commerce. There was a great turnout and many of the elected officials in Fayette County were present including two State Senators. Flight School Aircraft Falcon Aviation Academy has increased their fleet here from 6 aircraft to 10, this may vary from month to month but ultimately is great for the airport. FBO Hangar We are officially at capacity in the FBO Hangar, although I do not have an official wait list just yet. The next individual to ask will be the first on the FBO Hangar wait list. GPU Situation Our old GPU threw a rod the other day through the engine case, leaving a silver dollar sized hole. We were able to borrow one to get us by until the new to us GPU we ordered a couple weeks ago is delivered. Condo Development Some of you may have heard about a condo development that is slated to be built at the end of TDK next to the lake. The builder was instructed by the City Planning Department to obtain a letter of approval from the airport authority. Before we presented it to the authority we wanted to get the FAA s opinion on the location, so the builder has submitted a 7460 form to the FAA for an off-airport obstruction evaluation. The condo complex at first glance it does not appear to be an issue with our Runway Protection Zone and Transitional Surface, however we will wait to present this to you once we receive the study from the FAA. We hope that will happen at the next authority meeting. Durango Repair The Dodge Durango Courtesy car had to go in for maintenance. An issue with the anti-lock braking system and air conditioning were repaired. The cost was $1,100. Request For Information We responded to a request for information from the Fayette County Development Authority for an anonymous company that has a corporate fleet that is looking to relocate its business to the Atlanta area. While we do not know many details (yes, we asked), we do know they have a Gulfstream 650 or equivalent. Today the Development Authority asked for additional information regarding fuel availability.

4 ODALS We have found a local vendor who was a tenant of ours that was able to assist us in repairing our approach lighting system. We are still in need of parts and seems we are on our way to finding some from the buyer of the company we used to work with that designed and installed the ODALS. Parts are scarce as ODAL systems are antiquated and no new parts are being produced for them. There is a possibility of a potential capital expense on this in the near future, but we are not sure to what extent at this time. Area C Interest We have been in talks with three separate individuals who are very interested in building hangars in Area C. We have met with them multiple times and just today received an informal request in writing to run the initial hangar concept past the airport authority. AvGas Situation AvGas has been increasingly tougher to receive not only for us but many surrounding airports. Many of the fuel terminals that all fuel providers pull from have been down for maintenance for a number of reasons. There are not many terminals that provide AvGas to our area so when this happens the cost of fuel increases due to the additional freight. This also causes delays of delivery of fuel which gets us to the point where we run dangerously low on fuel supply for avgas. We have to plan our fuels loads carefully as our tank can only technically hold just over 13,000 gallons and load of fuel is around 8,000 gallons. We can t order fuel until we get down to 5,000 gallons. If we run through that 5,000 gallons quicker than anticipated (like we did last week, we went through 5,000 gallons in 5 days) and our fuel order gets delayed like it did last week then we run into the issue of running out of fuel. We were able to split a load with Dekalb Peachtree but that split load cost us an additional $0.30 per gallon. That cost gets passed on to the customers, hence the surge in fuel price here this week. It should level back out in the next couple of weeks, once we run through that pricier fuel. We are looking at additional storage options that would include a larger AvGas truck (at a nominal cost) to help assist with supply. Similar to what we do with Jet Fuel, we have a larger truck so we can accept more fuel more frequently. We will continue to monitor the situation and see if this is something that we need to look at further. After the Operations Report was complete. Bryan LaBrecque made a motion to modify the agenda and add an Executive Session, seconded by Allen Morrison.

5 IV. FINANCIAL REVIEW - Airport Manager (Hope Macaluso) Hope reported: April 2018 Revenue and Expense Highlights: In April, we were behind in revenues for the month due to continued lower than expected fuel margins. Also, there had been some back and forth with a through the fence partner on what is owned by them. You will see that in June those adjustments have been made. On the expense side of things, we were well below budget on maintenance in the month. We are well above the budgeted telephone budgeted expense due to a gap and negotiation with our main telephone and internet provider, NuLink, with which we have signed another long-term contract with for services. Overall expenses were just 1.3% over budget and net income for the month was 9.2% short of budget for the month, but still 35.8% ahead of budget year to date. May 2018 Revenue and Expense Highlights: We were below on jet fuel sales in May due to a two of our frequent customers being going for the entire month. Fuel margins continue to be lower than budgeted. However, car rental income continues to be strong and there were many call-outs in the month, giving us overall revenues above budget. Overall budgeted expenses were right in line. Net income for the month we were above budget and year to date we are almost 33% ahead of budget. Bryan asked if the customers that were gone for the entire month had returned and Hope responded that they had returned. Capital Expenses There were two capital expenses in the month. $12,000 was the down payment on our replacement GPU, which is on order and $2,846 was for fuel farm motors. One is a spare and one has been used at the fuel farm already. Grant Update We received the final payment for our last grant for the airfield lighting today. For the next grant, which is the Environmental Analysis for On and Off Airport Obstruction Mitigation, we expect to have an update for you in July, as the funding has been pushed to FY WK Dickson has been contracted by us to begin the Runway Justification Project and are currently working on it now and expect to have it completed by the end of this month.

6 V. OLD AGENDA ITEMS None VI. NEW AGENDA ITEMS Fuel Pricing and Self-Serve Fuel Presentation Mike started off by stating that the Self-Serve Fuel had been a question that had long been asked at the airport by tenants and that during the last Authority Meeting he mentioned it was a good time to review the subject again. During the presentation Mike covered many subjects. Beginning with how fuel was priced at Atlanta Regional Airport. Mike stressed the importance of the transparency with regards to fuel pricing and even walked the authority and the audience through an invoice and how typical mark up on tenant priced fuel was on average between 11% and 15% (or $0.33 to $0.38 per gallon mark-up) depending on the cost of fuel. Mike also mentioned how the 7% sales tax did not come back to the airport so this was not taken into consideration when calculating profit. He continued on to note the difference between a city/county subsidized airport like Pine Mountain was able to sell fuel at a much lower cost due to the fact they were backed by the county in this case. He also noted that many of the airports that were subsidized were reporting operating losses on an annual basis. He noted that Atlanta Regional Airport was not subsidized by the city or county and had to support itself through revenues generated through fuel sales, ground leases/rent and other miscellaneous revenue streams associated with aviation activities. Mike pointed out that a few months out of the year if comparing expenses to gross revenue generated from just AvGas, the airport would take a loss on Avgas. He also highlighted the importance of providing AvGas as many of the hangar owners utilized AvGas on a daily basis. All in all, AvGas as a percentage of gross monthly revenues only accounts for 5.5%, so a small portion of revenues generated by the airport. After explaining the thin margin made on AvGas, Mike launched into the financial feasibility of a Self-Serve AvGas fuel farm at the airport. After researching many small and large tank options, a 10,000 gallon tank made the most sense for the airport. This would let us receive an entire 8,000 gallon load of fuel and not bear the additional cost of splitting fuel loads if a smaller tank was installed. The tank installation and materials would cost approximately $220,000. This estimate was given to us through 3 different sources so this is the average of the estimates that also include our engineering consulting fees. Referring back to the fact that profit margins were so low on AvGas even from the fullservice truck, the perception of lower fuel prices at a Self-Serve pump would not justify

7 the outlay of such a large capital expenditure for the airport at this time. Recouping the capital expense using full service margins as an example would take the airport close to 40 years. This would exceed the useful life of the tank and essentially eliminated any hope of recouping the initial capital expense. If the airport honored the perceived lower fuel price and discounted self-serve by even $0.10, it would take the airport well over 60 years to recoup the initial capital expense of a self-serve facility. Based off of this research, staff did not recommend the capital outlay as it was not a fiscally responsible venture for the airport at this time. Tom Fulton thanked Mike and Hope for putting together a thorough presentation. Bryan LaBrecque commented that there was nothing captured in the report for good will to the tenants at the airport. Mike commented that there is certainly value to a good will gesture but he commented that there were other upcoming capital expenditures that Hope would mention later that would likely overshadow the thought of self-serve Capital Spending Presentation and Consideration Hope Macaluso began the presentation reminding the authority of the long-term debt that was still on the books, totaling $230,000. Hope also mentioned that the intergovernmental agreement between the Airport Authority and The City of Peachtree City would expire in 4 years. She also noted that the airport would need a plan to replace that income once that agreement came to an end. She also mentioned that Grant Projects for the next 5 years were totaling $14 million. Hope also reviewed the details of the April approved capital expenses that were approved by the authority, totaling $184,000. Hope noted that the authority had given staff a not to exceed number and to date we were under budget for the allotment. Hope then reviewed $168,400 of capital expenses that were operational needed and that were important to note. This list included a larger tug, enclosed bobcat/brush cutter, hangar office roof repair, area c parking seal /restripe, T hangar floor coating, additional security cameras, crew car replacement and repainting tie down spots. Hope also noted who each of these would benefit, most of which were geared toward tenants, transients and ultimately everyone in regards to safety. Hope continued on to review the $476,000 of more tenant centric additional capital expenses. This list included self-serve avgas, aircraft wash rack, hangar acquisition, FBO update/parking asphalt rejuvenation, T hangar bathrooms, WiFi in the T/D hangar area and additional storage hangars. Hope had again also broken down who each of these would benefit and all except the hangar acquisition would directly benefit the current and future tenants of the airport. Hope then broke down the $516,200 of potentially FAA or GDOT reimbursable projects that ultimately would benefit all the users of the airport. This list included runway length/strength justification study (approved in March), update/upgrade fuel farm, crack

8 seal aprons, condemnation escrow, area c fencing/gates, area c crack seal and Toy Box Hangar fencing. She reiterated that the majority of these projects would benefit all the users of the airport. She also reminded the Authority that while these are potentially reimbursable the initial outlay would be the responsibility of the airport to be reimbursed in a future grant project if approved by GDOT/FAA. Hope recapped her presentation and stated that it s important and appropriate to have reasonable reserve funds. She analyzed all of the factors and anticipated the capital needs in Area C in the short-term future to be needed. In the meantime, there are long term deferred maintenance items that need to be addressed. One is the moisture in the T- Hangars that those customers have been dealing with for years. She suggested the need to focus on taking care of our current infrastructure before adding new infrastructure that will also need to be maintained. Allen Morrison stated his hopes for the authority to entertain the T Hangar bathrooms in an upcoming meeting, even if it was to look at potential cost first. Hope agreed that staff would gather estimates and bring those to the July 2018 meeting. Tom Fulton agreed in the approach that staff was taking and noted that there were some big capital items on the horizon and to hold on any larger requests like the self-serve unit. Hope asked the authority for approval to spend $8,400 on the T Hangar Seal Coating. Tom Lacy made a motion to approve the capital expense as requested, seconded by Charles Murray. Prior to executive session, Tom Fulton opened the floor to the public for comment, but reminded those in attendance that the Authority was not required to answer. Kevin Smith (tenant) asked Mike the different vendors that were researched in regards to the self-serve fuel farm an if multiple quotes were given. Mike responded that there was a great resource in Peachtree City that was able to assist in providing multiple vendors for such an installation. He noted that that $220,000 was an average between three vendors. John Sciera asked Mike if the fuel provider would charge additional for delivery of a single load of fuel to two location on the airfield. Mike responded that they would and it could be as much at $0.30 per gallon, which was seen on a recent invoice from a split load earlier in June.

9 Derek Smith asked if any of the sales tax collected on AvGas comes back to the airport. Mike responded that it does not directly come back to the airport. VII. Executive Session Tom Fulton noted that no action would be taken after the Executive Session. Allen Morrison made a motion to adjourn the Regular Meeting at 8:15 pm and enter into Executive Session for real estate and attorney client privilege discussions, seconded by Bryan LaBrecque. Allen Morrison made a motion to adjourn the Executive Session and enter back into the regular meeting at 8:40pm, seconded by Bryan LaBrecque. VIII. Adjournment Bryan LaBrecque made a motion to adjourn the Regular Meeting at 8:41pm, seconded by Tom Lacy. Attest Tom Fulton, Chairman

Not Present: N/A. Tom Lacy made a motion to approve November minutes, seconded by Charles Murray.

Not Present: N/A. Tom Lacy made a motion to approve November minutes, seconded by Charles Murray. Peachtree City Airport Authority (PCAA) Regular Minutes Thursday, February 14 th, 2019 Aviation Center, Peachtree City-Atlanta Regional Airport 7:00 p.m. Members Present: Tom Fulton Chairman, Tom Lacy

More information

Peachtree City Airport Authority (PCAA) Regular Minutes Thursday, August 9 th, 2018 Aviation Center, Peachtree City-Atlanta Regional Airport 7:00 p.m.

Peachtree City Airport Authority (PCAA) Regular Minutes Thursday, August 9 th, 2018 Aviation Center, Peachtree City-Atlanta Regional Airport 7:00 p.m. Peachtree City Airport Authority (PCAA) Regular Minutes Thursday, August 9 th, 2018 Aviation Center, Peachtree City-Atlanta Regional Airport 7:00 p.m. Members Present: Tom Fulton Chairman, Bryan LaBrecque

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

AIRPORT COMMITTEE MEETING AGENDA September 06, :00 PM Moorhead Municipal Airport

AIRPORT COMMITTEE MEETING AGENDA September 06, :00 PM Moorhead Municipal Airport AIRPORT COMMITTEE MEETING AGENDA September 06, 2017-4:00 PM Moorhead Municipal Airport 1. Call to Order 2. Agenda Amendments 3. Approval of Minutes A June 14, 2017 4. Citizens to be Heard 5. Airport Capital

More information

Rates & Charges Analysis

Rates & Charges Analysis Aeronautics Division Rates & Charges Analysis Executive Summary Executive Summary In This Report: Airlines Rates and Charges Other Building Rental Rates Landing Fees Parking Rates Tie-Downs Special Use

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES MARK PESTRELLA, Director COUNTY OF LOS ANGELES AVIATION COMMISSION To Enrich Lives Through Effective and Caring Service 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100

More information

MINUTES SUBJECT TO CORRECTION BY THE BOARD OF AIRPORT COMMISSIONERS. CHANGES, IF ANY, WILL BE RECORDED IN THE MINUTES OF THE NEXT MEETING OF THE

MINUTES SUBJECT TO CORRECTION BY THE BOARD OF AIRPORT COMMISSIONERS. CHANGES, IF ANY, WILL BE RECORDED IN THE MINUTES OF THE NEXT MEETING OF THE MINUTES SUBJECT TO CORRECTION BY THE BOARD OF AIRPORT COMMISSIONERS. CHANGES, IF ANY, WILL BE RECORDED IN THE MINUTES OF THE NEXT MEETING OF THE BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS

More information

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015 COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday August 20, 2015 Minutes of the regular monthly meeting of the Board of Commissioners of the Coos County Airport District held on Thursday, August

More information

TABLE 4-1 REGIONAL ECONOMIC AIRPORT IMPACT. Jobs Supported

TABLE 4-1 REGIONAL ECONOMIC AIRPORT IMPACT. Jobs Supported Financial Analysis 4.0 Overview The 2011 State of Texas Airport System Economic Impact Study calculated that H.H. Coffield Regional Airport has annual local economic impact of $187,293. This value places

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

COOS COUNTY AIRPORT DISTRICT

COOS COUNTY AIRPORT DISTRICT COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday February 19, 2015 Minutes of the regular monthly meeting of the Board of Commissioners of the Coos County Airport District held on Thursday,

More information

Airport Commission Members, Reggie Cassagnol, and Bob Childress Ken Thurman, Chairman Airport Commission Meeting

Airport Commission Members, Reggie Cassagnol, and Bob Childress Ken Thurman, Chairman Airport Commission Meeting TO: FROM: REF: Airport Commission Members, Reggie Cassagnol, and Bob Childress Ken Thurman, Chairman Airport Commission Meeting When: Monday, April 10th, 2017 Time: 7:00 PM Where: Airport Terminal Building

More information

VIRGIN ISLANDS PORT AUTHORITY (VIPA) 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE. ! July

VIRGIN ISLANDS PORT AUTHORITY (VIPA) 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE. ! July VIRGIN ISLANDS PORT! July AUTHORITY (VIPA) 2016 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE FINANCIAL OPERATIONS VIPA AVIATION DIVISION VIRGIN ISLANDS PORT AUTHORITY 2 5-YEAR INCOME STATEMENT SNAPSHOT-

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA SPECIAL MEETING

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA SPECIAL MEETING WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AUTHORITY MEMBERS John Sundgren - Chair, Alvin Osborn - Vice-Chair, Michael Bodine, Desmond Johnston, and Ryan Smith AGENDA SPECIAL

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Financial Proposal for Gwinnett County Airport Briscoe Field

Financial Proposal for Gwinnett County Airport Briscoe Field Financial Proposal for Gwinnett County Airport Briscoe Field Financial Proposal For the Lease, Operation and Improvement RP039-11 of GWINNETT COUNTY AIRPORT BRISCOE FIELD Presented To Gwinnett County Board

More information

LOGAN - CACHE AIRPORT AUTHORITY BOARD MEETING DECEMBER 2, 2015 MINUTES

LOGAN - CACHE AIRPORT AUTHORITY BOARD MEETING DECEMBER 2, 2015 MINUTES LOGAN - CACHE AIRPORT AUTHORITY BOARD MEETING DECEMBER 2, 2015 MINUTES The Logan-Cache Airport Authority Board convened in a regular session on December 2, 2015 at 7:30 a.m. in the Cache County Historic

More information

2018 Accomplishments

2018 Accomplishments CY2018 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the current and future needs of the community

More information

GENERAL AVIATION AIRPORT AGREEMENTS

GENERAL AVIATION AIRPORT AGREEMENTS 33 rd Annual Basics of Airport Law Workshop and 2017 Legal Update Session #17 GENERAL AVIATION AIRPORT AGREEMENTS W. Eric Pilsk Kaplan Kirsch & Rockwell Corinne C. Nystrom, A.A.E., Airport Director Mesa-Falcon

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 INTRODUCTION The City of Hutchinson is issuing a Request For Proposal (RFP) for the private or commercial use of the Hangar

More information

Regular Board Meeting August 4, 2015

Regular Board Meeting August 4, 2015 Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Appendix C. User Survey Data

Appendix C. User Survey Data Appendix C User Survey Data Charlevoix Municipal Airport Master Plan APPENDIX C: 2010 USER SURVEY SUMMARY In support of the 2010 Master Planning effort for Charlevoix Municipal Airport (CVX), an aviation

More information

Business Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles

Business Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles 5 Business Plan INTRODUCTION Just as previous chapters have outlined plans for the airport s physical development, this chapter outlines a plan for the airport s financial development. More specifically,

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AUTHORITY MEMBERS Larry Morelock-Chair, Alvin Osborn-Vice-Chair, John Sundgren, Rodrigo Flores, Ryan Smith, and Michael Bodine.

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

1.0 CALL TO ORDER Chair, Jeff Munger, called the meeting to order at 4:03 PM on November 15, 2017.

1.0 CALL TO ORDER Chair, Jeff Munger, called the meeting to order at 4:03 PM on November 15, 2017. MINUTES SUBJECT TO CORRECTION BY THE BOARD OF AIRPORT COMMISSIONERS. CHANGES, IF ANY, WILL BE RECORDED IN THE MINUTES OF THE NEXT MEETING OF THE COMMISSION. BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT

More information

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis

More information

I. COMMUNICATIONS II. RESOLUTIONS, MOTIONS AND NOTICES

I. COMMUNICATIONS II. RESOLUTIONS, MOTIONS AND NOTICES AGENDA Aviation Committee May 23, 2016 7:00 PM I. COMMUNICATIONS II. RESOLUTIONS, MOTIONS AND NOTICES 1. Resolution authorizing agreement with McFarland Johnson on behalf of the Elmira Corning Regional

More information

PROMOTION CONFERENCES ADDITIONAL BENEFITS COMPLIMENTARY PUBLICATIONS

PROMOTION CONFERENCES ADDITIONAL BENEFITS COMPLIMENTARY PUBLICATIONS Airports Council International-North America (ACI-NA) represents Airport Members who enplane 95 percent of all domestic and virtually all international airline passenger and air cargo traffic in North

More information

CEDAR CITY REGIONAL AIRPORT BOARD MEETING JUNE 11, 2015

CEDAR CITY REGIONAL AIRPORT BOARD MEETING JUNE 11, 2015 CEDAR CITY REGIONAL AIRPORT BOARD MEETING A regular meeting of the Cedar City Regional Airport Board was held on Thursday, June 11, 2015 at 8:15 AM in the Conference Room at the Airport located at 2560

More information

ACRP 01-32, Update Report 16: Guidebook for Managing Small Airports Industry Survey

ACRP 01-32, Update Report 16: Guidebook for Managing Small Airports Industry Survey ACRP 01-32, Update Report 16: Guidebook for Managing Small Airports Industry Survey Goal of Industry Survey While there are common challenges among small airports, each airport is unique, as are their

More information

Minutes from July s meeting were reviewed. A motion was made by Tony to accept the minutes, it was seconded by Jim. It passed unanimously.

Minutes from July s meeting were reviewed. A motion was made by Tony to accept the minutes, it was seconded by Jim. It passed unanimously. Lemhi County Airport Board Meeting - August 14th, 2017 The meeting was called to order by Richard Natelson at 18:00 h Additional board members in attendance were: Don Jakovac, Jim Crawford, Nathan Bills,

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

AIRPORT FUND. Description. Summary

AIRPORT FUND. Description. Summary Description In March 1941 construction started for the airport at its present site. After Pearl Harbor, the airport, known as Pinellas Army Airfield, was used as a military flight-training base. After

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

Logansport Cass County Aviation Authority Meeting Minutes July 9 th, 2003 Board Meeting

Logansport Cass County Aviation Authority Meeting Minutes July 9 th, 2003 Board Meeting Logansport Cass County Aviation Authority Meeting Minutes July 9 th, 2003 Board Meeting Attendance: Board members - Guests - Bob Barr Paul Hipsher Pat McNarny Jim Steinberger Tad Wilkinson Mark Shillington;

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

Collier County Airport Authority. Joint Automated Capital Improvement Program

Collier County Airport Authority. Joint Automated Capital Improvement Program Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer

More information

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday June 18, 2015

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday June 18, 2015 COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday June 18, 2015 Minutes of the regular monthly meeting of the Board of Commissioners of the Coos County Airport District held on Thursday, June

More information

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT Signatory Airlines Landing Fee: (Net of GAC & SAC = $2.06 / 1,000 lbs) $3.32 / 1,000 lbs. Apron Fees: Square Foot Rate Landed Weight Rate $1.91 / sq. ft. $0.41

More information

Airport Strategic Planning Board (Airport Advisory Board) MEETING AGENDA

Airport Strategic Planning Board (Airport Advisory Board) MEETING AGENDA Airport Strategic Planning Board (Airport Advisory Board) MEETING AGENDA Monday, April 9th, 2018 4:00 P.M. Airport Administration Building 1723 McCollum Parkway ENTRANCE A Kennesaw, GA 30144 I. Call to

More information

Rates and Charges Guide 2018 Update Survey

Rates and Charges Guide 2018 Update Survey Rates and Charges Guide 2018 Update Survey If you need to provide information about more than one rate or charge in a particular section, please duplicate that page and complete it with the additional

More information

2017 Accomplishments

2017 Accomplishments CY2017 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the needs of the communities we serve. 2017

More information

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 Visioning Process: Overview SMO in 1917 (Cloverfield) Grass Landing Strip WWI Pilot Training Visioning

More information

Airport Advisory Committee Meeting Captain Walter Francis Duke Regional Airport February 24, 2003

Airport Advisory Committee Meeting Captain Walter Francis Duke Regional Airport February 24, 2003 Airport Advisory Committee Meeting Captain Walter Francis Duke Regional Airport February 24, 2003 CALL TO ORDER Korey Smith, Chairman, called the meeting to order at 6:00 p.m. Members present were: Bill

More information

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update Chapter Seven Implementation Plan Master Plan Update This chapter presents the 20-year improvement program for the continued development of the. The objectives of this chapter are to identify projects

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

FIRST AMENDMENT AIRLINE OPERATING AGREEMENT AND TERMINAL BUILDING LEASE. between. City Of Manchester, New Hampshire Department Of Aviation.

FIRST AMENDMENT AIRLINE OPERATING AGREEMENT AND TERMINAL BUILDING LEASE. between. City Of Manchester, New Hampshire Department Of Aviation. FIRST AMENDMENT AIRLINE OPERATING AGREEMENT AND TERMINAL BUILDING LEASE between City Of Manchester, New Hampshire Department Of Aviation and Airline December 2009 THIS FIRST AMENDMENT TO THE AIRLINE OPERATING

More information

MassDOT Aeronautics Division Capital Improvements Presentation

MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Board Retreat October 27, 2011 Presentation Agenda Capital Improvement Plan (CIP) Overview Airports Capital Improvement Plan (ACIP)

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES MARK PESTRELLA, Director COUNTY OF LOS ANGELES AVIATION COMMISSION To Enrich Lives Through Effective and Caring Service 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100

More information

AGENDA AIRPORTS BOARD Thursday June 21, :30 p.m. Beaufort County Government Building, County Council Chambers

AGENDA AIRPORTS BOARD Thursday June 21, :30 p.m. Beaufort County Government Building, County Council Chambers Page 2 AGENDA AIRPORTS BOARD Thursday June 21, 1:3 p.m. Beaufort County Government Building, County Council Chambers NO AUDIO/VIDEO WILL BE AVAILABLE AT THE HILTON HEAD ISLAND LIBRARY 1. CALL TO ORDER

More information

RAPID CITY REGIONAL AIRPORT

RAPID CITY REGIONAL AIRPORT RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

Aviation Tax Report. June 30, 2016

Aviation Tax Report. June 30, 2016 Aviation Tax Report June 30, 2016 Prepared by The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000 Toll-Free: 1-800-657-3774 TTY, Voice

More information

Columbus Regional Airport Authority. Financial Statements. August 31, Respectfully Submitted. Randy Bush, CPA, CIA. Chief Financial Officer

Columbus Regional Airport Authority. Financial Statements. August 31, Respectfully Submitted. Randy Bush, CPA, CIA. Chief Financial Officer Columbus Regional Airport Authority Financial Statements August 31, 2018 Respectfully Submitted Randy Bush, CPA, CIA Chief Financial Officer Unaudited for internal purposes CRAA Operating Revenue & Expenses

More information

SAN MARTIN BUSINESS PLAN COMMUNITY MEETING

SAN MARTIN BUSINESS PLAN COMMUNITY MEETING SAN MARTIN BUSINESS PLAN COMMUNITY MEETING Summary of Community Meeting Wednesday May 23, 2018 Santa Clara County Roads and Airports Department hosted a community meeting on Wednesday May 23 nd, 2018 from

More information

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017 Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about

More information

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT Signatory Airlines Landing Fee: (Net of General Airline Credit = $1.91 / 1,000 lbs) $3.17 / 1,000 lbs. Apron Fees: Square Foot Rate Landed Weight Rate $1.78 /

More information

EXHIBIT E to Signatory Airline Agreement for Palm Beach International Airport RATE AND FEE SCHEDULE

EXHIBIT E to Signatory Airline Agreement for Palm Beach International Airport RATE AND FEE SCHEDULE EXHIBIT E to Signatory Airline Agreement for Palm Beach International Airport RATE AND FEE SCHEDULE SECTION I - DEFINITIONS The following words, terms and phrases used in this Exhibit E shall have the

More information

LOGAN - CACHE AIRPORT AUTHORITY BOARD MEETING SEPTEMBER 3, 2014 MINUTES

LOGAN - CACHE AIRPORT AUTHORITY BOARD MEETING SEPTEMBER 3, 2014 MINUTES LOGAN - CACHE AIRPORT AUTHORITY BOARD MEETING SEPTEMBER 3, 2014 MINUTES The Logan-Cache Airport Authority Board convened in a regular session on September 3, 2014 at 7:30 a.m. in the Cache County Historic

More information

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO

More information

June 3, The June 3, 2010 meeting of the NIESA Board was called to order at 7:00 pm by the Chairperson Charles Galbreath.

June 3, The June 3, 2010 meeting of the NIESA Board was called to order at 7:00 pm by the Chairperson Charles Galbreath. The meeting of the NIESA Board was called to order at 7:00 pm by the Chairperson Charles Galbreath. Voting Members Present: C. Galbreath, R. Pollok, A. Hale, A Simmons, E. Griffes, F. Wilbrink, R. Cole.

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES MARK PESTRELLA, Director COUNTY OF LOS ANGELES AVIATION COMMISSION To Enrich Lives Through Effective and Caring Service 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

Review of Aviation Real Property Leases at Fort Lauderdale-Hollywood International Airport

Review of Aviation Real Property Leases at Fort Lauderdale-Hollywood International Airport Exhibit 1 Review of Aviation Real Property Leases at Fort Lauderdale-Hollywood International Airport Robert Melton, CPA, CIA, CFE, CIG County Auditor Audit Conducted by: Jenny Jiang, CPA, Audit Manager

More information

OPTIONS FOR LIMITED AIRCRAFT USAGE/ISSUES RELATING TO THE PURCHASE AND OWNERSHIP OF AN INTEREST IN A FRACTIONAL PROGRAM AIRCRAFT

OPTIONS FOR LIMITED AIRCRAFT USAGE/ISSUES RELATING TO THE PURCHASE AND OWNERSHIP OF AN INTEREST IN A FRACTIONAL PROGRAM AIRCRAFT Aviation Tax Law Webinar November 5, 2013 OPTIONS FOR LIMITED AIRCRAFT USAGE/ISSUES RELATING TO THE PURCHASE AND OWNERSHIP OF AN INTEREST IN A FRACTIONAL PROGRAM AIRCRAFT Presented By: Chris Younger 1

More information

CHAPTER 61 SHEBOYGAN COUNTY MEMORIAL AIRPORT

CHAPTER 61 SHEBOYGAN COUNTY MEMORIAL AIRPORT 61.01 OPERATION OF AIRPORT 61.02 DEFINITION OF WORDS AND PHRASES 61.03 AIRPORT OPERATION POLICIES 61.04 UTILITIES 61.05 ENTRANCES 61.06 SPECIAL VARIANCE 61.07 ENFORCEMENT 61.08 PENALTY 61.09 MULTIPLE OWNERSHIP

More information

Huronia/Midland Airport, CYEE

Huronia/Midland Airport, CYEE Huronia/Midland Airport, CYEE HURONIA MUNICIPAL AIRPORT- 2016 TO 2020 1. INTRODUCTION In 2010, The Huronia Municipal Airport Commission (HMAC) developed a five-year business plan to increase activity levels

More information

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised)

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised) Appendix D Orange County/John Wayne Airport (JWA) General Aviation Improvement Program (GAIP) Based Aircraft Parking Capacity Analysis and General Aviation Constrained Forecasts Technical Memorandum To:

More information

COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fee for FY18 October 1, 2017 through September 30, 2018

COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fee for FY18 October 1, 2017 through September 30, 2018 COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fee for FY18 October 1, 2017 through September 30, 2018 GROUND & FACILITY LEASE RATES Ground Lease Rate Bare ground for development Per Individual

More information

Passenger Facility Charge Application #1

Passenger Facility Charge Application #1 Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

Glenwood Springs Municipal Airport Semi-Annual Report to City Council January 4, 2018

Glenwood Springs Municipal Airport Semi-Annual Report to City Council January 4, 2018 Glenwood Springs Municipal Airport Semi-Annual Report to City Council January 4, 2018 Presented by the Airport Advisory Board Table of Contents Introduction... 2 Airport Revenue and Expenses... 2 Economic

More information

Columbus Regional Airport Authority. Financial Statements. March 31, Respectfully Submitted. Randy Bush, CPA, CIA. Chief Financial Officer

Columbus Regional Airport Authority. Financial Statements. March 31, Respectfully Submitted. Randy Bush, CPA, CIA. Chief Financial Officer Columbus Regional Airport Authority Financial Statements March 31, 2018 Respectfully Submitted Randy Bush, CPA, CIA Chief Financial Officer Unaudited for internal purposes CRAA Operating Revenue & Expenses

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY

More information

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Agenda» Website Update» Alternatives» Discussion» Evaluation» Schedule Agenda» Website Update» Alternatives» Discussion» Evaluation»

More information

Financial Feasibility Analysis

Financial Feasibility Analysis CHAPTER F Financial Feasibility Analysis 1. Introduction This chapter presents a funding plan for completion of recommended capital projects at Friedman Memorial Airport (the Airport) through FY 2034,

More information

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

AVIATION. MichiganReportCard.com 5

AVIATION. MichiganReportCard.com 5 MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure

More information

EAGL E CO U NT Y REGI O NAL AIRP ORT REP O RT

EAGL E CO U NT Y REGI O NAL AIRP ORT REP O RT EAGL E CO U NT Y REGI O NAL AIRP ORT 2018 A NNU A L REP O RT WELCOME Welcome to the 2018 Annual Report for Eagle County Regional Airport (EGE). I am pleased to share that EGE continues to experience strong

More information

Financial Reporting: What is Your Responsibility? Tina Kettle, United Technologies Corporation Doug Stewart, AircraftLogs Monday, Jan 16, 3:30 5:00

Financial Reporting: What is Your Responsibility? Tina Kettle, United Technologies Corporation Doug Stewart, AircraftLogs Monday, Jan 16, 3:30 5:00 Financial Reporting: What is Your Responsibility? Tina Kettle, United Technologies Corporation Doug Stewart, AircraftLogs Monday, Jan 16, 3:30 5:00 Agenda Session Objective Understanding the impact of

More information

Meeting Notes Public Open House

Meeting Notes Public Open House Meeting Notes Public Open House, 5:30-8:00 pm Fairbanks Pipeline Training Center, 3605 Cartwright Court, Fairbanks, Alaska= Agenda: Open House: 30 minutes Presentation: 45 minutes Question and Answers:

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

CITY OF DALLAS The Honorable Members of the Mobility Solutions, Infrastructure and Sustainability

CITY OF DALLAS The Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Memorandum CITY OF DALLAS The Honorable Members of the Mobility Solutions, Infrastructure and Sustainability To Committee: Lee M. Kleinman (Chair), Rickey D. Callahan (Vice-Chair), Sandy Grayson, Adam

More information

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING October 15, 2013 APPROVED 11/20/13

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING October 15, 2013 APPROVED 11/20/13 MINUTES SUBJECT TO CORRECTION BY THE BOARD OF AIRPORT COMMISSIONERS. CHANGES, IF ANY, WILL BE RECORDED IN THE MINUTES OF THE NEXT MEETING OF THE COMMISSION. MEMBERS PRESENT: MEMBERS ABSENT: BTV STAFF PRESENT:

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Marco Island Executive Airport 2016 Rates and Charges

Marco Island Executive Airport 2016 Rates and Charges Marco Island Executive Airport 2016 Rates and Charges Building Rates Office Space $18.5806 Per Sq Ft/Year Building A $4.2904 Per Sq Ft/Year Building B Single Engine Units $4.5515 Per Sq Ft/Year Building

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

JANUARY 2018 BOARD INFORMATION PACKAGE

JANUARY 2018 BOARD INFORMATION PACKAGE JANUARY 2018 BOARD INFORMATION PACKAGE MEMORANDUM TO: Members of the Airport Authority FROM: Lew Bleiweis, Executive Director DATE: January 19, 2018 Financial Report (document) Informational Reports: A.

More information

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING November 20, 2013 APPROVED 12/16/13

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING November 20, 2013 APPROVED 12/16/13 MEMBERS PRESENT: MEMBERS ABSENT: BTV STAFF PRESENT: OTHERS PRESENT: BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING November 20, 2013 APPROVED 12/16/13 Jeff Munger (Chairman)

More information