PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6195. Tonga Aviation Infrastructure Investment Project Region
|
|
- Clifford Paul
- 5 years ago
- Views:
Transcription
1 PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6195 (The report # is automatically generated by IDU and should not be changed) Project Name Tonga Aviation Infrastructure Investment Project Region East Asia Pacific Country Kingdom of Tonga Sector Aviation (100%) Lending Instrument IDA Credit/Grant Project ID P Borrower(s) Government of the Kingdom of Tonga Implementing Agency Ministry of Public Enterprises Environmental Screening [ ]A [ ]B [ ]C [ ]FI [ ]TBD (to be determined) Category Date PID Prepared December 21, 2010 Estimated Date of Appraisal April 1, 2011 Completion Estimated Date of Board May 17, 2011 Approval Concept Review Decision Following the review of the concept, the decision was taken to proceed with the preparation of the operation. I. Introduction and Contet Country Contet With its remote location, small size and dispersed islands setting, Tonga faces many challenges in developing and maintaining sustainable internal, regional and international transport and communication linkages, all of which are crucial to the economic development and social well-being of its estimated 105,000 population. The country is faced with limited capital resources, asset deterioration due to neglect of maintenance, and financial and administrative constraints, that have been eacerbated by both the recent global financial crisis and increasingly rigorous international security requirements. Recognizing the key place of transport in the economic and social fabric of the country, the Government of Tonga (GoT), with IDA ESW support, undertook a series of reviews from 2004 through 2006, including a comprehensive analysis of the multi-modal transport sector and options for rationalizing the aviation sector. Many of the recommendations arising from this work were adopted by GoT through the national Strategic Development Plan. In March 2006, the Ministries of Civil Aviation and Marine and Ports were merged under a Ministry of Transport (MoT) with additional responsibilities for some aspects of land transport. In July 2007, the regulator and operator functions in the aviation sector were formally separated the regulatory
2 functions remaining in the Department of Civil Aviation, MoT and the operator being corporatized as Tonga Airports Ltd (TAL). On December 12, 2008, the Tonga Transport Sector Consolidation Project (TSCP) (Grant No. H416-TO) for SDR3.4m (~ US$5.44m) became effective. The development objective of TSCP was: (i) to establish and consolidate the operations of the newly-created MoT as a unified transport sectorpolicy, planning and regulatory ministry; and, (ii) to improve the level of compliance of the civil aviation and maritime subsector entities with international safety and security standards. Sectoral and Institutional Contet The aviation components 1 of the TSCP have been highly successful and the GoT has requested the Bank to finance a number of additional high priority safety and security requirements at the three main airports Tongatapu Fua amotu International (TBU), Vava u (VAV) and Ha apai (HPA). These investments are required to meet ICAO standards and recommended practices, as well as airline safety standards, ensuring that Tonga s access to international markets and tourism can be maintained. Moreover, the proposed investments will preserve and etend the service life of eisting infrastructure assets as well as reduce the energy consumption of the airports. Relationship to CAS The Tonga CAS presented to the Bank s Board on October 19, 2010, points to the need to mainstream disaster risk reduction and climate change adaptation into infrastructure planning and management. Addressing climate change by providing carbon-neutral airport facilities are part of this investment program, as are investments in alternative and sustainable energy efficient technologies. This will help ensure that the airports are operated in an environmentally sustainable manner. II. Proposed Development Objective(s) Proposed PDO The proposed development objective is: to provide safe and secure air transport operations and environmentally sustainable and efficient airports. Key Results Monitoring Indicators: It is proposed that the success of the project will be monitored through three indicators: (i) Certification of the main three airports in accordance with 1 The TSCP investments consisted of: (i) Aviation Sector Strategic Development Plan; (ii) TAL Airports future investment study; (iii) Aviation sector regulatory surveillance and compliance obligations review and support; (iv) TBU PAPI navigational aid, supply installation and commissioning; (v) provision of a TBU fire tender; (vi) TBU hand-baggage screening X-ray machine; (vii) emergency power upgrades at TBU and VAV; (viii) new TBU rescue fire station; (i) TBU upgrade to passenger screening and transit facility; () TBU CCTV and access control.
3 ICAO standards and recommended practices; (ii) Implementation of the corrective action plan following ICAO s safety and security audits; and, (iii) Energy consumption at project airport terminals reduced by at least 30%. Intermediate outcome indicators, separately reported for each airport, are proposed to include: (i) Specific runways, taiways, and apron areas rehabilitated (ii) Eisting runway lights replaced with energy efficient lights; (iii) Percentage of TBU power supplied by renewable energy; (iv) Recommended air traffic navigation, surveillance and weather reporting equipment installed; (v) Percentage of airports water needs met through rain water harvesting; (vi) Percentage reduction in annual airport terminal power consumption; and, (vi) Civil Aviation Agency training and equipment needs assessment recommendations satisfactorily implemented. Beneficiaries: The project will benefit the population of Tonga by ensuring that its international air travel connections are not reduced due to the failure to provide services in accordance with ICAO requirements. Individual travelers will benefit through the provision of safer international and domestic air travel, and more efficient operations in the airport terminals. TAL will benefit by having significant reductions in their operating costs for the terminals through more energy efficient and environmentally sustainable terminals. III. Preliminary Description Component A: Aviation Infrastructure Investments: This component will invest in the aviation infrastructure at the three project airports so that they are able to meet the ICAO standards, while preserving and etending the service life of eisting airport assets. The activities include: Rehabilitation of airport pavements: The project will rehabilitate the runways, taiways and aprons and at all three airports. This will see the eisting surfaces milled (if needed) and replaced with asphalt concrete, cement concrete and/or interlocking concrete/stone pavers as appropriate, with proper attention to airfield drainage to prevent ponding on shoulders, aprons and other critical areas. Provision of renewable power: Implementation of discrete photovoltaic power source for generation of on-site power that is carbon-neutral during operation. This will not only significantly reduce airport operating costs, but do so using a non-polluting, renewable, and importantly, reliable energy source. Potentially, ecess energy could be supplied to the national grid, thereby reducing the diesel fuel demands and their related CO2 effects. Energy optimization of terminals: Improvements to terminals to reduce electrical consumption through both passive and technological means. Upgrading of runway lighting: The eisting lighting and cabling will be replaced with low power consumption LED fitures, reducing the energy demand by 90%. Security improvements: Improved fencing, access control, building management system, FIDS and CCTV for Fua amotu airport; X-ray equipment for hand baggage at Vava u airport;
4 Rain water harvesting and improved efficiency: Facilities will be provided to collect and store rain water from roof areas to significantly reduce the potable water demand and preserve natural water resources. The water will be used to service all sanitary demands and provide required collections for fire water for Crash Fire Rescue demands, and ground vehicle maintenance. Water consumption will be reduced by utilizing fitures and valves within the terminal buildings that are high efficiency/low consumption. Control tower: Construction of a new control tower at TBU, along with the necessary communication and surveillance equipment, for eample an ADS-B for Vava u and Fua amotu airports; PAPI and NDB for Fua amoto and Ha apai airports. Fire safety: Provision of a fire tender for Vava u airport; provision of fire equipment for firemen (jackets, oygen, etc.). Weather monitoring: Automatic Weather Observation Stations for all three airports. Consulting services: (i) Procurement of design and supervision consultant; and, (ii) Specialists for preparation of technical specifications on aviation equipment. Component B: Aviation Sector Reform: The TSCP has contributed towards major sector reform. The reform will continue through the project providing support to the Civil Aviation Department (CAD) to adopt and implement the new Civil Aviation Regulations as well as the agreed corrective action plan following the ICAO safety and security audits. This support will likely include a civil aviation advisor to CAD. Component C: Project Support and Training: (i) Support to the Project Implementation Unit (PIU); and, (ii) training program for staff of the MoT and CAD to address needs to carry-out regulatory oversight, and project support as necessary. IV. Safeguard Policies that might apply Safeguard Policies Triggered by the Project Yes No TBD Environmental Assessment (OP/BP 4.01) Natural Habitats (OP/BP 4.04) Pest Management (OP 4.09) Physical Cultural Resources (OP/BP 4.11) Involuntary Resettlement (OP/BP 4.12) Indigenous Peoples ( OP/BP 4.10) Forests (OP/BP 4.36) Safety of Dams (OP/BP 4.37) Projects in Disputed Areas (OP/BP 7.60) * Projects on International Waterways (OP/BP 7.50) V. Tentative financing Source: ($m.) * By supporting the proposed project, the Bank does not intend to prejudice the final determination of the parties claims on the disputed areas
5 Borrower/Recipient IBRD IDA Others (specify) VI. Contact point World Bank Contact: Mr. Christopher R. Bennett Title: Senior Transport Specialist Tel: cbennett2@worldbank.org Total Borrower/Client/Recipient Contact: Mr Tiofilusi Tiueti Title: Acting Secretary for Finance Tel: (676) ttiueti@finance.gov.to Implementing Agencies Contact: Mr. Inoke Vala Title: Secretary for Public Enterprises, Ministry of Public Enterprises Tel: ifvala@mpei.gov.to VII. For more information contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fa: (202) Web:
Pacific Aviation Investment Project Region. EAST ASIA AND PACIFIC Country. Specific Investment Loan - Adaptable Program Loan Project ID
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6595 Project Name Pacific
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Cusco Transport Improvement
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC849 Project Name Lombok
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC2258 Project Name Djibouti
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name EG-Second
More informationEVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE.
EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE. Challenge The safety and security of the aviation system and the traveling public are top priorities for all airports. The continued growth in
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC17238 Project Name Santa
More information1. Key development issues and rationale for Bank involvement
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name Rio Bogota Environmental Infrastructure Region LATIN AMERICA AND CARIBBEAN Sector Sewerage (70%); Flood protection
More informationICAO Technical Cooperation Progress and Future Potential Program on Environmental Sustainable Air Transportation in Indonesia
ICAO Technical Cooperation Progress and Future Potential Program on Environmental Sustainable Air Transportation in Indonesia 2013-2020 By Aviation and Climate Change Seminar, ICAO Headquarters, Montréal,
More informationAviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers
Aviation Data and Analysis Seminar 20-23 February 2017 Economics of Airports and Air Navigation Services Providers 250 7000 6000 200 5000 150 4000 Growth of air transport World recession SARS Freight Tonne
More informationGHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES
GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES SECTION 1 - CONTACT AND BACKGROUND INFORMATION 1.1 Contact Information Name of the Authority : Ghana Civil Aviation Authority Point of Contact
More informationNotice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport
Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County
More information2006 ANNUAL GENERAL MEETING
2006 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 19, 2006 Thank you Peter and good morning ladies and gentlemen and invited guests. Before proceeding
More informationCIVIL AVIATION AUTHORITY
CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview
More informationAir Transport Safety & Security Checklist
Air Transport Safety & Security Checklist Air Transport Safety Components Item Description Example / Picture CAA Technical Library CAA Computer System CAA General Equipment Airport Emergency Planning Technical
More informationTable of Contents. Master Plan March 2014 TOC i Spokane International Airport
Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land
More informationAndres Lainoja Eesti Lennuakadeemia
Andres Lainoja Eesti Lennuakadeemia In the beginning was the Word... Convention on International Civil Aviation (Doc 7300) was signed on 7 December 1944 International Civil Aviation Organization began
More informationDuring Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects
Page 1 of 5 May 21, 2007 HOME PROFILE SECTORS & SERVICES CAREERS SEMINARS & PAPERS LINK airport development Description of Service transportatio services link Airport Developm Pre-Construction Area Development
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationENVIRONMENT ACTION PLAN
ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written
More informationIRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority
IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationCLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257
Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and
More informationZANZIBAR AIRPORTS AUTHORITY PROJECTS
ZANZIBAR AIRPORTS AUTHORITY PROJECTS ZANZIBAR AIRPORTS AUTHORITY INTRODUCTION Zanzibar is a part of United Republic of Tanzania It consists of two main Islands, Unguja and Pemba, and several other smaller
More informationIATA Fuel Efficiency Program
IATA Fuel Efficiency Program IATA Fuel Efficiency Program The program was launched by IATA in 2004 in response to the rising price of fuel. It is focused on supporting the airlines to increase fuel efficiency
More informationAviation Sector Services. Transportation / Aviation
Aviation Sector Services Transportation / Aviation 01 04 Cover / Ottawa Macdonald Cartier International Airport, Ottawa ON; Above / San Diego International Airport, San Diego, CA Delivering World-class
More informationPort of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer
Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State Kurt Beckett Deputy Chief Executive Officer WA Ports A Unique Public Agency Mission: Create Jobs through Travel, Trade
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)
More information2012 Performance Framework AFI
2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical
More informationTWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)
INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda
More informationCOMMISSION IMPLEMENTING REGULATION (EU)
18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2975 West
More informationWhat is safety oversight?
What is safety oversight? ATM SAFETY MANAGEMENT SYSTEM AUDITORS SEMINAR FOR CAR/SAM REGIONS Mexico City, Mexico, 05-09 December 2005 ICAO Universal Safety Oversight Audit Programme /USOAP Safety oversight
More informationWelcome to AVI AFRIQUE 2017
Welcome to AVI AFRIQUE 2017 Single African sky and Functional Airspace Blocks: Improving Air Traffic Management The global ATM operational concept is fundamental framework drive ATM operational requirements,
More informationSECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1
Air Transport Connectivity Enhancement Project (RRP BHU 44239-013) SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Sector Road Map 1. Sector Performance,
More informationAII CHAIRMANSHIP OF MONTENEGRO PRIORITIES AND CALENDAR OF EVENTS-
MONTENEGRO MINISTRY OF FOREIGN AFFAIRS ADRIATIC AND IONIAN INITIATIVE CHAIRMANSHIP OF MONTENEGRO JUNE 2018-MAY 2019 AII CHAIRMANSHIP OF MONTENEGRO 2018-2019 -PRIORITIES AND CALENDAR OF EVENTS- Montenegro,
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA104159
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower(s) Implementing Agency
More informationCHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS
CHAP 5-1 CHAPTER 5 PERFORMANCE OPERATING LIMITATIONS 5.1 GENERAL 5.1.1 Aeroplanes shall be operated in accordance with a comprehensive and detailed code of performance established by the Civil Aviation
More informationRIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE
RIJEKA GATEWAY PROJECT CROATIA M. Audigé Program Team Leader ECSIE Transport Forum & Learning Week - Washington DC 2006 Transport Forum & Learning Week 2006 2 Historical Reminder Initially two separated
More informationANGLIAN WATER GREEN BOND
ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility
More informationPBN Implementation Plan Tonga
PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using
More informationPUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT
PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International
More informationCROSS-BORDER TRADE IN SERVICES
Disclaimer: In view of the Commission's transparency policy, the Commission is publishing the texts of the Trade Part of the Agreement following the agreement in principle announced on 21 April 2018. The
More informationEx-Ante Evaluation Southeast Asia Division 5 Southeast Asia and Pacific Department, JICA 1. Name of the Project
Ex-Ante Evaluation Southeast Asia Division 5 Southeast Asia and Pacific Department, JICA 1. Name of the Project Country: Republic of the Philippines Project: New Bohol Airport Construction and Sustainable
More informationAerodrome Certification Applicable provisions
Aerodrome Certification Applicable provisions ICAO CAR/SAM Seminar on Aerodrome Certification October 2017 Avner Shilo Technical Officer, Airport Operations and Infrastructure, ICAO Agenda The Chicago
More information75 YEARS OF EXPERIENCE 350+ AIRPORT PROJECTS AIRPORT TERMINAL ENGINEER (BUILDING DESIGN+CONSTRUCTION) AIRPORTS (ENR 2016)
COMMERCIAL AVIATION #2 AIRPORT TERMINAL ENGINEER (BUILDING DESIGN+CONSTRUCTION) #3 AIRPORTS (ENR 2016) 75 YEARS OF EXPERIENCE 350+ AIRPORT PROJECTS PILOTING YOUR SUCCESS FROM THE GROUND UP Designing and
More informationPUBLIC NOTICE. Table 1 Projects Proposed by Amendment
PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the
More informationA Master Plan is one of the most important documents that can be prepared by an Airport.
The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport
More informationREPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire
INTERNAL AUDIT DIVISION REPORT 2014/111 Audit of air operations in the United Nations Operation in Côte d Ivoire Overall results relating to the effective management of air operations in the United Nations
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationCity of Tallahassee, FL Department of Aviation
City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and
More information1.0 PURPOSE 2.0 REFERENCES 3.0 BACKGROUND
Page 1 of 6 1.0 PURPOSE This Order is issued to provide requirements and guidance on the qualifications, duties and responsibilities, staffing and training requirements for inspectors in order to ensure
More informationFramework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )
Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African (2017 2020) Activities and Actions AVIATION INFRASTRUCTURE PROGRAMMES/PROJECTS
More informationBY YAW NYAMPONG WORKSHOP ON AIR TRANSPORT, AIR AND SPACE LAW AND REGULATION ABU DHABI, UAE, APRIL 12-14, 2009
BY YAW NYAMPONG WORKSHOP ON AIR TRANSPORT, AIR AND SPACE LAW AND REGULATION ABU DHABI, UAE, APRIL 12-14, 2009 I. AVIATION ENVIRONMENTAL ISSUES Aircraft noise pollution Local air quality/pollution Surface
More informationAustralian Airport Association Stakeholder Dinner. 31 May 2018 Sydney, Australia. Speech by Angela Gittens
Australian Airport Association Stakeholder Dinner 31 May 2018 Sydney, Australia Speech by Angela Gittens Good evening ladies and gentlemen. It is a pleasure to be with you tonight and thank you again Caroline
More informationIntegration of Meteorological Data in the ATM System. Dhipak Lalla Air Traffic and Navigation Services
Integration of Meteorological Data in the ATM System Dhipak Lalla Air Traffic and Navigation Services Presentation Overview ATM Operational Concept & Community Phases of Airspace Management Central Airspace
More informationProject Data Sheet BASIC PROJECT DATA. Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River
BASIC PROJECT DATA Full project title: Short project title: (acronym) Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River Project logo: Project website: Project
More informationFort Wayne International Airport Master Plan Study. Executive Summary
Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationTRANSPORTATION: Airports and Aviation Services
TRANSPORTATION: Airports and Aviation Services Profile Our background GIBB is a leading multi-disciplinary engineering consulting firm based in South Africa with 67% Black ownership. The firm has a strong
More informationWhale Watching Tourism in the Kingdom of Tonga
Whale Watching Tourism in the Kingdom of Tonga Preliminary Report for the Pacific Islands Forum October 2007 A report for the International Fund for Animal Welfare and Opérations Cétacés Prepared by: Introduction:
More informationPPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI
PPCR/SC.4/5 October 9, 2009 Meeting of the PPCR Sub-Committee Washington, D.C. October 28, 2009 REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI Proposed Sub-Committee Decision The Sub-Committee reviewed
More informationDecision Strategic Plan Commission Paper 5/ th May 2017
Decision Strategic Plan 2017-2019 Commission Paper 5/2017 5 th May 2017 Commission for Aviation Regulation 3 rd Floor, Alexandra House Earlsfort Terrace Dublin 2 Ireland Tel: +353 1 6611700 Fax: +353 1
More informationAVIATION. MichiganReportCard.com 5
MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure
More informationASSEMBLY 39TH SESSION
International Civil Aviation Organization WORKING PAPER A39-WP/310 1 EX/113 9/8/16 ASSEMBLY 39TH SESSION Montréal, 27 September 7 October 2016 EXECUTIVE COMMITTEE Agenda Item 16: Aviation Security Policy
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationAIRPORTS COUNCIL INTERNATIONAL APEX IN SAFETY REFERENCE DOCUMENT
AIRPORTS COUNCIL INTERNATIONAL APEX IN SAFETY REFERENCE DOCUMENT The ACI programme designed for airports to achieve excellence in safety Version 2.3 1 September 2015 Airports Council International is the
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationTWINNING EGYPT ITALY STRENGTHENING THE AVIATION OVERSIGHT STANDARDS OF THE EGYPTIAN CIVIL AVIATION AUTHORITY
TWINNING EGYPT ITALY STRENGTHENING THE AVIATION OVERSIGHT STANDARDS OF THE EGYPTIAN CIVIL AVIATION AUTHORITY Twinning are EU initiatives to assist neighboring countries in the construction of their national
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. EG-Second Airports Development
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE EG-Second Airports Development
More informationRodrigues Regional Assembly Chief Commissioner s Office
Ref: CCO/CAV/1/2013 Rodrigues Regional Assembly Invitation for Expressions of Interest Consultancy Services for the Design of Runway Extension & Ancillary Works at Sir Gaetan Duval Airport Plaine Corail,Rodrigues
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA808. Project Name. Region Country Sector(s)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing
More informationTransportation Working Group Proposed Work Plan for 2018
2018/SOM2/SCE/006 Agenda Item: 3.3 Transportation Working Group Proposed Work Plan for 2018 Purpose: Consideration Submitted by: TPTWG Lead Shepherd Second SOM Steering Committee on Economic and Technical
More informationCONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES
International Civil Aviation Organization 30/5/08 WORKING PAPER CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES Montréal, 15 to 20 September 2008 Agenda Item 2: Specific issues related
More informationHIGH-LEVEL SAFETY CONFERENCE
17/3/06 List of Documentation No. 1 1/04/10 HIGH-LEVEL SAFETY CONFERENCE Montréal, 29 March to 1 April 2010 PART I LIST OF WORKING PAPERS IN NUMERICAL ORDER AS OF 1 APRIL 2010 1 1 Agenda with explanatory
More informationCOMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management
L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN
More informationAIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018
AIRPORT PLANNING Joseph K CHEONG Technical Officer, Airport Operations & Infrastructure, ICAO HQ Secretary, Aerodrome Design and Operations Panel Lima, September 2018 TOPICS THE AVIATION SYSTEM CHICAGO
More informationCASE STUDY The New Guayaquil International Airport
www.jacobs.com worldwide CASE STUDY The New Guayaquil International Airport Prepared for ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 September 11, 2018 Outline Existing
More informationCooperative Development of Operational Safety Continuing Airworthiness Programme. COSCAP-Gulf States. Training of Airworthiness Inspectors
COSCAP- Training of Airworthiness Inspectors Part V _ STATE SAFETY OVERSIGHT SYSTEM (ICAO Doc 9734, Part I) By Nadia Konzali COSCAP-GS Project Coordinator FLIGHT PLAN 1. Civil aviation regulations; 2.
More informationAAIB Safety Study - 1/2016
Farnborough House Berkshire Copse Road Aldershot, Hants GU11 2HH Tel: 01252 510300 Fax: 01252 376999 www.aaib.gov.uk AAIB Air Accidents Investigation Branch AAIB Safety Study - 1/2016 AIRWORTHINESS OF
More informationThe results of the National Tourism Development Strategy Assessments
The results of the National Tourism Development Strategy Assessments - 2012 (I) The assessment tool In 2012 the Sustainable Tourism Working Group of the CEEweb for Biodiversity prepared a guidance for
More informationMELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM
MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, 2011 8:30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM Pledge of Allegiance ACTION ITEMS APPROVAL OF MINUTES of the Regular Meeting of
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION
INTERNATIONAL CIVIL AVIATION ORGANIZATION Twenty First Meeting of the Africa-Indian Ocean Planning and Implementation Regional Group (APIRG/21) (Nairobi, Kenya, 9-11 October 2017) Agenda Item 5: Regional
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationDescription of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB
Description of Airport Charges Swedavia AB 2016 Appendix 3 to Conditions of Services, Swedavia AB Contents 1 Swedavias Charges... 3 2 Aircraft Related Charges... 4 2.1 Take-Off Charge... 4 2.2 Emission
More informationAVIATION ACTIVITY IN KIRIBATI
AVIATION ACTIVITY IN KIRIBATI Infrastructure and Regulatory Improvements in Kiribati: Enhancing Aerodrome Safety through Partnership, Collaboration and Today's Technology IN GLOBAL CONTEXT Two Hemispheres
More informationGREATER ORLANDO AVIATION AUTHORITY
GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3
More informationVarious Counties MINUTE ORDER Page 1 of I
TEXAS TRANSPORTATION COMMISSION Various Counties MINUTE ORDER Page 1 of I Various Districts Texas Government Code, Chapter 2056, requires that each state agency prepare a five-year strategic plan every
More informationScreening Chapter 14 Transport. Single European Sky (SES) 18 December Transport
Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe
More informationKey Statistical Indicator For The International Airports Operator In PPP/BOT/Project Finance Environment
Key Statistical Indicator For The International Airports Operator In PPP/BOT/Project Finance Environment Introduction Taken over airports in emerging markets and in immature environments (but not always
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2973 West
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT Sector Performance, Problems, and Opportunities
SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Fiji, 2014 2018 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Fiji is a maritime island state in the South
More informationNATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *
NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * Shaban Buza,, PhD, Professor Ramadan Duraku,, MSc, Lecturer KEY NOTES Introduction The Transport S&T system Overview of Transport research activities
More informationPublic Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport
Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationEXPERIENCE IN THE LIBERALIZATION OF AIR TRANSPORT IN THE MEMBER STATES OF THE WEST AFRICAN ECONOMIC AND MONETARY UNION (WAEMU)
February 2003 English and French only EXPERIENCE IN THE LIBERALIZATION OF AIR TRANSPORT IN THE MEMBER STATES OF THE WEST AFRICAN ECONOMIC AND MONETARY UNION (WAEMU) (Presented by Economic and Monetary
More informationAVIATION ENVIRONMENT CIRCULAR 2 OF 2013
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI AVIATION ENVIRONMENT CIRCULAR 2 OF 2013 File No. 04-01/2010-AED Dated: 13 th June
More information