USDA FOREST SERVICE, HIAWATHA NATIONAL FOREST Alger County, Michigan. Grand Island Primitive Cabins Project

Size: px
Start display at page:

Download "USDA FOREST SERVICE, HIAWATHA NATIONAL FOREST Alger County, Michigan. Grand Island Primitive Cabins Project"

Transcription

1 USDA FOREST SERVICE, HIAWATHA NATIONAL FOREST Alger County, Michigan I. INTRODUCTION Grand Island Primitive Cabins Project DECISION NOTICE and FINDING OF NO SIGNIFICANT IMPACT This document describes my decision and the rationale for implementing the Grand Island Primitive Cabins Project on the Hiawatha National Forest (HNF). This decision and findings are based on the Grand Island Primitive Cabins Project Environmental Assessment (EA) conducted by an interdisciplinary (ID) team. This decision involves permitting the construction of two primitive cabins that would be available for rental by the general public on the southern part of the Grand Island National Recreation Area (GINRA). The EA describes the Purpose and Need for the Proposed Action (p. 4), the Proposed Action (p. 5), the design elements of the Proposed Action (pgs. 7-8), Alternative 1 which was considered in detail (p. 9), alternatives considered but eliminated (pgs ) and the effects of the two alternatives on various resources (pgs ). The HNF has been managing GINRA since Since that time, the Forest has been developing infrastructure designed to accommodate public recreation use, protect resources, and increase accessibility. These projects have included establishing a passenger ferry service and interpretive bus tour, constructing roads, trails, toilets, water systems, beach accesses, day use areas, and campsites including two group sites. Summer recreation use has increased from 1,000 users on the passenger ferry in 1990 to 3,500 in Recreation opportunities on GINRA are receiving more exposure due to increased marketing, feature articles in travel and tourism publications, word of mouth and events such as the annual Grand Island Trail Marathon and 10K Run. II. DECISION RATIONALE A. Decision Based on the analysis and documentation provided in the Grand Island Primitive Cabins EA and comments received during scoping and the 30-day notice and comment period, it is my decision to select the Proposed Action. The design features and the mitigation measures for the Proposed Action described in the EA will be implemented (p. 7-10). B. Rationale 1

2 My decision to implement the Proposed Action considered existing conditions, environmental affects, and public comments. I also considered direction provided in the Forest Plan (p to 3-85), National Forest Management Act, National Environmental Policy Act, Endangered Species Act, Clean Water Act, and related regulations and policy. I made this decision based on the following reasons: 1. The Proposed Action best meets the Purpose and Need as described in the EA 2. The Proposed Action addresses issues brought up during scoping 3. The Proposed Action protects other resource objectives 1. The Proposed Action best meets the Purpose and Need. The Purpose and Need is found on page 4 and 5 of the EA. The legislation for GINRA directed the Management Plan to provide for a range of appropriate recreation opportunities consistent with the rustic natural, and historic character of the island [PL , Section 7 (b)(i)]. The management planning process that took place between 1990 and 1994 resulted in Forest Plan Standards and Guidelines that permitted seven primitive cabins sleeping no more that eight people each (EA, p. 4). No more than two could be located in the summer semi-primitive non-motorized ROS class and none on the Tombolo (EA, p. 4). The Standards and Guidelines did not specify the exact location for the cabins. That task is being accomplished through this sitespecific NEPA analyses. The above-mentioned Standards and Guidelines were incorporated into the 2006 Forest Plan (p. 3-80). In addition, the HNF completed a five year Strategic Plan ( ) for GINRA in which tourism trends, nationally and in the central UP region, were used to identify GINRA s niche in the regional recreation and tourism area. The Strategic Plan identifies Grand Island s niche in the Central UP as offering adventurous special interest activities with easy access to equipment rentals and guide services. Part of the service improvements identified to achieve the strategic vision includes providing primitive cabin and historic cottage overnight opportunities (Grand Island NRA Strategic Plan ). I think it is a reasonable approach to build two cabins initially. We are able to meet the need of diversifying the overnight accommodations and supporting regional tourism by providing diverse experiences for visitors; but by doing it in steps. Taking this first step gives the proponents and the Forest Service the opportunity to assess the need for further cabins by monitoring occupancy, visitor satisfaction, financial success, and any effects on recreationists of the first two cabins. I believe Cabin #1 s location is a good choice because the cabin is located along the west rim trail and near a beach location with a view to the west out into the expanse of Lake Superior (EA, p. 48). The site is away from concentrations of motorized use and the 2

3 feeling of privacy is high (EA, p. 42). It feels like you are in a remote part of the island when in fact you are only 0.8 mile from Williams Landing. It is accessible for hikers, bicyclists, and kayakers (EA, pgs ). As for Cabin #2 s location, my rationale for selecting it in the Proposed Action is much the same as for Cabin #1. Cabin #2 is located on a busier part of the island s rim than Cabin #1 even though both sites are in a Roaded Natural ROS (EA, p. 42). The desirable attribute of Cabin #2 is that it is located near the turnaround for the island bus and will afford ready access by bus for those who do not prefer to hike, bike, or kayak to the cabin (EA, p. 42). Yet, access is easy for hikers, bicyclists, and kayakers as well. Cabin #2 is also a desirable location because it is readily accessible to the rim trail and to views of the islands to the west and spectacular sunsets (EA, p. 48). In summary, I believe construction of these two cabins meets the Purpose and Need by moving the GINRA in the direction of the Desired Condition described in the Forest Plan (p. 3-89) by diversifying overnight accommodations. The cabins respond to a demonstrated need and help a greater number of people enjoy the hiking, biking, and kayaking opportunities on the island. 2. The Proposed Action addresses issues brought up during scoping. Issue 1 captured concerns that trails users may experience less remoteness or feel the area is less pristine than expected. Some commenter s expressed strong feeling that Cabin #1 s location would detract from the feeling of remoteness in this part of the island; that there would be adverse effects on other recreationists such as hikers and bicyclists. I believe section of the EA does an accurate job of disclosing the effects on other users. By employing the design elements and mitigation measures (EA, p. 7-10), the construction and occupancy of Cabin #1 would be fully in harmony with the Roaded Natural ROS class. Section of the EA accurately describes the effect of Cabin #2 on recreationists. Some commenters also had serious concerns that Cabin #1 would create a negative effect on visual quality. I believe the design elements and mitigation measures (EA, p. 7-10) maintain the visual quality objective (VQO) of Partial Retention. The size, design, and color of the cabin will blend in with the surrounding environment. It will be a priority to design a pathway and to locate the cabin site so as to make this site minimally visible from the trail. We will also minimize the number of large diameter trees removed during development of the site. Cabins have been present on the island for at least 170 years, scattered around the island s rim; they are a part of the history, scenery, and experience on the island (EA, pgs ). Issue 2 reflects concerns that construction and routine operation and maintenance of Cabin #1 would cause the trail to have the look and feel of a road as opposed to a trail. This would diminish the hike-in feel to the trail and would reduce the quality of the recreation experience. I believe by employing the design elements and mitigation 3

4 measures (EA, p. 7-10) we will be able to maintain the trail tread and current width. These measures include limiting the size of the construction equipment used to develop the site; limiting the size of vehicle and number of trips it makes to perform routine maintenance on the cabin; and limiting the size of the septic pump truck used to pump the toilet. 3. The Proposed Action protects other resource objectives Both cabin locations adhere to the requirement in the Grand Island legislation that directs facilities to be compatible with the rustic, natural, and historic character of the island and that their location would not impair the view from Pictured Rocks National Lakeshore. Scenic quality will be protected and the Partial Retention VQO will be maintained by employing the design elements and mitigation measures (EA, pgs. 7-10). Plant and wildlife resources would also be protected by following design elements and mitigation measures (EA, pgs. 7-10). Limited effects to Regional Forester sensitive species and no effects to threatened and endangered plant species would be anticipated as a result of implementing this decision (EA, p. 27). There would also be no effects to threatened or endangered or sensitive wildlife species as a result of implementing this decision (EA, p. 24). Heritage sites would be protected by implementing design elements and mitigation measures (EA, p. 56). III. OTHER ALTERNATIVES CONSIDERED During scoping, a number of commenters disagreed with our site selection. These comments led to identification of issues, which, in turn, led to development of Alternative 1. The EA discloses the environmental effects of the Proposed Action, Alternative 1, and the No Action alternative. I believe the range of alternatives addresses the Purpose and Need for the project and addresses the issues identified during the public involvement process. I considered three other locations for Cabin #1, but the EA did not evaluate them in detail (EA, pgs ). a. Alternative 1 Under Alternative 1, Cabin #2 s location would remain the same. Cabin #1 s location would be located 0.4 mile (2,000 feet) closer to William s Landing than Cabin #1 in the Proposed Action. It was developed in response to scoping comments that urged seeking a cabin location closer to Williams Landing. I did not select this location for two reasons: (1) the higher development costs associated with soils and water issues and (2) the desirability of the location from the recreationists experience standpoint. 4

5 Section of the EA points out that Cabin #1 is located in an area of hydric soils and is mapped as a wetland. A seasonal zone of water saturation is at the surface during half of the year. These factors would result in restrictions on development of the site and would complicate use and maintenance (EA, p. 19). Second, the cabin location would be oriented to the south across the west channel over to the mainland. Developments such as the Munising Tourist Park campground and the village of Christmas are visible from the shoreline in front of this cabin location. Traffic noise from M-28 is clearly audible from the site (EA, p. 41). I believe this attribute alone makes this site a poor choice from the standpoint of providing a quality experience for the cabin renter. The proximity to the Channel Marker site is another reason I do not prefer this location (EA, p. 50). While this alternative meets the Purpose and Need, it would not provide the quality recreation experience provided with the Proposed Action. b. Alternatives Considered but Eliminated from Detailed Study Cabin Location #1 Alternative Location A Several of the scoping comments suggested Cabin #1 should be located closer to Williams Landing where other existing developments are located. Proceeding west from the Center Road, soils are wet and unsuitable for construction all the way to about the 1,000 foot (0.2 miles) point west of the gate on the West Rim Trail. A site was identified at the 1,000 foot point and was subsequently reviewed by an ID team. Upon closer review, this site was rejected because of a low landscape position, wet soils, and high development costs (EA, p.10). There was no ready access to Lake Superior. This location did not meet the Purpose and Need because the location did not provide an opportunity for a high quality recreation experience; therefore, it was eliminated from detailed study (EA, p.10). Cabin Location #1 Alternative Location B A second site was identified as an alternative site for Cabin #1 approximately 1,600 feet (0.3 miles) from the gate on the West Rim Trail. The soils between Alternative Location A and Alternative Location B were also wet. The flagged location was visited by an ID team in 2008 and, as in Alternative Location A, the soils were found to be too wet, leading to either difficult construction options or high development costs (EA, pgs. 9-10). This site was similarly rejected because it did not meet the Purpose and Need. Cabin Location #1 Alternative Location C at Williams Landing Some of the scoping comments suggested Cabin #1 should be located at Williams Landing near the other existing developments so as to not infringe on the primitive nature of the southwest part of the island. This alternative was rejected because the location would not provide a pleasurable recreation experience for the cabin renter due to the amount of vehicle traffic and number of recreationists traveling to and from Williams Landing. The concept mapping for the Williams Landing Area already accommodates a 5

6 rustic lodge, store, garage/maintenance facility, and the existing Visitor Contact Station. Williams Landing will be a bustling start-off area, not a place for a quiet recreation experience (EA, p.11). Since this location did not meet the Purpose and Need, it was eliminated from detailed study. IV. PUBLIC INVOLVEMENT The Grand Island Primitive Cabins Project was listed in the October 2008 Schedule of Proposed Actions and in all subsequent issues. The proposal was mailed to 41 people and organizations for comment. The scoping period occurred from March 31 to April 21, The proposal was listed on the Forest s website and published in the legal section of the Marquette Mining Journal. Comments from seven individuals were received. One follow-up conversation was held with a commenter to clarify his written comments. Correspondence was also exchanged with the Michigan State Historic Preservation Officer regarding the project proposal. Lastly, an open house was held with Grand Island residents in the summer of 2008 at which the proposal was discussed. Using comments from the public, the ID team developed a list of issues to address. On July 2, 2009, the EA was sent out for review to the people and groups who commented during the scoping period. A legal notice was published in the July 2, 2009 edition of the Marquette Mining Journal and on the HNF website notifying the public of the availability of the EA. Comments were received from two individuals. These comments were considered and placed in the project file. V. FINDINGS REQUIRED BY OTHER LAWS AND REGULATIONS Consistency with Forest Plan Direction This action is consistent with the HNF Forest Plan and related Final Environmental Impact Statement (FEIS). Regional Forester Randy Moore signed the Record of Decision on the FEIS on March 20, Specifically, this decision is consistent with Standards and Guidelines for Management Area 8.5. VI. FINDING OF NO SIGNIFICANT IMPACT In reaching my determination under 40 CFR that preparation of an environmental impact statement is not needed, I considered the following factors and information developed during the analysis of the proposal disclosed in the Grand Island Primitive Cabins EA: A. Context The analysis of the proposal is in a localized area with implications only for the immediate area. The total acreage involved in the construction of both cabins is less than one acre. The acreage of GINRA is 13,500 acres. The cumulative effects of past 6

7 management, combined with the current proposal, and reasonably foreseeable future actions are displayed in Chapter 3 of the EA. As a result of the analysis of those effects, I feel the context of this decision, both from a biological and social standpoint, is localized. Based on the environmental effects analysis, I conclude there will be no significant effects. B. Intensity 1. Impacts that may be both beneficial and adverse My finding of no significant environmental effects considers both beneficial and adverse effects. Beneficial effects have not been used to offset or compensate for potential adverse effects. Impacts associated with my decision are discussed in Chapter 3 of the EA. The overall positive effect is to move the GINRA towards a future condition that provides a greater variety of overnight accommodations that allow hikers, bicyclists, and kayakers to enjoy the island to a greater degree. I conclude that implementing the Proposed Action will not have any significant direct, indirect, or cumulative effects. 2. The degree to which the Proposed Action affects public health and safety The cabins will be constructed so as to meet all Forest Service Health and Safety Code requirements (EA, p. 7). I conclude that there will be no significant effects to public health and safety. 3. Unique characteristics of the geographic area such as proximity to historic or cultural resources, park lands, prime farmlands, wetlands, wild and scenic rivers, or ecologically critical areas. All heritage sites determined to be eligible to the National Register of Historic Places (NRHP), or whose NRHP status remains undetermined, will be removed from the area of potential effects through the establishment of a protection zone around the sites wherein no vegetation management or earth disturbing activities will be permitted. There will be no adverse effects to heritage resources (EA, p. 56). I conclude that there will be no significant effects to heritage resources. There are no park lands or prime farmlands in or adjacent to the project area. 7

8 The national Wetland Inventory maps do identify wetlands within 100 feet of Cabin # 1 s location, but no significant impacts to wetlands are expected (EA, pgs ). There are no wild and scenic rivers located on GINRA. Ecologically critical areas are those areas which exhibit unique ecological characteristics or, if altered, may affect the viability of threatened or endangered plant or animal species. Botanical and wildlife surveys were conducted throughout the project area (EA, section 3.4 and 3.5). An evaluation of the affected environment for the Proposed Action (EA, Chapter 3) determined there were no ecologically critical areas where management activities would occur. I conclude that there would be no significant impacts to ecologically critical areas. Based on these considerations, I conclude that there will be no significant effects on unique characteristics within the geographic area. 4. The degree to which the effects on the quality of the human environment are likely to be highly controversial. Controversy as described above, is a dispute within the scientific community. I do not believe the effects of the associated management actions represent a scientifically controversial impact upon the quality of the human environment. The activities in the Proposed Action will contribute toward reaching the desired condition and meeting the goals and objectives outlined in the HNF Forest Plan. This EA is tiered to the Forest Plan EIS. Forest-wide effects of Forest Plan standards were disclosed in that EIS. All actions are of a similar type and intensity to activities that have occurred in the past throughout the HNF and in this area. Based on these considerations, I conclude that there would be no significant effects on the quality of the human environment that are likely to be controversial. 5. The degree to which the possible effects on the human environment are highly uncertain or involve unique or unknown risks. The HNF has some experience with introducing human elements into the natural landscape on GINRA. Over the past 19 years, a number of recreation facilities have been constructed. These include 19 campsites, 5 toilet buildings, 3 day use areas, 4 overlooks, a boneyard/parking area, bulletin boards, 2 beach accesses, 17 miles of road, 30 miles of trails, and dozens of signs and You are Here maps at road and trail intersections. We have constructed these facilities and amenities in a sensitive and appropriate way so as to be functional, yet to blend in with the natural environment. Over these years of implementing these changes on GINRA, we have gathered visitors reactions to the changes to the landscape. The consensus is that visitors have supported the changes as being necessary to accommodate recreation use and to protect resources. From the experience of the past 19 years, I would conclude that visitor s reaction to the cabins 8

9 would be much the same largely supportive of constructing cabins that will tastefully add to the island s landscape and recreation experience. In addition, we have almost 20 years experience managing two rental cabins on the HNF McKeever Cabin and Tom s Cabin. Our experience with these has been very positive. Occupancy and visitor satisfaction with both has been very high (comments from cabin log books). Based on the above information, I conclude there is not a high level of uncertainty or unique or unknown risks that have not been previously encountered. 6. The degree to which the action may establish a precedent for future actions with significant effects, or represents a decision in principle about a future consideration. This action is not a precedent setting decision. Effects of this project are minimal (EA, p. 18, 24, 33, 45-48, 54). As discussed above, there have been cabins on Grand Island for 170 years and we have experience with cabin construction and effects on the mainland. I reviewed the effects of the actions and find this project also fosters movement toward the desired condition in the Forest Plan. I conclude that this action does not establish precedence for future actions with unknown or significant risks to the environment. 7. Whether the action is related to other actions with individually insignificant but cumulative significant impacts. Chapter 3 of the EA discusses the combined effects of this project with other past, present, and reasonably foreseeable future actions (EA, p. 19, 25, 35, 48, 54, 56). The analysis convinces me there will not be a significant cumulative impact from this action individually or in concert with other related past or present actions, or those anticipated in the foreseeable future beyond what has already been disclosed in the HNF Forest Plan FEIS. Based on the discussion in the EA, I conclude there are no significant cumulative impacts. 8. The degree to which the action may adversely affect districts, sites, highways, structures, or objects listed in or eligible for listing in the National Register of Historic Places, or may cause loss, or destruction of significant scientific, cultural, or historical resources. No significant impacts are foreseen on any proposed or listed NRHPs, nor any loss or destruction of any scientific, cultural, or historic places (EA, p ). Based on the review of the proposed activities, design criteria and mitigation measures (EA, p.9), there is minimal risk that implementation of the Proposed Action would result in damage to heritage resources. 9

10 9. The degree to which the action may adversely affect an endangered or threatened species or its habitat that has been determined to be critical under the Endangered Species Act of No significant effects to any endangered or threatened species or their habitats are foreseen. The wildlife effects section of the EA concluded that there were no effects on gray wolf. Based upon the conclusions documented in the EA, my decision will not adversely affect endangered or threatened species, critical habitat or proposed critical habitat applicable to the Endangered Species Act. 10. Whether the action threatens a violation of Federal, State, or local law or requirements imposed for the protection of the environment. This project does not violate federal, state, or local laws, regulations, and requirements designed for the protection of the environment, including the National Forest Management Act of 1976 and associated implementation regulations which provide for amendments and revisions of forest plans. FINDING Based on the analysis disclosed in the Grand Island Primitive Cabins EA and my evaluation of the factors described in 40 CFR , this is not a major federal action, either individually or cumulatively, which will significantly affect the quality of the human environment. Therefore, an EIS is not needed. VII. FOREST PLAN CONSISTENCY This decision is consistent with both the Forest-wide and Management Area Standards and Guidelines for Management Area 8.5. All of the expected impacts from this project are consistent with the impacts disclosed in the FEIS. VIII. IMPLEMENTATION DATE If no appeal is received, implementation of this decision may occur on, but not before 5 business days from the close of the appeal-filing period. If an appeal is received, implementation may not occur for 15 days following the date of appeal disposition. IX. APPEAL OPPORTUNITIES This decision is subject to appeal pursuant to 36 CFR 215. An appeal may be filed by individuals and organizations that provided comments or otherwise expressed interest in the Proposed Action during the 30-day notice and comment period for this project. It is the appellant s responsibility to provide sufficient project-specific or activity-specific 10

11 evidence and rationale, focusing on the decision, to show why the responsible official s decision should be reversed. The appeal must have an identifiable name attached or verification of identity will be required. A scanned signature may serve as verification on electronic appeals. To appeal this decision, a written Notice of Appeal must be postmarked or received within 45 calendar days after the Legal Notice is published in the Mining Journal (Marquette, Michigan). However, when the 45-day filing period would end on a Saturday, Sunday, or federal holiday, then filing time is extended to the end of the next federal working day. The date of the publication of the Legal Notice is the only means for calculating the date by which appeals must be submitted. Those wishing to appeal this decision should not rely upon dates or timeframe information provided by any other source. At a minimum, an appeal must include information as specified in 36 CFR (b). The Notice of Appeal should contain a subject line Grand Island Primitive Cabins Project. Written Notice of Appeal must be sent to: Tom Schmidt, Appeal Deciding Officer Attn: Appeals & Litigation USDA-Forest Service, Eastern Region 626 E. Wisconsin Avenue Milwaukee, WI The Notice of Appeal may alternatively be faxed to , Attn: Appeals Deciding Officer, USDA Forest Service, Eastern Regional Office. Those wishing to submit appeals by may do so to: appeals-eastern-regional-office@fs.fed.us. Acceptable formats for electronic comments are text or html , Adobe portable document format, and formats viewable in Microsoft Office applications. Receipt of electronic appeals to this inbox will be automatically acknowledged. X. CONTACT PERSON The project record is available upon request at USDA Forest Service, 400 E. Munising Avenue, Munising, MI For additional information concerning this decision or the Forest Service appeal process, contact Dick Anderson, Grand Island Primitive Cabins Project leader, ext. 30 or at raanderson@fs.fed.us. XI. RESPONSIBLE OFFICIAL S SIGNATURE AND DATE /s/ Teresa A. Chase 12/02/09 Teresa A. Chase Date of Decision District Ranger 11

12 Discrimination Notice: The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sec, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individuals income is derived from any public assistance program. (Not all prohibited bases to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA s TARGET Center at (202) (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, DC , or call (800) (voice) or (202) (TDD). USDA is an equal opportunity provider. 12

Decision Memo Ice Age Trail Improvement (CRAC 37)

Decision Memo Ice Age Trail Improvement (CRAC 37) Decision Memo Ice Age Trail Improvement (CRAC 37) U.S. Forest Service Chequamegon-Nicolet National Forest, Medford-Park Falls Ranger District Taylor County, Wisconsin T32N, R2W, Town of Grover, Section

More information

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture United States Department of Agriculture Forest Service January 2012 Proposed Action Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties Payette National Forest Valley, Adams

More information

BACKGROUND DECISION. Decision Memo Page 1 of 6

BACKGROUND DECISION. Decision Memo Page 1 of 6 DECISION MEMO DEVIL S ELBOW BY-PASS, BOUNDARY TRAIL NO.1 U.S. FOREST SERVICE T9N, R7E, SECTION 9 RANGE 5E COWLITZ COUNTY WA MOUNT ST. HELENS NATIONAL VOLCANIC MONUMENT, GIFFORD PINCHOT NATIONAL FOREST

More information

White Mountain National Forest. Pond of Safety Accessible Trail & Shoreline Access Project. Scoping Report. Township of Randolph Coos County, NH

White Mountain National Forest. Pond of Safety Accessible Trail & Shoreline Access Project. Scoping Report. Township of Randolph Coos County, NH White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Pond of Safety Accessible Trail & Shoreline Access Project Township of Randolph Coos County, NH Scoping

More information

White Mountain National Forest

White Mountain National Forest White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Boles Brook Snowmobile Bridge Decision Memo Boles Brook Snowmobile Bridge Project Town of Woodstock

More information

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old

More information

Tracy Ridge Shared Use Trails and Plan Amendment Project

Tracy Ridge Shared Use Trails and Plan Amendment Project Tracy Ridge Shared Use Trails and Plan Amendment Project Scoping Document Forest Service Allegheny National Forest Bradford Ranger District McKean, County, Pennsylvania In accordance with Federal civil

More information

Hiawatha National Forest St. Ignace Ranger District. File Code: 1950 Date: August 5, 2011

Hiawatha National Forest St. Ignace Ranger District. File Code: 1950 Date: August 5, 2011 United States Department of Agriculture Forest Service Hiawatha National Forest St. Ignace Ranger District W1900 West US-2 St. Ignace, MI 49781 906-643-7900 File Code: 1950 Date: August 5, 2011 Dear National

More information

Sawtooth National Forest Fairfield Ranger District

Sawtooth National Forest Fairfield Ranger District United States Department of Agriculture Forest Service Sawtooth National Forest Fairfield Ranger District P.O. Box 189 Fairfield, ID. 83327 208-764-3202 Fax: 208-764-3211 File Code: 1950/7700 Date: December

More information

DESIGN FEATURES ASSOCIATED WITH THE SELECTED ALTERNATIVE

DESIGN FEATURES ASSOCIATED WITH THE SELECTED ALTERNATIVE -:::-= D DECISION NOTICE /FINDING OF No SIGNIFICANT IMPACT BRUNDAGE MOUNTAIN CAT-SKI OUTFITTER AND GUIDE PERMIT BOUNDARY EXPANSION U.S. FOREST SERVICE PAYETTE NATIONAL FOREST NEW MEADOWS RANGER DISTRICT

More information

White Mountain National Forest. Rumney Rocks Project Supplemental Environmental Assessment. 30-day Comment Report

White Mountain National Forest. Rumney Rocks Project Supplemental Environmental Assessment. 30-day Comment Report White Mountain National Forest United States Department of Agriculture Forest Service Rumney Rocks Project Supplemental Environmental Assessment Eastern Region Town of Rumney, Grafton County, NH 30-day

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,

More information

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit USDA Forest Service Mississippi Bluffs Ranger District, Shawnee National Forest Jackson and Union Counties, Illinois Proposed Action

More information

Ottawa National Forest Supervisor s Office

Ottawa National Forest Supervisor s Office United States Department of Agriculture Forest Service Supervisor s Office E6248 US2 Ironwood, MI 49938 (906) 932-1330 (906) 932-0122 (FAX) File Code: 1950/2350 Date: April 11, 2012 Dear Friends of the,

More information

Crystal Lake Area Trails

Crystal Lake Area Trails Lake Area Trails Welcome to the Lake area of the Big Snowy Mountains! This island mountain range in central Montana features peaks reaching to 8,600 feet and long, high ridges from which vistas of the

More information

DECISION MEMO For Bullis Hollow Trail

DECISION MEMO For Bullis Hollow Trail I. DECISION TO BE IMPLEMENTED A. Description of Decision DECISION MEMO For Bullis Hollow Trail USDA Forest Service, Eastern Region 9 Allegheny National Forest Bradford Ranger District Corydon Township

More information

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event Decision Memo 2015 Sun Valley Super Enduro & Cross-Country Mountain Bike Race Recreation Event USDA Forest Service Ketchum Ranger District, Sawtooth National Forest Blaine County, Idaho Background The

More information

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction Page 1 of 6 Background DECISION MEMO USDA Forest Service Jefferson Ranger District Jefferson County, Montana Rawhide Trail #7073 is located in the Elkhorn Mountain Range approximately 10 miles east of

More information

GREENWOOD VEGETATION MANAGEMENT

GREENWOOD VEGETATION MANAGEMENT APPENDIX G GREENWOOD VEGETATION MANAGEMENT PROJECT RECREATION RESOURCE REPORT Prepared by: Laurie A. Smith Supervisory Forester Stearns Ranger District Daniel Boone National Forest August 4, 2016 The

More information

Buford / New Castle Motorized Trail

Buford / New Castle Motorized Trail Buford / New Castle Motorized Trail Rifle Ranger District, White River National Forest Garfield County, Colorado Comments Welcome The Rifle Ranger District of the White River National Forest welcomes your

More information

DECISION MEMO Grand Targhee Resort Summer Trails. USDA Forest Service Caribou-Targhee National Forest Idaho Falls, Idaho 83401

DECISION MEMO Grand Targhee Resort Summer Trails. USDA Forest Service Caribou-Targhee National Forest Idaho Falls, Idaho 83401 DECISION MEMO Grand Targhee Resort Summer Trails USDA Forest Service Caribou-Targhee National Forest Idaho Falls, Idaho 83401 Background Situated on the east side of the Teton Mountain Range, Grand Targhee

More information

Buffalo Pass Trails Project

Buffalo Pass Trails Project Buffalo Pass Trails Project Hahns Peak/Bears Ears Ranger District, Medicine Bow-Routt National Forests and Thunder Basin National Grassland Routt County, Colorado T6N 83W Sections 3-5, 8; T6N 84W Sections

More information

Continental Divide National Scenic Trail Legislative History and Planning Guidance

Continental Divide National Scenic Trail Legislative History and Planning Guidance Continental Divide National Scenic Trail Legislative History and Planning Guidance Legislation, Policy, and Direction Regarding National Scenic Trails The National Trails System Act, P.L. 90-543, was passed

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

Daisy Dean Trail 628/619 ATV Trail Construction

Daisy Dean Trail 628/619 ATV Trail Construction Background and Purpose and Need The Daisy Dean ATV Trail Construction Project is located in the Little Belt Mountains, Musselshell Ranger District, Lewis and Clark National Forest approximately 32 miles

More information

Fremont Point Cabin Reconstruction and Expansion Project Project Proposal & Public Scoping Documentation

Fremont Point Cabin Reconstruction and Expansion Project Project Proposal & Public Scoping Documentation Fremont Point Cabin Reconstruction and Expansion Project Fremont-Winema National Forests Silver Lake Ranger District The Silver Lake Ranger District of the Fremont-Winema National Forests is proposing

More information

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project USDA FOREST SERVICE Rocky Mountain Region (R2) Shoshone National Forest Wapiti and Greybull Ranger District Park County, Wyoming Background

More information

DECISION MEMO Whetstone Ridge Trail #8020 Relocation

DECISION MEMO Whetstone Ridge Trail #8020 Relocation Page 1 of 7 Background DECISION MEMO Whetstone Ridge Trail #8020 Relocation USDA Forest Service Pintler Ranger District Granite County T4N, R16W, Sections 4,9,29 and T4N, R17W, Section 36 Whetstone Ridge

More information

Cascade River State Park Management Plan Amendment

Cascade River State Park Management Plan Amendment This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Cascade River State

More information

Recreation Opportunity Spectrum for River Management v

Recreation Opportunity Spectrum for River Management v Recreation Opportunity Spectrum for Management v. 120803 Introduction The following Recreation Opportunity Spectrum (ROS) characterizations and matrices mirror the presentation in the ROS Primer and Field

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

FINDING OF NO SIGNIFICANT IMPACT BACKCOUNTRY/WILDERNESS MANAGEMENT PLAN AND ENVIRONMENTAL ASSESSMENT ROCKY MOUNTAIN NATIONAL PARK

FINDING OF NO SIGNIFICANT IMPACT BACKCOUNTRY/WILDERNESS MANAGEMENT PLAN AND ENVIRONMENTAL ASSESSMENT ROCKY MOUNTAIN NATIONAL PARK FONSI FINDING OF NO SIGNIFICANT IMPACT BACKCOUNTRY/WILDERNESS MANAGEMENT PLAN AND ENVIRONMENTAL ASSESSMENT ROCKY MOUNTAIN NATIONAL PARK The Backcountry/Wilderness Management Plan for Rocky Mountain National

More information

Chattahoochee- Oconee National Forests. Decision Memo

Chattahoochee- Oconee National Forests. Decision Memo Page 1 of 6 USDA Forest Service Chattahoochee- Oconee National Forests Decision Memo Chattahoochee-Oconee National Forests Home Page Recreation Information Forest History Forest Facts Forest Management

More information

Decision Memo for Philmont Scout Ranch Bike Trail and Access Reroute Project

Decision Memo for Philmont Scout Ranch Bike Trail and Access Reroute Project Decision Memo Philmont Scout Ranch Bike Trail and Access Reroute Project USDA Forest Service, Southwestern Region Questa Ranger District, Carson National Forest Colfax County, New Mexico (T. 30N, R. 17E,

More information

Chetco River Kayaking Permit

Chetco River Kayaking Permit Decision Memo USDA Forest Service Rogue River-Siskiyou National Forest Gold Beach Ranger District - Curry County, Oregon Wild Rivers Ranger District Josephine County, Oregon BACKGROUND A special use permit

More information

Proposed Action Kaibab Campground Capital Improvement Project September 2008

Proposed Action Kaibab Campground Capital Improvement Project September 2008 Background Kaibab Campground Capital Improvement Project September 2008 The Williams Ranger District of the Kaibab National Forest is proposing to improve the Kaibab Lake Campground. Kaibab Lake Campground

More information

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa This document is scheduled to be published in the Federal Register on 02/26/2014 and available online at http://federalregister.gov/a/2014-04061, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF NATIONAL

More information

Decision Notice and Finding of No Significant Impact

Decision Notice and Finding of No Significant Impact United States Department of Agriculture Southwestern Region Decision Notice and Finding of No Significant Impact Travel Management on the West Side of the Carson National Canjilon, El Rito, and Tres Piedras

More information

Eagle Rock Loop Ouachita National Forest Page 1 of 8

Eagle Rock Loop Ouachita National Forest Page 1 of 8 EAGLE ROCK LOOP Eagle Rock Loop Ouachita National Forest Page 1 of 8 Hiking: Biking: Equestrian: Trail Highlights: This trail offers the longest loop trail in Arkansas. A combination of the Little Missouri,

More information

White Mountain National Forest

White Mountain National Forest White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Greeley Ponds and Flume Brook Trail Repair Project Waterville Valley, Grafton County, NH Decision Notice

More information

Glacial Lakes State Park Management Plan Amendment Camper Cabin Development

Glacial Lakes State Park Management Plan Amendment Camper Cabin Development Glacial Lakes State Park Management Plan Amendment Camper Cabin Development Minnesota Department of Natural Resources Division of Parks and Recreation November 2006 Glacial Lakes State Park Management

More information

United States Department of Agriculture. Forest Service

United States Department of Agriculture. Forest Service United States Department of Agriculture Forest Service DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT MT. HOUGH SOUTH PARK PROPOSED TRAILS SYSTEM PROJECT U.S. FOREST SERVICE, PLUMAS NATIONAL FOREST,

More information

Teton Basin Ranger District

Teton Basin Ranger District Teton Basin Ranger District P.O. Box 777 Driggs, ID 83422 File Code: 1950/2350 Date: August 5, 2002 Greetings: You received the preliminary Environmental Assessment (EA) for the Teton Pass Trail last summer.

More information

Alternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas

Alternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas Roadless Area Conservation FEIS Summary Table S-1. Comparison of Key Characteristics and Effects by Prohibition Alternative. The effects summarized in this table A would occur in inventoried roadless areas

More information

Draft Decision Notice and Finding of No Significant Impact

Draft Decision Notice and Finding of No Significant Impact United States Department of Agriculture Draft Decision Notice and Finding of No Significant Impact Zuni Mountain Trail Project Cibola National Forest, Mt Taylor Ranger District McKinley County & Cibola

More information

Memo. Board of County Commissioners. FROM: Tamra Allen, Planner. Buford/New Castle Motorized Trail. Date: February 13, 2012

Memo. Board of County Commissioners. FROM: Tamra Allen, Planner. Buford/New Castle Motorized Trail. Date: February 13, 2012 Memo TO: Board of County Commissioners FROM: Tamra Allen, Planner RE: Buford/New Castle Motorized Trail Date: February 13, 2012 Overview The White River National Forest Rifle District Office ( RDO ) issued

More information

Chetco River Kayaking Permit

Chetco River Kayaking Permit Preliminary Decision Memo USDA Forest Service Rogue River-Siskiyou National Forest Gold Beach Ranger District - Curry County, Oregon BACKGROUND A special use permit has been requested by Zachary Collier,

More information

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Background As part of Mass Audubon s mission to preserve the nature of Massachusetts for people and

More information

Lakes Landscape Travel Management

Lakes Landscape Travel Management Decision Notice & Finding of No Significant Impact Lakes Landscape Travel Management USDA Forest Service Columbine Ranger District, San Juan National Forest Archuleta, Hinsdale, and La Plata Counties,

More information

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture United States Department of Agriculture Forest Service Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 6944 South 3000 East Salt Lake City, UT 84121 801-733-2660 File Code: 1950/2300 Date:

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

Decision Notice and Finding of No Significant Impact

Decision Notice and Finding of No Significant Impact Decision Notice and Finding of No Significant Impact Steamboat Ski Area Summer Trails Project USDA Forest Service Medicine Bow-Routt National Forests Hahns Peak/Bears Ears Ranger District Routt County,

More information

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**: Recreation Opportunity Spectrum (ROS) Classes The Recreation Opportunity Spectrum (ROS) provides a way to describe the variations in the degree of isolation from the sounds and influences of people, and

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

Rochester Ranger District Wellness Trails Project

Rochester Ranger District Wellness Trails Project United States Department of Agriculture Forest Service Eastern Region September 2015 Rochester Ranger District Wellness Trails Project Decision Memo Green Mountain National Forest Rochester Ranger District

More information

Coronado National Forest Santa Catalina Ranger District

Coronado National Forest Santa Catalina Ranger District United States Department of Agriculture Forest Service Coronado National Forest Santa Catalina Ranger District File Code: 1950 Date: October 14, 2015 Dear Interested Party: The Santa Catalina Ranger District

More information

White Mountain National Forest

White Mountain National Forest White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Batchelder Brook and Guinea Pond Snowmobile Bridges Decision Memo Batchelder Brook/Guinea Pond Snowmobile

More information

White Mountain National Forest. Campton Day Use Area Development Project. Scoping Report. Prepared by the Pemigewasset Ranger District May 2013

White Mountain National Forest. Campton Day Use Area Development Project. Scoping Report. Prepared by the Pemigewasset Ranger District May 2013 White Mountain National Forest Campton Day Use Area Development Project United States Department of Agriculture Forest Service Eastern Region Towns of Thornton and Campton, Grafton County, NH Scoping Report

More information

Dear Reviewing Officer:

Dear Reviewing Officer: From: To: Subject: Date: Attachments: Peter Hart FS-r02admin-review Objection Re: Maroon Bells Snowmass Wilderness Overnight Visitor Use Management Plan Monday, August 14, 2017 8:38:01 PM Final Objection

More information

WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes

WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes Date: 3/7/2017 Roadless Area: Ruby South Description of Project Activity or Impact to

More information

Kelly Motorized Trails Project Proposed Action

Kelly Motorized Trails Project Proposed Action Kelly Motorized Trails Project Proposed Action November 28, 2011 The Flagstaff Ranger District of the Coconino National Forest is seeking public input on the proposed Kelly Motorized Trails Project (formerly

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

Tourism and Wetlands

Tourism and Wetlands CONVENTION ON WETLANDS (Ramsar, Iran, 1971) 43 rd Meeting of the Standing Committee Gland, Switzerland, 31 October 4 November 2011 DOC. SC43-27 Tourism and Wetlands Action requested. The Standing Committee

More information

St. Joe Travel Management EA CULTURAL RESOURCES

St. Joe Travel Management EA CULTURAL RESOURCES St. Joe Travel Management EA CULTURAL RESOURCES Bruce Gibson May 2015 Regulatory Framework Forest Plan The Idaho Panhandle National Forests (IPNF) Forest Plan requires systematic cultural resource inventory

More information

PURPOSE AND NEED. Introduction

PURPOSE AND NEED. Introduction Public Scoping: Allocation of Recreation Capacity for Commercial Outfitter Guide Services on North Kruzof Island Trails (Kruzof Island Outfitter Guide) PURPOSE AND NEED Introduction The U.S. Department

More information

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan. March 19, 2014 Flagstaff Biking Organization PO Box 23851 Flagstaff, AZ 86002 Vern Keller Coconino National Forest Attn: Plan Revision 1824 South Thompson Street Flagstaff, Arizona 86001 coconino_national_forest_plan_revision_team@fs.fed.us

More information

NATIONAL PARK SERVICE CERTIFICATION OF COMPLETED SEGMENTS OF THE NORTH COUNTRY NATIONAL SCENIC TRAIL

NATIONAL PARK SERVICE CERTIFICATION OF COMPLETED SEGMENTS OF THE NORTH COUNTRY NATIONAL SCENIC TRAIL NATIONAL PARK SERVICE CERTIFICATION OF COMPLETED SEGMENTS OF THE NORTH COUNTRY NATIONAL SCENIC TRAIL Completed trail segments that (1) follow the route identified in the 1982 National Park Service (NPS)

More information

White Mountain National Forest Androscoggin and Evans Notch Ranger Districts

White Mountain National Forest Androscoggin and Evans Notch Ranger Districts United States Department of Agriculture Forest Service White Mountain National Forest Androscoggin and Evans Notch Ranger Districts 300 Glen Road Gorham, NH 03581-1399 Comm: (603) 466-2713 TTD: (603) 466-2856

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

Draft Record of Decision

Draft Record of Decision United States Department of Agriculture Forest Service September 2014 Draft Record of Decision Oregon Dunes NRA Management Area 10 (C) Designated Routes Project Central Coast Ranger District-Oregon Dunes

More information

Decision Notice & Finding of No Significant Impact Telephone Canyon Trails Project

Decision Notice & Finding of No Significant Impact Telephone Canyon Trails Project Decision Notice & Finding of No Significant Impact Telephone Canyon Trails Project Spring Mountain National Recreation Area Humboldt-Toiyabe National Forest Clark and Nye Counties, Nevada United States

More information

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts September 30, 2016 Superintendent Yosemite National Park Attn: Wilderness Stewardship Plan P.O. Box 577 Yosemite, CA 95389 RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan,

More information

Scott Silveira, District 5 Supervisor SOCIAL MEDIA POLICIES AND PROCEDURES

Scott Silveira, District 5 Supervisor SOCIAL MEDIA POLICIES AND PROCEDURES Scott Silveira, District 5 Supervisor SOCIAL MEDIA POLICIES AND PROCEDURES PURPOSE Scott Silveira, District 5 Supervisor,recognizes a need to augment his traditional communication methods with the use

More information

Limited English Proficiency Plan

Limited English Proficiency Plan Limited English Proficiency Plan City of Boulder City Boulder City Municipal Airport Title IV Program, 49 CFR 21 About The Airport Boulder City Municipal Airport (BVU) is the third busiest airport in the

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

RUSHMORE CONNECTOR TRAIL PROPOSAL

RUSHMORE CONNECTOR TRAIL PROPOSAL PURPOSE AND NEED Background The U.S. Forest Service, Black Hills National Forest (Forest Service) has received a special use permit application from the State of South Dakota Department of Game, Fish and

More information

Figure 1-Example of terracing from livestock

Figure 1-Example of terracing from livestock To: District Ranger Matt Janowiak April 3, 2016 P.O. Box 439, Bayfield, CO 81122 comments-rocky-mountain-san-juan-columbine@fs.fed.us From: Greg Warren Golden, CO 80401 Please consider the following comments

More information

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Form 1221-2 (June 1969) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Release 8-83 Date Subject 8353 Trail Management Areas Secretarially Designated (Public)

More information

Recreation Specialist

Recreation Specialist United States Department of Agriculture Forest Service October 2016 Recreation Specialist Report Red Rock Ranger District Coconino National Forest Coconino County, Arizona 1 Distribution/Availability Statement:

More information

Wilderness Specialist s Report

Wilderness Specialist s Report United States Department of Agriculture Forest Service July 2009 Wilderness Specialist s Report Travel Management Rule EIS USDA Forest Service Southwestern Region Apache-Sitgreaves National Forests Prepared

More information

MANAGEMENT DIRECTION STATEMENT June, 1999

MANAGEMENT DIRECTION STATEMENT June, 1999 Thompson River District MANAGEMENT DIRECTION STATEMENT June, 1999 for Roche Lake Provincial Park Ministry of Environment Lands and Parks BC Parks Division Table of Contents I. Introduction A. Setting

More information

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Payette National Forest Krassel Ranger District Valley and Idaho Counties, Idaho

More information

5.0 OUTDOOR RECREATION OPPORTUNITIES AND MANAGEMENT

5.0 OUTDOOR RECREATION OPPORTUNITIES AND MANAGEMENT 5.0 OUTDOOR RECREATION OPPORTUNITIES AND MANAGEMENT 5.1 Introduction This section describes the range of recreational activities that currently take place in Marble Range and Edge Hills Parks, as well

More information

RIM TRAIL EXTENSION PROJECT

RIM TRAIL EXTENSION PROJECT DECISION MEMO For RAINBOW RIM TRAIL EXTENSION PROJECT Located on National Forest System Lands USDA Forest Service, Southwest Region Kaibab National Forest - North Kaibab Ranger District T.35 N, R.1 E,

More information

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R Cultural Resource Management Report R2015-05-03-10005 Undertaking Description: The proposes to perform road maintenance and meadow restoration on the Deer Valley 4wd trail and road maintenance on the Blue

More information

Draft Environmental Impact Statement

Draft Environmental Impact Statement United States Department of Agriculture Forest Service Pacific Southwest Region Draft Environmental Impact Statement Inyo National Forest Motorized Travel Management R5-MB-182 January 2009 Inyo Mountains

More information

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION Manitoba Wildands December 2008 Discussions about the establishment of protected lands need to be clear about the definition of protection. We will

More information

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement.

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement. [3411-15-P] DEPARTMENT OF AGRICULTURE Forest Service Angeles National Forest; Los Angeles County, CA Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS AGENCY: ACTION: Forest Service,

More information

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF RECREATION AND PARKS RECREATIONAL CARRYING CAPACITY GUIDELINES

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF RECREATION AND PARKS RECREATIONAL CARRYING CAPACITY GUIDELINES FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF RECREATION AND PARKS RECREATIONAL CARRYING CAPACITY GUIDELINES THE SELECTION AND CAPACITY DETERMINATION OF USE SITES Introduction The Division

More information

Wilderness Research. in Alaska s National Parks. Scientists: Heading to the Alaska Wilderness? Introduction

Wilderness Research. in Alaska s National Parks. Scientists: Heading to the Alaska Wilderness? Introduction Wilderness Research in Alaska s National Parks National Park Service U.S. Department of Interior Scientists: Heading to the Alaska Wilderness? Archeologist conducts fieldwork in Gates of the Arctic National

More information

WILDERNESS PLANNING. Wilderness. Interagency Regional Wilderness Stewardship Training. Alamosa, Colorado - March 26-29, 2007

WILDERNESS PLANNING. Wilderness. Interagency Regional Wilderness Stewardship Training. Alamosa, Colorado - March 26-29, 2007 WILDERNESS PLANNING Interagency Regional Wilderness Stewardship Training Alamosa, Colorado - March 26-29, 2007 Suzanne Stutzman Lead Planner/Wilderness Coordinator National Park Service, Intermountain

More information

CHAPTER I. PURPOSE OF AND NEED FOR ACTION

CHAPTER I. PURPOSE OF AND NEED FOR ACTION CHAPTER I. PURPOSE OF AND NEED FOR ACTION DIFFERENCE BETWEEN FEIS AND DEIS A Draft Environmental Impact Statement was prepared by the Lewis and Clark National Forest and released for public comment on

More information

Montana Wilderness Association v. McAllister, 666 F.3d 549 (9th Cir. 2011). Matt Jennings I. INTRODUCTION

Montana Wilderness Association v. McAllister, 666 F.3d 549 (9th Cir. 2011). Matt Jennings I. INTRODUCTION Montana Wilderness Association v. McAllister, 666 F.3d 549 (9th Cir. 2011). Matt Jennings I. INTRODUCTION In Montana Wilderness Association v. McAllister, 1 the United States Court of Appeals for the Ninth

More information

Wallowa Falls Hydroelectric Project FERC Project No. P-308 Proposed Study Plans - Recreation August 2011

Wallowa Falls Hydroelectric Project FERC Project No. P-308 Proposed Study Plans - Recreation August 2011 Wallowa Falls Hydroelectric Project FERC Project No. P-308 August 2011 Prepared by: PacifiCorp Energy Hydro Resources 825 NE Multnomah, Suite 1500 Portland, OR 97232 For Public Review Wallowa Falls Hydroelectric

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What is being proposed? What are the details of the proposal? Where is the project area located?

More information

Camper Cabins in National Forest Campgrounds. Jon Benson Recreation Specialist USDA Forest Service Superior National Forest

Camper Cabins in National Forest Campgrounds. Jon Benson Recreation Specialist USDA Forest Service Superior National Forest Camper Cabins in National Forest Campgrounds Jon Benson Recreation Specialist USDA Forest Service Superior National Forest Superior National Forest The Superior National Forest is known locally, regionally,

More information

Discussion Topics. But what does counting tell us? Current Trends in Natural Resource Management

Discussion Topics. But what does counting tell us? Current Trends in Natural Resource Management Discussion Topics What are the outputs of natural resource management How do we measure what we produce What are the outputs of resource recreation management Ed Krumpe CSS 287 Behavioral approach to management

More information

SOCIAL CONFLICT BETWEEN MOTORIZED AND NON-MOTORIZED RECREATIONAL ACTIVITIES.

SOCIAL CONFLICT BETWEEN MOTORIZED AND NON-MOTORIZED RECREATIONAL ACTIVITIES. SOCIAL CONFLICT BETWEEN MOTORIZED AND NON-MOTORIZED RECREATIONAL ACTIVITIES. There is a great disparity in opinions about the effects on a person s recreational experience when they encounter others on

More information

County of Elgin Tourism Signage Policy Addendum A

County of Elgin Tourism Signage Policy Addendum A 1.0 INTRODUCTION County of Elgin Tourism Signage Policy Addendum A 1.1 PURPOSE OF ELGIN TOURISM SIGNAGE POLICY To define the eligibility, use, design and authority for tourism oriented directional signage

More information

WASHINGTON STATE PARKS LAND CLASSIFICATION SYSTEM

WASHINGTON STATE PARKS LAND CLASSIFICATION SYSTEM WASHINGTON STATE PARKS LAND CLASSIFICATION SYSTEM Administrative Code Establishing Land Classification System WAC 352-16-020 Land classification system. State park areas are of statewide natural, cultural,

More information