1 ANNUAL REPORT 2013 PREPARED BY PETER J FALLA SENIOR MANAGER, PROJECTS & ROADS

2 Contents 1 EXECUTIVE SUMMARY 3 2 ESTABLISHING THE BRAND OF GUERNSEY ROADS 4 3 TRANSFORMING THE WAY GUERNSEY ROADS OPERATES 4 4 WORK COMPLETED IN FINANCES 6 6 LOOKING FORWARD 8 2

3 1). Executive Summary 2013 was a year of transformation for Guernsey Roads during which it established itself as a business with its own identity. It had to mould itself into a business that met the current needs of its customers. It also had to be operated efficiently to support the States in its need to maximise return on investment in its infrastructure, and to ensure it supported both the strategic aims and objectives of the Public Services Department and the States of Guernsey. This transformation could not take place overnight but significant steps took place in 2013 to bring about change, which could be built upon in 2014, allowing the development of a ten year Business Plan. I am grateful for the co-operation and support of all of the staff at Guernsey Roads for their help and assistance in They have enthusiastically faced and met challenges brought about by the need for change and adaptation, and their support in taking on additional challenges and extra duties has been admirable. We are looking forward to a year of further change in 2014 as we continue our transformation to drive Guernsey Roads to deliver well-maintained public highways that enable the efficient movement of people and goods, and make a positive contribution to Island life in social, economic and environmental terms. Peter J Falla Senior Manager, Projects & Roads 3

4 2). Establishing the Brand of Guernsey Roads As part of its mandate, the Public Services Department (PSD) is responsible for the following aspects of the public highway: The maintenance of the structure and wearing surfaces of the 400km road network The maintenance of the surfaces of green lanes Road cleansing The management, collection and disposal of surface waters that fall on and/or pass under the road network (road drainage). Up until 2013 Roads has simply been seen as a section of PSD s Head Office but it was decided that, although it did not have its own source of funding, Guernsey Roads should be more business-like to ensure it spent public funds in the most efficient manner. In recognition of this it became a quasi-business Unit and was given the name Guernsey Roads. Throughout 2013 Guernsey Roads has been establishing its brand. It set out to ensure that Islanders are at the heart of everything it does with its aim being always to deliver services as efficiently and effectively as possible. 3). Transforming the Way Guernsey Roads Operates Business planning is essential for any operation looking after expensive assets and servicing a wide customer base. In 2013 Guernsey Roads carried out a lot of background work to complete this process. Guernsey Roads has not previously carried out long-term business planning. In order for Guernsey Roads to demonstrate it is spending public money in the most effective manner it needed to commence the process of outlining its future strategic direction. To provide this direction it needed to review the current condition and performance of the highways infrastructure, and form a programme of actions necessary to ensure the satisfactory performance of those assets and ensure it has the necessary resources to fulfil that plan. Guernsey Roads has identified the stages that it needs to go through to move to an asset management approach. Specific areas of notable progress in 2013 are as follows: Real-term reduction in the cost of individual resurfacing projects 250 remedial works across the Island Commenced review of laws covering damage to the highways Clearer prioritising of works First condition survey to provide assessment of the condition of all the Island s roads Streamlining of procedure for adoption of new residential and commercial estate roads (for consideration by the States in 2014) Completion of road age database 4

5 Introduction of quarterly reports for all utilities highlighting outstanding reinstatement works has successfully reduced the number of outstanding works Improved contracts for 2014 requiring that contractors find efficiencies in the way they work Established joined-up working with Planning & Building Control to ensure those carrying out development near roads are made aware formally of the need to liaise with Guernsey Roads Development of closer working relationships with the Traffic and Transport Services section of the Environment Department Development of closer working relationships with parishes Over 80 % reduction in printing costs for letters notifying residents of road closures Finalisation of framework contract of rates for 2014 for remedial works. This allows the most cost-effective contractor to be selected, removing the need for quoting, which reduces costs. 4). Increased Engagement with Islanders As part of its transformation Guernsey Roads is adapting to ensure that Islanders are at the heart of everything we do. This means having effective systems in place to record and respond to all feedback that is reported by members of the public, often in relation to newly formed potholes, drainage issues, or areas that have suffered from littering. Any reports such as these are recorded on a database, and where appropriate inspected by a Highways Inspector to assess the issue and recommend an effective solution. These will then be considered by the project managers. They will review the findings and allocate a suitable priority to any works required, based on the scale of the issue and other pending works. Guernsey Roads will provide feedback to the person who raised the issue providing them with details of how the issue will be resolved and an expected timescale. The aim is to ensure that at all times customers are kept well-informed and treated with respect and courtesy. 5

6 5). Work Completed in 2013 SCHEMES Les Tranquesous, St. Saviour/Castel Rue des Marchez/ Rue des Heches, St. Pierre du Bois Petite Hurette, Castel Calais Road, St. Martin Rue du Douit, Castel La Grande Marais, Vale Le Mont Saint/Grande Rue, St. Saviour La Grande Maison, St. Sampson s * Courtil Portier Estate, St. Andrew La Rue du Hurel, St. Martin Croix Martin, St. Saviour * Rue St. Germain, Castel Les Oberlands, SPP/St. Martin s * Les Canichers, St. Peter Port Val Des Terres (patching)* La Route De Braye, Vale Rue des Villets, Forest Les Baissieres, SPP/Castel Le Dos d'ane, Castel Rue du Rignet, St. Saviour Rue de la Grange, St. Saviour Les Petites Fontaines, St. Peter Port Vauvert, St. Peter Port Les Ozouets Road, St. Peter Port Ruette Julienne, Castel Robergerie Road, St. Sampson s Rue Cohu/Landes du Marche, Castel/Vale Les Traudes, St. Martin s Rue des Rigneaux, St. Saviour Route Isabelle, St. Peter Port Castle Road, Vale Route des Barras, Vale Rue des Issues & Rue Fevresse, St. Saviour * Calais Lane, St. Martin s (part)* Le Bouet, St. Peter Port Rue Cohu, Castel *Additional schemes (i.e. not in original programme) 6). Finances 2013 Original Budget ( 000s) 2013 Total Authorised ( 000s) Net Expenditure by Budget 2013 Actual 2012 Actual ( 000s) ( 000s) 1,198 *1,336 Road cleansing 1,270 1,189 2,610 2,636 Road Resurfacing & 2,221 2,281 Reconstruction Minor Repairs and Maintenance *Additional funds provided by Treasury and Resources Department to cover additional costs incurred by Island-wide clear-up after exceptional event caused by snow and high winds was a transitional year for Guernsey Roads with it looking to rapidly enhance its management of the highways under new leadership. The 2013 resurfacing programme had already been costed and scheduled before the change. However, the team began to identify 6

7 new efficiencies, which would not have a negative effect in the long-term, and reduced costs, which meant that savings were made. Several additional resurfacing projects were undertaken on minor roads but additional major projects could not be planned in for the reasons outlined above. Ongoing roads maintenance programmes do not readily fit with annual budget cycles. Works for the following year s resurfacing programme are finalised by the summer of the previous year. This is because utilities need to perform works in the road at least six months before the road is resurfaced, to allow for settlement, and the closures need to be programmed in well in advance around the utilities network maintenance programmes. Should a proportion of the budget remain towards the end of the year because of a cancellation, or because of the cost of works being reduced for various reasons, including the base layers of a road being in a better condition than expected, there is limited opportunity to include other jobs within the works programme in their place. Therefore, remaining funds can often only be used in small amounts on minor roads or remedial works. Even these must be booked several weeks in advance or, for roads near key buildings like schools, several months in advance. Several schemes were cancelled in Rue Flere ( 77k) was cancelled because of a delay in another scheme caused by snow, Upland/Monument Road ( 80k) was cancelled because one utility was unable to complete works at the same time as another and delayed its works until the following year. A scheme at Pedvin Street ( 160k) was also cancelled because the original estimate proved to be inaccurate in terms of both cost and duration was also a transitional year for SAP. Guernsey Roads fully embraced the new system but later found it needed to exercise general caution around the management information available in SAP with regard to spend against budgets. Errors in the reporting function in SAP during the year made it difficult to ascertain the true position of expenditure against budget. This need to be cautious meant that the approach had to be even more prudent than would usually be the case, erring on the side of a possible underspend. Staff changes as a result of retirement created the opportunity to evaluate the management arrangements and to create budgetary savings. The Department is acutely aware that it must drive forward improvement in the management of the finances of roads. In many ways 2013 was a testing year because it was a year of transition to a new way of operating. Such change presents challenges and there has been some overlap between the old and the new will continue the process and it is expected that by the end of this year the fundamental part of the transformation will be complete. 7

8 7). Looking Forward 2014 will be another transitional year for Guernsey Roads as it concludes its current transformation process and continued drive to reduce costs in real terms without reducing the long-term performance of the asset. Continued efforts to reduce costs wherever possible may result in budget figures that are slightly high but staff will work hard to programme in additional works to maximise the amount of work it carries out within its budget. This has to be the ultimate aim as it is proven that earlier intervention in maintaining assets reduces costs in the long-term and the phrase a stitch in time saves nine certainly applies. The States of Guernsey needs to act as it has allowed the roads to deteriorate over the years for a variety of reasons, and the deterioration will continue without additional investment leading to a negative impact on Island life. Counteractive action is needed and Guernsey Roads will be producing a business plan in 2014 setting out how it will address the deteriorating roads. 8

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

YORKSHIRE DALES NATIONAL PARK AUTHORITY ITEM 10 CHARGING FOR THE USE OF AUTHORITY OWNED PUBLIC TOILETS

YORKSHIRE DALES NATIONAL PARK AUTHORITY ITEM 10 CHARGING FOR THE USE OF AUTHORITY OWNED PUBLIC TOILETS YORKSHIRE DALES NATIONAL PARK AUTHORITY ITEM 10 Date: 31 March 2015 Report: CHARGING FOR THE USE OF AUTHORITY OWNED PUBLIC TOILETS Purpose of the report 1. To seek Members approval to trial for two years,

More information

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada Evaluation of Transport Canada s Program of Payments to Other Government or International Agencies for the Operation and Maintenance of Airports, Air Navigation, and Airways Facilities (Also known as the

More information

Councillors Noble (Chair), Gollick and Worton. There were no declarations of pecuniary or non-pecuniary interests.

Councillors Noble (Chair), Gollick and Worton. There were no declarations of pecuniary or non-pecuniary interests. MEETING: Dearne Area Council DATE: Monday, 4 April 2016 TIME: 10.00 am VENUE: Meeting Room, Goldthorpe Library MINUTES Present Councillors Noble (Chair), Gollick and Worton. 43 Declarations of Pecuniary

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1. Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, Letchworth Garden City Introduction As part of central government

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

Customer consultation

Customer consultation Customer consultation Anglian Waterways navigation charges 2018/19 July 2017 Introduction We need to increase the boat registration charges payable for any boat kept, used or let for hire on our Anglian

More information

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project Item 1 To: Leadership Board On: 3 June 2015 Report by: Director of Development and Housing Services Heading: City Deal Strategic Business Cases 1. Summary 1.1 This report seeks approval from the Board

More information

LITTLE WALDINGFIELD PARISH COUNCIL Minutes of Meeting held on Tuesday 20 th September 2016 at 7.30pm in the Parish Room

LITTLE WALDINGFIELD PARISH COUNCIL Minutes of Meeting held on Tuesday 20 th September 2016 at 7.30pm in the Parish Room Present: Attending: Councillors Andy Sheppard (Chairman), Stewart Braybrook, Jeremy Coomber, Tim Sheppard and Chris White. Colin Spence (Suffolk County Councillor), Dave Crimmin (Clerk) and 1 resident.

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire INTERNAL AUDIT DIVISION REPORT 2014/111 Audit of air operations in the United Nations Operation in Côte d Ivoire Overall results relating to the effective management of air operations in the United Nations

More information

The Traffic Management Act (TMA) 2004 and roadworks; and lane rental under the New Roads and Streetworks Act (1991) in England

The Traffic Management Act (TMA) 2004 and roadworks; and lane rental under the New Roads and Streetworks Act (1991) in England The Traffic Management Act (TMA) 2004 and roadworks; and lane rental under the New Roads and Streetworks Act (1991) in England Introduction and purpose of note In view of the review of SRWC functions,

More information

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment TITLE Ryeish Green and Grays Fruit Farm Sports Hub Projects FOR CONSIDERATION BY The Executive on 30 July 2015 WARD DIRECTOR LEAD MEMBER Shinfield South and Wokingham Without Heather Thwaites, Director

More information

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and

More information

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan INTERNAL AUDIT DIVISION REPORT 2014/065 Audit of air operations in the United Nations Assistance Mission in Afghanistan Overall results relating to the effective management of air operations in the United

More information

Delamere & Oakmere Parish Council Meeting

Delamere & Oakmere Parish Council Meeting Delamere & Oakmere Parish Council Meeting MINUTES OF THE MONTHLY, PARISH MEETING OF DELAMERE AND OAKMERE PARISH COUNCIL HELD ON MONDAY 17 TH JULY 2017 AT 7.15P.M. DELAMERE COMMUNITY CENTRE, STATION ROAD,

More information

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

JOB DESCRIPTION FBO Manager

JOB DESCRIPTION FBO Manager JOB DESCRIPTION FBO Manager RESPONSIBLE TO: LOCATION: Managing Director London Biggin Hill Airport Ltd WHAT IS THE JOB LIKE? The role holder will have an oversight of operational issues and teams to ensure

More information

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089 Safety & Airspace Regulation Group Code of Practice Issue 13, August 2013 Civil Aviation Authority 2013 All rights reserved. Copies of this publication may be reproduced for personal use, or for use within

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016 Part 149 CAA Consolidation 1 February 2016 Aviation Recreation Organisations - Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 149 prescribes rules governing the

More information

BOARHUNT PARISH COUNCIL MEETING - Minutes of 6 th July 2016

BOARHUNT PARISH COUNCIL MEETING - Minutes of 6 th July 2016 Present Other Apologies Cllr E. Schofield (Chair) Clerk G. Wright Cllr C. Crowe Cllr C. Norwood WCC Cllr N. Cutler (from 7.40pm) Cllr C. Harmsworth Cllr B. Dell HCC Cllr P. Stallard Cllr J. Parker One

More information

Research Briefing Flood and Coastal Erosion Risk Management in Wales

Research Briefing Flood and Coastal Erosion Risk Management in Wales Research Briefing Flood and Coastal Erosion Risk Management in Wales Author: Wendy Dodds Date: September 2017 National Assembly for Wales Research Service The National Assembly for Wales is the democratically

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

BARROW GURNEY PARISH COUNCIL

BARROW GURNEY PARISH COUNCIL BARROW GURNEY PARISH COUNCIL Minutes of the Annual Parish Meeting of the Parish Council held in the village hall, Barrow Gurney, on 11 May 2015. Present: Eric Gates (Chairman), Phil Carnell, Andy Robbins,

More information

Gotherington Parish Council Action Plan 2018/19 Working document adopted at Parish Council Annual Meeting on 8 May 2018 and reviewed annually

Gotherington Parish Council Action Plan 2018/19 Working document adopted at Parish Council Annual Meeting on 8 May 2018 and reviewed annually Action Plan 2018/19 Working document adopted at Parish Council Annual Meeting on 8 May 2018 and reviewed annually Parishes are the smallest areas of civil administration in England and provide the statutory

More information

Miontuairiscí / Meeting Minutes. Trim Municipal District. Ordinary Meeting

Miontuairiscí / Meeting Minutes. Trim Municipal District. Ordinary Meeting Trim Municipal District Ordinary Meeting 2:15p.m., 19 th February 2016, Trim Civic Offices An Cathaoirleach, Councillor Noel French, presided. Councillors Present: Enda Flynn, Joe Fox, Trevor Golden, Caroline

More information

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 6pm on 19 JANUARY 2016

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 6pm on 19 JANUARY 2016 HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 6pm on 19 JANUARY 2016 Present: Councillor S Walsh (Chairman Essex County Council) Councillors R Gooding and J Lodge (Essex County Council)

More information

Western Bay of Plenty District Council

Western Bay of Plenty District Council Western Bay of Plenty District Council Minutes of Meeting No. TP13 of the Te Puke Community Board held on 14 June 2018 at the Te Puke Library and Service Centre commencing at 7.00pm Present Members P Miller

More information

Mapping the Journey: Exploring the Voluntary Sector s Relationship with Community Planning in North Lanarkshire

Mapping the Journey: Exploring the Voluntary Sector s Relationship with Community Planning in North Lanarkshire VANL Exploring the Voluntary Sector s Relationship with Community Planning in North Lanarkshire A Timeline Overview for Voluntary Sector and Community Planning Partners Report from Voluntary Action North

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

CYNGOR CYMUNED DINAS POWYS COMMUNITY COUNCIL

CYNGOR CYMUNED DINAS POWYS COMMUNITY COUNCIL CYNGOR CYMUNED DINAS POWYS COMMUNITY COUNCIL MINUTES PRESENT: of the Monthly Meeting of Dinas Powys Community Council held in the Lee Hall, Dinas Powys, on Thursday, 14 th April 2016. Cllrs. K. Hatton

More information

Noise Action Plan Summary

Noise Action Plan Summary 2013-2018 Noise Action Plan Summary Introduction The EU Noise Directive 2002/49/EU and Environmental Noise (Scotland) Regulations 2006 requires airports with over 50,000 movements a year to produce a noise

More information

FOISA status Exemption under section 30 (prejudice to effective conduct of public affairs) REDACTED VERSION

FOISA status Exemption under section 30 (prejudice to effective conduct of public affairs) REDACTED VERSION MINUTES OF THE 209 TH MEETING OF HIGHLANDS & ISLANDS AIRPORTS LTD ( HIAL ) BOARD HELD AT THE GLEN MORISTON TOWNHOUSE HOTEL, INVERNESS, ON 25 TH FEBRUARY 2014 AT 10:00 Present Mr Grenville Johnston Chairman

More information

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 April 2016 Title Brent Cross Cricklewood Gowling Wragge Lawrence Graham (UK) LLP Report of Commissioning Director, Growth and Development Wards Child s

More information

Great Barrier Local Board OPEN MINUTES

Great Barrier Local Board OPEN MINUTES OPEN MINUTES Minutes of a meeting of the Great Barrier Local Board held in the Council Chambers, Auckland Town Hall, 301-305 Queen Street, Auckland on Wednesday, 9 July 2014 at 4:30pm. PRESENT Chairperson

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.00 pm on 29 NOVEMBER 2012

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.00 pm on 29 NOVEMBER 2012 HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.00 pm on 29 NOVEMBER 2012 Present: Councillor A Walters Chairman. Councillor J Salmon (Uttlesford District Council). Councillors R

More information

MINUTES OF THE MEETING OF LEEDS PARISH COUNCIL Held in Leeds Village Hall on Tuesday 11th March 2014 at 7.30pm.

MINUTES OF THE MEETING OF LEEDS PARISH COUNCIL Held in Leeds Village Hall on Tuesday 11th March 2014 at 7.30pm. MINUTES OF THE MEETING OF LEEDS PARISH COUNCIL Held in Leeds Village Hall on Tuesday 11th March 2014 at 7.30pm. 011/2014 Present: Cllrs Fort Govett Young Wallace China Springford Gallihawk Also: Parish

More information

STAFF REPORT INFORMATION ONLY

STAFF REPORT INFORMATION ONLY Insert TTC logo here STAFF REPORT INFORMATION ONLY Outstanding Board Items Date: February 25, 2016 To: From: TTC Board Chief Executive Officer Summary A status update on outstanding items is submitted

More information

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 Go Ultra Low City Bid Success Announced on Monday 25 January, the Department for Transport (DfT) allocated 7M to the four West of England authorities

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Airways New Zealand Queenstown lights proposal Public submissions document

Airways New Zealand Queenstown lights proposal Public submissions document Airways New Zealand Queenstown lights proposal 2014 Public submissions document Version 1.0 12 December, 2014 Contents 1 Introduction... 3 2 Purpose... 3 3 Air New Zealand Limited... 4 3.1 Proposed changes

More information

Norfolk Parking Partnership Joint Committee

Norfolk Parking Partnership Joint Committee Norfolk Parking Partnership Joint Committee Item No Report title: Annual Report 2015/16 Date of meeting: 29 September 2016 Responsible Chief Tom McCabe - Director of Community and Officer: Environmental

More information

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules Subpart B Certification Requirements 175.51 Personnel Requirements (a) Each applicant for the grant of an aeronautical information service certificate shall engage, employ or contract: (1) a senior person

More information

Scotland s Water Industry: Past, Present and Future

Scotland s Water Industry: Past, Present and Future Scotland s Water Industry: Past, Present and Future A presentation by Katherine Russell Director of Strategy and Corporate Affairs Water Industry Commission for Scotland 16 June 2015 www.watercommission.co.uk

More information

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation

More information

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation.

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. The current Island Rights of Way Improvement Plan is a comprehensive document and much of its content is still relevant

More information

Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada

Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada 2018 Federal Budget Submission House of Commons Standing Committee on Finance Introduction The Canadian Airports Council is

More information

New free City connector bus service

New free City connector bus service The Adelaide City Council invites engagement from the community about New free City connector bus service 99C City Loop and Adelaide Connector free bus services to merge: Project Summary Adelaide City

More information

Local Development Scheme

Local Development Scheme Local Development Scheme August 2014 Local Development Scheme (August 2014) / Page 2 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation

More information

GOLD COAST AIRPORT - Runway 14 southern departures trial

GOLD COAST AIRPORT - Runway 14 southern departures trial Post Implementation Review GOLD COAST AIRPORT - Runway 14 southern departures trial Version 1 Effective January 2016 Airservices Australia 2016 1 of 13 Introduction At the request of the community, Airservices

More information

INTERNATIONAL FIRE TRAINING CENTRE

INTERNATIONAL FIRE TRAINING CENTRE INTERNATIONAL FIRE TRAINING CENTRE RFFS SUPERVISOR INITIAL LICENSING OF AERODROMES CHAPTER 8 THE MINIMUM REQUIREMENTS TO BE MET IN THE PROVISION OF RESCUE AND FIRE FIGHTING SERVICES AT UK LICENSED AERODROMES

More information

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 141 CAA Consolidation 10 March 2017 Aviation Training Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 141 prescribes rules governing the certification

More information

MINUTES OF THE MEETING OF THE TRANSPORT COMMITTEE HELD ON FRIDAY, 21 APRIL 2017 AT COMMITTEE ROOM A, WELLINGTON HOUSE, WELLINGTON STREET, LEEDS

MINUTES OF THE MEETING OF THE TRANSPORT COMMITTEE HELD ON FRIDAY, 21 APRIL 2017 AT COMMITTEE ROOM A, WELLINGTON HOUSE, WELLINGTON STREET, LEEDS MINUTES OF THE MEETING OF THE TRANSPORT COMMITTEE HELD ON FRIDAY, 21 APRIL 2017 AT COMMITTEE ROOM A, WELLINGTON HOUSE, 40-50 WELLINGTON STREET, LEEDS Present: Councillor Keith Wakefield OBE (Chair) Councillor

More information

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director

More information

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,

More information

Infrastructure for Growth

Infrastructure for Growth A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has

More information

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana THE COMMONWEALTH SECREATARIAT SEEKS APPLICATIONS FOR THE POST OF REGIONAL TRADE ADVISER (RTA) FOR AN ASSIGNMENT WITH THE CARIBBEAN COMMUNITY (CARICOM) SECRETARIAT DATE REQUIRED: December 2014 REPORTING

More information

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003 26/2/03 English only WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION Montreal, 24 to 29 March 2003 Agenda Item 1: Preview 1.1: Background to and experience of liberalization

More information

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION Page 41 REPORT TITLE: SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION REPORT PROVIDED BY: Road Services Engineer Director City Infrastructure 1.

More information

MONTHLY OPERATIONS REPORT SEPTEMBER 2015

MONTHLY OPERATIONS REPORT SEPTEMBER 2015 MONTHLY OPERATIONS REPORT SEPTEMBER 215 Table of Contents SEPTEMBER 215 Section Page September Highlights... 3 Strategic Goals Progress Update... 4 Ridership... 6 Revenue... 9 Expenses... 1 System Summary...

More information

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy 1. Introduction (Deadline for consultation responses is 19 February 2016) The CAA is currently

More information

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition March 1, 2017 Financial Reporting Center Revenue Recognition Working Draft: Time-share Revenue Recognition Implementation Issue Issue #16-6: Recognition of Revenue Management Fees Expected Overall Level

More information

Office of Utility Regulation

Office of Utility Regulation Office of Utility Regulation Competition for 3G Mobile Telecommunications Licence Report on the Consultation Document No: OUR 06/03 February 2006 Office of Utility Regulation Suites B1 & B2, Hirzel Court,

More information

Office of Utility Regulation

Office of Utility Regulation Office of Utility Regulation Register of Mobile Phone Operator Mast Sites in the Bailiwick of Guernsey Document No: OUR 09/09 July 2009 Office of Utility Regulation Suites B1 & B2, Hirzel Court, St Peter

More information

South of England north-south connectivity

South of England north-south connectivity South of England north-south connectivity An outline economic case for the inclusion of north-south connectivity improvements to form part of the government s road investment strategy (RIS2) Weston-super-Mare

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

STRATEGIC REVIEW 2015/16

STRATEGIC REVIEW 2015/16 STRATEGIC REVIEW 2015/16 STRATEGIC REVIEW 2015/16 Executive Summary Over the last 12 months the company has continued to develop, successfully broadening our client base, introducing new services, winning

More information

Guernsey and Alderney Airport

Guernsey and Alderney Airport Guernsey and Alderney Airport Annual Report 2017 Page 1 of 22 Contents Forward from the General Manager Page 3 2017 in Facts and Figures Page 4 2017 in Review Page 5 Finance Overview Page 9 Safety Overview

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

Training and licensing of flight information service officers

Training and licensing of flight information service officers 1 (12) Issued: 16 August 2013 Enters into force: 1 September 2013 Validity: Indefinitely Legal basis: This Aviation Regulation has been issued by virtue of Section 45, 46, 119 and 120 of the Aviation Act

More information

A30 Chiverton to Carland Cross Statement of Community Consultation

A30 Chiverton to Carland Cross Statement of Community Consultation A30 Chiverton to Carland Cross Statement of Community Consultation Table of contents 1 Introduction... 3 2 The application... 4 3 The scheme... 5 4 Early stages of consultation... 7 5 Statutory consultation...

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

Penpont Multi Use Games Area

Penpont Multi Use Games Area Penpont Multi Use Games Area Anyone for tennis, or hockey, or football, or...? A report of how Penpont got a MUGA Prepared by: Penpont Community Council 1 Why did we build our Multi Use Games Area?...

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

2006 Preliminary Results. 7 March 2007

2006 Preliminary Results. 7 March 2007 2006 Preliminary Results 7 March 2007 Anthony Rabin 16 Headline numbers 2005 2006 Revenue 4,938m 5,852m +19% Pre-tax profit* 134m 152m +13% Adjusted eps* 24.1p 27.3p +13% Full-year proposed dividend 8.1p

More information

MINUTES OF THE MEETING OF ICKFORD PARISH COUNCIL. Held on 9th February 2016, at 7.30pm at Ickford Village Hall Annexe

MINUTES OF THE MEETING OF ICKFORD PARISH COUNCIL. Held on 9th February 2016, at 7.30pm at Ickford Village Hall Annexe MINUTES OF THE MEETING OF ICKFORD PARISH COUNCIL Held on 9th February 2016, at 7.30pm at Ickford Village Hall Annexe Present: Councillor Andrew Brunet (AB) - Chairman Councillor Barbara Kolbert (BK) Councillor

More information

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017. Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD 4560 Submitted via online portal 2 June 2017 Dear Sir /Madam, RE: DRAFT ENVIRONMENTAL AND LIVEABILITY STRATEGY The Green Building Council

More information

Request for quotation

Request for quotation Request for quotation Request: Destination NSW is seeking an itemised quotation for the provision of Production Crew Services for Vivid Sydney 2019. For the avoidance of doubt, Destination NSW may procure

More information

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures West Belfast Partnership 218-226 Falls Road Belfast BT12 6AH T: 02890809202 A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures Issued

More information

Open Meeting. To update the Board on issues arising from the previous meeting.

Open Meeting. To update the Board on issues arising from the previous meeting. Open Meeting To Raglan Community Board From Tony Whittaker General Manager Strategy & Support Date 28 August 2017 Prepared by Sharlene Jenkins PA General Manager Strategy & Support Chief Executive Approved

More information

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire Council Policy Published by South Cambridgeshire District Council November 2016 Adoption and Maintenance of Sustainable

More information

HONDURAS AGENCY of CIVIL AERONAUTICS (AHAC) RAC-OPS-1 SUBPART Q FLIGHT / DUTY TIME LIMITATIONS AND REST REQUIREMENTS. 01-Jun-2012

HONDURAS AGENCY of CIVIL AERONAUTICS (AHAC) RAC-OPS-1 SUBPART Q FLIGHT / DUTY TIME LIMITATIONS AND REST REQUIREMENTS. 01-Jun-2012 HONDURAS AGENCY of CIVIL AERONAUTICS (AHAC) RAC-OPS-1 SUBPART Q FLIGHT / DUTY TIME LIMITATIONS AND REST REQUIREMENTS 01-Jun-2012 Contents Contents... 2 RAC OPS.1.1080 General provisions... 3 RAC OPS.1.1085

More information