INNOVAT MINERAL PROCESS SOLUTIONS LIMITED. INN16CO-CS-001 July 21, INNOVAT Case Study 5M t/a Heap Leach Northern Canada Project

Size: px
Start display at page:

Download "INNOVAT MINERAL PROCESS SOLUTIONS LIMITED. INN16CO-CS-001 July 21, INNOVAT Case Study 5M t/a Heap Leach Northern Canada Project"

Transcription

1 760 Brant St., Suite 405C, Burlington ON, L7R 4B8, Canada Tel Fax INN16CO-CS-001 July 21, 2016 Document: Project: TECHNICAL MEMORANDUM INNOVAT Case Study 5M t/a Heap Leach Northern Canada Project This memorandum presents an economic comparison based on a 5M t/a heap leach Feasibility Study related to a Northern Canada project. All assumptions for the purposes of this comparison have been accepted from the Heap Leach base case and have not been adjusted except as required to implement a Continuous Vat Leaching (CVL) based process. INNOVAT has endeavoured to conservatively estimate the CVL cases and utilized the detailed estimates provided within the Feasibility study to account for adjustments as required to implement CVL in place of Heap Leaching. 1.0 INTRODUCTION Two economic analyses are presented in this memo, one of which have been prepared by INNOVAT, and one of which was presented as a heap leach by the owner. All costing where possible has been carried forward, or based on the base case. The models are as follows: Base case: 5M t/a Heap Leach Facility (unadjusted as published) Direct Comparison: 5M t/a Continuous Vat Leaching The following considerations were used when evaluating the alternate methods: Maintain design criteria of the original project plan Use direct cost from original Feasibility study where feasible Use comparable project cost where direct cost is not feasible A 3% increase in recovery is expected, with a residence time of 24 hours

2 NORTHERN CANADA PROJECT HEAP LEACH/CVL COMPARISON INN16CO BASIS OF COMPARISON 2.1 FEASIBILITY STUDY CONFIGURATION The feasibility study has been completed on the basis of a 5M t/a heap leach operating in Northern Canada, with unique provisions as required for the extreme cold temperatures. Mining is conducted year round, with haul trucks directly feeding the primary jaw crusher for 275 days per year. Mining outside of the 275 day period results in stacking of the ore in a 1.5Mt stockpile. The heap leach is constructed using the haul trucks following crushing to 50mm. The heap leach is constructed and operated during the 275 day warmest period. Outside of the 275 day period, provisions are included to prevent freezing of the heap. These include an insulating layer of ore overtop of the heap, raincoat liners on the sides of the heap, and heating of the process solution using both waste heat and dedicated heating circuits. The leach period is approximately 200 days, with rapid leaching having occurred in the early portion of the leach cycle. 2.2 REVISIONS TO ACCOMMODATE CVL FACILITY INNOVAT has attempted to capture an identical system in which the only changes are the removal of the heap leach facility, and the installation of a continuous vat leach plant. This change will affect the flow sheet, in that processing is expected to occur year round, and no high capacity stockpile is expected to be required. To the maximum extent possible, re-handle of material will be eliminated. Waste material is not required for the construction of the CVL (as it is for heap leach), and processing can begin immediately upon commissioning of the CVL facility. Despite this, no adjustment has been made to the mining schedule, or timing of Capital Expenditures. All mining previously carried out pre-production has remained preproduction, and in reality would be shifted to production years, for a net improvement in economics through elimination of one preproduction year.

3 NORTHERN CANADA PROJECT HEAP LEACH/CVL COMPARISON INN16CO 3 The crushing circuit will require modification as a result of the Continuous Vat Leaching process feed size requirement of -6mm. It has been assumed that one additional crusher is required to accommodate this change. The cost of this inclusion has been estimated on the basis of the current primary and secondary crushing circuit cost as captured in both the CAPEX and OPEX within the feasibility. The CVL facility has been assumed to fit in series with the existing material handling circuit, and not require significant modification to the material handling circuit, except to remove the 1.5 million tonne stockpile which is no longer required. 3.0 COMPARISON OF COSTS 3.1 PRE-PRODUCTION CAPITAL EXPENDITURE - PROCESS Capital cost categorized as process related are as follows: Leach Facility and Crushing facility. The cost changes considered by this comparison are detailed below. The leach facility was adjusted with the removal of all costs associated with the Heap Leach Facility, and replacement with the costs associated with a Continuous Vat Leach facility. Life of mine, the heap leach accounts for 63M expenditure. A CVL facility is expected to incur capital expense of 28M life of mine. The addition of a crushing stage increases the capital expenditure associated with the ore crushing and handling circuit. Utilizing the estimates provided within the feasibility study and referencing similar projects, the implication of an added stage of crushing is estimated at 5M, increasing the CAPEX of this category by 29%. 3.2 PRE-PRODUCTION CAPITAL EXPENDITURE MINING Mining costs have been reduced as a function of the elimination of the 1.5M tonne stockpile, and associated required re-handling. The impact of this has been conservatively estimated via the elimination of 2 haul trucks LOM, leaving 18 haul trucks required in the most demanding year. It is expected that this could be further reduced, as the haul trucks are used to build the heaps, which is not required in the CVL case. In the CVL case, the waste would be conveyed to the

4 NORTHERN CANADA PROJECT HEAP LEACH/CVL COMPARISON INN16CO 4 waste dump for placement. The LOM mining costs are expected to be reduced from 132M to 128M. 3.3 PRE-PRODUCTION CAPITAL EXPENDITURE - PROCESS All other capital costs have been accepted without modification. Savings may be available for other categories, specifically camps, and indirects, but are not quantified as they are not expected to be significant given the overall CAPEX. Camps could be reduced in size to accommodate the reduced worker requirement resulting from the low manpower requirement of the CVL facility, and the year round nature of production. This change has not been studied. Indirects could likely also be reduced as a function of the elimination of 1 year of preproduction activities. This change has not been made as the details of the indirects are not available for scrutiny. 3.4 OPERATING EXPENSE - MINING Mining costs were reduced as a function of the reduced haul requirements primarily as a result of the elimination of the 1.5Mt stockpile and associated re-handling, but also as a result of the use of haul trucks for construction of the heaps in the base case. The elimination of haul trucks and increase in hauling efficiency resulted in a savings of 0.147/t mined. 3.5 OPERATING EXPENSE - PROCESSING Processing costs have been assessed for a net savings of 0.37/t processed. This savings is a combination of reduced labour requirement, reduced power/fuel cost, and reduced maintenance and consumables. Labour requirements have been reduced as the elimination of the heap removes the need for 8 workers (10% of process labour) related to heap leach pad operations, drip line and pipe welders. This is offset by the need for labour monitoring the CVL facility, estimated at 4 workers for a net

5 NORTHERN CANADA PROJECT HEAP LEACH/CVL COMPARISON INN16CO 5 savings of 4 workers, with fully loaded salaries attributing 0.07/t processed to the operating cost of the facility. Power and fuel costs account for 0.85/t processed in the base case. Elimination of the requirement to heat the solutions and maintain heap temperature through the winter is estimated to provide a savings of 0.20/t, with the addition of a tertiary crushing stage offsetting this for a net power and fuel cost savings of 0.10/t. Maintenance and consumables has been adjusted for the elimination of the heap leach piles and addition of a CVL facility. The feasibility study assesses the cost of heap leach operating maintenance and consumable use as 0.26/t (attributed to HL Operations Piping, Drip emitters, and liners). The elimination of much of these costs and addition of CVL maintenance costs results in a net savings of 0.20/t. 3.6 MONITORING/RECLAMATION & CLOSURE The closure requirements are expected to be significantly reduced, as the discharge from the CVL facility is dewatered, detoxified and stackable. The LOM costs of the heap leach closure activities are estimated at 60M. The CVL closure costs are expected to be reduced by 20M, for a total LOM cost of 40M. This is a function of ongoing closure, with reclamation activities beginning year 1 (the process discharge is detoxified and ready for immediately reclamation as it is released from the CVL). 3.7 TAXES Taxes have not been considered in this comparison. All figures are presented on a pre-tax basis. 3.8 TRANSPORT, INSURANCE, REFINING, ROYALTIES The same formula for determining the total cost of this category has been used across all cases. Since the CVL installation has a higher total recovery, the total cost over the life of the project has increased, but remains the same on a per ounce basis.

6 NORTHERN CANADA PROJECT HEAP LEACH/CVL COMPARISON INN16CO ONGOING CAPITAL EXPENDITURE Sustaining capital expenditure was largely unchanged with the exception of the closure costs (as previously noted), and the costs associated with the heap leach. The heap leach underwent expansions during LOM contributing 34 M in total expenditure to the sustaining cost. The elimination of the heap removes all of this cost, leaving only the tailings impound facility, which is fed dewatered, detoxified, stackable tails. The cost of this facility has been estimated at 6 M, for a net savings of 28 M. 4.0 SUMMARY OF COMPARISON A summary of the key financial parameters is shown in Table 2. Here you can see that the 5M t/a CVL case offers superior economics in comparison to the base case across all metrics. In evaluating the source of the improved economics, the following items are cited as the primary reasons: CAPEX Savings (Both pre-production and Sustaining) OPEX Savings Recovery Improvement Recovery Speed (Time value of money) In assessing the relative importance of the above factors, the primary contributor to the economic improvement is the Recovery speed (Time value of money). The gains attributed to recovery speed alone account for 66.7% of the total improvement. This is followed by the recovery improvement at 17.6%, and finally by CAPEX and OPEX savings each accounting for ~2% of the gain. This data has been presented in Table 1.

7 NORTHERN CANADA PROJECT HEAP LEACH/CVL COMPARISON INN16CO 7 Table 1 - Source of IRR Improvement Relative Contribution to IRR Improvement Recovery within 24 hours (Time value of money) 66.7% Improvement in Recovery (+3%) 17.6% CAPEX Savings 2.2% OPEX Savings 1.8% Table 2 - Key Financial Parameters Base Case Heap (5M t/a) CVL Case (5M t/a) Mine Life 10 year 10 year CAPEX (Pre-Production) M 314 M CAPEX (Sustaining/Closure) 157 M 108 M Pre-Tax IRR 50.4% 73.7% Operating Years to Payback (5%) Pre-Tax NPV At 0% Discount Rate M M At 5% Discount Rate 762 M 942 M At 10% Discount Rate 528 M 683 M Average cash cost per oz Cost per oz (including Capital) The significant improvement as a result of increased recovery speed (200 days for Heap Leach, and 24 hours for CVL) was an initial surprise, and was subsequently verified through scrutiny of the underlying data and confirmed correct. In addition, this improvement does not take into

8 NORTHERN CANADA PROJECT HEAP LEACH/CVL COMPARISON INN16CO 8 account the savings potential at mine closure related to all costs associated with operating the heap for the final 200 day cycle once the mine has been exhausted. The CVL facility would require operation for Mine Life + one 24 hour leach cycle as well as the duration required to process the final solutions and tailings; whereas the heap leach would require operation for mine life days processing + a washing and detoxification program. The savings associated with the additional year of labour requirement is significant, and has not been accounted for in the CVL case. 5.0 APPENDIX

9 APPENDIX NORTHERN CANADA PROJECT HEAP LEACH/CVL COMPARISON INN16CO A LOM Kaminak - Coffee Creek FS Economic Model Discount Period Metal Price Au US /oz 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 Exchange Rate CAD:USD MINE SCHEDULE 5M t/a Heap Leach (Base Case) Supremo Oxide Ore M tonnes Oxide Grade g/t Upper Transition Ore M tonnes Upper Transition Grade g/t Middle Transition Ore M tonnes Middle Transition Grade g/t Lower Transition Ore M tonnes Lower Transition Grade g/t Total Ore M tonnes Waste M tonnes Strip Ratio w:o Total Supremo Mined M tonnes Latte Oxide Ore M tonnes Oxide Grade g/t Upper Transition Ore M tonnes Upper Transition Grade g/t Middle Transition Ore M tonnes Middle Transition Grade g/t Lower Transition Ore M tonnes Lower Transition Grade g/t Total Ore M tonnes Waste M tonnes Strip Ratio w:o Total Latte Mined M tonnes Double Double Oxide Ore M tonnes Oxide Grade g/t Upper Transition Ore M tonnes Upper Transition Grade g/t Middle Transition Ore M tonnes Middle Transition Grade g/t Lower Transition Ore M tonnes Lower Transition Grade g/t Total Ore M tonnes Waste M tonnes Strip Ratio w:o Total Double Double Mined M tonnes Kona Oxide Ore M tonnes Oxide Grade g/t Upper Transition Ore M tonnes Upper Transition Grade g/t Middle Transition Ore M tonnes Middle Transition Grade g/t Lower Transition Ore M tonnes Lower Transition Grade g/t Total Ore M tonnes Waste M tonnes Strip Ratio w:o Total Kona Mined M tonnes TOTAL - All Zones Oxide Ore M tonnes Oxide Grade g/t Upper Transition Ore M tonnes Upper Transition Grade g/t Middle Transition Ore M tonnes Middle Transition Grade g/t Lower Transition Ore M tonnes Lower Transition Grade g/t Total Ore M tonnes Waste M tonnes Strip Ratio w:o Throughput Rate tpd Total Grade g/t Total Mined M tonnes Total Au to Heap koz ,157 Total Recoverable Au to Heap koz ,862 Au Recovery % 0% 0.0% 86.5% 82.0% 81.3% 86.1% 86.2% 86.8% 87.7% 89.6% 89.0% 91.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 86.3% Au Recovered koz ,862 PAYABLE METALS Total Recovered Au koz ,862 % 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% oz ,858 Payable Au USM ,137 C M ,739 US/payable oz Refining Costs C M Royalties C M C M Net Smelter Return (NSR) after Royalties C M ,708 OPEX C /tonne mined Mining C M C /tonne ore Processing C M C /tonne ore Surface and Infrastructure C M C /tonne ore G&A C M C M ,094 Total Opex C /payable oz C/t ore Net Operating Cashflow C M ,614 CAPEX Mining C M On-Site Development C M Ore Crushing and Handling C M Heap Leach C M Process Plant C M On-Site Infrastructure C M Off-Site Infrastructure C M Indirects C M EPCM C M Owner Costs C M Closure C M Subtotal C M Contingency C M CAPEX incl. Contingency C M Pre-Production C M Sustaining & Closure C M Working Capital C M Net Pre-Tax Cashflow C M (32) (78) (109) (5) (5) (4) (10) (5) (3) (2) (2) (4) (4) 1,113 Cumulative Net Cashflow C M (32) (110) (219) (61) ,130 1,157 1,152 1,147 1,143 1,133 1,128 1,125 1,123 1,120 1,117 1,113 Pre-Tax Payback Period Years 3.5 Pre-Tax IRR % % Pre-Tax NPV 5% C M (32) (75) (99) (3) (2) (2) (5) (2) (1) (1) (1) (1) (1) 762 Income Taxes & Yukon Quartz Tax C M (2) (1) Net After Tax Cash Flow C M Cumulative After-Tax Cash Flow C M After-Tax Payback Period Years 4.0 After-Tax IRR % 36.8% After-Tax NPV 5% C M (32) (75) (110) (2) (2) (2) (5) (2) (1) (1) (1) (1) (1) 455

10 APPENDIX NORTHERN CANADA PROJECT HEAP LEACH/CVL COMPARISON INN16CO B Coffee Creek Cash Flow - Continuous Vat Leaching: *(5Mtpa)* Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 LOM Au US /oz 1, Exchange Rate CAD:USD Supremo Oxide Ore tonnes Oxide Grade g/t Upper Transition Ore tonnes Upper Transition Grade g/t Middle Transition Ore tonnes Middle Transition Grade g/t Lower Transition Ore tonnes Lower Transition Grade g/t Total Ore tonnes Waste tonnes Strip Ratio w:o Total Supremo Mined tonnes Latte Oxide Ore tonnes Oxide Grade g/t Upper Transition Ore tonnes Upper Transition Grade g/t Middle Transition Ore tonnes Middle Transition Grade g/t Lower Transition Ore tonnes Lower Transition Grade g/t Total Ore tonnes Waste tonnes Strip Ratio w:o Total Latte Mined tonnes Double Double Oxide Ore tonnes Oxide Grade g/t Upper Transition Ore tonnes Upper Transition Grade g/t Middle Transition Ore tonnes Middle Transition Grade g/t Lower Transition Ore tonnes Lower Transition Grade g/t Total Ore tonnes Waste tonnes Strip Ratio w:o Total Double Double Mined tonnes Kona Oxide Ore tonnes Oxide Grade g/t Upper Transition Ore tonnes Upper Transition Grade g/t Middle Transition Ore tonnes Middle Transition Grade g/t Lower Transition Ore tonnes Lower Transition Grade g/t Total Ore tonnes Waste tonnes Strip Ratio w:o Total Kona Mined tonnes Total - All Zones Oxide Ore tonnes Oxide Grade g/t Upper Transition Ore tonnes Upper Transition Grade g/t Middle Transition Ore tonnes Middle Transition Grade g/t Lower Transition Ore tonnes Lower Transition Grade g/t Total Ore tonnes Waste tonnes Strip Ratio w:o Throughput Rate tpd Total Grade g/t Total Mined tonnes Total Au to CVL koz ,153 Total Recoverable Au koz ,919 Au Recovery % % Au Recovered oz ,919 Payable Metals Total Recovered Au koz ,919 Payable Au % 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 23 koz USM ,202 CM ,823 Refining Costs US/payable oz CM Royalties CM CM 2 Net Smelter Return (NSR) after Royalties CM ,790 OPEX Mining C/tonne mined CM Processing C/tonne ore CM Surface and Infrastructure C/tonne ore CM G&A C/tonne ore CM Total OPEX CM ,023 C/payable oz C/tonne ore Net Operating Cashflow CM ,768 CAPEX Mining CM On-Site Development CM Ore Crushing and Handling CM CVL CM Process Plant CM On-Site Infrastructure CM Off-Site Infrastructure CM 24 4 Indirects CM EPCM CM Owner Costs CM Closure CM - 40 Subtotal CM Contingency CM CAPEX incl. Contingency CM Pre-Production CM Sustaining & Closure CM Working Capital CM Net Cashflow ,323 Cumulative Cashflow ,074 1,305 1,345 1,343 1,341 1,339 1,337 1,335 1,333 1,331 1,329 1,327 1,325 1,323 Pretax Payback Period 2.7 Pretax IRR 73.67% Pretax NPV 5% % % 503

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008 DELIVERING DISCIPLINED GROWTH 1 Cautionary Statements All statements, other than statements of historical fact, contained or incorporated by reference in this presentation, including any information as

More information

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133 132 EL LIMON MINE: EMPLOYEES & CONTRACTORS 133 B2Gold Employees Direct 552 Nicaraguans 548 Expats 4 Unionized 494 Men 499 Women 53 Contractors Employees 570 Men 529 Women 41 EL LIMON MINE: NICARAGUA OPEN

More information

Inca de Oro Copper-Gold Project and Carmen deposit sale process

Inca de Oro Copper-Gold Project and Carmen deposit sale process PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 7 3117 2000 F: +61 7 3846 4899 E:

More information

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter 18th October 2012 Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter Highlights Record shipped tonnes and production physicals in the September Quarter Shipped tonnes

More information

Candelaria and Ojos del Salado Chile

Candelaria and Ojos del Salado Chile TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 130,000-132,000 tonnes copper Cash costs of $1.35 per lb copper after by-product credits

More information

Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain

Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain 25 York Street, 17th Floor Toronto, ON Canada M5J 2V5 NEWS RELEASE Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain Toronto, Ontario June 29, 2016 In advance of an analyst

More information

Corporate Presentation March 2015

Corporate Presentation March 2015 Corporate Presentation March 2015 March 2015 Serabi Gold and Brazil Serabi Gold plc is dual listed (TSX:SBI, AIM:SRB), gold mining and development company with operations in Northern Brazil. The Company

More information

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines. ...the best way to grow production is to construct a centralised processing facility drawing feed from nearby satellite mines. Development Projects Turner River Hub Project The Company has been conducting

More information

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION December 11 2012 KINROSS GOLD CORPORATION 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained or incorporated by reference in or

More information

For personal use only

For personal use only HIGHLIGHTS Mount Bundy Gold Project Drill results from Rustlers Roost shows 117m at 1.5 g/t gold including 8m at 6.9 g/t gold with other broad intercepts - Drill program highlights potential to further

More information

Lihir Operations. 14 th PNG Mining and Petroleum Investment Conference. 5 December 2016

Lihir Operations. 14 th PNG Mining and Petroleum Investment Conference. 5 December 2016 Lihir Operations 14 th PNG Mining and Petroleum Investment Conference 5 December 2016 Disclaimer Forward Looking Statements These materials include forward looking statements. Often, but not always, forward

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH April 2018

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH April 2018 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2018 12 April 2018 Key Points* ly sales increased 16% to 1.0 million wet metric tonnes (Mwmt), for ore sales revenue of $60 million

More information

Quarterly Report for the Period Ending 30 September 2014

Quarterly Report for the Period Ending 30 September 2014 For Immediate Release 17 October 2014 Quarterly Report for the Period Ending 30 September 2014 17 October 2014 ISSUED CAPITAL Ordinary Shares: DIRECTORS 468M CHAIRMAN: Robert Kennedy NON-EXECUTIVE DIRECTORS:

More information

Cadia East PC2 recorded its highest quarterly ore production, and PC1 recommenced ore production

Cadia East PC2 recorded its highest quarterly ore production, and PC1 recommenced ore production Quarterly Report For the three months ended 30 ember 2017 (figures are unaudited and in US$ except where stated) Key Points (1) ember Quarter 2017 Gold production of 523koz for the quarter, down 5.2% from

More information

Lihir record milling throughput rate of 14.5mtpa (annualised) delivering record quarterly gold production

Lihir record milling throughput rate of 14.5mtpa (annualised) delivering record quarterly gold production Quarterly Report For the three months ended 30 e 2017 (figures are unaudited and in US$ except where stated) Key Points (1) Financial Year 2017 Gold production of 2,381koz for the year, down 2.4% for the

More information

For personal use only

For personal use only Southern Cross Goldfields Ltd ASX Announcement 5 September 2014 Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Wonawinta Silver Project (60 M oz) to be acquired

More information

December 2017 Quarterly Report

December 2017 Quarterly Report ASX Announcement 31 January 2018 ASX: CRB December 2017 Quarterly Report KEY POINTS Continuation of work including final design criteria and front end engineering following Demonstration Plant test work

More information

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited)

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited) Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited) Key Points Operations Record quarterly gold production of 463,170oz (390,096oz). Group cash

More information

STANSTED AIRPORT LIMITED REGULATORY ACCOUNTS PERFORMANCE REPORT FOR THE YEAR ENDED 31 MARCH Financial Review...1. Performance Report...

STANSTED AIRPORT LIMITED REGULATORY ACCOUNTS PERFORMANCE REPORT FOR THE YEAR ENDED 31 MARCH Financial Review...1. Performance Report... PERFORMANCE REPORT CONTENTS Page Financial Review...1 Performance Report...3 Notes to the Performance Report...4 Stansted Regulatory Accounts PERFORMANCE REPORT Financial Review General overview Stansted

More information

Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates

Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates 25 York Street, 17th Floor Toronto, ON Canada M5J 2V5 NEWS RELEASE Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates Toronto,

More information

PROJECTS & TECHNICAL SERVICES

PROJECTS & TECHNICAL SERVICES PROJECTS & TECHNICAL SERVICES 1.0 2.0 3.0 4.0 5.0 JOHN NITSCHKE EGM Projects & Technical Services 6.0 7.0 8.0 9.0 OZ MINERALS NOVEMBER 2009 PAGE 40 STRATEGY SUPERIOR TOTAL SHAREHOLDER RETURNS ZERO HARM

More information

BHP Billiton Iron Ore. Asset Development Projects

BHP Billiton Iron Ore. Asset Development Projects BHP Billiton Iron Ore Asset Development Projects September 2003 Agenda Mining Area C Project Area C to Yandi Rail Project Products and Capacity Expansion (PACE) Project System Capacity Increases to 100Mtpa

More information

Australian Securities Exchange Notice

Australian Securities Exchange Notice Australian Securities Exchange Notice 30 January 2017 ILUKA BUSINESS REVIEW UPDATE AND THE IMPACT ON 2016 AND 2017 FINANCIAL RESULTS Iluka Resources Limited (Iluka) provides the following update relating

More information

Australian Securities Exchange Notice

Australian Securities Exchange Notice Australian Securities Exchange Notice 12 December 2017 ASX: ILU CATABY PROJECT APPROVED WITH OFFTAKE AGREEMENTS SECURED FOR 85 OF SYNTHETIC RUTILE PRODUCTION Cataby mineral sands project approved; with

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

2011 Annual General Meeting. Greg Robinson Managing Director & CEO

2011 Annual General Meeting. Greg Robinson Managing Director & CEO 2011 Annual General Meeting Greg Robinson Managing Director & CEO Disclaimer Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve

More information

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT 26 October 2018 Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 Board of Directors: David Quinlivan Luke Tonkin

More information

For personal use only

For personal use only 5 September 2016 ABN 91 124 752 745 Drilling Underway At The Koala Gold Mine, Mt Coolon Gold Project, Qld Stage 1 drilling for 1,100 metres has commenced on schedule at the Koala Gold Mine. Drilling is

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

NEWCREST LOOKING TO THE FUTURE

NEWCREST LOOKING TO THE FUTURE NEWCREST LOOKING TO THE FUTURE Sandeep Biswas Managing Director and Chief Executive Officer Disclaimer Forward Looking Statements This presentation includes forward looking statements. Forward looking

More information

For personal use only

For personal use only Coziron Resources Limited ABN: 91 112 866 869 Level 24, 44 St George s Terrace Perth Western Australia 6000 PO Box Z5183 Perth WA 6831 Phone: +61 8 6211 5099 Facsimile:+61 8 9218 8875 Website: www.coziron.com

More information

AUSIMM - Technical Meeting & AGM

AUSIMM - Technical Meeting & AGM The Construction, Commissioning and Ramp-Up of the Prominent Hill Mine John Nitschke Executive General Manager Projects and Technical Services AUSIMM - Technical Meeting & AGM Tuesday 10th November 2009

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

Lorena Gold Project Malachite AGM 29 November 2017

Lorena Gold Project Malachite AGM 29 November 2017 Lorena Gold Project Malachite AGM 29 November 2017 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated

More information

Lihir Operations PNG Mining and Petroleum Conference 24 November Peter Aitsi Country Manager, PNG

Lihir Operations PNG Mining and Petroleum Conference 24 November Peter Aitsi Country Manager, PNG Lihir Operations PNG Mining and Petroleum Conference 24 November 2015 Peter Aitsi Country Manager, PNG Disclaimer Forward Looking Statements These materials include forward looking statements. Often, but

More information

BofAML Global Metals, Mining & Steel Conference May Victor Gobitz - CEO

BofAML Global Metals, Mining & Steel Conference May Victor Gobitz - CEO BofAML Global Metals, Mining & Steel Conference May 2017 Victor Gobitz - CEO Cautionary Statement This presentation contains certain information that may constitute forward-looking information under applicable

More information

Kinross Production Continues on Plan

Kinross Production Continues on Plan Kinross Production Continues on Plan 40 KING STREET WEST, 52 ND FLOOR TORONTO, ON M5H 3Y2 TEL: 416 365 5123 FAX: 416 363 6622 TOLL FREE: 866-561-3636 PRESS RELEASE July 28, 2005, Toronto, Ontario Kinross

More information

NEWS RELEASE. Supplemental information:

NEWS RELEASE. Supplemental information: 25 York Street, 17th Floor Toronto, ON Canada M5J 2V5 NEWS RELEASE Kinross Acquires Strategic Nevada Assets Strengthens portfolio with two quality mines in world-class jurisdiction Large prospective land

More information

Ferrovial increases net profit by 12%, to 287 million euro

Ferrovial increases net profit by 12%, to 287 million euro All-time record backlog: 23.695 billion euro Ferrovial increases net profit by 12%, to 287 million euro Revenues expanded by 2.8% to 3.758 billion euro, supported by solid performance in the international

More information

On The Road To Silver Mining In Mexico

On The Road To Silver Mining In Mexico On The Road To Silver Mining In Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director & CEO Corporate Overview ASX Code KEY STATISTICS AZS Share Price A$0.034 (@ 5/10/2016)

More information

For personal use only

For personal use only For the period ended 30 September 2014 HIGHLIGHTS STORMONT (TASMANIA) JOINT VENTURE GOLD PROJECT MINING AND PRODUCTION COMPLETED. LORENA GOLD PROJECT CONSTRUCTION CONTINUES TO ADVANCE. COMMISSIONING EXPECTED

More information

Ramelius Resources Limited ASX:RMS

Ramelius Resources Limited ASX:RMS Ramelius Resources Limited ASX:RMS Diggers & Dealers 3-5 August 2015 Ramelius Resources Limited Diggers and Dealers - August 2015 2 Forward Looking and Competent Persons Statements Forward Looking Statements

More information

JUNE 2017 QUARTERLY ACTIVITIES REPORT

JUNE 2017 QUARTERLY ACTIVITIES REPORT ASX RELEASE 25 JULY 2017 JUNE 2017 QUARTERLY ACTIVITIES REPORT Cash flow positive result for the quarter even after significant development activities and repayment of Nullagine deferred royalties to the

More information

December 2018 Quarterly Production Report

December 2018 Quarterly Production Report 31 January 2019 December 2018 Quarterly Production Report Fortescue Metals Group Limited (ASX: FMG, Fortescue) Fortescue has released its December 2018 quarterly production results, reporting total shipments

More information

Airplane Value Analysis Alex Philip

Airplane Value Analysis Alex Philip Airplane Value Analysis Alex Philip Istanbul Technical University Air Transportation Management M.Sc. Program Fundamentals of Airline Management Module 7: 14 October 2015 Financial evaluation of projects

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

Curragh Operational Tour

Curragh Operational Tour Curragh Operational Tour Analyst Briefing Wednesday 17 May 2006 Curragh Operational Tour 17 May 2006 1 Overview Stewart Butel Director Coal Operations Wesfarmers Energy Curragh Operational Tour 17 May

More information

For personal use only

For personal use only QUARTERLY ACTIVITIES REPORT PERIOD ENDED 30 JUNE 2015 ASX Announcement ASX Code: VXR Released: 31 July 2015 Venturex Resources Limited (ASX: VXR) is pleased to report its activities for the June 2015 Quarter.

More information

ASPIRING TO BE WORLD CLASS. BMO Nesbitt Burns Gold Conference March 3, 2004

ASPIRING TO BE WORLD CLASS. BMO Nesbitt Burns Gold Conference March 3, 2004 ASPIRING TO BE WORLD CLASS BMO Nesbitt Burns Gold Conference March 3, 2004 Kinross Today Kinross is now a major gold producer, focused in the Americas Concerns addressed: Financial leverage strong balance

More information

Recent Exploration of the Olympic Dam

Recent Exploration of the Olympic Dam Recent Exploration of the Olympic Dam Southern Orebody DAVE THOMAS Olympic Dam Development Study SA Explorers Conference 2 December 2005 BHP Billiton profile (2005) The company BHP Billiton is the world

More information

QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT QUARTERLY ACTIVITIES REPORT For the quarter ended 31 December 2010 ABN: 38 108 779 782 Silver Lake Resources Ltd ( Silver Lake or the Company ) is pleased to present this Quarterly Activities Report. Les

More information

Managing through disruption

Managing through disruption 28 July 2016 Third quarter results for the three months ended 30 June 2016 Managing through disruption 3 months ended Like-for-like (ii) m (unless otherwise stated) Change 30 June 2016 30 June 2015 change

More information

TRANSIT WINDSOR REPORT

TRANSIT WINDSOR REPORT TRANSIT WINDSOR REPORT MISSION STATEMENT: PROVIDING SAFE, RELIABLE AND AFFORDABLE PUBLIC TRANSIT FOR THE COMMUNITY THROUGH CONTINUOUS IMPROVEMENT IN CUSTOMER CARE, ENVIRONMENTAL STEWARDSHIP AND EMPLOYEE

More information

Maximum Levels of Airport Charges

Maximum Levels of Airport Charges Maximum Levels of Airport Charges Annual Compliance Statement for 24 September to 31 December 2003 and for the Regulatory Period 20 and Provisional Price Caps for the Regulatory Period 20 Commission Paper

More information

PRESS RELEASE CNMC GOLDMINE ACHIEVES SIGNIFICANT PRODUCTION MILESTONE WITH THE SUCCESSFUL COMMISSIONING OF ITS HEAP LEACH PLANT, PRODUCING RECORD 740

PRESS RELEASE CNMC GOLDMINE ACHIEVES SIGNIFICANT PRODUCTION MILESTONE WITH THE SUCCESSFUL COMMISSIONING OF ITS HEAP LEACH PLANT, PRODUCING RECORD 740 3 January 2013 Company Registration No.: 201119104K PRESS RELEASE CNMC GOLDMINE ACHIEVES SIGNIFICANT PRODUCTION MILESTONE WITH THE SUCCESSFUL COMMISSIONING OF ITS HEAP LEACH PLANT, PRODUCING RECORD 740.82

More information

On The Road To Silver & Gold Mining In Mexico

On The Road To Silver & Gold Mining In Mexico On The Road To Silver & Gold Mining In Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director & CEO Corporate Overview ASX Code KEY STATISTICS AZS Share Price A$0.032 (@

More information

Anglo Pacific Group PLC Acquisition of a Royalty on the Cañariaco Copper Project

Anglo Pacific Group PLC Acquisition of a Royalty on the Cañariaco Copper Project News Release June 8, 2018 Anglo Pacific Group PLC Acquisition of a Royalty on the Cañariaco Copper Project This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014

More information

Minara Resources Limitedit Sydney February Peter Johnston

Minara Resources Limitedit Sydney February Peter Johnston Minara Resources Limitedit Sydney February 2008 y y y Peter Johnston Important t Notice This presentation contains certain statements which may constitute forward-looking statements. Such statements are

More information

Cadia Valley. Peter Smith Executive General Manager Australian Operations

Cadia Valley. Peter Smith Executive General Manager Australian Operations Cadia Valley Peter Smith Executive General Manager Australian Operations Disclaimer Forward Looking Statement These materials include forward looking statements. Often, but not always, forward looking

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER October 2017

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER October 2017 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2017 20 October 2017 Key Points* Sales increased ~40% in the September quarter to 0.84 million wet metric tonnes (Mwmt) including

More information

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager Australian Site Tour Mt Keith Operation Jaco Harwig General Manager 28 October 2008 Important notices Reliance on third party information The views expressed here contain information that have been derived

More information

ASX Appendix 4D Half-Year Financial Report

ASX Appendix 4D Half-Year Financial Report ASX Appendix 4D Half-Year Financial Report 31 December 2011 NEWCREST MINING LIMITED AND CONTROLLED ENTITIES ASX APPENDIX 4D AND FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2011 ABN: 20 005 683

More information

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 5: 10 March 2014

More information

DAA Response to Commission Notice CN2/2008

DAA Response to Commission Notice CN2/2008 22 nd September 2008 DAA Response to Commission Notice CN2/2008 1 DAA welcomes the opportunity to respond to the Commission notice CN2/2008 which discusses the interaction between the regulations governing

More information

Iron Ore Update. Ian Ashby President Iron Ore 6 May 2009

Iron Ore Update. Ian Ashby President Iron Ore 6 May 2009 Iron Ore Update Ian Ashby President Iron Ore 6 May 2009 Important Notices Reliance on Third Party Information The views expressed here contain information that have been derived from publicly available

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT

More information

AIR CANADA REPORTS FIRST QUARTER RESULTS

AIR CANADA REPORTS FIRST QUARTER RESULTS AIR CANADA REPORTS FIRST QUARTER RESULTS As a result of the deconsolidation of Jazz effective May 24, 2007, Air Canada s consolidated results for the first quarter of 2008 are not directly comparable to

More information

1Q 2017 Earnings Call. April 18, 2017

1Q 2017 Earnings Call. April 18, 2017 1Q 2017 Earnings Call April 18, 2017 Safe Harbor Statement Certain statements included in this presentation are forward-looking and thus reflect our current expectations and beliefs with respect to certain

More information

Outlook: FY13 EBITDA guidance $28M - $29M. Pursuing contracted 300MW in 2013 growth strategy. FY13 maiden franked dividend payment expected

Outlook: FY13 EBITDA guidance $28M - $29M. Pursuing contracted 300MW in 2013 growth strategy. FY13 maiden franked dividend payment expected ASX CODE PEA ISSUED CAPITAL Ordinary Shares 360.8M Options 10.7M KPS CONTRACTED CAPACITY 240MW HYDRO CONTRACTED CAPACITY 6MW 14 February 2013 STRONG ORGANIC GROWTH UNDERPINS RECORD PACIFIC ENERGY RESULT

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter MONTRÉAL, November 4, 2010 Air Canada today reported operating income

More information

E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018

E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018 1 E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018 SAFE HARBOR This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A

More information

24.1 Economic modelling

24.1 Economic modelling 24 ECONOMIC ASSESSMENT 24.1 Economic modelling 24.1.1 Government revenue estimates Clarification was requested on the estimated revenues to be received by the South Australian Government as a result of

More information

ASX Appendix 4D Half-Year Financial Report

ASX Appendix 4D Half-Year Financial Report ASX Appendix 4D Half-Year Financial Report 31 December 2012 NEWCREST MINING LIMITED AND CONTROLLED ENTITIES ASX APPENDIX 4D AND FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2012 ABN: 20 005 683

More information

The Economic Contribution of Cruise Tourism to the Southeast Asia Region in Prepared for: CLIA SE Asia. September 2015

The Economic Contribution of Cruise Tourism to the Southeast Asia Region in Prepared for: CLIA SE Asia. September 2015 BREA Business Research & Economic Advisors The Economic Contribution of Cruise Tourism to the Southeast Asia Region in 2014 Prepared for: CLIA SE Asia September 2015 Business Research & Economic Advisors

More information

Construction Access Routes

Construction Access Routes Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project Feasibility Study Project No. 12 7606 00 Construction Access Routes Document No. C-EV-10-003 Rev. B 1 March 2004 Prepared by: Fluor Engineering

More information

Half-yearly Report 2013

Half-yearly Report 2013 Half-yearly Report 2013 Financial result unchanged PORT OF ROTTERDAM THROUGHPUT DECREASED SLIGHTLY Throughput in the port of Rotterdam in the first half of the year decreased by 0.9% compared to the first

More information

Summary o f Results for the First Half of FY2018

Summary o f Results for the First Half of FY2018 Summary o f Results for the First Half of FY2018 November 9, 2018 (9005) https://www.tokyu.co.jp/ Contents Ⅰ.Executive Summary 2 Ⅱ.Conditions in Each Business 6 Ⅲ.Details of Financial Results for the 13

More information

Cerro del Gallo CERRO RESOURCES NL. Developing gold & silver production + Exploring for precious metals

Cerro del Gallo CERRO RESOURCES NL. Developing gold & silver production + Exploring for precious metals Cerro del Gallo CERRO RESOURCES NL Developing gold & silver production + Exploring for precious metals CJO TSX.V & ASX October 2011 Cerro Resources NL Forward Looking Statements All information contained

More information

For personal use only

For personal use only Iron Ore Holdings Ltd Investor Presentation July 2014 IOH - Company Status 2 Corporate Overview Background ASX listed in 2005 1.6 billion tonnes JORC Mineral Resources Iron Valley Project production in

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

Delivering Disciplined Growth

Delivering Disciplined Growth Delivering Disciplined Growth Denver, CO September 19-22, 2010 Cautionary Statement on Forward Looking Information All statements, other than statements of historical fact, contained or incorporated by

More information

For personal use only

For personal use only ASX Release 24 April 2012 Westgold secures the High Grade Great Fingall Gold Mine Westgold Resources (ASX:WGR) is pleased to advise that it has acquired the 49% relevant interest in the Great Fingall Deeps

More information

Half Year Results Newcrest Mining 15 February 2016

Half Year Results Newcrest Mining 15 February 2016 Half Year Results Newcrest Mining 15 February 2016 Half Year Financial Results & Update Newcrest has reported a half year Statutory profit 1 of USD 81 million and an Underlying profit 2 of USD 63 million,

More information

Thank you for participating in the financial results for fiscal 2014.

Thank you for participating in the financial results for fiscal 2014. Thank you for participating in the financial results for fiscal 2014. ANA HOLDINGS strongly believes that safety is the most important principle of our air transportation business. The expansion of slots

More information

BHP Billiton Iron Ore Western Australia. Iron Ore. Mining Operations. Phil Price Vice President Integrated Planning

BHP Billiton Iron Ore Western Australia. Iron Ore. Mining Operations. Phil Price Vice President Integrated Planning BHP Billiton Iron Ore Western Australia Mining Operations Phil Price Vice President Integrated Planning Iron Ore Visitors Safety Induction Office Area 1. In an emergency - a siren will sound 2. Stay with

More information

Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes

Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes 29 October 2014 1 Purpose This document outlines Airways proposed price increase for new lights

More information

GROWTH DELIVERING DISCIPLINED. The Kinross Difference. Increased Margins, Cash Flow & Leverage to Gold Price. Kinross Gold Corporation January 2008

GROWTH DELIVERING DISCIPLINED. The Kinross Difference. Increased Margins, Cash Flow & Leverage to Gold Price. Kinross Gold Corporation January 2008 Cormark Securities Annual Gold Conference January 16, 2008 DELIVERING DISCIPLINED GROWTH 1 The Kinross Difference Rising Production Declining Costs Increased Margins, Cash Flow & Leverage to Gold Price

More information

Gruyere Project Development Update

Gruyere Project Development Update ASX Announcement 21 June 2017 Gruyere Project Development Update Highlights Project Capital budget revised to A$532 1 million (3.5% increase) following engineering, procurement and construction review

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 1, 2011 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT CONTRACT AMENDMENT NO. 8 ACTION ITEM RECOMMENDATION It is recommended

More information

GOLDEN ARMOR SELF STORAGE 8216 Route 16 Framersville Station, NY United States

GOLDEN ARMOR SELF STORAGE 8216 Route 16 Framersville Station, NY United States Property Report GOLDEN ARMOR SELF STORAGE Presented by: Gary Greco 252 North Street Buffalo, New York 14201 Office: Mobile: (716) 583-0815 Fax: (716) 393-2680 The information above has been obtained from

More information

Genius Properties / Cerro de Pasco Resources Merger Opportunity. June 2018

Genius Properties / Cerro de Pasco Resources Merger Opportunity. June 2018 Genius Properties / Cerro de Pasco Resources Merger Opportunity June 2018 Forward-looking Statement This presentation contains forward-looking statements within the meaning of the United States Private

More information

MINES LIMITED. Metals For Our Time. September 2009 MOLY1 MOLY MINES LIMITED. MOL_MoCuFe_Roadshow_Sept_ pptx

MINES LIMITED. Metals For Our Time. September 2009 MOLY1 MOLY MINES LIMITED. MOL_MoCuFe_Roadshow_Sept_ pptx 1 Mo, Cu & Fe Metals For Our Time September 2009 MOL_MoCuFe_Roadshow_Sept_20090901 1.pptx 2009 Roadshow Dr Derek Fisher CEO Moly Mines Ltd Disclaimer 2 This presentation includes forward looking statements

More information

Land area 1.73 million km 2 Queensland population (as at December 2016) Brisbane population* (preliminary estimate as at 30 June 2016)

Land area 1.73 million km 2 Queensland population (as at December 2016) Brisbane population* (preliminary estimate as at 30 June 2016) Queensland - 11 Queensland OVERVIEW Queensland is nearly five times the size of Japan, seven times the size of Great Britain, and two and a half times the size of Texas. Queensland is Australia s second

More information

AIR CANADA REPORTS 2010 FIRST QUARTER RESULTS Operating loss narrows; revenue and traffic growth reflect strengthening economy

AIR CANADA REPORTS 2010 FIRST QUARTER RESULTS Operating loss narrows; revenue and traffic growth reflect strengthening economy AIR CANADA REPORTS 2010 FIRST QUARTER RESULTS Operating loss narrows; revenue and traffic growth reflect strengthening economy MONTRÉAL, May 6, 2010 Air Canada today reported a reduced operating loss of

More information

SKYWEST, INC. ANNOUNCES THIRD QUARTER 2012 RESULTS

SKYWEST, INC. ANNOUNCES THIRD QUARTER 2012 RESULTS NEWS RELEASE For Further Information Contact: Michael J. Kraupp Chief Financial Officer and Treasurer Telephone: (435) 634-3212 Fax: (435) 634-3205 FOR IMMEDIATE RELEASE: November 7, 2012 SKYWEST, INC.

More information

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY Isabelle Ghetti 1, B.Morgan 2, R.Massie 1, Gary Blumberg 2 1 Shoalhaven City Council, Nowra, NSW 2 Royal

More information

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2013 (These figures are unaudited)

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2013 (These figures are unaudited) Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2013 (These figures are unaudited) Overview Newcrest s production for the March 2013 quarter was 514,421 ounces of gold and

More information