1 This report summarises the Company s activities for the 3 months ended 31 December HIGHLIGHTS Gold production for the quarter of 39,320 ounces at a cash cost of A$381 per ounce. This took Equigold s production for the half year ended 31 December 2007 to 81,240 ounces at a cash cost of A$363 per ounce. Construction of the Bonikro Gold Project proceeding well with forecast commissioning of the plant in May 2008 and first gold production in June Highly significant results returned from resource drilling at the Akissi So deposit, 12km from Bonikro, including: - 21 metres at 9.70g/t from 45 metres - 20 metres at 7.15g/t from 19 metres - 9 metres at 10.50g/t from 17 metres - 13 metres at 4.56g/t from 59 metres - 14 metres at 3.32g/t from 50 metres - 16 metres at 3.25g/t from 18 metres Encouraging results from the first two holes in the Bonikro Deeps diamond drilling programme including: - 17 metres at 10.70g/t from 98 metres - 23 metres at 2.63g/t from 324 metres - 14 metres at 3.71g/t from 360 metres - 19 metres at 3.33g/t from 153 metres Encouraging results from the shallow resource drilling at Dougbafla East, 15km from Bonikro, including: - 39 metres at 2.91g/t from 46 metres - 33 metres at 2.21g/t from 76 metres - 8 metres at 19.83g/t from 5 metres - 23 metres at 1.52g/t from 7 metres Significant RAB intersection on previously untested anomaly TSA003 on the Timbe licence with mineralisation open to the north, south and east metres at 4.68g/t from 4 metres Trench sampling on the TSA001 anomaly (Timbe licence) returned a significant intersection: - 92 metres at 1.39g/t Completion of in excess of 21,000 metres of exploration drilling, testing 12 prospects on 5 project areas with results from almost 5,000 metres of this drilling pending. Cash, bullion and liquid investments of $68.3 million (September 2007: $88.7 million). Sale of the Kirkalocka project (excluding stockpiles, mill and all other infrastructure) for $1.5 million in cash and $3.5 million in shares in the acquirer. Page 1 25/01/08

2 CORPORATE Gold Forward Sales At the end of the December 2007 quarter Equigold had 30,396 ounces of gold forward sold on a spot deferred basis at A$907 per ounce and 177,600 ounces forward sold under flat forward contracts at A$600 per ounce with quarterly deliveries through until September The Company also has 151,980 ounces of sold gold call options at a strike price of A$700 per ounce expiring in 2011 and Forward sales contracts and call options represent approximately a 20% commitment of total gold reserves. The average cash delivery price achieved for gold sales during the quarter was A$754 per ounce, which was affected by the preferential delivery to lower priced forward sale contracts. Cash Holdings At the end of the quarter, Equigold had cash, bullion and liquid investments totalling $68.3 million (Sept 07: $88.7 million). The Company s operations generated a cash surplus of $14.6 million during the quarter (Sept 07: $17.5 million). During the quarter, capital expenditure on the development of the Bonikro project was $21.1 million (Sept 07: $15.1 million). The Company had no secured debt as at 31 December OPERATIONS PRODUCTION Production for the quarter is summarised below: Dec 2007 Sept 2007 June 2007 Mar 2007 Gold Production (oz) 39,320 41,920 36,342 37,756 Cash Cost (A$/oz) Gold production of 39,320 ounces at a cash cost of $381 per ounce reflected another strong operating performance from Equigold s two Australian projects and took production for the half year to 31 December 2007 to 81,240 ounces at a cash cost of A$363 per ounce. MOUNT RAWDON (EQUIGOLD 100%) Production Operating results at the Mt. Rawdon project for the December 2007 quarter are tabled below: Dec 2007 Sept 2007 June 2007 Mar 2007 Ore mined (tonnes) 918, , , ,114 Ore milled (tonnes) 901, , , ,093 Head grade (g/t) Recovery (%) Plant Availability (%) Total production (oz) 29,543 31,919 27,747 28,319 Cash cost (A$/oz) Page 2 25/01/08

3 Gold production of 29,543 ounces for the quarter was 7% lower than the near record production of the prior quarter due to the lower grade of 1.09g/t (Sept 07: 1.30g/t) in the areas of the open pit mined during the quarter. This had a consequential effect on the cash cost of production, which rose 15% from the prior quarter to $357 per ounce. The mine grade for the second half of FY 2008 is forecast at 0.99g/t, in line with the overall reserve grade. This will see production from the Mt. Rawdon project in the second half of FY 2008 of around 50,000 ounces at a cash cost in the order of A$380 - A$400 per ounce. This will take the full year gold production forecast for the Mt. Rawdon project to 111,000 ounces. KIRKALOCKA (EQUIGOLD 100%) The operating results at the Kirkalocka Gold Mine for the December 2007 quarter were as follows: Dec 2007 Sept 2007 June 2007 Mar 2007 Ore milled (tonnes) 354, , , ,080 Head grade (g/t) Recovery (%) Plant Availability (%) Total production (oz) 9,840 10,001 8,595 9,437 Cash cost (A$/oz) Gold production of 9,840 ounces for the quarter was 2% lower than the prior quarter due to the lower grade milled of 0.99g/t, offset by better mill throughput. This was due to the milling during the quarter of mainly softer but lower grade run of mine stockpiles. The cash cost of production was $28 per ounce (6%) lower than the September 2007 quarter due to the absence of the $80 per ounce cost associated with mining the small satellite pits in the prior quarter. This saving was offset by the effect of milling the lower grade run of mine stockpile ore. Milling of the run of mine stockpiles is expected to be completed in May 2008, at which time the project will move into the closure and final rehabilitation phase. DEVELOPMENT BONIKRO PROJECT (IVORY COAST) By the end of the December 2007 quarter, significant progress had been made towards the development of the Bonikro project. Work completed in the December quarter is summarised below: Engineering Practical completion of the mechanical design was achieved in the September 2007 quarter. Electrical design was completed this quarter. Detailing of design drawings was 99% complete by the end of the quarter. Procurement By the end of the quarter procurement was approximately 98% complete. Remaining procurement items are predominantly spares and construction materials. Approximately 95% of all equipment procured is scheduled to arrive in Ivory Coast by the end of February Page 3 25/01/08

4 Site Works By the end of the quarter concrete work was approximately 90% complete with the key areas of the mill and crusher foundations poured during the quarter. Erection of the CIL tanks was completed during the quarter, with painting of the tanks now in progress and scheduled for completion by the end of January Construction of all site buildings was 95% complete. In country fabrication of structural steel is progressing with several contracts let during the quarter. Contracts for the pre-cast ROM retaining wall panels and reclaim tunnel have been let, with erection due to commence in late February The primary crusher main frame is on site together with the two SAG mill shells. Delivery of the cyclone tower, mill platform and top of tank structural steelwork has commenced with the erection expected to commence in the third week of February Mining By the end of the quarter the bulk of the Company s mining fleet was operational with two excavators and five dump trucks being utilised in operator training, topsoil clearing in the pit and ROM area, waste mining and tailings dam construction. Subsequent to the end of the quarter the final two Cat 777F dump trucks and the Cat 988H loader were delivered and are now operational. The major remaining items of equipment in the earthmoving fleet, a Cat D9R bulldozer and a Cat 16M grader are expected to arrive in Abidjan in late February and early March 2008 respectively. By the end of December 2007 quarter 25,000 cubic metres of waste had been mined from the Bonikro pit. Removal of topsoil from the pit area was 40% complete and from the ROM area was 80% complete. Waste from the pit was placed on the ROM pad base to form part of the delivery platform for ore feed to the crusher. Topsoil was stockpiled in separate storage areas. Drilling and sampling of blast holes in some thick lateritic zones in the Bonikro open pit commenced during the quarter and at the end of the quarter approximately 3,200 metres of drilling and sampling had been completed in initial shot patterns. The construction of the explosives magazine commenced during the quarter with mounding completed and all fence post holes drilled or dug. Work commenced on placement of the first two magazines. Tailings Dam By the end of the quarter the base of the initial wall of the tailings dam had been cleared and had been prepared (80% complete) by removal of unsuitable materials for receiving waste on the flanks of the walls. Part of the keyway had been dug (20% complete) and digging of a toe drain and placement of gravel had commenced (20% complete). Placement and compaction of suitable materials in the dam wall commenced early in the March 2008 quarter. Process Water Supply Previous ground water exploration and water balance studies have indicated that sufficient process water is available for Bonikro operations from bore developments and dam catchment in the project area. Three process water supply bores have been completed and await final pump testing. Development of further bores is planned in the March 2008 quarter using a contract drill rig due to arrive in Ivory Coast in late January Two flow through dams for rainfall runoff harvesting in the wet seasons have been planned and designed. Construction of these dams will commence in the March 2008 quarter on completion of the crop compensation process for the areas concerned. The development of a small dividing wall in the tailings dam is due to commence shortly and will provide a location for storage of harvested water prior to start up, assisting with water recovery in the early stages of operations. Page 4 25/01/08

5 Three bores remain to be developed in the Bonikro pit area for pit dewatering purposes. These bores will be completed in the March 2008 quarter. Water from pit dewatering will be used for process water and dust suppression. Project Schedule and Expenditure The current construction schedule forecasts commissioning of the plant in May 2008 and commencement of gold production in June By the end of the December 2007 quarter, the Company had committed approximately A$54.4 million and spent approximately A$48.2 million on the development of the Bonikro project. At the end of the quarter, the total construction cost is forecast to be materially in line with the original budget of A$98.4 million. Page 5 25/01/08

6 EXPLORATION IVORY COAST Equigold NL effective 94% and Manager. The December 2007 quarter was a very successful one for Equigold, both in terms of exploration work completed and discovery. A total of 21,252 metres of drilling was completed, including 645 holes of RAB for 13,400 metres, 82 holes of RC drilling for 6,518 metres and 4 deep diamond holes for 1,334 metres. The RAB drill programmes were focussed continuing the first pass drilling on the Timbe licence and on following up previously reported anomalous results on the Kokoumbo and Didievi licences. A significant intersection on the TSA003 (Timbe) anomaly warranted a follow up RAB programme which was also completed this quarter. RC drilling alternated between infilling resource drilling on the Akissi-So deposit and drilling pre-collars for the Bonikro deeps diamond programme. The diamond drill rig drilled 1,334 metres of diamond core, completing deep holes at Bonikro. The December 2007 quarter also saw the granting of two important exploration licence extensions. An eastern extension of the highly prospective Timbe licence was granted and a regional soil sampling programme was immediately started on this area. A partial relinquishment of the Didievi licence was completed to facilitate its western extension to cover the prospective Blaffo Guetto soil anomaly. At the end of the quarter, Equigold s total granted tenement holdings was 8,033 square kilometres with a further 13,919 square kilometres under application. Hiré permit (828 square kilometres) The Hire permit is located approximately 12 kilometres south east of the Bonikro mine site. The current calculated inferred gold resources contained within the Akissi-So and Assonji-So prospects amount to 365,000 ounces. Page 6 25/01/08

7 Akissi-So The focus during the December 2007 quarter was to reduce the Akissi-So resource drilling spacing down to a 25 x 25 metres pattern to allow the calculation of a measured and indicated resource. During the December 2007 quarter, 81 RC drill holes for 6,091 metres were drilled. A few holes in the south-eastern end were unable to be completed due to poor ground conditions, so diamond drilling may be required in this area. At the time of writing the results from the last 31 holes drilled were still pending. Significant intersections from drilling during the quarter are listed below: Hole No Drill Type Easting Northing Azimuth Dip Final depth From To Interval Gold Grade (g/t) HRC129 RC HRC130 RC HRC133 RC HRC134 RC HRC135 RC HRC138 RC HRC138 RC HRC139 RC HRC141 RC HRC144 RC HRC144 RC HRC145 RC HRC145 RC HRC147 RC HRC148 RC HRC150 RC HRC151 RC HRC152 RC HRC154 RC HRC155 RC HRC156 RC HRC156 RC HRC157 RC HRC157 RC HRC158 RC HRC161 RC HRC162 RC HRC163 RC HRC164 RC HRC166 RC HRC169 RC HRC171 RC HRC174 RC HRC175 RC An updated resource calculation will be completed in the March 2008 quarter. It appears likely that the results from drilling this quarter will increase the tonnes and grade of the current JORC resource calculation of 2,420,000 tonnes at 3.43 g/t for 267,000 ounces. In light of the results, further infill RC drilling is required for another 200 metres along strike towards the North-east where the deposit is still open. Page 7 25/01/08

8 Akissi So Long Section showing December 2007 drilling Assonji-So The Assonji-So deposit has an inferred resource of 98,100 ounces. Shortly before the end of the quarter the Assonji- So infill drill programme commenced. The 37 hole, 2,500 metre, RC programme is designed to test the northeastern and south-western strike extensions of the prospect and to reduce the drill spacing in order to upgrade the resource from inferred to measured and indicated. Results are pending. Oume permit (473 square kilometres) Bonikro Deeps By the end of the December 2007 quarter, five out of the nine planned drill holes from the Bonikro Deeps diamond drilling programme had been completed. Only two of these holes have the complete down hole assays returned. Significant intersections from the assays received are summarised below: Hole No Drill Type Easting Northing Azimuth Dip Final depth From To Interval Gold Grade (g/t) ODD011 DD ODD011 DD ODD011 DD ODD011 DD ODD013 RC ODD013 RC ODD013 DD ODD013 DD ODD013 DD ODD013 DD ODD013 DD ODD013 DD ODD013 DD ODD014 RC Page 8 25/01/08

9 This drilling has shown that the host rock of the mineralisation, the Bonikro granodiorite, isn t as vertical as previously thought. It thickens to over 300 meters in places and has a much more moderate dip towards the west at depth. The drilling has shown that the mineralisation does continue beneath the current open pit design. The deepest high grade drill sample returned to date is 12.8 grams per tonne gold in ODD013, at 143 metres below the current pit shell. Results are still pending on three other completed diamond holes where core logging indicates similar zones of prospective alteration assemblage within the felsic host rock. The diamond drilling programme is expected to be completed in the March 2008 quarter. An updated resource calculation will be undertaken once all assay results are returned. Dougbafla East The Dougbafla East deposit is located approximately 15 kilometres north of Bonikro. During the previous quarter 9,000 metres of RC drilling were completed to reduce the drill spacing on the Dougbafla East deposit down to a 25 x 50 metre pattern. All the results from this drill programme have been received and some of the more significant intersections are tabled below: Hole No Drill Type Easting Northing Azimuth Dip Final depth From To Interval Gold Grade (g/t) ORC372 RC ORC385 RC ORC391 RC ORC394 RC ORC400 RC ORC402 RC ORC403 RC ORC404 RC ORC410 RC ORC411 RC ORC412 RC ORC421 RC ORC427 RC ORC428 RC ORC429 RC ORC430 RC ORC431 RC ORC438 RC ORC439 RC ORC442 RC ORC444 RC ORC447 RC ORC449 RC ORC452 RC An inferred resource calculation will be completed during the March 2008 quarter. The mineralisation is still open to the north and further drilling is being planned. Further infill drilling is also required in areas where, until now, standing water has restricted access. Timbe Permit (527 square kilometres) During the December 2007 quarter 6,711 metres of RAB drilling were completed on the TSA003 (131 holes for 4,058 metres) and TSA006 (124 holes for 2,653 metres) prospects. Trenching was also completed on the TSA001 and TSA005 anomalies. Page 9 25/01/08

10 TSA001 A 108 hole (2,791 metres) first pass RAB programme was completed on the TSA001 soil anomaly in the prior quarter. The results indicated a zone of mineralisation with over 1,200 metres strike length. The most significant results are listed below: Hole No Drill Type Easting Northing Azimuth Dip Final depth From To Interval Gold Grade (g/t) TRA003 RAB TRA044 RAB TRA052 RAB TRA088 RAB TRA099 RAB TRA100 RAB TRA101 RAB TRA102 RAB TRA104 RAB TRA104 RAB In addition to the RAB drilling, two trenches (3 metres deep) were dug over the core of the soil anomaly. The trenches were mapped and sampled. TTR001 returned a highly significant intersection of 92 metres at 1.39 g/t, and TTR002, 12 metres at 0.73 g/t. The trench mapping showed that the near surface mineralisation is associated with stock work quartz veining along an andesite-basalt lithological contact. Further mapping is currently being undertaken before follow up with a RC drill programme. Page 10 25/01/08

11 TSA003 The results from the first pass RAB drill programme (1,739 metres) showed a low grade corridor of mineralisation with a strike length of 2,000 metres. However, TRA109 returned a very promising intersection of 29 metres at 4.68 g/t. This high grade intersection is east of the interpreted low grade mineralised zone and could be associated with a higher grade parallel structure. It is associated with quartz veining hosted in undifferentiated schist. The results are summarised below: Hole No Drill Type Easting Northing Azimuth Dip Final depth From To Interval Gold Grade (g/t) TRA109 RAB TRA124 RAB TRA160 RAB The mineralisation in TRA109 is open to the north, south and east. On receipt of this intersection an immediate follow-up RAB drill programme (62 holes for 2,194 metres) was planned and completed late in the quarter. These results are pending. TSA005 In order to better understand the structure of the TSA005 soil anomaly area, a 50 metre trench was dug over the high value southern portion of the anomaly. Trench sampling returned an intersection of 16 metres at 0.86 g/t. The mineralisation is associated with a three metre thick, north-south striking quartz vein and surrounding stock work veining. Further mapping and a follow up RAB drill programme will be undertaken during the March 2008 quarter. Kokoumbo permit (456 square kilometres) During the quarter 3,471 metres of RAB drilling (200 holes) were completed on the Kokoumbo South, KSA014, KSA015 and Sin Aboisso prospects. Results for most of that drilling were received as well as from previously reported drilling on KSA010 and Ahouekro prospects. The significant results are listed below: Prospect Hole No Drill Type Easting Northing Azimuth Dip Final depth From To Interval Gold Grade (g/t) KSA010 KRA422 RAB KSA010 KRA422 RAB KSA015 KRA581 RAB Sin Aboisso KRA600 RAB Sin Aboisso KRA603 RAB The KSA010, KSA015 and Sin Aboisso intersections are hosted in a strongly oxidised mafic protolith. A follow-up drill programme of 59 RAB holes for 653 metres to test the strike extension of the significant intersection at KSA015 was completed in the December 2007 quarter. The results from this programme are pending. Further field investigations are required on all three prospects before the planning of any future drilling. Didievi permit (490 square kilometres) During the quarter the exploration focus on the Didievi licence was on the DSA004 (103 RAB holes for 1,810 metres) and Pranoi (87 RAB holes for 1,408 metres) prospects. Page 11 25/01/08

12 DSA004 The 1,810 metre follow-up drill programme was designed to test the eastern and southern extent of the DSA004 prospect. Previous drilling has confirmed mineralisation over a strike length of 800 metres with a best result of 4 metres at 5.62g/t. The mineralisation is hosted in quartz veins within an andesite unit. Assay results are pending. Pranoi The 1,408 metres of RAB drilling at Pranoi were the completion of an earlier infill drill programme. This drilling was following up previously reported significant results including 4 metres at 1.43g/t from surface, 8 metres at 1.5g/t from 24 metres, 1 metre at 35.38g/t from 56 metres and 3 metres at 3.4g/t from 11 metres. Assay results are pending. The largely unprospective northern portion of the Didievi licence was relinquished during the December 2007 quarter to facilitate an extension of the licence to the west covering the very significant Blaffo Guetto gold in soil anomaly with dimensions of 1.5 x 2.5 kilometres with a peak value of 1,300ppb. The Blaffo Guetto prospect is a walk-up drill target and a first pass air-core programme is currently being planned and will be completed as a priority in the March 2008 quarter. MOUNT RAWDON Equigold NL 100% and manager. Mount Perry Rutile Reserve A scheduled meeting with the native title claimants should facilitate the completion of this 450 metre drill programme in the March 2008 quarter. Outer Rawdon, Mount Shamrock and Yeatman A detailed aeromagnetic survey (covering 640 square kilometres on 100 metre spacing) over these three licences has been approved and is schedule to commence in the March 2008 quarter. Also in the March quarter, a 600 metre RC drill programme will be conducted in the Kent s Knob and Mount Ophir areas to test for higher-grade mineralisation within known intrusive breccia pipes that exist within the area. Mount Rawdon Gold Mine In the second half of December 2007, a 2,750 metre RC and diamond drill programme commenced. The 5 planned drill holes are designed to test for the high grade feeder system below the current pit design. A total of 282 metres of RC drilling and metres of diamond core drilling were completed with the results pending. KIRKALOCKA Equigold NL 100% and manager. During the quarter Equigold signed a heads of agreement with Mount Magnet South NL (ASX: MUM) to sell to that company all of the exploration and mining tenements at the Kirkalocka project. Consideration payable to Equigold on settlement is a $1.5 million cash payment and the issue of MUM shares to the value of $3.5 million (based on a 90 day average closing price). Equigold retains ownership of all current broken ore stockpiles, the processing plant and infrastructure at the project and is responsible for completing current environmental rehabilitation obligations. Page 12 25/01/08

13 CORPORATE DIRECTORY Directors N. Giorgetta Chairman M. Clark Managing Director M. Hart Executive Director R. Kestel Non Executive Director P. Lee Non Executive Director D. Netherway Non Executive Director Company Secretary D. Lim Shareholder Enquiries Enquiries concerning shareholdings should be addressed to: Security Transfer Registrars Pty Ltd PO Box 535, Applecross, WA 6953 Australia Tel: Fax: registrar@securitytransfer.com.au Registered Office First Floor, 7 Sleat Road Applecross, WA, Australia, 6153 Tel: Fax: Web: Stock Exchange Australian Stock Exchange Codes: EQI Capital Shares on issue: million QUALIFICATION STATEMENT The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Morgan Hart. Mr Hart is a full-time employee of Equigold NL and a member of the Australasian Institute of Mining and Metallurgy. Mr Hart has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hart consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Page 13 25/01/08

Quarterly Activities Report Period Ended 31 March 2018

Quarterly Activities Report Period Ended 31 March 2018 23 April 2018 Quarterly Activities Report Period Ended 31 March 2018 ASX Code: EXG Key Points During the March 2018 Quarter, Kalgoorlie North Gold Project (KNGP) activities predominantly involved resource

More information

For personal use only

For personal use only INDOCHINE MINING LIMITED ACN 141 677 385 ASX: IDC 29 July 2011 Company Announcements Office Australian Securities Exchange 8 Pages Quarterly Activities Report For Quarter ended 30 June 2011 Highlights

More information

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED ASX ANNOUNCEMENT 16 MARCH 2017 CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED St Barbara Limited (SBM) commits $1.5 million placement at 50 cents per share for 5% stake Funding will allow

More information

MARCH 2018 QUARTERLY ACTIVITIES REPORT

MARCH 2018 QUARTERLY ACTIVITIES REPORT X AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT 27 April 2018 MARCH 2018 QUARTERLY ACTIVITIES REPORT Syndicated prepares for new phase of drilling at Monument Gold Project drilling commences in early April

More information

Australian Mines increases Marymia ground holding

Australian Mines increases Marymia ground holding 11 June 2015 Australian Mines increases Marymia ground holding Australian Mines Limited ( Australian Mines or the Company ) is pleased to advise shareholders that it has entered into a farm-in and joint

More information

For personal use only

For personal use only 5 September 2016 ABN 91 124 752 745 Drilling Underway At The Koala Gold Mine, Mt Coolon Gold Project, Qld Stage 1 drilling for 1,100 metres has commenced on schedule at the Koala Gold Mine. Drilling is

More information

Quarterly Activities Report Period Ended 31 December 2017

Quarterly Activities Report Period Ended 31 December 2017 24 January 2018 ASX Code: EXG Quarterly Activities Report Period Ended 31 December 2017 Key Points Successful completion of the Zoroastrian open pit ore treatment campaign. Cash balance peaks at $8.1M

More information

Ramelius Resources Limited ASX:RMS

Ramelius Resources Limited ASX:RMS Ramelius Resources Limited ASX:RMS INVESTOR PRESENTATION March 2012 1 Forward Looking and Competent Persons Statements Forward looking statements This presentation contains certain forward looking statements

More information

For personal use only

For personal use only Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 ASX ANNOUNCEMENT 04 July 2012 Completion of Asset Sale Agreement

More information

QUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA

QUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA QUARTERLY OPERATIONS REPORT 30 JUNE 2016 Highlights: YAMARNA Geochemical blade-refusal aircore programme confirms the extent of the Jatz basement gold anomaly at over 1.5 km in strike. Multiple RC drilling

More information

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT 26 October 2018 Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 Board of Directors: David Quinlivan Luke Tonkin

More information

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso The Directors of D Aguilar Gold Limited (ASX Code: DGR) are pleased to draw the attention of shareholders to

More information

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES ASX ANNOUNCEMENT 21 April 2015 FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES The new Four Eagles Gold Project Joint Venture with GEV and Providence has commenced after the renewal

More information

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA Zara Joint Venture, Eritrea (Dragon Mining Limited - 20% interest) Koka Gold Deposit Dragon Mining Limited,

More information

For personal use only

For personal use only HIGHLIGHTS Mount Bundy Gold Project Drill results from Rustlers Roost shows 117m at 1.5 g/t gold including 8m at 6.9 g/t gold with other broad intercepts - Drill program highlights potential to further

More information

For personal use only

For personal use only QUARTERLY ACTIVITIES REPORT PERIOD ENDED 30 JUNE 2015 ASX Announcement ASX Code: VXR Released: 31 July 2015 Venturex Resources Limited (ASX: VXR) is pleased to report its activities for the June 2015 Quarter.

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 30 APRIL 2015 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS PROJECTS Over 2,000m of RC drilling planned at SA Titan Gold & IOCG Project Drilling planned to test strong EM conductor for high grade

More information

For personal use only

For personal use only 28 September 2018 GBM EXECUTES AGREEMENT WITH MINJAR TO ACQUIRE TWIN HILLS GOLD PROJECT IN DRUMMOND BASIN, QUEENSLAND HIGHLIGHTS Binding Sale and Purchase Agreement signed with Minjar Gold Pty Ltd 1 to

More information

QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT QUARTERLY ACTIVITIES REPORT For the quarter ended 31 December 2010 ABN: 38 108 779 782 Silver Lake Resources Ltd ( Silver Lake or the Company ) is pleased to present this Quarterly Activities Report. Les

More information

FOR THE THREE MONTHS ENDED 31 MARCH 2012

FOR THE THREE MONTHS ENDED 31 MARCH 2012 FOR THE THREE MONTHS ENDED 31 MARCH 2012 PROMINENT HILL CONTAINED METAL PRODUCTION MARCH 2012 QUARTER TOTAL COPPER (TONNES) 27,182 TOTAL GOLD (OUNCES) 38,887 OZMINERALS.COM C1 CASH COSTS US96.9c/lb HIGHLIGHTS

More information

LAS OPEÑAS DRILLING COMMENCED

LAS OPEÑAS DRILLING COMMENCED ASX Announcement 17 October 2012 LAS OPEÑAS DRILLING COMMENCED LAS OPEÑAS, ARGENTINA Diamond drilling program commenced Targeting both high-grade epithermal veins and breccia bodies CERRO VERDE, CHILE

More information

For personal use only

For personal use only ABN 52 007 626 575 Date 23 rd May 2016 The Manager Market Announcements Office ASX Ltd 4th Floor, 20 Bridge Street Sydney NSW 2000 ASX Code: JRV JOINT VENTURE WITH AUSTRALIAN MINES LIMITED (ASX: AUZ) The

More information

December 2017 Quarterly Report

December 2017 Quarterly Report ASX Announcement 31 January 2018 ASX: CRB December 2017 Quarterly Report KEY POINTS Continuation of work including final design criteria and front end engineering following Demonstration Plant test work

More information

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

Market Announcement ASX:NTL, NZX:NTL For Immediate Release Market Announcement ASX:NTL, NZX:NTL For Immediate Release Commodity Exposure GOLD and SILVER Board and Management Charbel Nader Chairman/Independent Director Quarterly Activities Report to 30 September

More information

Quarterly Report for the Period Ending 30 September 2014

Quarterly Report for the Period Ending 30 September 2014 For Immediate Release 17 October 2014 Quarterly Report for the Period Ending 30 September 2014 17 October 2014 ISSUED CAPITAL Ordinary Shares: DIRECTORS 468M CHAIRMAN: Robert Kennedy NON-EXECUTIVE DIRECTORS:

More information

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT DECEMBER 2017 QUARTERLY ACTIVITIES REPORT Completion of 1.3Moz WA gold merger and $5.33m capital raising allows Spitfire to hit the ground running in 2018 Scheme of arrangement between Aphrodite Gold and

More information

ON TIME AND ON BUDGET: PROCESSING PLANT OVER 90% COMPLETE AND FIRST PRODUCTION SET FOR MARCH

ON TIME AND ON BUDGET: PROCESSING PLANT OVER 90% COMPLETE AND FIRST PRODUCTION SET FOR MARCH MT MORGANS GOLD PROJECT UPDATE 11 JANUARY 2018 ON TIME AND ON BUDGET: PROCESSING PLANT OVER 90% COMPLETE AND FIRST PRODUCTION SET FOR MARCH Underground mining 873m ahead of schedule with ore intersected

More information

Highlights. Quarterly Activities Report: September Kurnalpi Project. Lindsays project

Highlights. Quarterly Activities Report: September Kurnalpi Project. Lindsays project Quarterly Activities Report: September 2018 KalNorth Gold Mines Limited Date: 31 October 2018 ASX Code: KGM Issued Capital 894.24 million Ordinary shares Current Share Price $0.006 Market tfollo Capitalisation

More information

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation Outstanding exploration and trial mining results from The Mount deposit pave way to create a 2 nd operational centre

More information

For personal use only

For personal use only ASX Release 24 April 2012 Westgold secures the High Grade Great Fingall Gold Mine Westgold Resources (ASX:WGR) is pleased to advise that it has acquired the 49% relevant interest in the Great Fingall Deeps

More information

Ramelius Resources Limited ASX:RMS

Ramelius Resources Limited ASX:RMS Ramelius Resources Limited ASX:RMS Diggers & Dealers 3-5 August 2015 Ramelius Resources Limited Diggers and Dealers - August 2015 2 Forward Looking and Competent Persons Statements Forward Looking Statements

More information

For personal use only

For personal use only ASX Announcement 15 May 2012 ARTEMIS ACQUIRES STRATEGIC WEST PILBARA GOLD AND BASE METALS ASSETS About Artemis Resources Artemis Resources is an ASX-listed mineral exploration company with a focus on gold:

More information

Northern Territory. Ark wishes to extend the strike and further define the size of the Golden Honcho deposit, with the

Northern Territory. Ark wishes to extend the strike and further define the size of the Golden Honcho deposit, with the Ark Secures Approval to Commencee Mining Activities at Project, Northern Territory Sydney, 19 August 2014: The Board of Ark Mines Ltd (ASX: AHK) is pleased to announce that it has obtained approval from

More information

Kidman agrees to acquire 1Moz Mt Holland gold field in WA

Kidman agrees to acquire 1Moz Mt Holland gold field in WA December 18th, 2015 Kidman Resources Limited ABN 88 143 526 096 Corporate Details: ASX Code: KDR Issued capital: 142.3M ordinary shares Substantial Shareholders: Capri 22.7m (15.97%) Holdex Nominees 11.3m

More information

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION BRIEFING PAPER BHP BILLITON SUMMARY BHP Billiton has approved development of a new iron ore mine at Mining Area

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER October 2017

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER October 2017 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2017 20 October 2017 Key Points* Sales increased ~40% in the September quarter to 0.84 million wet metric tonnes (Mwmt) including

More information

For personal use only

For personal use only ASX Release 31 July, 2012 MONTERAY MINING GROUP Tel: +61 7 5538 2558 Fax: +61 7 5526 8922 info@monteraymining.com.au www.monteraymining.com.au Contact: KEVIN DART Chairman kjdart@charpac.com.au JOHN HANNAFORD

More information

Gruyere Project Development Update

Gruyere Project Development Update ASX Announcement 21 June 2017 Gruyere Project Development Update Highlights Project Capital budget revised to A$532 1 million (3.5% increase) following engineering, procurement and construction review

More information

2011 Annual General Meeting. Greg Robinson Managing Director & CEO

2011 Annual General Meeting. Greg Robinson Managing Director & CEO 2011 Annual General Meeting Greg Robinson Managing Director & CEO Disclaimer Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve

More information

Corporate Presentation March 2015

Corporate Presentation March 2015 Corporate Presentation March 2015 March 2015 Serabi Gold and Brazil Serabi Gold plc is dual listed (TSX:SBI, AIM:SRB), gold mining and development company with operations in Northern Brazil. The Company

More information

First Thunderbox gold now anticipated in June Quarter 2016

First Thunderbox gold now anticipated in June Quarter 2016 Corporate Details: 16th September 2015 ASX code: SAR Corporate Structure: Ordinary shares on issue: 792.8m Unvested employee performance rights: 7.3m Market Capitalisation: A$340m (share price A$0.43)

More information

Lorena Gold Project Malachite AGM 29 November 2017

Lorena Gold Project Malachite AGM 29 November 2017 Lorena Gold Project Malachite AGM 29 November 2017 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated

More information

For personal use only

For personal use only For the period ended 30 September 2014 HIGHLIGHTS STORMONT (TASMANIA) JOINT VENTURE GOLD PROJECT MINING AND PRODUCTION COMPLETED. LORENA GOLD PROJECT CONSTRUCTION CONTINUES TO ADVANCE. COMMISSIONING EXPECTED

More information

For personal use only

For personal use only Southern Cross Goldfields Ltd ASX Announcement 5 September 2014 Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Wonawinta Silver Project (60 M oz) to be acquired

More information

2 September The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT

2 September The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT 2 September 2014 The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT Please find following for shareholders information, an announcement

More information

Quarterly Activities Report For The Period Ending 30 June 2018

Quarterly Activities Report For The Period Ending 30 June 2018 Quarterly Activities Report For The Period Ending 30 June 2018 Highlights for the quarter ending 30 June 2018 Accent Resources completed one Diamond drill hole on the Magnetite Range Project E59/875 during

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 31 Oct 2016 Focus Minerals Ltd Activities and Cashflow Report for September Quarter 2016 Exploration Highlights During the Quarter During the September Quarter, Focus Minerals Ltd ( Focus

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)

More information

Quarterly Activities Report For The Period Ending 31 March 2018

Quarterly Activities Report For The Period Ending 31 March 2018 Quarterly Activities Report For The Period Ending 31 March 2018 Highlights for the quarter ending 31 March 2018 Accent Resources have completed one Diamond drill hole (DD03) on the Magnetite Range Project

More information

HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10.

HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10. 1305 1090 West Georgia Street, Vancouver, BC, V6E 3V7 Phone: +1 604 685 9316 / Fax: +1 604 683 1585 NEWS RELEASE November 27, 2017 HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND

More information

Australian Securities Exchange Notice

Australian Securities Exchange Notice Australian Securities Exchange Notice 30 January 2017 ILUKA BUSINESS REVIEW UPDATE AND THE IMPACT ON 2016 AND 2017 FINANCIAL RESULTS Iluka Resources Limited (Iluka) provides the following update relating

More information

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe Market Announcements Office ASX Ltd 4 th Floor, 20 Bridge Street, Sydney NSW 25 May 2015 ASX code: MUX Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe Agreement

More information

December 2014 Quarterly Report

December 2014 Quarterly Report Corporate Structure Shares 35,970,000 Options 7,250,000 Perf. Rights 5,000,000 Cash $4.2m ASX Code - BBR Directors Patrick Ford Non-Executive Chairman Chris Cowan Executive Director Nelson Reynolds Non-Executive

More information

For personal use only

For personal use only Iron Ore Holdings Ltd Investor Presentation July 2014 IOH - Company Status 2 Corporate Overview Background ASX listed in 2005 1.6 billion tonnes JORC Mineral Resources Iron Valley Project production in

More information

Activities Report for the quarter ended 30 th June 2011

Activities Report for the quarter ended 30 th June 2011 Activities Report for the quarter ended 30 th June 2011 Admiralty Resources NL (ASX: ADY) Issued capital 606,518,966 shares (as of 30 June 2011) 606,518,966 shares (current) Top 20 Shareholders : 50.50%

More information

KEY POINTS. Significant Resource increase at the Tier-1 mines:

KEY POINTS. Significant Resource increase at the Tier-1 mines: NORTHERN STAR ESTABLISHES 10-YEAR MINE LIVES AFTER RESERVES TRIPLE TO 3.5MOZ AND RESOURCES HIT 10.2MOZ Outstanding result underpins increase in production to 600,000ozpa from next year; Reserves added

More information

Gruyere Gold Project Update

Gruyere Gold Project Update ASX Announcement 30 July 2018 Gruyere Gold Project Update First gold remains scheduled for the June quarter 2019 Revised Project Final Forecast Capital cost estimate of $621 million (level of accuracy

More information

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited)

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited) Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited) Key Points Operations Record quarterly gold production of 463,170oz (390,096oz). Group cash

More information

For personal use only

For personal use only ASX / Media Announcement 10 November 2017 Artemis Resources Limited ARBN: 80 107 051 749 Level 3, IBM Building, 1060 Hay Street, West Perth, WA Australia, 6006 PO Box R933 Royal Exchange NSW Australia,

More information

For personal use only

For personal use only Artemis Resources Limited ARBN: 80 107 051 749 Level 3, IBM Building, 1060 Hay Street, West Perth, WA Australia, 6006 PO Box R933 Royal Exchange NSW Australia, 1225 Phone: +61 2 9078 7670 Facsimile: +61

More information

For personal use only

For personal use only AMEX RESOURCES LIMITED (ASX: AXZ) For personal use only 31 July 2012 QUARTERLY REPORT For the period ended 30 June 2012 The Manager Company Announcements Office Australian Securities Exchange Exchange

More information

Recent Exploration of the Olympic Dam

Recent Exploration of the Olympic Dam Recent Exploration of the Olympic Dam Southern Orebody DAVE THOMAS Olympic Dam Development Study SA Explorers Conference 2 December 2005 BHP Billiton profile (2005) The company BHP Billiton is the world

More information

For personal use only

For personal use only 31 January 2012 DIRECTORS Michael Fry Chairman Ian Prentice Managing Director Darren Misquitta Executive Director Robert Kipp Non Executive Director Matthew Driscoll Non Executive Director Suzie Foreman

More information

Quarterly Activities Report for the period ended 30 September 2018

Quarterly Activities Report for the period ended 30 September 2018 Maroon Gold s Black Jack Gold Processing Plant which will process Agate Creek Ore Level 9, Waterfront Place, 1 Eagle St, Brisbane QLD 4000 Directors GPO Box 1164, Brisbane QLD 4001 Mr Stephen Bizzell (Chairman)

More information

JUNE 2017 QUARTERLY ACTIVITIES REPORT

JUNE 2017 QUARTERLY ACTIVITIES REPORT ASX RELEASE 25 JULY 2017 JUNE 2017 QUARTERLY ACTIVITIES REPORT Cash flow positive result for the quarter even after significant development activities and repayment of Nullagine deferred royalties to the

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH April 2018

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH April 2018 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2018 12 April 2018 Key Points* ly sales increased 16% to 1.0 million wet metric tonnes (Mwmt), for ore sales revenue of $60 million

More information

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp=== OMNR ^ååì~ä=déåéê~ä=jééíáåö OT=klsbj_bo=OMNR=== ^puw=cjp=== 2 `çêéçê~íé=pìãã~êó Board & Management Capital Structure Robert Kennedy Non-Executive Chairman A Chartered Accountant and a Director since 14

More information

For personal use only

For personal use only ABN: 57 126 634 606 Phone: +61 (7) 4032 3319 info@csdtin.com.au Snapshot: Current CSD Share Price: $0.10 Current LME Tin Price: $24,475 Key Points Snow Peak Mining Pty Ltd acquisition of Kagara s Central

More information

Quarterly Activities Report December 2018

Quarterly Activities Report December 2018 ASX: EQE 31 January 2019 About Equus Mining: Equus Mining is an ASX listed Company focused on developing natural resource projects strategically located near existing mine and other infrastructure. Follow-up

More information

Altera Resources Ltd

Altera Resources Ltd 31 January 2011 QUARTERLY REPORT FOR THE 3 MONTHS ENDED 31 December 2010 HIGHLIGHTS Completed the acquisition of JDC and coal projects in Kalimantan, Indonesia New board and management of highly experienced

More information

WOOLGAR PROJECT DRILL PROGRAM RESULTS NOVEMBER 2004

WOOLGAR PROJECT DRILL PROGRAM RESULTS NOVEMBER 2004 2nd December 2004 Announcements Officer Australian Stock Exchange Limited Level 10 20 Bond Street Sydney NSW 2000 ACN 008 901 380 ABN 35 008 901 380 Level 1 173 Mounts Bay Road Perth, Western Australia

More information

For personal use only

For personal use only 28 July 2016 ASX Release Kidman Resources Limited ABN 88 143 526 096 Corporate Details: ASX Code: KDR / KDRO Issued capital: 237.2 M ordinary shares 47.45 M Options Substantial Shareholders: Capri Holdings

More information

QUARTERLY REPORT 1 JULY 2017 to 30 SEPTEMBER 2017

QUARTERLY REPORT 1 JULY 2017 to 30 SEPTEMBER 2017 31 October, 2017 Australian Securities Exchange Level 5, 20 Bridge Street SYDNEY NSW 2000 QUARTERLY REPORT 1 JULY 2017 to 30 SEPTEMBER 2017 Stonewall Resources Limited (ASX: SWJ) Stonewall, Company or

More information

Newcrest Mining Limited

Newcrest Mining Limited Newcrest Mining Limited Colin Moorhead Newcrest a portfolio of opportunities Disclaimer Forward Looking Statement These materials include forward looking statements. Often, but not always, forward looking

More information

KEY POINTS OVERVIEW PRODUCTION HIGHLIGHTS SECURITIES

KEY POINTS OVERVIEW PRODUCTION HIGHLIGHTS SECURITIES PRODUCTION HIGHLIGHTS Gold Produced 31 Dec 2010 21,451 oz 30 Sep 2010 21,833 oz 31 Dec 2009 40,224 oz Total Cash Costs (incl Royalty) 31 Dec 2010 US$458/oz 30 Sep 2010 US$465/oz 31 Dec 2009 US$312/oz Average

More information

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines. ...the best way to grow production is to construct a centralised processing facility drawing feed from nearby satellite mines. Development Projects Turner River Hub Project The Company has been conducting

More information

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March OZ MINERALS AUSTRALIAN COPPER CONFERENCE TERRY BURGESS - Managing Director & CEO 23-24 March 2011 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals

More information

For personal use only

For personal use only Coziron Resources Limited ABN: 91 112 866 869 Level 24, 44 St George s Terrace Perth Western Australia 6000 PO Box Z5183 Perth WA 6831 Phone: +61 8 6211 5099 Facsimile:+61 8 9218 8875 Website: www.coziron.com

More information

SPITFIRE RESOURCES LIMITED SPITFIRE DIVERSIFIES WITH TASMANIAN COAL ACQUISITION

SPITFIRE RESOURCES LIMITED SPITFIRE DIVERSIFIES WITH TASMANIAN COAL ACQUISITION Regulatory Announcement Go to market news section Company TIDM Headline Released Number CHL Spitfire Resources Update 07:00 23-May-08 1434V07 RNS Number : 1434V 23 May 2008 Spitfire Resources Limited Update

More information

For personal use only

For personal use only ASX Code: AIV Issued Capital 802,747,240 ordinary shares (AIV) 1,100,000 unlisted options ACTIVITIES REPORT QUARTER ENDED 30 JUNE 2016 Market Capitalisation $7.224M (26 July 2016, $0.009) Directors Min

More information

Market Release 11 March 2019

Market Release 11 March 2019 Market Release 11 March 2019 Newcrest to acquire potential Tier 1 orebody in Canada Newcrest Mining Limited (Newcrest) has entered into an agreement with TSX-listed Imperial Metals Corporation (Imperial)

More information

FOCUS MINERALS LIMITED

FOCUS MINERALS LIMITED FOCUS MINERALS LIMITED FFT:FZA ASX:FML Driving Sustainable Profitable Production Focus 1.2Mtpa Three Mile Hill processing plant in Coolgardie, WA Campbell Baird, CEO Denver Gold Forum: 9 th 12 th September

More information

Australian Securities Exchange Notice

Australian Securities Exchange Notice Australian Securities Exchange Notice 12 December 2017 ASX: ILU CATABY PROJECT APPROVED WITH OFFTAKE AGREEMENTS SECURED FOR 85 OF SYNTHETIC RUTILE PRODUCTION Cataby mineral sands project approved; with

More information

4th Quarter Report 2015

4th Quarter Report 2015 4th Quarter Report 2015 HIGHLIGHTS Successful visit of Algerian Delegation to China Increase and extension of Asipac debt facility Marketing Agreement for production from Bird-in-Hand Gold Project Placement

More information

UNLOCKING THE POTENTIAL OF THE EAST MENZIES GOLDFIELD

UNLOCKING THE POTENTIAL OF THE EAST MENZIES GOLDFIELD NOVEMBER 2013 UNLOCKING THE POTENTIAL OF THE EAST MENZIES GOLDFIELD www.stratummetals.com.au ASX:SXT DISCLAIMER This presentation may contain certain forward looking statements and projections regarding:

More information

JUNE 2012 QUARTERLY REPORT

JUNE 2012 QUARTERLY REPORT 43 Outram St West Perth WA 6005 Phone: (08) 9321 8845 Fax: (03) 9321 8854 Email info@baru.com.au 26 July 2012 JUNE 2012 QUARTERLY REPORT Board of Directors Richard Anthon (Chairman) Kevin Nichol (Executive

More information

Angas Zinc Mine From Prediction to Production

Angas Zinc Mine From Prediction to Production TERRAMIN AUSTRALIA LIMITED Angas Zinc Mine From Prediction to Production Bob Singer SA Explorers Conferenc ce 28 November 2008 Important information The information in this presentationn is designed as

More information

Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain

Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain 25 York Street, 17th Floor Toronto, ON Canada M5J 2V5 NEWS RELEASE Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain Toronto, Ontario June 29, 2016 In advance of an analyst

More information

Okvau Gold Project, Cambodia First Mover Status Proven Development Team >100,000oz pa >2 g/t Open Pit AISC <US$750/oz

Okvau Gold Project, Cambodia First Mover Status Proven Development Team >100,000oz pa >2 g/t Open Pit AISC <US$750/oz Okvau Gold Project, Cambodia First Mover Status Proven Development Team >100,000oz pa >2 g/t Open Pit AISC

More information

Quarterly Results. Greg Robinson CEO & Managing g Director

Quarterly Results. Greg Robinson CEO & Managing g Director December 2011 Quarterly Results Greg Robinson CEO & Managing g Director Disclaimer Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve

More information

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133 132 EL LIMON MINE: EMPLOYEES & CONTRACTORS 133 B2Gold Employees Direct 552 Nicaraguans 548 Expats 4 Unionized 494 Men 499 Women 53 Contractors Employees 570 Men 529 Women 41 EL LIMON MINE: NICARAGUA OPEN

More information

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter 18th October 2012 Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter Highlights Record shipped tonnes and production physicals in the September Quarter Shipped tonnes

More information

For personal use only

For personal use only De Grey Mining Ltd A.B.N. 65 094 206 292 The Bold Explorer 14 October 2011 ASX/MEDIA RELEASE DE GREY FURTHER EXPANDS ARGENTINA HOLDINGS De Grey Mining Ltd (De Grey or the Company) is pleased to announce

More information

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE The world s 5 th largest gold producer, Harmony Gold Mining Company Limited ( Harmony ) and Australasia s largest gold company, Newcrest

More information

African Gold Group, Inc.

African Gold Group, Inc. -1- BCE Place, Canada Trust Tower, 27 th Floor, 161 Bay Street, Toronto, Canada M5J 2S1 e.mail : info@africangoldgroup.com website : www.africangoldgroup.com African Gold Group, Inc. TSX-V: AGG AFRICAN

More information

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014.

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014. ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014. EXPLORATION ACTIVITIES Orion s efforts towards project growth, evaluation, and rationalisation have been the focus

More information

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2012 (These figures are unaudited)

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2012 (These figures are unaudited) Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2012 (These figures are unaudited) Overview Production for the March 2012 quarter was 532,237 ounces of gold and 18,072 tonnes

More information

Quarterly Activities Report For the period ended 31 December 2017

Quarterly Activities Report For the period ended 31 December 2017 Quarterly Activities Report For the period ended 31 December 2017 About Aeris Resources (ASX: AIS) is an established copper producer and developer with multiple mines and a 1.8 Mtpa copper processing plant

More information

Quarterly Report Newcrest Mining Limited For the three months ending 30 September 2011 (These figures are unaudited)

Quarterly Report Newcrest Mining Limited For the three months ending 30 September 2011 (These figures are unaudited) Overview Quarterly Report Newcrest Mining Limited For the three months ending 30 September 2011 (These figures are unaudited) Newcrest s production and cost guidance is maintained for 2012. September quarter

More information

RIU EXPLORERS CONFERENCE PRESENTATION

RIU EXPLORERS CONFERENCE PRESENTATION 25 February 2015 For Immediate Release RIU EXPLORERS CONFERENCE PRESENTATION Ramelius Resources Limited advises that Chief Executive Officer, Mark Zeptner will deliver the attached presentation at the

More information