1 October 2016 Scoping Summary Report Wolf Creek Ski Area Meadow Lift Development Prepared for: Rio Grande National Forest Divide Ranger District W. Hwy 160 Del Norte, Colorado Prepared by: Ecosphere Environmental Services, Inc. 776 E. Second Avenue Durango, CO (970) Durango, CO Pagosa Springs, CO Santa Fe, NM Farmington, NM

2

3 This page intentionally left blank.

4

5 Ecosphere Environmental Services, Inc. Scoping Summary Report Table of Contents 1. Introduction Proposed Action Meadow Lift Multi-Use Building Access and Electrical Service Ski Trails Bridges Scoping Scoping Activities Scoping Letter Legal Notice Press Release Scoping Comments Issues Identification for Consideration in the Environmental Assessment Issue Identification Considered Beyond Scope Issue Identification to Resolve through Policy or Administration Activities Following Scoping References Appendix A Scoping Letter... A-1 Appendix B Mailing List... B-1 Appendix C Legal Notice... C-1 Appendix D Press Release... D-1 Appendix E Comment Summary... E-4 Wolf Creek Ski Area Meadow Lift Development i

6 Scoping Summary Report Ecosphere Environmental Services, Inc. List of Tables Table 1-1. Estimated vegetation and/or surface disturbance from the Proposed Action...2 Table 2-1. Legal Notice Publication Schedule...6 Table 3-1. Resource/Issue Categories and Number of Times Identified...7 Abbreviations and Acronyms CFR EA Ecosphere EIS FONSI FSR MDP Meadow Lift NEPA USFS WCSA Code of Federal Regulations Environmental Assessment Ecosphere Environmental Services, Inc. Environmental Impact Statement Finding of No Significant Impact Forest System Road Master Development Plan Meadow Ski Lift National Environmental Policy Act U.S. Forest Service Wolf Creek Ski Area ii Wolf Creek Ski Area Meadow Lift Development

7 Ecosphere Environmental Services, Inc. Scoping Summary Report 1. Introduction The Wolf Creek Ski Area (WCSA) is proposing to construct the Meadow Ski Lift (Meadow Lift), a multi-use building at the top of the lift, ski trails, the Alberta Lift winter use-only bridge (with magic carpet conveyance), and the Meadow Lift bridge. All components of the Proposed Action are located within the WCSA Special Use Permit boundary. The development is located in Mineral County, Colorado, between Pagosa Springs and South Fork, Colorado, south of U.S. Highway 160. The Proposed Action would be located primarily on U.S. Forest Service (USFS) Rio Grande National Forest-managed land. A small portion of the Proposed Action (the Meadow Lift base terminal and associated access road) would be located on privately owned land. The legal description of the proposed project is Sections 8, 9, and 16, Township 37 North, Range 2 East, New Mexico Principal Meridian. The WCSA operates under a Ski Area Term Special Use Permit with the USFS. One of the conditions of the Special Use Permit is that WCSA must develop a Master Development Plan (MDP). In 2012, WCSA released an update to its 1997/1998 MDP. The 2012 MDP (Ecosphere 2012) included a public outreach and input effort, and introduced the concept of the Meadow Lift as part of future development plans for WCSA. Also under the Special Use Permit, WCSA s operations must comply with the management direction provided in the 1996 Forest Plan (USFS 1996). Although the USFS accepted the 2012 MDP, potential impacts of individual projects must be evaluated per the National Environmental Policy Act (NEPA). Implementation of any project on National Forest System lands within WCSA s Special Use Permit area is contingent on site-specific environmental analysis and decision documentation under the NEPA. 1.1 Proposed Action The Proposed Action includes: Construction of the Meadow Lift and a multi-use building at the top of the lift Installation of underground electrical service Construction of approximately 1,140 feet of new access roads and improvements to existing access roads Clearing and/or grading of approximately 12 new ski trails Construction of the Alberta Lift bridge (with magic carpet conveyance) over an unnamed tributary to the South Fork of Pass Creek Construction of the Meadow Lift bridge on the South Fork of Pass Creek Table 1-1 lists the project components and the estimated amount of vegetation or ground disturbance. Wolf Creek Ski Area Meadow Lift Development 1

8 Scoping Summary Report Ecosphere Environmental Services, Inc Meadow Lift Table 1-1. Estimated vegetation and/or surface disturbance from the Proposed Action Project Component Disturbance Type Size (feet) Acres Meadow Lift Line Tree clearing along the line 2,115 by Meadow Lift Towers (8) Ground disturbance 10 by 10/tower 0.02 Meadow Lift Terminals Ground disturbance 60 by Multi-use Building Ground disturbance 50 by Access Roads Ground disturbance 1,140 by Electrical Service No new disturbance 3,950 by 2 0 Meadow Lift Trails Tree clearing - 40 Tumbler Trail Tree clearing; grading - 10 Alberta Lift Bridge Ground disturbance 12 by Meadow Lift Bridge Ground disturbance 80 by Total 53.6 The proposed Meadow Lift would be a detachable, high-speed quad chairlift approximately 2,115 feet long with eight support towers. Support towers would average 35 feet in height. A lower and upper terminal structure would house machinery and provide access to the lift line. Each terminal would be approximately 25 feet tall and would require a construction space of approximately 1,200 square feet (60 feet long by 20 feet wide). The bottom terminal would be located downslope and southeast of the bottom terminal of the Alberta Lift, on the north side of an unnamed tributary to the South Fork of Pass Creek. The top terminal would be located near the Alberta Lift between the existing Bankshot and Serendipity ski runs. The Meadow Lift would not be used in low-snow conditions; 50 inches of base snow depth would be necessary before opening the lift. No earthmoving or grading would be required to clear the network of new trails served by the Meadow Lift; however, there could be some ground disturbance from using mechanical methods to fell trees. Construction of the lift and associated terminals is expected to take 3 to 4 months. To minimize disturbance, tree removal, excavation associated with the lift towers, and tower installation would be conducted over the snow. No construction would occur in drainages or wetlands. Some tree removal would be required. Live and standing dead trees would be removed within an approximately 50-foot-wide corridor for the lift line construction. A track hoe or similar tracked equipment would be used to excavate the approximately 7-foot-deep, 5-footsquare lift tower footers. Similar techniques used to construct the existing Elma, Treasure, and Alberta Lifts would be used the concrete would be flown in via helicopter and then the footers would be poured on site. 2 Wolf Creek Ski Area Meadow Lift Development

9 Ecosphere Environmental Services, Inc. Scoping Summary Report Once the footers are prepared and cured, the lift towers would be flown in, placed via helicopter, and secured by ground crews Multi-Use Building The Proposed Action would include construction of a multi-use building at the top of the Meadow Lift adjacent to the top terminal similar in dimension (approximately 50 by 80 feet) and style to the existing Raven s Nest multi-use building at the top of the Raven Lift. The multi-use building would be built into the hill slope, with the downhill side approximately 32 feet tall and the uphill side approximately 16 feet tall. During the off-season (summer), the building would be used to store lift chairs and would include space for chairlift maintenance. During the winter, the building would provide restroom facilities, a warming area, and food service, thus maximizing efficient use of indoor space. The multi-purpose building would be constructed during the summer, after the lift is completed. Construction is expected to take 4 months. Equipment required for construction may include a dozer, a grader, concrete trucks, and light- and heavy-duty vehicles. Vehicles and personnel would access the construction area along existing and proposed roads. Water would be hauled to a cistern at the multi-use building, and building facilities would be low-water use. The multi-purpose building would be similar to the Raven s Nest and would use a zero-discharge evaporative composting system; there would be no septic system. An existing 2,000-gallon holding tank would contain fluids that do not evaporate. About three times each year, these fluids would be pumped and transported to the WCSA treatment plant. The ski area operates a Class C, Domestic-Minor Municipal Mechanical Plant that discharges into an unnamed tributary to Pass Creek following ultraviolet disinfection. This discharge point is currently permitted by the Colorado Department of Public Health and Environment, Water Quality Control Division. Additionally, according to the terms of this permit, WCSA receives and processes wastewater from the Colorado Department of Transportation facilities located north of Highway Access and Electrical Service Construction, operation, and maintenance access to the proposed top Meadow Lift terminal would be via a closed logging road off Forest System Road (FSR) 391. The bottom terminal would be accessed from a closed logging road off FSR 391 between the base of the Alberta lift and Alberta Park Reservoir. The logging roads would require upgrading to provide operation and maintenance access. Upgrading could include grading, crowning and ditching for adequate drainage, and gravel surfacing. Minimal live tree removal is expected for the road upgrades. The Proposed Action would construct two sections of new road to access the lift terminals: one approximately 685 feet long and the other approximately 455 feet long. The access roads would be approximately 22 feet wide, with a gravel surface. Disturbance from construction of the proposed access roads would be approximately 0.6 acre. Gates would be installed to restrict access along these roads during the off-season (summer). Both access roads would be for summer use only and in winter would be part of the trail network. These two routes would be the only ingress and egress points for equipment used during construction of the lift. Access road upgrades and construction would occur after snow has melted and the ground has dried. No construction would occur in drainages or wetlands. Wolf Creek Ski Area Meadow Lift Development 3

10 Scoping Summary Report Ecosphere Environmental Services, Inc. To power the lift and multi-purpose building, an underground, high-voltage electric power line would be installed within the footprint of the FSR 391, the abandoned logging road to the top terminal of the Meadow Lift, and the proposed new access road. The power line would be approximately 3,950 feet long and installed in an approximately 18-inch-wide by 3-foot-deep trench. The underground power line would not result in any ground disturbance beyond the road footprint Ski Trails Up to 50 acres may be cleared and revegetated (with herbaceous species) to provide groomable skiing terrain. For this analysis, the Meadow Lift Trails, which conceptually encompass approximately 40 acres, are portrayed to be 100 feet wide; however, actual width would likely be less. Live and standing dead trees would be removed or thinned across 100-foot-wide corridors (on average) to create the ski runs, and any hazard trees adjacent to proposed runs would be removed. Trails may be narrower in heavy timber and wider in spaces that are more open. Given the relatively flat terrain crisscrossed by drainages, grooming would occur only on approximately 20 percent (10 acres) of proposed Meadow Lift Trails. The Tumbler Trail development would disturb approximately 10 acres. Live and standing dead trees would be removed or thinned and the trail leveled to meet industry standards. The Tumbler Trail would tie into the existing Okey Dokey and A-Way trails. Tumbler would consist of two spurs: north and south. The north portion of the proposed Tumbler Trail would join the existing Okey Dokey Trail approximately 400 feet below the top of Okey Dokey. Downslope from this point, the existing Okey Dokey trail would be renamed and would become part of Tumbler. The north spur would continue to follow a two-track road along the existing Okey Dokey Trail. For analysis purposes, the north spur would be approximately 100 feet wide south of and including the existing two-track road. The south spur would roughly parallel the north spur approximately 150 to 200 feet south and would be approximately 200 feet wide; though actual cleared width would be less. No ground-disturbing activities or tree removal are planned for the Okey Dokey Trail. When designing and cutting these trails, WCSA would include a series of impact-reducing design features, such as tree islands, feathered edges, and areas that follow the area s natural openings and contours. Any tree removal to open up the trails is proposed to occur in late spring, over snow. It may be necessary to use equipment for larger-scale tree clearing needed for ski runs. No ground-disturbing activities or grooming would occur in drainages or wetlands. Future ski trail maintenance would be completed under WCSA s Ski Area Term Special Use Permit with the USFS Bridges A short bridge would allow beginners who come down A-Way Trail to cross over a tributary of the South Fork of Pass Creek that supplies Alberta Reservoir. The actual length and width of the Alberta Lift bridge would be determined by a final survey and engineering design. Once constructed, the bridge would occupy approximately 1,200 square feet (0.03 acre). The proposed bridge abutments would be concrete and located outside the drainage s ordinary high water mark and its associated wetlands and riparian zone. The bridge would be used by skiers and grooming equipment. During the ski season, the bridge would accommodate a covered, magic carpet- 4 Wolf Creek Ski Area Meadow Lift Development

11 Ecosphere Environmental Services, Inc. Scoping Summary Report style lift, similar to the Lynx Lift constructed in the summer of During the off-season, the bridge would be closed to vehicles. The Meadow Lift bridge would be constructed over the South Fork of Pass Creek as shown on Figure 2. The bridge would be approximately 60 by 80 feet in dimension and would allow skiers to cross the channel from south to north and access the lower Meadow Lift terminal. Approximately 0.4 acre of a knoll just south of the bridge location would be cleared of vegetation and graded to install the bridge. An approximately 80 by 200-foot area would be needed to install the culvert and grade the knoll. Grading would reduce the elevation of the knoll by approximately 10 feet and remove approximately 5,900 cubic yards of fill. If needed, material from the knoll would be used to install the bridge; any excess would be transported off site via truck. To minimize disturbance, vegetation removal in this area would be completed over snow. 2. Scoping Scoping is the process that is used to determine the scope of issues and alternatives to be addressed in a NEPA analysis. In this case, the project is expected to be analyzed in an Environmental Assessment (EA). Scoping begins before analysis of impacts is completed. This public involvement milestone is an integral part of the project s development. The purpose of soliciting input during the scoping period is to properly identify as many relevant issues, alternatives, mitigation measures, and analytical tools as possible so they can be incorporated into the environmental document. Due to the well-defined nature of the proposed action, the scoping period was combined with the 30-day comment period required under 36 CFR Scoping Activities Scoping activities included: Sending an informative letter with a project description and area map to individuals identified by the USFS as interested parties Publication of a legal notice in the Valley Courier the RGNF s newspaper of record The distribution of a press release to additional area news media outlets Publication in the RGNF s Schedule of Proposed Actions and posting project information on the forest s website Individuals were provided several methods to share their comments with the USFS, including a project-specific address and a facsimile number. Both the scoping letter and legal notice highlighted the opportunity to comment and the implications for eligibility during the objection period. 2.2 Scoping Letter Scoping letters containing a project description and comment submittal information were sent to 76 addressees consisting of individual stakeholders; business owners; local, state, and federal representatives and elected Wolf Creek Ski Area Meadow Lift Development 5

12 Scoping Summary Report Ecosphere Environmental Services, Inc. officials; non-profit organizations and clubs; and tribal entities. A copy of the scoping letter is included in Appendix A; the project mailing list is included in Appendix B. 2.3 Legal Notice A legal notice for the project was published in the Valley Courier (the newspaper of record). Additional noticed were published in The Pagosa Springs Sun, and in a suite of newspapers published by Valley Publishing, which covers the San Luis Valley area. Table 1-2 lists the newspaper and the date of publication. Table 2-1. Legal Notice Publication Schedule Newspaper Valley Courier August 31, 2016 The Pagosa Springs Sun September 1, 2016 The Del Norte Prospector September 1, 2016 The Conejos County Citizen August 31, 2016 The Mineral County Miner September 1, 2016 Date The Monte Vista Journal August 31, 2016 and September 7, 2016 * The South Fork Tines September 1, 2016 Center Post Dispatch September 1, 2016 * There was a small area of print loss/no ink within in the legal notice published in the Monte Vista Journal on August 31, 2016; because of the loss of print text in that legal notice, the Monte Vista Journal published the legal notice a second time on September 7, The legal notice identified the scoping comment period as within 30 days following publication of the legal notice in the Valley Courier. Therefore, the comment period was expected to close on or about September 30, A copy of the legal notice is included as Appendix C. 2.4 Press Release On August 29, 2016, the project press release was sent to the same newspapers in which the legal notice was published (see Table 2-1) and to the Durango Herald, Pueblo Chieftain, and Associated Press. Local area radio stations KGIW, KRZA, KSLV, KSPK, and NPR affiliate KRCC out of Colorado Springs also received the press release. A copy of the press release is included as Appendix D. 3. Scoping Comments Scoping comments were accepted during a 30-day period from September 1, 2016 through September 30, Interested parties had the opportunity to submit written comments, comments, or facsimile directly to the Rio Grande National Forest, Divide Ranger District, West Highway 16, Del Norte, Colorado 81132; comments-rocky-mountain-rio-grande-divide@fs.fed.us; or (719) During the scoping comment period, the USFS received 11 comment submittals submitted in hard copy letter and format. These 11 submittals contained 20 individual comments. Following the close of the comment- 6 Wolf Creek Ski Area Meadow Lift Development

13 Ecosphere Environmental Services, Inc. Scoping Summary Report scoping period, comments were compiled and analyzed to identify issues and concerns, reviewed and entered into an electronic database. Along with these comments, an additional comment received following the close of the comment period was included in the analysis and discussed in Section 3.1. A summary of the resource/issue category mentioned in the scoping comments is explained below. Appendix E contains the comment summary table. 3.1 Issues Identification for Consideration in the Environmental Assessment Table 3-1 lists of the resource/issue categories mentioned in the scoping comments for consideration in the EA. Table 3-1. Resource/Issue Categories and Number of Times Identified Issue Identified Number of Times Issue Identified Socioeconomics 2 Vegetation Management 2 Wildlife 2 Public Health and Safety 1 Visual and Aesthetics 1 Water Quality 1 Planning Process and Alternatives 1 Socioeconomics One of the two comments received and assigned to this resource category reflects concern about the increase of the price of the season pass with any development at the Wolf Creek Ski Area; the other commenter acknowledged the importance of the Wolf Creek Ski Area to the local economy and stated that the benefits of the project outweigh any impacts of the project s development. Vegetation Management The issue category was assigned to two comments that focused on the tree-clearing component proposed as part of this project. One commenter noted that " selective thinning and clearing of the forest will increase the overall health of the forest ; the other commenter believed that The proposed largescale clearing of trees will be irreversible and will drastically change the character of the ski area. Wildlife Concern about impacting wildlife was expressed in both comments received in this issue category. One commenter simply stated that they have observed lynx many times while skiing and hiking in the project area; the other commenter cited the sensitive ecology in the project area and believes that less development makes it possible to preserve wildness for wildlife. Public Health and Safety A commenter expressed concern over the location of the proposed project by stating, As the terrain in question includes many gullies, chutes and cliffs, it seems exceptionally poor terrain to attempt to develop into a beginner area as significant hazards would exist mere feet from the new cleared trails. Wolf Creek Ski Area Meadow Lift Development 7

14 Scoping Summary Report Ecosphere Environmental Services, Inc. Visual and Aesthetics Concern was noted by one commenter that the project as proposed would mean more cables, towers, lift chairs, and less trees. Water quality The concern was expressed over maintaining good water quality in the area. The commenter noted that they believed the USFS would work with the U.S. Army Corps of Engineers on addressing water quality. Planning Process and Alternatives A commenter noted that the proposed project ski lift is short and does not take advantage of the available vertical terrain. The commenter questioned why that particular geographic aspect was chosen instead of extending the top of the lift to the ridge line and also noted that the lift appears to have no significant vertical gain for the investment. 3.2 Issue Identification Considered Beyond Scope Several of the comment submittals contained statements either for or against the proposed project. In the NEPA process, commenting on a proposed project is not a vote on whether the proposed project should take place or not; therefore, these comments were categorized under the considered beyond scope. Nonetheless, any information provided during the scoping process can influence decision makers and their final decisions. Of those commenters who expressed an opinion, their preference on the proposed project can be summarized as six were in favor of the project and four were opposed. 3.3 Issue Identification to Resolve through Policy or Administration The Hopi Tribe responded to the scoping letter with a specific request to the USFS to provide the tribe with copies of the cultural resource survey of the area and the draft EA for their review and comment. This type of collaboration occurs through the Section 106 Consultation between the federal government and tribes; therefore, this request was coded as an issue to be resolved or addressed through policy or administrative action. 4. Activities Following Scoping The purpose of an EA is to determine the significance of the environmental effects and to look at alternative means to achieve the objectives of a proposed project. The EA is intended to be a concise document that briefly provides sufficient evidence and analysis for determining whether to prepare an Environmental Impact Statement (EIS), a larger more detailed and usually related to a major action significantly affecting human health or the environment; aids an agency s compliance with NEPA when an EIS is not necessary; and facilitates the preparation of an EIS if it is determined to be necessary (CEQ-EOP 2007). Since the EA evaluates the significance of a proposed project, it focuses on any effects of the proposed project that may significantly impact or affect human health or the environment. Many times the EA will identify ways in which the regulatory agency or project proponent can revise the proposed action to minimize environmental effects (CEQ-EOP 2007). 8 Wolf Creek Ski Area Meadow Lift Development

15 Ecosphere Environmental Services, Inc. Scoping Summary Report The EA process concludes with either a Finding of No Significant Impact (FONSI) or a determination to proceed with an EIS. A FONSI is a document that presents the reason why the USFS has concluded that there are no significant environmental impacts expected to occur upon implementation of the project action. The FONSI must also include, summarize, or attach and incorporate by reference the EA. An EIS will be prepared if the USFS determines that the proposed project is considered a major federal action significantly affecting the quality of the human environment. The regulatory requirements for an EIS are more detailed than those in an EA (CEQ- EOP 2007). Should the EA lead to a FONSI, the draft Decision Notice, FONSI, and EA will be made available to the public; the notice of this availability will be made in local newspapers and to interested parties on the project mailing list. Only those who submitted timely and specific written comments during the 30-day scoping comment period are eligible to file an objection per 36 CFR Part 218. Many projects and activities, and most land management plan amendments and revisions, are subject to a predecisional administrative review process, commonly referred to as an objection process. Direction for the project-level objection process is at 36 CFR 218. Under the process, individuals and entities may file objections after an environmental analysis document is completed and before a decision document is signed. The process builds on early participation and collaboration efforts, with the intention of resolving concerns before a decision is made. An objection is a written document submitted by an individual or organization seeking a pre-decisional administrative review of a proposed project and documented with an EA or EIS. An individual or organization may file an objection, if they submitted comments specific to the proposed project during scoping or other opportunity for public comment. The Responsible Official for the proposed project may not issue a decision until the Reviewing Officer has responded to all pending objections. A written response will be issued within 45 days. Wolf Creek Ski Area Meadow Lift Development 9

16 Scoping Summary Report Ecosphere Environmental Services, Inc. 5. References Council on Environmental Quality, Executive Office of the President (CEQ-EOP) A Citizen s Guide to the NEPA, Having Your Voice Heard. December. Ecosphere Environmental Services, Inc. (Ecosphere) Wolf Creek Ski Area Master Development Plan. September. United States Forest Service (USFS). 1996a. Revised Land and Resource Management Plan, Rio Grande National Forest, USFS Rocky Mountain Region, Rio Grande National Forest, Monte Vista, CO, November 7, Available online at: 10 Wolf Creek Ski Area Meadow Lift Development

17 Ecosphere Environmental Services, Inc. Scoping Summary Report Appendix A Scoping Letter Wolf Creek Ski Area Meadow Lift Development A-1

18 Scoping Summary Report Ecosphere Environmental Services, Inc. A-2 Wolf Creek Ski Area Meadow Lift Development

19 Ecosphere Environmental Services, Inc. Scoping Summary Report Wolf Creek Ski Area Meadow Lift Development A-3

20 Scoping Summary Report Ecosphere Environmental Services, Inc. A-4 Wolf Creek Ski Area Meadow Lift Development

21 Ecosphere Environmental Services, Inc. Scoping Summary Report Appendix B Mailing List Wolf Creek Ski Area Meadow Lift Development B-1

22

23 Ecosphere Environmental Services, Inc. Scoping Summary Report Appendix Table B-1. Mailing List Name Organization Address City State Nancy Butler Rio Grande Headwaters Land Trust (RiGHT) P.O. Box 444 Del Norte CO Rio De La Vista Rio Grande Headwaters Land Trust (RiGHT) P.O. Box 444 Del Norte CO Paige Singer Rocky Mountain Wild 1536 Wynkoop St, Ste 900 Denver CO Tehri Parker Rocky Mountain Wild 1536 Wynkoop St, Ste 900 Denver CO Christine Canaly San Luis Valley Ecosystem Council P.O. Box 223 Alamosa CO Scott Robson Julie Mach Colorado Mountain Club and Backcountry Snowsports Alliance Colorado Mountain Club and Backcountry Snowsports Alliance th Street, Suite 200 Golden CO th Street, Suite 200 Golden CO Steve Earle San Juan Outdoor Club P.O. Box 3856 Pagosa Springs CO Jeff Reichel San Juan Outdoor Club P.O. Box 3856 Pagosa Springs CO Larry Olin Gray Wolf Ski Club P.O. Box 2394 Pagosa Springs CO Muriel Eason Gray Wolf Ski Club P.O. Box 2394 Pagosa Springs CO James Dickhoff Pagosa Springs Nordic Club P.O. Box 568 Pagosa Springs CO Penny Kipley Pagosa Lakes Property Owners Association 45 Eagles Loft Circle Pagosa Springs CO Curtis Cloutier Up the Creek Ski & Rec Club P.O. Box Denver CO Scott Jones Colorado Snowmobile Association P.O. Box 262 Milliken CO Roger Pennington San Juan Sledders Snowmobile Club 37 Red Cliffs Road Durango CO Tim Batchelor Wolf Creek Trailblazers Snowmobile Club P.O. Box 3194 Pagosa Springs CO Curtis Miller South Fork Powder Busters (snowmobile club) P. O. Box 262 Milliken CO Elizabeth Baugh Silverthread Outdoor Recreation Club of the San Luis Valley P.O. Box 343 South Fork CO Robert Kukuk Silverthreaders Club P.O. Box 702 Creede CO Wolf Creek Ski Area Meadow Lift Development B-1

24 Scoping Summary Report Ecosphere Environmental Services, Inc. Forest & Jaclyn Bramwell Name Organization Address City State SnowCountry Snowmobile Tours/Third Generation Outfitters, LLC 135-F Country Center Dr. #93 Pagosa Springs CO Wolf Creek Snowmobile Tours 3505 US-160 Pagosa Springs CO Rick & Jill House Indian Summer Outfitters P.O. Box 1891 Pagosa Springs CO Scott Taylor High Country Fishing Charters 558 Ginger Circle Pagosa Springs CO Tom Knopick Duranglers 923 Main Ave. Durango CO Clyde Dooly Town of Creede P.O. Box 457 Creede CO Greg Schulte Town of Pagosa Springs P.O. Box 1859 Pagosa Springs CO James Dickhoff Town of Pagosa Springs P.O. Box 1859 Pagosa Springs CO Steve Wadley Archuleta County Government P.O. Box 1507 Pagosa Springs CO Clifford Lucero Archuleta County Government P.O. Box 1507 Pagosa Springs CO Michael Whiting Archuleta County Government P.O. Box 1507 Pagosa Springs CO Ramona Weber Mineral County P.O. Box 70 Creede CO Scott Lamb Mineral County P.O. Box 70 Creede CO Janelle Kukuk Mineral County P.O. Box 70 Creede CO Ellen Roberts Senator - District East Colfax Denver CO Gail Schwatrz Senator - District East Colfax Denver CO Scott Tipton Congressman- District E Second Ave Suite 230 Durango CO Eric or Lisa Burt Kristi Mountain Sports 3223 Main Street Alamosa CO Eric or Lisa Burt Kristi Mountain Sports 680 Grand Ave Del Norte CO Joel Condren 8200 Mountain Sports W. Highway 160 South Fork CO Ryan Graber Alpine Bike and Ski Highway 160 South Fork CO Jeff Greer Summit Ski & Sports 172 Pagosa Street Pagosa Springs CO Matt Yoksh Pagosa Ski Rental P.O. Box 1739 Pagosa Springs CO B-2 Wolf Creek Ski Area Meadow Lift Development

25 Ecosphere Environmental Services, Inc. Scoping Summary Report Name Organization Address City State Dan and Juannalee Park Alpen Haus 2800 Cornerstone Drive Pagosa Springs CO Pagosa Springs Area Chamber of Commerce 105 Hot Springs Blvd Pagosa Springs CO Tracey Gillespie South Fork Chamber of Commerce P.O. Box 577 South Fork CO Della Brown Creede & Mineral County Chamber of Commerce PO Box 580 Creede CO Jack Llewellyn Durango Chamber of Commerce P.O. Box 2587 Durango CO Joanie Berde Carson Forest Watch P.O. Box 15 Llano NM Rick Basagoitia Colorado Parks & Wildlife 0772 County Road 1 East Monte Vista CO Rocky Smith Rocky Mountain Wild 1030 Pearl St #9 Denver CO SLV Ecosystem Council P.O. Box 223 Alamosa CO Bryan Bird WildEarth Guardians 312 Montezuma, Suite A Santa Fe NM Mineral County Commissioners P.O. Box 70 Creede CO Rio Grande County Commissioners 925 6th Street #207 Del Norte CO Kevin Terry Trout Unlimited P.O. Box 281 Del Norte CO Zeke Ward RWEACT P.O. Box 721 Lake City CO Craig Cotton Colorado Division of Water Resources, Div Murphy Drive Alamosa CO Alden Naranjo NAGPRA Representative SUIT P.O. Box 737 Ignacio CO Terry Knight, Sr. Dr. Jeff Blythe Tribal Hisoric Preservation Officer Ute Mountain Ute Tribe Tribal Historic Preservation Officer Jicarilla Apache Tribe P.O. Box 468 Towoac CO P.O. Box 1367 Dulce NM Leigh Kuwanwisiwma Director, Hopi Cultural Preservation Office P.O. Box 123 Kykotsmovi AZ Betsy Chapoose Cultural Rights and Protection Office Ute Tribe of the Uintah & Ouray Reservation P.O. Box 190 Ft. Duchesne UT Governor Phillip Perez Pueblo of Nambe Route 1, Box 117-BB Santa Fe NM Wolf Creek Ski Area Meadow Lift Development B-3

26 Scoping Summary Report Ecosphere Environmental Services, Inc. Name Organization Address City State Tamara Billie Cultural Program Navajo Nation P.O. Box 7440 Window Rock AZ Timothy Menchego Tribal Resource Administrator Pueblo of Santa Ana Two Dove Road Santa Ana Pueblo NM Governor Daniel Ortiz Santo Domingo Pueblo P.O. Box 99 Santo Domingo Pueblo NM John Cruz Cultural Program Ohkay Owingeh P.O. Box 1532 San Juan NM Ben Chavarria Cultural Preservation and Land Rights P.O. Box 580 Espanola NM Donovan Gomez Tribal Administrator Taos Pueblo P.O. Box 1846 Taos NM Governor Leroy Arquero Pueblo de Cochiti P.O. Box 70 Cochiti NM Governor of Picuris Cultural Program P.O. Box 127 Penasco NM Kurt Dongoske Tribal Historic Preservation Officer Zuni Heritage & Historic Preservation P.O. Box 1149 Zuni Pueblo NM Gaylord Siow Tribal Historic Preservation Office P.O. Box 194 Laguna NM Tribal Administrator Pueblo of Acoma P.O. Box 309 Acoma Pueblo NM Jimmy Arterberry Tribal Historic Preservation Officer P.O. Box 908 Lawton OK B-4 Wolf Creek Ski Area Meadow Lift Development

27 Ecosphere Environmental Services, Inc. Scoping Summary Report Appendix C Legal Notice Wolf Creek Ski Area Meadow Lift Development C-1

28 Scoping Summary Report Ecosphere Environmental Services, Inc. Legal Notice Meadow Lift Project The Rio Grande National Forest is inviting public comment and participation in an environmental analysis to construct the Meadow Lift and associated facilities on U.S. Forest Service land operated under a Special Use Permit by the Wolf Creek Ski Area (WCSA). The proposal is located within the WCSA Special Use Permit boundary in Mineral County, Colorado. The legal description of the proposal is Sections 8, 9 and 16, Township 37 North, Range 2 East, New Mexico Principal Meridian. The proposed Meadow Lift would be approximately 2,100-foot-long lift with eight towers and terminals at each end. A 50 by 80 feet multi-use building would also be constructed for storage during the summer and as a service area during the winter. To access the lift for construction and maintenance, two sections of graveled road would be constructed; approximately 685 and 455 feet in length. An underground powerline would be installed in an existing closed Forest Service road and in a proposed access road. Up to 50 acres may be cleared and replanted to provide groomable skiing terrain in the proposed Meadow Lift and existing Elma Lift areas. A short pedestrian bridge would be constructed to cross over a tributary of the Alberta Reservoir and a box culvert would be installed in an unnamed south fork of Pass Creek to allow skiers to cross the channel. The proposal is tentatively scheduled to begin construction in May Wolf Creek Ski Area s 2012 Master Development Plan introduced the concept of the Meadow Lift for future development. Although the USFS has accepted the 2012 Master Development Plan, implementation of any project within WCSA s Special Use Permit area is contingent on site-specific environmental analysis and decision documentation under the National Environmental Policy Act. The Rio Grande National Forest is working with a third-party environmental contractor to prepare the environmental analysis. The comment period coincides with scoping and is 30 days from the first day after publication in the Valley Courier the Rio Grande National Forest s newspaper of record. This legal notice is expected to be published on August 31, The publication date of the legal notice in the newspaper of record is the exclusive means for calculating the time to submit written comments on the proposed project or activity to be analyzed and documented in an Environmental Assessment. Only those who submit timely and specific written comments, signed by each individual or entity or verify identity upon request, during the 30-day comment period will be eligible for Objection status under CFR 36 Part (b)(4). Written, facsimile, hand-delivered, or electronic comments concerning this project will be accepted. Written comments should be submitted to Meadow Lift Project at: Divide Ranger District, W. Hwy 160, Del Norte, CO Comments may also be sent via to comments-rocky-mountainrio-grande-divide@fs.fed.us or via facsimile to Additional information can be obtained by calling Matt Dayer at or at the Forest website at C-2 Wolf Creek Ski Area Meadow Lift Development

29 Ecosphere Environmental Services, Inc. Scoping Summary Report Publish one time on August 31, ed to Valley Courier: on August 24, 2016 USFS Contact Information: Matt Dayer: and/or Ecosphere Contact Information: Janet Wolf: and/or Billing information: Ecosphere Environmental Services Attn: Janet Wolf 776 East Second Avenue Durango, Colorado Please submit proof of publication with billing. Also sent to Pagosa Springs Sun for publication on September 1, 2016 and Valley Publishing for publication on August 31 or September 1, 2016 dependent on specific newspaper publication date: ed to Pagosa Spring Sun: on August 24, ed to Valley Publishing: on August 24, 2016 Wolf Creek Ski Area Meadow Lift Development C-3

30

31 Ecosphere Environmental Services, Inc. Scoping Summary Report Appendix D Press Release Wolf Creek Ski Area Meadow Lift Development D-1

32 Scoping Summary Report Ecosphere Environmental Services, Inc. RIO GRANDE NATIONAL FOREST 1803 W. Highway 160 MONTE VISTA, CO Contact: Mike Blakeman, FOR IMMEDIATE RELEASE: August 29, 2016 Rio Grande National Forest Begins Analysis of Proposed Wolf Creek Ski Area Meadow Lift Project DEL NORTE, Colorado The Rio Grande National Forest is inviting public input on an environmental analysis to construct the Meadow Lift and associated facilities on National Forest System land operated under a special use permit by the Wolf Creek Ski Area (WCSA). The proposed project is located within the WCSA special use permit boundary in Mineral County. The proposed Meadow Lift would be approximately 2,100 feet in length with eight towers and terminals. A 50 by 80 foot multi-use building would be constructed for storage during the summer and as a service area during the winter. Two sections of gravel road, totaling less than a quarter mile, would be constructed to access the lift for construction and maintenance. An underground powerline would be installed under an existing closed Forest Service road and a proposed access road. Up to 50 acres may be cleared of trees and revegetated to provide open skiing terrain in the proposed Meadow Lift and existing Elma Lift areas. If approved, the project is tentatively scheduled to begin construction in May Wolf Creek Ski Area s 2012 Master Development Plan introduced the concept of the Meadow Lift for future development. Although the USFS accepted the 2012 Master Development Plan, implementation of any project within WCSA s special use permit area is contingent on site-specific environmental analysis. The Rio Grande National Forest is working with a third-party contractor to prepare the environmental analysis. Public input would be most useful if received within 30 days following publication of the legal notice in the Valley Courier. This legal notice is expected to be published on August 31, Written comments should be submitted to Meadow Lift Project at: Divide Ranger District, W. Hwy 160, Del Norte, CO Comments may also be ed to comments-rocky-mountain-riogrande-divide@fs.fed.us or sent by facsimile to D-2 Wolf Creek Ski Area Meadow Lift Development

33 Ecosphere Environmental Services, Inc. Scoping Summary Report Additional information may be obtained by contacting Matt Dayer at or at the Rio Grande National Forest website at # # # Wolf Creek Ski Area Meadow Lift Development D-3

34 Scoping Summary Report Ecosphere Environmental Services, Inc. Appendix E Comment Summary E-4 Wolf Creek Ski Area Meadow Lift Development

35 Ecosphere Environmental Services, Inc. Scoping Summary Report Submission Number Commenter Type Standing for Objection Period Submitted Appendix Table E-1. Socioeconomics comments Submission and Comment 005 Individuals Yes Socioeconomics Consideration 008 Organizations/ Non-profits Yes Hard Copy Socioeconomics Consideration Category Consideration Comment Consider in EA Consider in EA a new development at the area they drastically increase the price of the season pass. Locals like me are having a hard time keeping up with the increases in the lift prices. Given the importance of Wolf Creek Ski Area to the local economy in winter and that a good number of our membership skis there in the winter, we feel the benefits well outweigh the impact of this development Submission Number Commenter Type Standing for Objection Period Appendix Table E-2. Vegetation management comments Submitted Submission and Comment 004 Individuals Yes Vegetation Management 011 Individuals Yes Vegetation Management Category Consideration Comment Consider in EA Consider in EA " selective thinning and clearing of the forest will increase the overall health of the forest " I am writing to express my opposition to the Meadows lift project, specifically the clearing of trails. The proposed large-scale clearing of trees will be irreversible and will drastically change the character of the ski area This terrain is best maintained in its natural state. Wolf Creek Ski Area Meadow Lift Development E-5

36 Scoping Summary Report Ecosphere Environmental Services, Inc. Submission Number Commenter Type Standing for Objection Period Submitted Appendix Table E-3. Wildlife comments Submission and Comment Category Consideration Comment 005 Individuals Yes Wildlife Consider in EA I ski that area a lot and hike out and I have run into lynx many times in that area. 010 Individuals Yes Hard Copy Wildlife Consider in EA Due to the sensitive ecology of the area in question, I would like to see the wolf creek pass area have the least development possible to preserve wildness for wildlife and maintain the unique character of the area. Submission Number Commenter Type Standing for Objection Period Appendix Table E-4. Public health and safety comments Submitted Submission and Comment 011 Individuals Yes Public Health and Safety Category Consideration Comment Consider in EA As the terrain in question includes many gullies, chutes and cliffs, it seems exceptionally poor terrain to attempt to develop into a "beginner area" as significant hazards would exist mere feet from the new cleared trails. E-6 Wolf Creek Ski Area Meadow Lift Development

37 Ecosphere Environmental Services, Inc. Scoping Summary Report Submission Number Commenter Type Standing for Objection Period Appendix Table E-5. Visual and aesthetics comments Submitted Submission and Comment 001 Individuals Yes Hard Copy Visual and Aesthetic Category Consideration Comment Consider in EA More installment in a near location appears to be more cables, towers, lift chairs, less trees to occur Appendix Table E-6. Water quality comments Submission Number Commenter Type 008 Organization/ Non-profits Standing for Objection Period Submitted Submission and Comment Yes Hard Copy Water Quality Category Consideration Comment Consider in EA Our primary concern here would be for maintaining good water quality in the area, which we are sure you are addressing with the Army Corp [sic] of Engineers. Wolf Creek Ski Area Meadow Lift Development E-7

38 Scoping Summary Report Ecosphere Environmental Services, Inc. Appendix Table E-7. Planning process and alternatives Submission Number Commenter Type 012 Commercial Sector/Businesses Standing for Objection Period Submitted Submission and Comment No Planning Process and Alternatives Category Consideration Comment Consider in EA Wolf Creek is notorious for having a lack of vertical feet to ski without intersecting roads and trails. Looking at a reference topo map, it seems the proposed lift is short and doesn't take advantage of all the available vertical terrain. Is there a reason they chose the aspect they did? Any other reason they chose to not go all the way to the top of the ridge? Looking at the slope and gradient analysis, is seems this is a lift with no significant vertical gain for the investment. E-8 Wolf Creek Ski Area Meadow Lift Development

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

1803 West Hwy 160 Monte Vista, CO (719) TTY (719) USDA Forest Service Rio Grande National Forest http://www.fs.fed.us/r2/riogrande 1803 West Hwy 160 Monte Vista, CO 81144 (719)852-5941 TTY (719)852-6271 USDI Bureau of Land Management San Luis Valley Center

More information

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David David Johnson From: Sent: To: Cc: Subject: Attachments: David Johnson Tuesday, April 12, 2011 4:33 PM Thomas Malecek Dave Dyer; Jason Marks (jmarks@segroup.com) VWC Scoping Letter

More information

Sawtooth National Forest Fairfield Ranger District

Sawtooth National Forest Fairfield Ranger District United States Department of Agriculture Forest Service Sawtooth National Forest Fairfield Ranger District P.O. Box 189 Fairfield, ID. 83327 208-764-3202 Fax: 208-764-3211 File Code: 1950/7700 Date: December

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

Decision Memo Ice Age Trail Improvement (CRAC 37)

Decision Memo Ice Age Trail Improvement (CRAC 37) Decision Memo Ice Age Trail Improvement (CRAC 37) U.S. Forest Service Chequamegon-Nicolet National Forest, Medford-Park Falls Ranger District Taylor County, Wisconsin T32N, R2W, Town of Grover, Section

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture United States Department of Agriculture Forest Service January 2012 Proposed Action Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties Payette National Forest Valley, Adams

More information

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark,

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO 81301 Dear Mark, We are pleased to offer the following comments on the draft San Juan Public Lands Center management plans

More information

Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs

Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs What happened at this meeting? - Identified conservation easements - Discussed In-stream Flows -

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

Daisy Dean Trail 628/619 ATV Trail Construction

Daisy Dean Trail 628/619 ATV Trail Construction Background and Purpose and Need The Daisy Dean ATV Trail Construction Project is located in the Little Belt Mountains, Musselshell Ranger District, Lewis and Clark National Forest approximately 32 miles

More information

Ortiz River Ranch Pagosa Springs, Colorado

Ortiz River Ranch Pagosa Springs, Colorado Ortiz River Ranch Pagosa Springs, Colorado This ranch provides an exceptional opportunity to own a property with frontage on the San Juan and Navajo Rivers, lush irrigated pastures, and beautiful rolling

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

Plaza del Rio. Rio Grande Sanctuary. Exclusive Home Sites in the San Luis Valley, Colorado

Plaza del Rio. Rio Grande Sanctuary. Exclusive Home Sites in the San Luis Valley, Colorado Plaza del Rio Rio Grande Sanctuary Photography by Gary Tyson River Valley Group, LLC and Team Murphy Realty, LLC offer for sale: Exclusive Home Sites in the San Luis Valley, Colorado Plaza del Rio Exclusive

More information

GOLDEN BACKCOUNTRY RECREATION ADVISORY COMMITTEE (GBRAC)

GOLDEN BACKCOUNTRY RECREATION ADVISORY COMMITTEE (GBRAC) GOLDEN BACKCOUNTRY RECREATION ADVISORY COMMITTEE (GBRAC) MINUTES from November 1, 2006 Meeting Attending: Sector / Stakeholder GBRAC Commercial Aerial Motorized Sector GBRAC Habitat Protection; Sport Fishing

More information

Tahoe National Forest Over-Snow Vehicle Use Designation

Tahoe National Forest Over-Snow Vehicle Use Designation Tahoe National Forest Over-Snow Vehicle Use Designation USDA Forest Service Tahoe National Forest February 20, 2015 Introduction The Forest Service, U.S. Department of Agriculture will prepare an Environmental

More information

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit USDA Forest Service Mississippi Bluffs Ranger District, Shawnee National Forest Jackson and Union Counties, Illinois Proposed Action

More information

PURPOSE AND NEED. Introduction

PURPOSE AND NEED. Introduction Public Scoping: Allocation of Recreation Capacity for Commercial Outfitter Guide Services on North Kruzof Island Trails (Kruzof Island Outfitter Guide) PURPOSE AND NEED Introduction The U.S. Department

More information

MEETING MINUTES Page 1 of 5

MEETING MINUTES   Page 1 of 5 Page 1 of 5 50178.000 May 26, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Citizens Advisory Committee Meeting MEETING LOCATION MEETING PURPOSE Amy Eckland ISSUED BY SIGNATURE PARTICIPANT See attached

More information

Yard Creek Provincial Park. Management Plan

Yard Creek Provincial Park. Management Plan Yard Creek Provincial Park Management Plan Draft January 2010 Yard Creek Provincial Park Management Plan Approved by: telàlsemkin/siyam/chief Scott Benton Bill Williams Squamish Executive Director ation

More information

PROPOSED PARK ALTERNATIVES

PROPOSED PARK ALTERNATIVES 8 Chimne y Rock State Park M a ster Pl an 2011 PROPOSED PARK ALTERNATIVES Introduction Three different park development concepts were prepared and presented to the citizens of North Carolina through a

More information

White Mountain National Forest

White Mountain National Forest White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Boles Brook Snowmobile Bridge Decision Memo Boles Brook Snowmobile Bridge Project Town of Woodstock

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction Page 1 of 6 Background DECISION MEMO USDA Forest Service Jefferson Ranger District Jefferson County, Montana Rawhide Trail #7073 is located in the Elkhorn Mountain Range approximately 10 miles east of

More information

National Forests and Grasslands in Texas

National Forests and Grasslands in Texas United States Department of Agriculture Forest Service National Forests and Grasslands in Texas Sam Houston NF 394 FM 1375 West New Waverly, Texas 77358 Phone 936-344-6205 Dear Friends, File Code: 1950

More information

White Mountain National Forest. Rumney Rocks Project Supplemental Environmental Assessment. 30-day Comment Report

White Mountain National Forest. Rumney Rocks Project Supplemental Environmental Assessment. 30-day Comment Report White Mountain National Forest United States Department of Agriculture Forest Service Rumney Rocks Project Supplemental Environmental Assessment Eastern Region Town of Rumney, Grafton County, NH 30-day

More information

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 APPLICANT: REFER TO: St. Louis and Lake Counties Regional Rail Authority 2018-01942-ARC Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 SECTION:404 - Clean Water Act 1. APPLICATION FOR

More information

Loveland Valley Lodge Expansion Environmental Assessment Recreation Resource Report

Loveland Valley Lodge Expansion Environmental Assessment Recreation Resource Report United States Department of Agriculture Forest Service Loveland Valley Lodge Expansion Environmental Assessment Recreation Resource Report Clear Creek Ranger District, Arapaho National Forest, Clear Creek

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

RIM TRAIL EXTENSION PROJECT

RIM TRAIL EXTENSION PROJECT DECISION MEMO For RAINBOW RIM TRAIL EXTENSION PROJECT Located on National Forest System Lands USDA Forest Service, Southwest Region Kaibab National Forest - North Kaibab Ranger District T.35 N, R.1 E,

More information

KANANASKIS COUNTRY PROVINCIAL RECREATION AREAS MANAGEMENT PLAN DRAFT TERMS OF REFERENCE - November 20, 2007

KANANASKIS COUNTRY PROVINCIAL RECREATION AREAS MANAGEMENT PLAN DRAFT TERMS OF REFERENCE - November 20, 2007 KANANASKIS COUNTRY PROVINCIAL RECREATION AREAS MANAGEMENT PLAN DRAFT TERMS OF REFERENCE - November 20, 2007 BACKGROUND There are 42 Provincial Recreation Areas (PRAs) within Kananaskis Country located

More information

Appalachian Power Company Smith Mountain Hydroelectric Project FERC No Debris Management Plan

Appalachian Power Company Smith Mountain Hydroelectric Project FERC No Debris Management Plan Appalachian Power Company Smith Mountain Hydroelectric Project FERC No. 2210 Debris Management Plan Final July2008 TABLE OF CONTENTS Description Page SUMMARY 1 1.0 Introduction.. 2 1.1 Project Lands and

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

AGENCY SCOPING MEETING

AGENCY SCOPING MEETING AGENCY SCOPING MEETING Environmental Impact Statement (EIS) Conducted for the Friedman Memorial Replacement Airport in the Wood River Region of South Central Idaho December 4, 2007 1:00 p.m. 4:00 p.m.

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information

Attachment O Verified Statement of Christopher Banet Page 1 of 7

Attachment O Verified Statement of Christopher Banet Page 1 of 7 Attachment O Verified Statement of Christopher Banet Page 1 of 7 Attachment O Verified Statement of Christopher Banet Page 2 of 7 Curriculum Vitae Education Christopher Banet United States Department of

More information

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 1 Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 Willow Lake and Kit Carson Peak 2 SUMMARY The Rocky Mountain Field Institute began Phase 1 of a multi-phase,

More information

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

Project Planning, Compliance, and Funding

Project Planning, Compliance, and Funding Project Planning, Compliance, and Funding The plans above offer high level guidance to ensure that the A.T. is managed effectively as a whole unit in a decentralized management structure. Cooperative management

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

NATIONWIDE PERMIT ACTIONS JULY - SEPTEMBER Action Type Project Name Closure Method County State SPA SCO NWP River West Development

NATIONWIDE PERMIT ACTIONS JULY - SEPTEMBER Action Type Project Name Closure Method County State SPA SCO NWP River West Development DA Number Action Type Project Name Closure Method County State SPA-2013-00282- River West Development Chaffee CO SPA-2010-00457 Delbert Smith Conejos CO SPA-2010-00457 Delbert Smith Conejos CO SPA-2013-00379

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

USDA United States ~ Department of A riculture

USDA United States ~ Department of A riculture USDA United States ~ Department of A riculture Forest Service Lassen National Forest Pacific Ranger District 2550 Riverside Drive Susanville, CA 96130-4774 File Code: 1950 Date: January 14, 2015 Dear hlterested

More information

Finn Creek Park. Management Direction Statement Amendment

Finn Creek Park. Management Direction Statement Amendment Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date

More information

Geoscape Toronto The Oak Ridges Moraine Activity 2 - Page 1 of 10 Information Bulletin

Geoscape Toronto The Oak Ridges Moraine Activity 2 - Page 1 of 10 Information Bulletin About 13,000 years ago as the Laurentide Ice Sheet melted, glacial meltwater accumulated between the ice sheet and the Niagara Escarpment. This formed a lake basin into which gravel and sand were deposited.

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

Susitna-Watana Hydroelectric Project (FERC No ) Recreation Resources Study Study Plan Section Study Implementation Report

Susitna-Watana Hydroelectric Project (FERC No ) Recreation Resources Study Study Plan Section Study Implementation Report (FERC No. 14241) Recreation Resources Study Study Plan Section 12.5 2014 Study Implementation Report Prepared for Prepared by AECOM November 2015 TABLE OF CONTENTS 1. Introduction... 4 2. Study Objectives...

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC REQUEST FOR QUALIFICATIONS: PROFESSIONAL, EXPERIENCED TRAIL BUILDERS FOR THE CONSTRUCTION OF THE FONTA FLORA STATE TRAIL LAKE JAMES SECTION BURKE COUNTY COMMUNITY DEVELOPMENT INTRODUCTION Burke County

More information

Notice of Intent to Repatriate Cultural Items: U.S. Department of Agriculture, Forest

Notice of Intent to Repatriate Cultural Items: U.S. Department of Agriculture, Forest This document is scheduled to be published in the Federal Register on 06/06/2013 and available online at http://federalregister.gov/a/2013-13461, and on FDsys.gov 4312-50 DEPARTMENT OF THE INTERIOR National

More information

RECREATION. Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area.

RECREATION. Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area. RECREATION Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area. OPPORTUNITIES FOR SOLITUDE / QUIET TRAILS. One attraction

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

Office of Commercial Space Transportation: Notice of Availability, Notice of Public

Office of Commercial Space Transportation: Notice of Availability, Notice of Public This document is scheduled to be published in the Federal Register on 04/20/2018 and available online at https://federalregister.gov/d/2018-08345, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Restore and implement protected status that is equivalent, or better than what was lost during the mid-1990 s

Restore and implement protected status that is equivalent, or better than what was lost during the mid-1990 s THE ROSSLAND RANGE, OLD GLORY AREA. Executive summary. The Friends of the Rossland Range Society, on behalf of the local outdoor community, seeks to accomplish the following with respect to the Old Glory

More information

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event Decision Memo 2015 Sun Valley Super Enduro & Cross-Country Mountain Bike Race Recreation Event USDA Forest Service Ketchum Ranger District, Sawtooth National Forest Blaine County, Idaho Background The

More information

Proposed Scotchman Peaks Wilderness Act 2016 (S.3531)

Proposed Scotchman Peaks Wilderness Act 2016 (S.3531) 1 Proposed Scotchman Peaks Wilderness Act 2016 (S.3531) Frequently Asked Questions PLACE Where is the area that would be designated as Wilderness? The lands outlined in S.3531 lie within Idaho along its

More information

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP 16. Prior to construction, Mountain Valley shall file with the Secretary, for review and approval by the Director of OEP, a segment-specific construction and operation access plan for the area between

More information

S Central Coast Heritage Protection Act APRIL 21, 2016

S Central Coast Heritage Protection Act APRIL 21, 2016 STATEMENT OF GLENN CASAMASSA ASSOCIATE DEPUTY CHIEF, NATIONAL FOREST SYSTEM U.S. FOREST SERVICE U.S. DEPARTMENT OF AGRICULTURE BEFORE THE UNITED STATES SENATE COMMITTEE ON ENERGY AND NATURAL RESOURCES

More information

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Payette National Forest Krassel Ranger District Valley and Idaho Counties, Idaho

More information

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa This document is scheduled to be published in the Federal Register on 02/26/2014 and available online at http://federalregister.gov/a/2014-04061, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF NATIONAL

More information

GATEWAY PHASE 2. U.S. Forest Service and the Mount Shasta Trails Association

GATEWAY PHASE 2. U.S. Forest Service and the Mount Shasta Trails Association GATEWAY PHASE 2 U.S. Forest Service and the Mount Shasta Trails Association PROJECT DEVELOPMENT Brief history - Gateway Phase 1 - IMBA conceptual plan - BikeShasta: concert series - USFS & MSTA partnered

More information

Plans and Design Calculations for the Alder Creek Diversion Fish Screen

Plans and Design Calculations for the Alder Creek Diversion Fish Screen TECHNICAL MEMORANDUM Plans and Design Calculations for the Alder Creek Diversion Fish Screen El Dorado Irrigation District 2890 Mosquito Road Placerville, CA 95667 Alder Creek Diversion Fish Screen Plans

More information

TONGASS NATIONAL FOREST

TONGASS NATIONAL FOREST TONGASS NATIONAL FOREST UNITED STATES DEPARTMENT OF AGRICULTURE-FOREST SERVICE Contact: Dennis Neill Phone: 907-228-6201 Release Date: May 17, 2002 SEIS Questions and Answers Q. Why did you prepare this

More information

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows

More information

Appendix L Technical Memorandum Aesthetics

Appendix L Technical Memorandum Aesthetics Technical Memorandum Aesthetics 1.0 AESTHETICS This section provides a discussion of the aesthetic resources in the vicinity of ARTIC. Aesthetics pertain to the elements that make a certain view pleasing

More information

Colorado s Instream Flow Program at 40. Celebrating 40 Years of Success and Challenges January 15, 2014 Denver, Colorado

Colorado s Instream Flow Program at 40. Celebrating 40 Years of Success and Challenges January 15, 2014 Denver, Colorado Colorado s Instream Flow Program at 40 Celebrating 40 Years of Success and Challenges January 15, 2014 Denver, Colorado ISF Program established in 1973 by Senate Bill 97 Recognized the need to correlate

More information

Architectural Review Commission

Architectural Review Commission Architectural Review Commission staff report Item 3: Project Planner: Applicant/Owner: VITALITY BOWLS SIGNAGE APPEAL 100 CRESCENT DRIVE PLN 14-0473 Jeff Olsen, (925) 671-5206, jolsen@ci.pleasant-hill.ca.us

More information

To: Cam Hooley From: Trails 2000 Date: September 30, 2016 Re: Hermosa Comments. Dear Cam:

To: Cam Hooley From: Trails 2000 Date: September 30, 2016 Re: Hermosa Comments. Dear Cam: ! To: Cam Hooley From: Trails 2000 Date: September 30, 2016 Re: Hermosa Comments Dear Cam: Trails 2000 is commenting on the Forest Service Management Plan for the Hermosa Creek Watershed Management Plan

More information

Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1

Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1 Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1 Recommended Wilderness Background The Whitefish Range has a long management and legislative history associated

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

APPENDIX. Alberta Land Stewardship Act AMENDMENTS TO THE SOUTH SASKATCHEWAN REGIONAL PLAN

APPENDIX. Alberta Land Stewardship Act AMENDMENTS TO THE SOUTH SASKATCHEWAN REGIONAL PLAN APPENDIX Alberta Land Stewardship Act AMENDMENTS TO THE SOUTH SASKATCHEWAN REGIONAL PLAN 1 All references to Alberta Environment and Sustainable Resource Development, Environment and Sustainable Resource

More information

Disclosure Document for Castle Mountain Resort Future Development

Disclosure Document for Castle Mountain Resort Future Development Disclosure Document for Castle Mountain Resort Future Development September 2018 1._ Introduction Castle Mountain Resort Inc. (CMR) has completed a Master Development Plan that proposes to expand the existing

More information

Buford / New Castle Motorized Trail

Buford / New Castle Motorized Trail Buford / New Castle Motorized Trail Rifle Ranger District, White River National Forest Garfield County, Colorado Comments Welcome The Rifle Ranger District of the White River National Forest welcomes your

More information

September 14, Comments of the Colorado Trail Foundation On the USFS Scoping Notice of August 13, 2010 RE: the relocation of the CDNST/CT Page 1

September 14, Comments of the Colorado Trail Foundation On the USFS Scoping Notice of August 13, 2010 RE: the relocation of the CDNST/CT Page 1 THE COLORADO TRAIL FOUNDATION Comments on the U.S. Forest Service Scoping Notice of August 13, 2010 Regarding the Relocation of THE COLORADO TRAIL AND CONTINENTAL DIVIDE NATIONAL SCENIC TRAIL From La Garita

More information

Wilderness Process #NP-1810: Your letter ID is NP September 5, 2018

Wilderness Process #NP-1810: Your letter ID is NP September 5, 2018 Wilderness Process #NP-1810: Your letter ID is NP-1810-2602-96 September 5, 2018 RE: GMUG Wilderness Evaluation Revised Evaluation Criteria and Draft Report Forest Revision Planning Team: The Continental

More information

CASE NO. 2019CW10 (REF NO. 12CW118).

CASE NO. 2019CW10 (REF NO. 12CW118). IN THE DISTRICT COURT IN AND FOR WATER DIVISION NO. 4 STATE OF COLORADO TO: ALL PERSONS INTERESTED IN WATER APPLICATIONS IN SAID WATER DIVISION NO. 4 Pursuant to C.R.S. 37-92-302, as amended, you are notified

More information

Update on the Aspen/Pitkin County Airport Improvements

Update on the Aspen/Pitkin County Airport Improvements Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No. Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed

More information

Coronado National Forest Santa Catalina Ranger District

Coronado National Forest Santa Catalina Ranger District United States Department of Agriculture Forest Service Coronado National Forest Santa Catalina Ranger District File Code: 1950 Date: October 14, 2015 Dear Interested Party: The Santa Catalina Ranger District

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Establishing a National Urban Park in the Rouge Valley

Establishing a National Urban Park in the Rouge Valley STAFF REPORT ACTION REQUIRED Establishing a National Urban Park in the Rouge Valley Date: March 29, 2012 To: From: Wards: Reference Number: Executive Committee Deputy City Manager, Cluster B All p:\2012\cluster

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

Lakes Landscape Travel Management

Lakes Landscape Travel Management Decision Notice & Finding of No Significant Impact Lakes Landscape Travel Management USDA Forest Service Columbine Ranger District, San Juan National Forest Archuleta, Hinsdale, and La Plata Counties,

More information

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE As the culmination of the first phase of the master planning process, this Program Development Report creates the framework to develop the Calero County

More information

National Wilderness Steering Committee

National Wilderness Steering Committee National Wilderness Steering Committee Guidance White Paper Number 1 Issue: Cultural Resources and Wilderness Date: November 30, 2002 Introduction to the Issue Two of the purposes of the National Wilderness

More information

Buffalo Pass Trails Project

Buffalo Pass Trails Project Buffalo Pass Trails Project Hahns Peak/Bears Ears Ranger District, Medicine Bow-Routt National Forests and Thunder Basin National Grassland Routt County, Colorado T6N 83W Sections 3-5, 8; T6N 84W Sections

More information

Thank you for this second opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

Thank you for this second opportunity to comment on the proposed revisions to the Coconino National Forest Management plan. March 8, 2011 Flagstaff Biking Organization PO Box 23851 Flagstaff, AZ 86002 Yewah Lau Coconino National Forest Attn: Plan Revision 1824 South Thompson Street Flagstaff, Arizona 86001 Sent via electronic

More information

Title: Agritourism along the Collegiate Peaks Scenic Byway. Title: Inspiring the Colorado Nordic Industry to Come To Life

Title: Agritourism along the Collegiate Peaks Scenic Byway. Title: Inspiring the Colorado Nordic Industry to Come To Life $25,000 Chaffee County Visitors Bureau Title: Agritourism along the Collegiate Peaks Scenic Byway Project Description: This campaign will promote Collegiate Peaks Scenic Byway in Chaffee County as the

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

Project Summary 2009

Project Summary 2009 Project Summary 2009 SB-2009-MN-55360: Lady Slipper Scenic Byway Pedestrian Walkway State Submission Date not submitted Division Submission Date not submitted State Priority 0 This application must be

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Hermosa Area Preservation The Colorado Trail Foundation 4/11/2008

Hermosa Area Preservation The Colorado Trail Foundation 4/11/2008 Hermosa Area Preservation The Colorado Trail Foundation 4/11/2008 Legend d o Tr ail NPA - National Protection Area ra NCA - National Conservation Area o e C Th The Colorado Trail lo FS inventoried Roadless

More information

WELCOME. Pikes Peak Summit Complex Environmental Assessment Scoping Meeting. August 25th, pm Colorado Springs, CO

WELCOME. Pikes Peak Summit Complex Environmental Assessment Scoping Meeting. August 25th, pm Colorado Springs, CO WELCOME Pikes Peak Summit Complex Environmental Assessment Scoping Meeting August 25th, 2015 3-7pm Colorado Springs, CO PROCESS AND PUBLIC INVOLVEMENT Public Scoping August 21- September 21, 2015 WE ARE

More information

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement.

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement. [3411-15-P] DEPARTMENT OF AGRICULTURE Forest Service Angeles National Forest; Los Angeles County, CA Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS AGENCY: ACTION: Forest Service,

More information

Kelly Motorized Trails Project Proposed Action

Kelly Motorized Trails Project Proposed Action Kelly Motorized Trails Project Proposed Action November 28, 2011 The Flagstaff Ranger District of the Coconino National Forest is seeking public input on the proposed Kelly Motorized Trails Project (formerly

More information