Contents. Contents Tables Figures

Size: px
Start display at page:

Download "Contents. Contents Tables Figures"

Transcription

1 Contents Contents Tables Figures i ii iii Abatement Alternatives Evaluation, Part 2 Introduction F.57 Noise Analysis Methodology F.58 Alternatives Analysis F.59 Contour Evaluation F.72 Alternatives Considerations Summary F.73 Consultant s Recommendations F.74 FAR Part 150 Study i

2 Tables Table F CNEL Contour Comparison For Each Modeled Alternative F.72 Table F4 Noise Abatement Alternatives Summary F.73 FAR Part 150 Study ii

3 Illustrations Figure F17 Runway 19R Departure Procedures F.62 Figure F18 Increased Use of Runways 32R for Northbound Departures F.65 Figure F19 Future 2012 Noise Exposure Map F.76 FAR Part 150 Study iii

4 Noise Abatement Alternatives Evaluation, Part 2 Introduction This FAR Part 150 Study Working Paper presents a second range of operational alternatives that has been identified for review at Buchanan Field Airport (CCR) by the Steering Committee and the public. In addition to the operational alternatives, generalized land use and administrative alternatives are also presented. The objective of each operational alternative is to provide noise abatement beyond what is currently realized under existing conditions. An evaluation of each operational alternative has been completed to allow a judgment to be made regarding whether or not the alternative would provide additional noise abatement, if implemented. Alternative numbers, page numbers, and table numbers are consecutive to the previous Noise Abatement Alternatives Evaluation Working Paper. Listed below are new Aircraft Operational, Off-Airport Land Use and Administrative Alternatives that have been suggested for review and analysis subsequent to the last Committee meeting. These alternatives consist of incorporating new flight procedures, as well as administrative alternatives. The term Flight Management System (FMS) will be used generically within this document to include a wide variety of new technology satellite-based navigational systems. The alternatives under consideration are designed to build upon the existing program that is being implemented at Buchanan Field Airport. Because Buchanan Field Airport already has a comprehensive restriction on aircraft that can operate at the Airport (and this restriction cannot be changed or altered without completing an FAA Part 161 study), these proposed alternatives focus on measures to have aircraft that utilize the Airport operate as quietly as possible through additional voluntary measures by promoting the use of new navigational technology and the improved compliance monitoring that can be achieved with an enhanced noise and flight track monitoring system. Additionally, the Airport has a number of existing programs that are presented within this Part 150 Study for FAA review and approval so that any enhancements to these programs will qualify for additional FAA Part 150 funding. FAR Part 150 Study F.57

5 Aircraft Operational Alternatives Alternative 9 Alternative 10 Runway 19R Visual Flight Rules Departure Procedures for Turbojet Aircraft Increased Use of Runway 32R as the Preferred Runway for Northbound Departures Off-Airport Land Use Alternatives Alternative 11 Continue Recommended Land Use Controls from Previous Noise Compatibility Program Administrative Alternatives Alternative 12 Alternative 13 Create a Noise Mitigation Sub-Committee of the Airport Advisory Committee (AAC) Continual Assessment and Updating of the Part 150 Study Noise Analysis Methodology The metric to evaluate noise abatement alternatives, as specified by the FAA for use in FAR Part 150 studies, is the cumulative Community Noise Equivalent Level (CNEL) noise metric. For certain alternatives, the Single Event Noise Exposure Level (SENEL) noise metric was used to help illustrate the potential noise benefits that may occur with those alternatives. The SENEL noise metric was primarily employed for alternatives for which the noise levels over 65 CNEL would not change; however, there would be expected improvements to the SENEL. Some of the alternatives would result in changes to CNEL at locations beyond the 65 CNEL noise contour; for these alternatives, the SENEL noise contours will illustrate the noise effects in areas surrounding the Airport. The CNEL metric information is presented in both graphic and tabular format in this report. Consistent with discussions presented in previous Working Papers, all of the analyses for the Buchanan Field Airport FAR Part 150 study are based upon year 2012 future conditions (five years in the future from the expected date of submission). CNEL noise contours have been developed for selected alternatives to graphically depict areas exposed to specific CNEL noise levels. The comparison of noise contours for various alternatives illustrates how the contour may change in size and area relative to each other. The CNEL noise contours are presented in terms of the 65 CNEL noise value. These contours are the average annual CNEL noise level. FAR Part 150 Study F.58

6 Alternatives Analysis The following sections of this Working Paper provide a detailed analysis for each alternative. The analysis provides a description of the noise goal for the alternative, a description of the alternative, a description of how it varies from existing procedures, and a description of how potential change in noise may result from implementation of the alternative. FAR Part 150 Study F.59

7 Alternative 9 Runway 19R Visual Flight Rules Departure Procedures for Turbojet Aircraft Goal Alternative 9 was developed for Runway 19R turbojet departures with the goal of aircraft following the left-turn (east) Instrument Flight Rules (IFR) flight tracks during Visual Flight Rules (VFR) conditions. The goal of Alternative 9 is for turbojet aircraft departing Runway 19R, during visual flight rules, to depart and make a climbing left turn (east), similar to the Kanan Two IFR procedure. Description This procedure would not increase the utilization of the existing Runway 19R turbojet departure procedure wherein aircraft make a climbing left (east) turn to intercept the CCR VHF Ominidirectional Range (VOR) or Kanan Non-Directional Beacon (NDB) north of the Airport. Departures to the east (left turn) would depend on Air Traffic Control (ATC) workload, aircraft sequencing, and weather conditions. Existing Procedures Approximately 50% of the turbojet departures at Buchanan Field are conducted under VFR conditions; that is, when visual flight rules are in effect and pilots do not solely rely on their instruments for guidance. During VFR conditions, aircraft departing to the south on Runway 19R make a climbing right or left turn to intercept the Kanan Non- Directional Beacon (NDB) that is 3.4 miles north of the Airport. Currently, approximately two-thirds of the aircraft turn to the right (west) and one-third turn to the left (east). For the close-in areas around the Airport, the left turn VFR procedure is similar to the Kanan Two departure, which is an IFR procedure. [The Kanan Two departure was referred to and depicted in Alternative 1; Figure F2 of Part 150 Study Working Paper Two on page F.7 in the illustration entitled Existing Buchanan Eight and Kanan Two Instrument Departure Procedures. Working Paper Two was presented in September 2006.] The Kanan Two departure was published in June 2006, which superseded the Kanan One departure procedure. Aircraft that used the Kanan One departure executed a climbing right (west) or left (east) turn on departure; the Kanan Two departure changed the departure to be a climbing left (east) turn only. The Kanan Two procedure published in June 2006 has aircraft depart runway heading, then fly north to the Kanan NDB. Once reaching the NDB, aircraft resume own navigation, flying to its destination. Subsequent IFR Kanan departures will most likely have aircraft fly runway heading, turn to the north to intercept the CCR VOR instead of the NDB, then resume own navigation to its destination. FAR Part 150 Study F.60

8 New Procedure Aircraft would depart Runway 19R and execute a climbing left-turn, similar to the Kanan Two instrument departure. The departure procedure would not change from the existing procedure other than the majority of aircraft would be turning to the east, instead of west. New Procedure Noise Analysis Alternative 9 could be used by all of the turbojet aircraft fleet operating at Buchanan Field Airport since it does not require special navigational equipment. This analysis assumes two-thirds of the VFR turbojet aircraft would turn left (east) while one-third would turn right (west). The average annual CNEL noise contours were used to evaluate the noise exposure consequences of this Alternative. Table F3 located at the end of this Working Paper, summarizes the changes to the 65 CNEL noise exposure contours that would result from implementation of this alternative in comparison with the 2012 Baseline. As this table notes, Alternative 9 would not change the overall population and housing exposed to 65 CNEL in comparison to the Baseline. This is due to the fact that turbojet aircraft start the eastbound turn beyond the 65 CNEL noise exposure contour. Figure F17 shows the noise exposure contours for this alternative relative to the 2012 Baseline noise contour. Alternative 9 benefits, impacts, and observations: Benefits Overfly more compatible land uses to the southeast of the Airport, including an industrial park. VFR departure procedure would be similar to current IFR procedure. Impacts and Observations Procedure uses Visual Flight Rules; the procedure will have some dispersion on the flight track. An environmental document may need to be prepared. Requires Pilot Education. FAR Part 150 Study F.61

9 The Barnard Dunkelberg & Company Team Arthur Rd A St Cen tral Ave Bates Ave Forni Dr Mallard Dr Solano Way Pike Ln Pacheco Blvd Sunrise Dr Blum Rd 65 CNEL 70 CNEL Imhoff Dr State Route 4 Northwood Dr Arnold Industrial Way Sanford St Sanford St Hilltop Rd Grant St Prestwick Ave Holiday H ills Dr MARTINEZ Muir Rd PACHECO 75 CNEL 75 CNEL Kay Ave Claudia Dr Ida Dr N 6th St Marsh Dr 1st Ave Bisso Ln Gill Dr 70 CNEL CONCORD 2nd St 65 CNEL 6th St Morello Ave Gol f Club Rd I-680 Market St Ellis St Davis Ave Kiki Dr PLEASANT HILL Viking Dr Willow Pass Rd State Route 242 Traynor Rd Cowell Rd B St Craig Dr Taylor Blvd Gelbke Ln Ridge Dr Sylvia Dr Legend N Stevens Cir Rose Ln 0 1,500 3,000 Feet Doris Dr Carey Dr Sierra Rd Detroit Ave City Limit Boundary Runway 19 East Turn Lane Dr Figure F17 Runway 19R East Turn Departure CNEL Noise Contours { Buchanan Field FAR Part 150 Study} F.62

10 Alternative 10 Increased Use of Runway 32R as the Preferred Runway for Northbound Departures Goal The goal of Alternative 10 is for northbound departing aircraft to use Runway 32R when possible. Aircraft would, when able, use Runway 32R for northbound departures in order to place aircraft over compatible land use areas. Description Alternative 10 analyzes the feasibility of Runways 1L/R and Runway 32R available for northbound departures at the same time, with Runway 32R being preferred for northbound departures. Aircraft would use Runway 32R instead of Runways 1L/R in order to place as much aircraft activity over compatible land use areas as possible. The use of Runway 32R would be requested when available. Availability depends primarily on weather conditions, specifically the direction of the wind and traffic. Currently, when aircraft depart for destinations to the north, they predominately use Runways 1L/R. The majority of the time when Runways 1L/R are active, wind conditions are such that Runway 32R could be used as well. Included in this evaluation were discussions with FAA Air Traffic Control (ATC) personnel and FAA Flight Standards to evaluate the use of Runway 32R for departures, while Runways 1L/R and Runways 19L/R are considered the active runways. To determine which runway should be active, the primary indicator is wind; the runway that is most aligned with the prevailing wind is generally the active runway. When the tower is active, the tower will assign aircraft to a departing runway unless the pilot requests otherwise. Existing Procedures Aircraft depart to the north on Runway 32R and Runways 1L/R. Primarily only one set of parallel runways are active at a time. Although, while only one set of parallel runways is being assigned by ATC, a pilot may request another runway for departure. ATC will determine if the request can be accommodated based on aircraft activity, ATC workload, and weather conditions. Aircraft that depart to the north typically depart runway heading, turning after crossing Highway 4. On average, Runways 1L/R are the active runways for northbound departures; there is only one set of parallel runways considered active at any given time. According to a Standard Operating Procedure (SOP), effective June, 15, 2004, based upon discussions between the Tower and the County, any time the winds are calm (5 knots or less), Runway 32R is the preferred departure runway. In interviews with ATC personnel, it has been determined that the preferred departure runway concept is maximized whenever possible. For operational reasons, sometimes the runway switch to, or from, Runway 32R is accelerated or delayed, based upon weather data or traffic in the pattern. The use of the preferred noise departure runway seems to be utilized close to practical frequency, given weather and operational imperatives. FAR Part 150 Study F.63

11 New Procedure The procedure is designed to further utilization of the preferred noise departure runway (Runway 32R) when conditions permit, using the existing departure procedures. Aircraft would depart Runway 32R, fly runway heading until crossing Highway 4, then resume their own navigation or fly a heading assigned by ATC. Aircraft would be able to request a departure on Runway 32R while Runways 1L/R or Runways 19L/R are active. New Procedure Noise Analysis Alternative 10 could be used by all of the aircraft operating at Buchanan Field Airport. The main focus of this alternative is for the smaller, propeller aircraft to use Runway 32R as the primary northbound departure runway. The average annual CNEL noise contours were used to evaluate the noise exposure consequences of this Alternative. Table F3, located at the end of this Working Paper, summarizes the changes to the 65 CNEL noise exposure contours that would result from implementation of this alternative in comparison with the 2012 Baseline. This analysis assumed an additional 5% of operations would shift to Runway 32R. As this table notes, Alternative 10 would not change the overall population and housing exposed to 65 CNEL in comparison to the Baseline. Figure F18 shows the noise exposure contours for this Alternative relative to the 2012 Baseline noise contour. Alternative benefits, impacts, and observations: Benefits Existing northbound departure procedure would remain the same. Increases the use of compatible land uses for northbound departure procedures. Impacts and Observations Requires ATC coordination. Dependent on weather and ATC workload. Requires Pilot Education. FAR Part 150 Study F.64

12 The Barnard Dunkelberg & Company Team Arthur Rd A St Cen tral Ave Bates Ave Forni Dr Mallard Dr Solano Way Pike Ln Pacheco Blvd Sunrise Dr Blum Rd 65 CNEL 70 CNEL Imhoff Dr State Route 4 Northwood Dr Arnold Industrial Way Sanford St Sanford St Rd Hilltop Grant St Prestwick Ave H Holiday ills Dr MARTINEZ Muir Rd PACHECO 75 CNEL 75 CNEL Claudia Dr Ida Dr N 6th St Marsh Dr Bisso Ln Kay Ave Kay Ave 1st Ave Gill Dr 70 CNEL CONCORD 2nd St 65 CNEL 6th St Morello Ave Gol f Club Rd I-680 Market St Ellis St Davis Ave Kiki Dr PLEASANT HILL Viking Dr Willow Pass Rd State Route 242 Traynor Rd Cowell Rd B St Craig Dr Taylor Blvd Gelbke Ln Ridge Dr Sylvia Dr Legend N Cir Stevens Rose Ln 0 1,500 3,000 Feet Doris Dr Carey Dr Rd Sierra Detroit Ave City Limit Boundary Runway 1-32 Shift Lane Dr Figure F18 Increased Use of Runway 32R Northbound Departures CNEL Noise Contours { Buchanan Field FAR Part 150 Study} F.65

13 Alternative 11 Continue Recommended Land Use Controls from Previous Noise Compatibility Program Goal The overall goal of Alternative 11 is to continue the off-airport land use recommendations. Land use recommendations are not within the airport s authority to implement, but must be implemented by surrounding jurisdictions having land use control authority. These continued recommendations will mitigate noise exposure to citizens. Description The previous FAR Part 150 Program recommended several land use mitigation elements, including: The adoption of a standardized land use compatibility standards and guidelines for the County and surrounding jurisdictions. Amend local General Plans to precluded new or redeveloped housing units and other noise sensitive uses within areas of high noise or over flights. Amend local subdivision requirements to require noise insulation and avigation easements in all new or redeveloped housing units within areas exposed to noise levels in excess of CNEL 60 db. Amend local ordinances to require acoustical studies and noise insulation to comply with Title 25, California Administrative Code for areas exposed to noise levels in excess of CNEL 65 db. Require noise or avigation easement in newly developed areas. Update the Airport Land Use Plan as necessary. Existing Recommendations The previous FAR Part 150 Study contained these recommendations in the Noise Compatibility Program, which were approved in the Record of Approval. Not all have been implemented, and conditions have changed since the recommendations were presented. However, they are still valid and should continue. It is the recommendation of this Part 150 Study to implement or carry forward those measures that have not yet been implemented from the previous Part 150 Study. FAR Part 150 Study F.66

14 New Procedure No new off-airport land use mitigation measures are recommended. The existing recommendations are still valid and should be reviewed in light of changes to jurisdictional requirements. The 1991 Record of Approval accepted, for Part 150 purposes, all of the recommendations outlined above. As part of the continuing Noise Program at the Airport, the proposed Noise Committee (see the next Alternative) should monitor the effectiveness of the local entities adopting and implementing these recommendations. Without proper follow through, the recommendations can easily get lost in the everyday workload of the various entities having authority to implement them. While it is not in the airport s authority to implement land use guidelines, the Airport is the body that is most appropriate to monitor how land use controls are being utilized by the surrounding jurisdictions. There are a few methods airports can use to monitor land use; many airports use their Airport Land Use Commission (ALUC) or airport noise committee as a venue to review local land use policy. These organizations can determine any changes to be made to land use policy and suggest those to the local governing bodies. This body can also be the forum that local real estate agents can go to regarding where airport disclosures are necessary. New Procedure Noise Analysis As the 65 CNEL noise contour does not encompass any non-compatible land uses, there was no noise analysis prepared for this Alternative. Alternative 11 benefits, impacts, and observations: Benefits Prevents introduction of new noncompatible land uses. Provides interior noise reduction to noise sensitive uses. Provides notice to prospective buyers that they may be living in an area of aircraft noise exposure.. Impacts and Observations Political process is sometimes difficult to overcome. Many jurisdictions to deal with. Jurisdictions sometimes reluctant to implement land use controls. FAR Part 150 Study F.67

15 Alternative 12 Create a Noise Mitigation Sub-Committee of the Airport Advisory Committee (AAC) Goal The goal of Alternative 12 is to establish a Noise Mitigation Committee as a Sub- Committee of the Airport Advisory Committee (AAC), with a balanced representation of pilots, citizens, FAA personnel, County representatives, interested Master Plan Study Committee Members, and tenants to assist and provide continuing guidance in implementing the study recommendations. This committee will utilize knowledge developed through the Part 150 Study and help build the partnerships needed to implement these measures, and develop any new measures as needed. Description The County will establish a Noise Mitigation Committee through the auspices of the Airport Advisory Committee, to help guide and implement the Study recommendations. This is especially true with the Fly Quiet Program. The Master Plan Steering Committee has been instrumental in identifying and establishing these recommendations. It is recommended that a similar committee, under the leadership of the AAC, continue to monitor programs implemented as a result of the Part 150 Study after its completion, establish the particulars of the Fly Quiet Program guidelines, review flight track changes, and provide input in developing the enhancement to the flight track/noise monitoring system. Existing Procedure Presently, there is no committee structure specifically designed to address aircraft noise and land use compatibility issues. The Master Plan Steering Committee is too large to function as a continuing committee, but some existing members could sit on the proposed new sub-committee of the AAC. New Procedure This alternative proposes to form a new committee to specifically address aircraft noise and land use compatibility issues. Considerable time and effort have been expended, by both the Airport and the Steering Committee, in the development of these recommendations, especially the learning curve effort and the building of relationships that are valuable communication tools that should be expanded upon and not lost at the end of the process. FAR Part 150 Study F.68

16 It is important to continue a working collaboration between the airport operator and local communities during airport planning efforts. This process could continue to provide educational benefits while fostering stronger collaboration and trust among stakeholders. This ensures all interests are heard. It is also important to include members of the parties responsible for implementing the recommendations. This is important for the continued successful implementation of the noise abatement program and operation of the Airport. New Procedure Noise Analysis Because this is an administrative action, no noise analysis was warranted and/or prepared. Alternative 12 benefits, impacts, and observations: Benefits Continues learning curve and knowledge learned from this Study. Improved citizen liaison and community service. Improve transient pilot communication concerning noise program. Creates a regional team approach to noise mitigation implementation. Impacts and Observations Development of another committee may be unwieldy; consolidation of existing committees may be advantageous. FAR Part 150 Study F.69

17 Alternative 13 Continual Assessment and Updating of the Part 150 Study Goal The goal of this Alternative is to review and update the Part 150 Study, as needed, to reflect changes in the noise environment due to operational changes, land use changes, or facility changes. Description A Part 150 Study is generally a five-to-seven year program recommended to be reevaluated at regular intervals to look at noise conditions generated by the current fleet mix, the level of operations, and to review the five-year forecasted operations. A Part 150 Study is a snapshot in time and should be reviewed periodically. Federal regulations recommend a new study be completed if there is a significant increase or decrease in noise levels resulting from changes at the Airport. In addition, if there is a significant change in either aircraft types or numbers of operations, or significant new facilities, the Study is recommended to be re-evaluated earlier. Existing Procedures This FAR Part 150 Study is an update of the 1991 Record of Approval for the most recent Part 150 Study. New Procedure Airport management is recommended to undertake a periodic review of the aircraft types and numbers, along with the actual number of operations occurring, and determine if they are consistent with the projections contained in this FAR Part 150 document. FAR defines the level of change necessary to trigger a revision of the Noise Exposure Map to be when any change in the operation of the Airport would create any substantial new non-compatible use in any area depicted on the map beyond that which is forecast for the fifth calendar year after the date of approval; that is, if that change results in an increase or a decrease in the yearly day-night average sound level of 1.5 CNEL or greater in either an area formerly compatible but made non-compatible, or in a land area which was previously determined to be non-compatible and whose non-compatibility is not significantly increased. The various recommendations would also be reviewed for their ability to mitigate the projected noise intrusion and the overall effectiveness of the program. This is triggered by a 15% change in aircraft operations over what was forecasted for future operations. FAR Part 150 Study F.70

18 Generally, at the end of the five-year planning period, all of the forecasts and aircraft fleet mix would be re-evaluated to determine the extent to which they have changed from those projected in this study. They would be updated to reflect the following five years. If necessary, new mitigation measures would be evaluated. Contingent upon federal funds, the Noise Compatibility Program would be re-evaluated and a public review of documents would be incorporated. New Procedure Noise Analysis No noise analysis was warranted and/or prepared for this Alternative. Alternative 13 benefits, impacts, and observations: Benefits Meet regulatory requirements for review and update. Provide for changing conditions. Study does not get lost on the shelf. Impacts and Observations Staff time to review and coordinate operations. Could require consultants to update Study. FAR Part 150 Study F.71

19 Contour Evaluation The table on the following page compares Alternative 9 and Alternative 10 to the 2012 Base Case 65 CNEL noise contour. As can be seen, there are no noise sensitive uses within the 65 CNEL noise contour under any conditions. The next table, Table F4, Comparison Matrix For Alternatives, presents a summary of each of the alternatives and how they relate to several decision parameters. Table F CNEL CONTOUR COMPARISON FOR EACH MODELED ALTERNATIVE Buchanan Field Airport FAR Part 150 Noise Compatibility Study 2012 Future Base Case Alt 9 Alt 10 Total Non- Compatible 1 Total Non- Compatible 1 Total Non- Compatible 1 CNEL 65 Housing Units Populatio n Schools Churches Alternative 9. Runway 19R Visual Flight Rules Departure Procedures for Turbojet Aircraft. Alternative 10. Increased Use of Runway 32R as the Preferred Runway for Northbound Departures. 1 Housing units that have not been sound attenuated due to previous noise studies. Note: Population numbers derived from the average number of persons per household per census tract times the number of housing units, rounded to the nearest five. FAR Part 150 Study F.72

20 Alternatives Considerations Summary The following table, entitled NOISE ABATEMENT ALTERNATIVES SUMMARY, summarizes the planning considerations for the five additional abatement alternatives. Table F4 NOISE ABATEMENT ALTERNATIVES SUMMARY Buchanan Field Airport FAR Part 150 Study Alt. Alt. Alt. Alt. Alt. Factor Reduce Residents in the 65 CNEL Contour No No No No No Reduces Single Event Level Yes Yes No No No Increases Airport Staff Effort in Administration of Program No No Could Yes Yes Requires FAA Coordination Yes Yes No Yes Yes Requires Environmental Documentation Could No No No No Federal Funding Eligibility N/A N/A No Could Yes Utilizes Advanced Technology No No No No No Increases Pilot Education No No No Yes No Increases Aircraft Fuel Burn No No No No No Over Fly New Area No No No No No Reduces Over Flight of Existing Area Yes Yes No No No Cost of Implementation Low Low Low Low Medium Requires On-Board Equipment No No No No No Alternative 9. Runway 19R Visual Flight Rules Departure Procedures for Turbojet Aircraft. Alternative 10. Increased Use of Runway 32R as the Preferred Runway for Northbound Departures. Alternative 11. Continue Recommended Land Use Controls from Previous Noise Compatibility Program. Alternative 12. Create a Noise Mitigation Sub-Committee of the Airport Advisory Committee (AAC). Alternative 13. Continual Assessment and Update of the FAR Part 150 Study. Low: <$250,000 Medium: $250,000 to $750,000 High: >$750,000 FAR Part 150 Study F.73

21 Consultant s Recommendations The following summarizes the recommendations of the consultants, both recommendations for implementation and recommendations for further consideration. The recommendations for implementation are grouped as Aircraft Operational Recommendations, On-Airport Operational Recommendations, Off-Airport Land Use Recommendations, and Administrative Recommendations. Aircraft Operational Implementation Recommendations Recommendation One (Alt. 1) Recommendation Two (Alt. 2) Recommendation Three (Alt.9) Recommendation Four (Alt. 10) Required Navigation Performance (RNP) Departure Procedures for Turbojet Aircraft using FMS Technology. Aircraft Approach Angles and Altitudes for Landing Turbojet Aircraft. Runway 19R Visual Flight Rules Departure Procedures for Turbojet Aircraft. Increased Use of Runway 32R as the Preferred Runway for Northbound Departures. On-Airport Operational Implementation Recommendations Recommendation Six (Alt. 5) Install Pilot Controlled Lighting on Runway 14L/32R. Off-Airport Land Use Implementation Recommendations Recommendation Seven (Alt. 11) Continue Recommended Land Use Controls from Previous Noise Compatibility Program. Administrative Implementation Recommendations Recommendation Eight (Alt. 6) Recommendation Nine (Alt. 7) Update Noise Abatement Brochures and On-Airport Signs. Upgrade Noise Monitoring System and Include Multilateration. Recommendation Eleven (Alt. 8) Develop Fly Quiet Program. FAR Part 150 Study F.74

22 Recommendation (Alt. 12) Create a Noise Mitigation Sub-Committee of the Airport Advisory Committee (AAC). The following summarizes the recommendations for further consideration. The recommendations for further study are grouped as Aircraft Operational Recommendations and On-Airport Operational Recommendations. These recommendations should be considered for further study to consider methods of funding or unanticipated increase in operations (maintenance run-up requirements). Aircraft Operational Recommendations for Further Consideration and Study Recommendation One (Alt. 3) Quiet Propeller Aircraft Technology; Propeller Training Aircraft Fleet, Propeller Blade Technology and Adjustable Pitch Propeller Departure Settings. On-Airport Operational Recommendations for Further Consideration and Study Recommendation Five (Alt. 4A) Run-Up Noise Mitigation, Pre-flight Run-up Areas. Recommendation Two (Alt. 4B) Run-Up Noise Mitigation, Maintenance Run-up Areas (GRE). Future Noise Exposure Map The Future Noise Exposure Map is shown on the following page on Figure F19, and represents the implementation recommendations. However, since none of the recommendations affect the size of the contour, the Future Noise Exposure Map is also the same as the future Base Case contour and would not change if none of the recommendations were implemented. FAR Part 150 Study F.75

23 The Barnard Dunkelberg & Company Team Arthur Rd A St Cen tral Ave Bates Ave Forni Dr Mallard Dr Solano Way Pike Ln Pacheco Blvd Sunrise Dr Blum Rd 65 CNEL 70 CNEL Imhoff Dr State Route 4 Northwood Dr Arnold Industrial Way Sanford St Sanford St Hilltop Rd Grant St Prestwick Ave Holiday H ills Dr MARTINEZ Muir Rd PACHECO 75 CNEL 75 CNEL Kay Ave Claudia Dr Ida Dr N 6th St Marsh Dr 1st Ave Bisso Ln Gill Dr 70 CNEL CONCORD 2nd St 65 CNEL 6th St Morello Ave Gol f Club Rd I-680 Market St Ellis St Davis Ave Kiki Dr PLEASANT HILL Viking Dr Willow Pass Rd State Route 242 Traynor Rd Cowell Rd B St Craig Dr Taylor Blvd Gelbke Ln Ridge Dr Sylvia Dr Legend N Stevens Cir Rose Ln 0 1,500 3,000 Feet Doris Dr Carey Dr Sierra Rd Detroit Ave City Limit Boundary 2012 Combined DNL Lane Dr Figure F19 Future 2012 Noise Exposure Map { Buchanan Field FAR Part 150 Study} F.76

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 ise Study Strategic Business Plan FAR Part 150 Meeting September 28, 2006 Agenda Introduction Part 150 Study Working Paper Two Operational Alternatives

More information

Contents. Contents Tables Figures. Introduction F.1 Noise Analysis Methodology F.2 Alternatives Analysis F.3 Contour Evaluation F.54.

Contents. Contents Tables Figures. Introduction F.1 Noise Analysis Methodology F.2 Alternatives Analysis F.3 Contour Evaluation F.54. Contents Contents Tables Figures i ii iii Noise Abatement Alternatives Evaluation Introduction F.1 Noise Analysis Methodology F.2 Alternatives Analysis F.3 Contour Evaluation F.54 Buchanan Field Airport

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 A Noise Compatibility Study, prepared under Part 150 of the Federal Aviation Regulations (FAR), is a voluntary program aimed at balancing

More information

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To: Federal Aviation Administration Memorandum Date: June 19, 2008 From: To: Subject: Richard Doucette, Environmental Protection Specialist LaVerne Reid, Airports Division Manager John Donnelly, Regional Counsel

More information

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014 LAX Community Noise Roundtable Aircraft Noise 101 November 12, 2014 Overview Roles and Responsibilities for Aircraft Noise Relevant Federal Regulations Relevant California Regulations Aircraft Noise Metrics

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

Master Plan & Noise Compatibility Study Update

Master Plan & Noise Compatibility Study Update Working Document-Subject to Change, March 2010 Master Plan & Noise Compatibility Study Update (14 CFR Part 150) TECHNICAL ADVISORY COMMITTEE March 24, 2010 Working Document-Subject to Change, March 2010

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 Pursuant to the California Department of Transportation

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation

More information

PLAN Anoka County - Blaine Airport

PLAN Anoka County - Blaine Airport Reliever Airports: NOISE ABATEMENT PLAN Anoka County - Blaine Airport INTRODUCTION The noise abatement plan for the Anoka County-Blaine Airport was prepared in recognition of the need to make the airport

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation

More information

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D STAFF REPORT SUBJECT: Airport Land Use Consistency Determination Betteravia Plaza MEETING DATE: AGENDA ITEM: 8D STAFF CONTACT: Andrew Orfila RECOMMENDATION: Adopt findings for the Betteravia Plaza project

More information

Welcome to Public Information Workshop 1. San Francisco International Airport FAR Part 150 Study Update Noise Exposure Map Report

Welcome to Public Information Workshop 1. San Francisco International Airport FAR Part 150 Study Update Noise Exposure Map Report Welcome to Public Information Workshop 1 Chetcuti Room, City of Milbrae 450 Poplar Avenue Milbrae, California 94030 Wednesday, June 4, 2014 5:45 p.m. to 6:45 p.m. PDT The FAA typically uses the airport

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

Part 150 and Part 161: Purpose, Elements, and Process

Part 150 and Part 161: Purpose, Elements, and Process Part 150 and Part 161: Purpose, Elements, and Process Presentation to: Noise Compatibility Committee January 29, 2015 Ted Baldwin Part 150, Airport Noise Compatibility Planning FAA created in response

More information

CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES

CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES This chapter provides the detailed descriptions of the recommended Part 150 noise abatement, land use management, and program management measures

More information

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration DCA Presented to: Arlington County By: Terry Biggio, Vice President Air Traffic Services Date: June 18, 2015 Air Traffic Roles and Responsibilities As aviation technology advances, the FAA is putting in

More information

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM)

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) INTRODUCTION The Noise Abatement Plan (FCM Plan) for the Flying Cloud Airport has been prepared in recognition of the need to make the

More information

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Public Information Workshop November 2017 1 14 CFR Part 150 Overview Establishes the methodology

More information

Appendix A. Meeting Coordination. Appendix A

Appendix A. Meeting Coordination. Appendix A Appendix A Meeting Coordination Appendix A Philadelphia International Airport Noise Compatibility Program Update FAR Part 150 Noise Compatibility Program Update Report Prepared by: DMJM Aviation AECOM

More information

1.0 OUTLINE OF NOISE ANALYSIS...3

1.0 OUTLINE OF NOISE ANALYSIS...3 Table of Contents 1.0 OUTLINE OF NOISE ANALYSIS...3 2.0 METHODOLOGY...3 2.1 BACKGROUND...3 2.2 COMPUTER MODELING...3 3.0 EXISTING NOISE ENVIRONMENT...4 3.1 EXISTING SANTA MONICA MUNICIPAL AIRPORT NOISE...4

More information

KOAK HIGH. Metropolitan Oakland Intl Airport Oakland, California, United States

KOAK HIGH. Metropolitan Oakland Intl Airport Oakland, California, United States NOISE ABATEMENT PROCEDURES by Whispertrack Diagram #1: North Field Abatement Procedures All Aircraft Categories / Runways: 10L, 10R, 28L, 28R & 33 p. 1 of 9 NOISE ABATEMENT PROCEDURES by Whispertrack Diagram

More information

DCA Airport Noise. MWAA WG Dec 15, 2016

DCA Airport Noise. MWAA WG Dec 15, 2016 DCA Airport Noise MWAA WG Dec 15, 2016 BACKGROUND FAA Next Gen noise Analyzed on macro level Data below 3K Ft under estimated community level impacts Primary focus has been on departure procedures 1 part

More information

KTRK HIGH. Truckee Tahoe Airport Truckee, California, United States

KTRK HIGH. Truckee Tahoe Airport Truckee, California, United States Diagram #1: Abatement Arrival Procedures All Aircraft Categories / All Runways p. 1 of 9 Diagram #2: Abatement Departure Procedures All Aircraft Categories / All Runways p. 2 of 9 NOISE ABATEMENT PROCEDURES

More information

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011

More information

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport

More information

Technical Report. Aircraft Overflight and Noise Analysis. Brisbane, California. December Prepared by:

Technical Report. Aircraft Overflight and Noise Analysis. Brisbane, California. December Prepared by: Aircraft Noise Abatement Office Technical Report Aircraft Overflight and Noise Analysis Brisbane, California Prepared by: P.O. Box 8097 San Francisco, California 94128 (650) 821-5100 Introduction In response

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Public Information Workshop #2 January 2019 Station 1: Par t 150 Over view 14 CFR Part 150

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Measuring, Managing and Mitigating Aircraft Related Noise

Measuring, Managing and Mitigating Aircraft Related Noise Measuring, Managing and Mitigating Aircraft Related Noise Airport noise is, understandably, a significant issue for some of our neighbouring communities. Achieving the most appropriate balance between

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Comparison Between Old and New ALUC Plans

Comparison Between Old and New ALUC Plans A P P E N I X H Comparison Between Old and New ALUC Plans OVERVIEW This Placer County Airport Land Use Compatibility Plan (ALUCP) sets forth land use compatibility criteria for the environs of Auburn Municipal,

More information

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY CHAPTER 7 AIRPORT LAND USE COMPATILIBILTY CHAPTER 7 AIRPORT LAND USE COMPATIBILIITY 7.0 INTRODUCTION On airport aviation related development is typically compatible with aircraft operations. On airport

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Part 150 Update Status and Recommendation

Part 150 Update Status and Recommendation Part 150 Update Status and Recommendation Presentation to: Noise Compatibility Committee October 26, 2010 Ted Baldwin 2 Topics Part 150 background Project status Noise Exposure Map Noise Compatibility

More information

RTIA Runway Utilization Discussion Paper

RTIA Runway Utilization Discussion Paper RTIA Runway Utilization Discussion Paper December 2003 1.0 Introduction The Airport Noise Advisory Panel (ANAP) is a voluntary committee formed by the Airport Authority of Washoe County (AAWC) Board of

More information

14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY. Technical Committee Meeting #2 August 23, 2017

14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY. Technical Committee Meeting #2 August 23, 2017 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Technical Committee Meeting #2 August 23, 2017 1 Agenda Introductions Review of the Role of the TC Meeting Facilitator Review of TC Meeting No.1 Data

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Minneapolis-St. Paul International Airport (MSP)

Minneapolis-St. Paul International Airport (MSP) 2 nd Quarter 2016 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting Metropolitan Airports Commission Noise Program Office April 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the

More information

Van Nuys Airport December 2011 Updated 14 C.F.R. Part 150 Noise Exposure Maps page 1

Van Nuys Airport December 2011 Updated 14 C.F.R. Part 150 Noise Exposure Maps page 1 Updated 14 C.F.R. Part 150 Noise Exposure Maps page 1 1 INTRODUCTION The federal Airport Safety and Noise Abatement Act of 1979 1 ( ASNA ), as amended, defines procedures under which the federal government,

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 Visioning Process: Overview SMO in 1917 (Cloverfield) Grass Landing Strip WWI Pilot Training Visioning

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

FRENCH VALLEY AIRPORT (F70) Sky Canyon Dr. Murrieta, CA. Phone: Riverside FAA FSDO Complaint Line: (951)

FRENCH VALLEY AIRPORT (F70) Sky Canyon Dr. Murrieta, CA. Phone: Riverside FAA FSDO Complaint Line: (951) FRENCH VALLEY AIRPORT (F70) 37600 Sky Canyon Dr. Murrieta, CA Phone: 951-600-7297 Riverside FAA FSDO Complaint Line: (951) 276-6701 Visit the F70 website for additional information regarding the airport

More information

APPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1

APPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 APPENDIX K LAND USE Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 Appendix K Land Use THIS PAGE INTENTIONALLY LEFT BLANK Charles M. Schulz - Sonoma County Airport

More information

St. Paul Downtown Airport (STP)

St. Paul Downtown Airport (STP) Reliever Airports: NOISE ABATEMENT PLAN St. Paul Downtown Airport (STP) 1 INTRODUCTION The noise abatement plan for the St. Paul Downtown Airport (STP) was prepared in recognition of the need to make the

More information

APPENDIX H NOISE COMPATIBILITY PROGRAM ALTERNATIVES

APPENDIX H NOISE COMPATIBILITY PROGRAM ALTERNATIVES CHICAGO MIDWAY INTERNATIONAL AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE DRAFT APPENDIX H NOISE COMPATIBILITY PROGRAM ALTERNATIVES This appendix discusses the consideration and evaluation of

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

SUN Users Chris Pomeroy, Airport Manager SUN Air Traffic Procedures 2017/2018 Winter Ski Season

SUN Users Chris Pomeroy, Airport Manager SUN Air Traffic Procedures 2017/2018 Winter Ski Season To: From: Re: SUN Users Chris Pomeroy, Airport Manager SUN Air Traffic Procedures 2017/2018 Winter Ski Season Dear SUN Users, Friedman Memorial Airport (SUN) welcomes you to our Airport and our community.

More information

Portland International Jetport FAR Part 150 Update

Portland International Jetport FAR Part 150 Update Portland International Jetport FAR Part 150 Update Part 150 Noise Advisory Committee Meeting 4 December 2002 Harris Miller Miller & Hanson Inc. In association with: Vanasse Hangen Brustlin, Inc. Simat,

More information

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP)

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP) 3 RD QUARTER 2016 MINNEAPOLIS-ST. PAUL INTERNATIONAL AIRPORT (MSP) PUBLIC INPUT MEETING Metropolitan Airports Commission Noise Program Office July 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the

More information

KSMO HIGH. Santa Monica Muni Airport Santa Monica, California, United States

KSMO HIGH. Santa Monica Muni Airport Santa Monica, California, United States Diagram #1: Airport Diagram with Monitors and Turbine Aircraft Hold Areas Aircraft Categories: A, B, C, D & E / Runways: 03 & 21 p. 1 of 7 NOISE ABATEMENT PROCEDURES by Whispertrack Diagram #2: Monitors

More information

Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Noise Compatibility Committee

Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Noise Compatibility Committee Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Presentation to: Noise Compatibility Committee October 29, 2015 Ted Baldwin What are NADPs? Departure

More information

This Handbook provides guidance and sets forth policy and procedures used in the administration of the Airport Improvement Program.

This Handbook provides guidance and sets forth policy and procedures used in the administration of the Airport Improvement Program. National Policy ORDER 5100.38D Effective date: September 30, 2014 SUBJ: Airport Improvement Program Handbook 1. PURPOSE. This Handbook provides guidance and sets forth policy and procedures used in the

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Welcome to Public Information Workshop 1. San Francisco International Airport 14 CFR Part 150 Study Update Noise Compatibility Program Report

Welcome to Public Information Workshop 1. San Francisco International Airport 14 CFR Part 150 Study Update Noise Compatibility Program Report Welcome to Public Information Workshop 1 Chetcuti Room, City of Millbrae 450 Poplar Avenue, Millbrae, California 94030 Tuesday, August 11, 2015 7:00 p.m. to 8:00 p.m. PDT A 14 CFR Part 150 Study: Assesses

More information

During all other times operators are required to use the designated run-up locations for run-ups above idle power.

During all other times operators are required to use the designated run-up locations for run-ups above idle power. OVERVIEW Thank you for your interest in the Portland International Airport Management Program. We appreciate your commitment to noise abatement and helping us remain good neighbors. The Port of Portland

More information

Boise Airport 14 CFR Part 150 Study Update

Boise Airport 14 CFR Part 150 Study Update Boise Airport 14 CFR Part 150 Study Update Updated Noise Exposure Maps and Noise Compatibility Program Prepared for: CITY OF BOISE Prepared by: HNTB Corporation CSHQA Wyle Laboratories Synergy Consulting

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

Fly Quiet Report. 3 rd Quarter November 27, Prepared by:

Fly Quiet Report. 3 rd Quarter November 27, Prepared by: November 27, 2017 Fly Quiet Report Prepared by: Sjohnna Knack Program Manager, Airport Noise Mitigation Planning & Environmental Affairs San Diego County Regional Airport Authority 1.0 Summary of Report

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

Updates to Procedures at St. John s International Airport

Updates to Procedures at St. John s International Airport October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International

More information

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #4 June 8 & 9, 2016

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #4 June 8 & 9, 2016 Airport Land Use Compatibility Plan (ALUCP) Update Public Information Meeting #4 June 8 & 9, 2016 Agenda 1. Study Process 2. Noise Complaint Patterns 3. Proposed Overflight Areas (AOA) 4. Proposed Land

More information

KPGD HIGH. Punta Gorda Airport Punta Gorda, Florida, United States. Diagram #1: KPGD Departures. NOISE ABATEMENT PROCEDURES by Whispertrack

KPGD HIGH. Punta Gorda Airport Punta Gorda, Florida, United States. Diagram #1: KPGD Departures. NOISE ABATEMENT PROCEDURES by Whispertrack Diagram #1: Departures http://whispertrack.com/airports/ p. 1 of 6 Diagram #2: Arrivials http://whispertrack.com/airports/ p. 2 of 6 OVERVIEW Welcome to PGD. Abatement Procedures for all Aircraft. abatement

More information

COMMUNITY NOISE MITIGATION SUGGESTIONS

COMMUNITY NOISE MITIGATION SUGGESTIONS COMMUNITY NOISE MITIGATION SUGGESTIONS Toronto Pearson is one of North America's fastest growing global hub airports, handling nearly 40 million passengers today, and well on its way to reaching greater

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) November 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered

More information

Off-Airport Land Use Compatibility Planning

Off-Airport Land Use Compatibility Planning CHAPTER 9 Off-Airport Land Use Compatibility Planning The issue of aviation related noise and its impact on people continues to be a controversial topic in the vicinity of our nation s airports. Airports

More information

Noise Management Analysis. Tampa International Airport. February 2018

Noise Management Analysis. Tampa International Airport. February 2018 Tampa International Airport February 2018 Prepared for: Hillsborough County Aviation Authority 4100 George J. Bean Parkway Tampa, FL 33607 TABLE OF CONTENTS Tampa International Airport Page Executive Summary...

More information

NOISE ABATEMENT PROCEDURES

NOISE ABATEMENT PROCEDURES 1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions

More information

Windmills & Airspace Can We Work Together?

Windmills & Airspace Can We Work Together? May 29, 2008 Windmills & Airspace Can We Work Together? J. Randolph Babbitt C O N F I D E N T I A L www.oliverwyman.com Windmills & Airspace Overview of Airspace Issues For Wind Turbine Sites The FAA s

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee May 8, 2014 Audio/Video recordings are made of this meeting 1 Item 1 Review and Approve Draft Meeting Minutes Minutes from March 19, 2014 2 Item 2 Review of Operations Report

More information

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR This appendix sets forth the detailed input data that was used to prepare noise exposure contours for 2022 Baseline conditions. H.1 DATA SOURCES AND ASSUMPTIONS

More information

Boston Logan. Airport Noise Study

Boston Logan. Airport Noise Study Boston Logan International Airport Boston Logan Airport Noise Study Level 3 Screening Analysis December 2012 Prepared by Ricondo & Associates, Inc. Prepared for Federal Aviation Administration in collaboration

More information

ACI-NA Airport Board Members and Commissioners Annual Conference

ACI-NA Airport Board Members and Commissioners Annual Conference ACI-NA Airport Board Members and Commissioners Annual Conference APRIL 27, 2009 O Hare Noise Compatibility Commission Reducing Aircraft Noise through Successful Community Partnerships ONCC Mission To assist

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

Portable Noise Monitor Report

Portable Noise Monitor Report Portable Noise Monitor Report Chicago O Hare International Airport Site 2117 5843 N. Christiana Avenue, Chicago July 14, 217 through August 2, 217 USH5-ILH15-ILS8-CHI39 Visit the O Hare Noise webpage on

More information

Aircraft Noise. Why Aircraft Noise Calculations? Aircraft Noise. SoundPLAN s Aircraft Noise Module

Aircraft Noise. Why Aircraft Noise Calculations? Aircraft Noise. SoundPLAN s Aircraft Noise Module Aircraft Noise Why Aircraft Noise Calculations? Aircraft Noise Aircraft noise can be measured and simulated with specialized software like SoundPLAN. Noise monitoring and measurement can only measure the

More information

at: Accessed May 4, 2011.

at:   Accessed May 4, 2011. 3.11 SAFETY 3.11.1 Background and Methodology As with other forms of transportation, there is risk associated with aviation activities. This section focuses on risk to those on the ground near airports.

More information

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures Safety Enhancement Action: Implementers: Statement of Work: Safety Enhancement 213.5 RNAV Safe Operating and Design Practices for STARs and RNAV Departures To mitigate errors on Standard Terminal Arrival

More information

UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. GRANT OF EXEMPTION

UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. GRANT OF EXEMPTION In the matter of the petition of the DEPARTMENT OF DEFENSE UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. Exemption No. 5100C For an exemption from the provisions 25863 Of sections

More information

Fly Quiet Report. Presented at the June 7, 2017 Airport Community Roundtable Meeting

Fly Quiet Report. Presented at the June 7, 2017 Airport Community Roundtable Meeting Images used by SFO are Rights Managed Images and have specific usages defined. Please see photography usage guidelines document for more information and only use approved images on SFO Widen Media Collective.

More information

KVNY HIGH. Van Nuys Airport Van Nuys, California, United States

KVNY HIGH. Van Nuys Airport Van Nuys, California, United States Diagram #1: Van Nuys Abatement and Curfew Regulation Page 1 Aircraft Categories: A, B & C / All Runways p. 1 of 20 Diagram #2: Van Nuys Abatement and Curfew Regulation Page 2 p. 2 of 20 Diagram #3: Van

More information

KHND MEDIUM. Henderson Executive Airport Las Vegas, Nevada, United States. Diagram #1: Airport Map All Aircraft Categories / All Runways

KHND MEDIUM. Henderson Executive Airport Las Vegas, Nevada, United States. Diagram #1: Airport Map All Aircraft Categories / All Runways Diagram #1: Airport Map http://whispertrack.com/airports/ p. 1 of 5 Diagram #2: Abatement Chart http://whispertrack.com/airports/ p. 2 of 5 OVERVIEW To reduce noise over adjacent residential areas, please

More information

Fly Quiet Report. Presented at the August 3, 2016 Airport Community Roundtable Meeting

Fly Quiet Report. Presented at the August 3, 2016 Airport Community Roundtable Meeting Images used by SFO are Rights Managed Images and have specific usages defined. Please see photography usage guidelines document for more information and only use approved images on SFO Widen Media Collective.

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

KPDX HIGH. Portland Intl Airport Portland, Oregon, United States

KPDX HIGH. Portland Intl Airport Portland, Oregon, United States OVERVIEW Thank you for your interest in the Portland International Airport Management Program. We appreciate your commitment to noise abatement and helping us remain good neighbors. The Port of Portland

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

Fly Quiet Report. Presented at the November 2, 2016 Airport Community Roundtable Meeting

Fly Quiet Report. Presented at the November 2, 2016 Airport Community Roundtable Meeting Images used by SFO are Rights Managed Images and have specific usages defined. Please see photography usage guidelines document for more information and only use approved images on SFO Widen Media Collective.

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

6.C.1 AIRPORT NOISE. Noise Analysis and Land Use Impact Assessment FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT

6.C.1 AIRPORT NOISE. Noise Analysis and Land Use Impact Assessment FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT 6.C.1 AIRPORT NOISE The existing land uses are described in Chapter Five, Affected Environment. The methodologies used to develop the Geographic Information System (GIS) land use database, the estimated

More information

UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. GRANT OF EXEMPTION

UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. GRANT OF EXEMPTION In the matter of the petition of the DEPARTMENT OF DEFENSE UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. Exemption No. 5100B For an exemption from the provisions 25863 Of sections

More information

Part 150 Noise Compatibility Program Checklist

Part 150 Noise Compatibility Program Checklist Part 150 Noise Compatibility Program Checklist I. IDENTIFICATION AND SUBMISSION OF PROGRAM: Page Number A. Submission is properly identified: 1. 14 C.F.R Part 150 NCP? Yes, Cover, Fly Sheet, Cover Letter

More information

Van Nuvs Airport Noise Programs Overview

Van Nuvs Airport Noise Programs Overview Van Nuvs Airport Noise Programs Overview Los Angeles World Airports (LAWA) devotes significant attention, staff, and financial resources to noise programs at Van Nuys Airport (VNY), including outreach,

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

Arriving and departing aircraft at Edinburgh Airport

Arriving and departing aircraft at Edinburgh Airport Arriving and departing aircraft at Edinburgh Airport Contents Introduction... 3 Arriving aircraft... 3 The Instrument Landing System (ILS)... 6 Visual Approach... 6 Non Directional Beacon Approach... 6

More information

Noise Programs in Areas Outside DNL 65 db

Noise Programs in Areas Outside DNL 65 db Noise Programs in Areas Outside DNL 65 db AAAE Airport Noise and Mitigation Symposium Boca Raton, FL October 5, 2009 Mary Ellen Eagan Harris Miller Miller & Hanson Inc. Agenda Background on DNL 65 Issues

More information

APPENDIX C NOISE ANALYSIS

APPENDIX C NOISE ANALYSIS APPENDIX C NOISE ANALYSIS KBE Final - 10/11/16 Existing Noise The extent of existing noise resulting from aircraft operations at Central Colorado Regional Airport (AEJ) was determined using the FAA-approved

More information