MAKING AIRLINE SCHEDULES MORE ROBUST

Size: px
Start display at page:

Download "MAKING AIRLINE SCHEDULES MORE ROBUST"

Transcription

1 MAKING AIRLINE SCHEDULES MORE ROBUST F. Bian 1, E.K. Burke 2, S. Jain 3, G. Kendall 2, G.M. Koole 4, J.D. Landa Silva 2, J. Mulder 5, M.C.E. Paelinck 5, C. Reeves 6, I. Rusdi 7, M.O. Suleman 1 4 Free Uuniversity of Amsterdam, The Netherlands, 3 Aston University, UK, 6 Coventry University,UK, 7 Technical University of Delft, The Netherlands, 5 KLM Airlines, The Netherlands, 2 The University of Nottingham, UK, 1 University of Oxford, UK Abstract: Key words: Aircraft fleet can have a major effect on the efficiency and smooth running of an airline. Constructing good quality schedules is essential for an airline to operate in an effective and efficient way in order to accomplish high levels of consumer satisfaction and to maximise profits. The robustness of an airline schedule is an indicative measure of how good the schedule is because a robust plan allows the airline to cope with the unexpected disturbances which normally occur on a daily basis. This paper describes a method to measure the robustness of schedules for aircraft fleet scheduling within KLM airlines. The method is based on the Aircraft on Ground (ACOG) measure, it employs statistical methods (although alternative methods were also considered) and it is shown to provide a good estimation of the robustness of a given schedule. Modeling, Airline Scheduling, Schedule Quality Measures. 1. INTRODUCTION The problem of generating fleet schedules is crucially important to the efficiency of an airline (Barnhart et al., 1997; Barnhart and Talluri, 1997). An effective schedule can lead to significant savings. It can also, and perhaps more importantly, contribute to higher levels of customer satisfaction. Customers who experience regular delays with a particular airline are likely to take their custom elsewhere. Of course, delays are inevitable for a wide range of reasons (e.g. technical breakdowns, security alerts, adverse weather etc.). However, an indicative measure of the quality

2 of an airline schedule is its level of robustness: How well can a schedule cope with a delay(s) to a particular aircraft(s)? Is there enough slack in the schedule to minimise the knock on effect of a delay to a particular aircraft? If there is no slack in the schedule then a delay to one aircraft could affect a significant proportion of the fleet. This could have major resource implications. If passengers miss connecting flights then the airline has to cover the incurred costs. However, building slack into the schedule is expensive. It essentially involves aircraft standing idle. One of the goals in trying to generate a high quality fleet schedule is to build in enough slack to ensure that the schedule has an acceptable level of robustness while, at the same time, attempting to keep costs at an effective level. It would be very easy indeed to build a very robust schedule. However, it would be too expensive to implement. It would also be possible to build a schedule which minimises cost by decreasing aircraft idle time. However, this could easily lead to an increase in the overall incurred costs if one minor delay to one aircraft leads to a chain of delays. In summary, the goal is to provide an effective balance between robustness and aircraft idle time. The integration of schedule optimisation algorithms and other systems in an airline is crucial to achieve an effective scheduling environment that considers all functions of the airline (Mathaisel, 1997). Reviews of research on airline scheduling are presented in (Etschmaier and Mathaisel, 1985; Richter, 1989). A more recent survey on models and solution methods for a range of problems in aircraft scheduling was carried out by (Gopalan and Talluri, 1998). Aircraft scheduling is often addressed simultaneously with other associated problems. An example is provided by fleet assignment with time windows where the assignment of aircraft is carried out simultaneously to scheduling flight departures in order to improve flight connection opportunities and minimise costs (Rexing et al., 2000). The scheduling of maintenance operations and of aircraft are considered simultaneously using network models and a two phase heuristic by (Feo and Bard, 1989) while crew availability and maintenance operations are taken into account while tackling the fleet assignment problem in (Clarke and Hane, 2001). The additional constraint of equal aircraft utilisation when tackling fleet assignment and aircraft routing problems is considered by (Barnhart et al., 1998). A network model for large-scale fleet assignment problems that permits the expression of constraints within a unified framework was presented by (Rushmeier and Kontogiorgis, 1997). Integer linear programming techniques have been applied by several researchers to tackle fleet assignment, aircraft routing and related problems (Richardson, 1975; Abara, 1989; Subramanian, 1994, Hane et al., 1995). Dynamic programming and heuristics have also been investigated for the

3 problem of fleet assignment (El Moudani and Mora-Camino, 2000). Recently, modern metaheuristics have been used to tackle airline scheduling problems. For example, simulated annealing was applied to the optimisation of airline schedules by (Mashford and Marksjo, 2001). Sosnowska and Rolim showed that by applying simulated annealing to the fleet assignment and aircraft routing, improvements of about 10 to 20 percent over the method used by the company could be achieved (Sosnowska and Rolim, 2001). A genetic algorithm was applied to generate alternative routes for air traffic by (Oussedik et al., 2000). Also recently, genetic search methods have been applied to solve the problem of sequencing the arrival of aircraft in airports (Hansen, 2003; Ciesielski and Scerri, 1997; Ciesielski and Scerri, 1998). Re-scheduling is a crucial activity for airlines and it has to be carried out on a daily basis due to a number of uncertainties and unforeseen events. Disruptions of planned schedules can result in a chain of events that can cause major disruptions throughout the system. A survey of techniques employed to recover from these disruptions is presented by (Filar et al., 2001). A stochastic model is employed by (Rosenberger et al., 2003) to show that the actual performance of an airline differs greatly from the planned performance while (Argüello and Bard, 1997) propose a GRASP method to reconstruct schedules while minimising costs and satisfying constraints. Network models and Lagrangian relaxation were used by (Yan and Lin, 1997) for aircraft re-scheduling given a specific disruption that affects the airline operations greatly and causes substantial decrements in profits and levels of service: the temporary closure of airports (see also Thengvall et al., 2001). The problem of changing the assigned aircraft to specific flights while satisfying existing constraints is addressed by (Jarrah, 2000; Talluri, 1996; Klincewicz and Rosenwein, 1995). A steepest ascent local search heuristic was applied by (Love et al., 2002) to re-schedule aircraft and it was capable of finding good quality schedules in a short amount of time. The allocation of arrival slots in airports affects the efficient implementation of airline schedules and this activity can be disrupted by many factors such as bad weather, cancelled flight and other unforeseen events (Vazquez-Marquez, 1991). Simulation models for these types of operations in airports are described in (Andresussi et al., 1981; Milan, 1997) while (Dear and Sherif, 1991) proposed one of the earliest algorithms for the automation of these operations. Instead of the traditional FCFS (first-comefirst-served) system, delay exchanges in arrival sequencing and scheduling permit airlines to express relative arrival priorities so that these can be taken into account for the arrival slot allocation (Carr et al., 1998; Carr et al., 1999; Carr et al., 2000). The problem of scheduling aircraft when multiple runways are available has been addressed using queuing theory by (Bolender and

4 Slater, 2000). A population heuristic was applied by (Beasley et al., 2001) for the optimisation of the arrival sequence of aircraft to a UK airport in order to improve runway utilisation. Linear programming and an alternative heuristic were applied to the arrival sequencing problem with single and multiple runways by (Beasley et.a1., 2000). A detailed description of the dynamic planner used to carry out the scheduling, sequencing, runway allocation and other operations related to the scheduling of aircraft arrivals is given by (Wong, 2000). Other related airline scheduling issues that have been investigated are for example: The airline scheduling problem in charter companies which is different mainly because the market is well-known and the schedule can be changed completely from period to period (Erdmann et al., 2001). The assignment and routing of a fleet of aeromedical airlifts in military sectors (Ruland, 1999). The impact that the rotation of aircraft has on the construction of schedules (Wu and Caves, 2002). The construction of weekend fleet assignments (Kontogiorgis and Acharya, 1999). The problem that is addressed in this paper is discussed in the next section. It represents a real world problem that faces KLM Airlines on a daily basis. 2. PROBLEM DESCRIPTION Within KLM, two departments are responsible for the fleet schedule. The network planning department produce schedules which are then passed to the operations department who have the responsibility for implementing them and running them on a day-to-day basis. These two departments have conflicting objectives. The network department aims to produce a schedule which is as cost effective as possible. This essentially means maximising aircraft usage by minimising their idle time. The operations department have the reverse objective. The overall schedule has to achieve the kind of balance between these two objectives that is briefly described above. The aim for KLM is to introduce a method that checks the robustness of a schedule, from the network department, before it is passed to the operations department for implementation. One way to achieve this is to run a

5 simulation. However, this is seen as too time consuming and other methods are sought to test for the robustness of the schedule. KLM flies to over 150 destinations using 97 aircraft. Four times a year, a new flight schedule is developed. Though the operational feasibility is taken into account to a certain degree during the development process, the aim at that stage is largely to maximise the number of seats that can be sold. During schedule development, KLM considers various commercial aspects such as the expected demand per destination and the number of possible transfer connections at Schiphol Airport. The realisation of a flight schedule involves a number of parties. As described above, the initial plan is developed by KLM s Network department. The initial plan is based on commercial and strategic insights and long term plans for the fleet composition, cabin crew and baggage handling. Two months before the beginning of a schedule plan the plan is handed over to the operational department, the Operation Control Center. From that moment on they are the owners of the plan and small adaptations have to be evaluated and approved by them. This department will try to prevent and solve problems such as emergencies and bottlenecks and, in case of unsolved problems, try to minimize the effects on succeeding flights. A final plan is created two weeks before the beginning of the plan where passenger bookings are matched with aircraft capacities In order to monitor the performance of a flight schedule, some critical performance indicators are defined. These are: The departure and arrival punctuality, that is the percentage of flights that departed or arrived on time. The completion factor, that is the percentage of accomplished flights. These are all flights that were not cancelled. The No Connection Passenger factor, that is the percentage of transfer passengers that missed their connections due to operational problems. The Irregularity-rate, that is the number of bags that were not delivered on time. For the punctuality performance indicator the contribution of each of the involved parties is also monitored. This introduces the concept of building blocks. The whole operational process is divided into sub processes, (the so called building blocks). Each building block is owned by a capacity and service provider, these being Ground Services, Front Office, Air Traffic Management, Engineering and Maintenance, Cabin and Cockpit Crew, Cargo and Operations Control. Seven Building Blocks have been established, these are called:

6 BB1: Flight BB2: Arriving aircraft BB3: Layover aircraft BB4: Departing aircraft BB5: BB5.1 Transferring passengers BB5.2 Transferring baggage BB6: BB6.1 Arriving passengers BB6.2 Arriving baggage BB7: BB7.1 Departing passengers BB7.2 Departing baggage A diagrammatical representation of the temporal sequence of the building blocks and their relationships to each other is shown in figure 1. All Doors 1st door open Closed 1 Flight 2 Arriving aircraft 5.2 Transferring baggage 5.2 Transferring baggage 4 Departing aircraft 1 Flight 3 Layover 6.1 Arriving passengers 6.2 Arriving baggage 7.2 Departing baggage 7.1 Departing passengers 5.1 Transferring passengers 5.1 Transferring passengers 1st door All Doors open Closed Figure 1. Building Blocks Sequence and Relationships. These have been delimited in order to provide clear process distinction as well as accountability. The doors being opened and closed are the points at which responsibility passes from one capacity and service provider to another. The distinction of the 1 st door being opened is made because a door can either be the passenger

7 door(s) or a baggage door(s). For example, once a plane has physically landed it is not actually considered to have landed (i.e. with responsibility passed to the ground staff) until one (passenger OR baggage) door has been opened. In contrast, responsibility changes back again when all doors have been closed, not just one door. All these agreements and the flight schedule itself comes together into an operational plan. This functions as a contract between Network, Operations Control and the Building Blocks (Capacity & Service Providers). The plan covers an operational plan period of between 2 to 4 months spread over the year. It consists of agreements concerning a schedule plan and a capacity plan position for each specific period. It contains a demand driven schedule that has been fully checked with the Building Block representatives (Capacity & Service Providers) and Operations Control by means of an operational check. Eventually the agreements enable each provider to deliver an operational performance forecast. This could deviate from the targets as laid down in the corresponding Business Plan. Each operational plan will be finalized two months (at the latest) prior to each operational plan period. The schedule is usually published as an Aircraft Rotation Schedule, which is different each week. This is due to the fact that each day many adaptations are made so as to minimise delays. For instance, if KLM know that an aircraft will arrive at Schiphol Airport with a delay, they could assign its next flight to another aircraft so that that flight can still leave on time. Usually, KLM will also need other adaptations to have all flights fit into the Rotation Schedule again. When a schedule is first published, KLM do not know the exact layout of the Rotation Schedule, so they publish a hypothetical average one instead. Before a schedule is published, an estimation of the expected punctuality (that is the percentage of "on time" flights) is performed using a simple deterministic model. As this model lacks accuracy, a simulation model is currently being developed in order to enable a better forecast. This model simulates aircraft movements according to a given schedule. The model subjects the schedule to a stress test by generating various disruptions such as air traffic congestion, delays during the boarding process or unexpected problems during maintenance. Throughout the simulation, a Problem Solver algorithm attempts to resolve delays by swapping flights in the Rotation Schedule, or in extreme cases, by canceling flights. More successful runs of the simulation are considered as better schedules for implementation. A simulation, though, has several disadvantages. Processing times are usually too long, which limits the number of schedules that can be assessed Also, KLM need to collect a huge amount of data about the processes that are being simulated. For the simulation model currently under development they need statistics about the variation in the actual flight duration, the

8 variation in the time it takes to handle an aircraft on the ground (boarding, fuelling, catering, etc.), breakdown times of each aircraft type etc. Each of these statistics must constantly be updated to reflect the change in flight routes, working methods, fleet, etc. KLM are currently seeking a more simple model that would enable them to make a comparative statement, such as: "Of a number of alternative schedules, schedule X will provide the best performance." 3. MODELS FOR THE PROBLEM It was anticipated that there should be some features of any schedule that would be correlated with its performance. The first question is then what features should be investigated? A brainstorming session with representatives of KLM led to some suggestions. It was expected that the number of potential swaps available to a delayed flight would be an important factor, but measuring this value was not easy. In practice, it might also be necessary to undertake a cascade of swaps, so another possible measure of performance would be the length of time and/or the number of swaps needed to restore the schedule to its normal condition. However, this is also complicated to determine, although the Problem Solver module of the simulation could be invoked if necessary. After further discussion, it was agreed to look at a simpler measure, which could easily be found, and is arguably a surrogate for some of the more complex measures suggested. This is the 'Aircraft on Ground' (ACOG) measure discussed in the next section. Having obtained some features related to this measure, the next step is the identification of a suitable model for purposes of prediction. Candidates here include multiple linear regression methods, regression trees, neural nets and other pattern recognition techniques. However, the fact that the amount of data available was small meant that data-hungry methods should be avoided if at all possible. Thus it was resolved to begin the investigation with traditional statistical methods. 4. EXPERIMENTAL RESULTS Eleven schedules were available (Summer/Winter , apart from the last 13 weeks of 2002). KLM's operation at Schiphol is such that the activity occurs in 4 major waves - a deliberate strategy to maximise passengers' opportunities for making onward connections. Graphing the number of aircraft available on the ground reveals this pattern clearly. These

9 can be counted in 2 ways: the more accurate picture is obtained by subtracting the lengths of BB2 and BB4, leaving just those aircraft that are actually idle at a given moment. However, it is a simpler calculation to count the whole of the time on the ground from 'First Door Open' to 'Last Door Closed', which comprises the whole of BBs 2,3 and 4. In the case of European operations, each day is more or less identical, so peaks can be defined quite easily. For each peak, the first 4 moments of the 'Aircraft on Ground' (ACOG) values were calculated for each day, using both definitions BB3 and BB234. As days are so alike (apart from the very first day of a new schedule), one day can be selected at random as a representative of a schedule. As there are 4 peaks daily, we have 16 features as inputs, which we need to associate with the performance indicators (PIs) already calculate by KLM. The ones used for the models developed here were simply the departure and arrival punctualities: the fraction of planes (of those scheduled) that departed or arrived on time. As a first step, correlations were calculated between the PIs and the 16 input variables. The 6 or 7 most highly correlated input variables were than used in a stepwise regression procedure (using S-plus) to determine the best balance between parsimony and explanatory power. (S-plus uses the Akaike information Criterion for this purpose.) The table below summarises the models determined by this approach. PI Departure Punctuality Using BB3 only Using BB234 Predictor sets p4m, p1sd, p1sk, p1k p2m, p4m, p2sd, p4sd, p3sk R-squared 95.6% 91.6% P value(f-test) PI Arrival Punctuality Predictor sets p4m, p1sk, p3sk, p3k p1m, p4m R-squared 95.2% 84.1% P value(f-test) In this table, p1 means the 1st peak, m is the 1st moment (mean), sd the 2nd (standard deviation), sk the 3rd (skewness) and k the 4th (kurtosis). Of interest is the fact that p4m the mean number of ACOG is important for all 4 models, but the other predictors seem to be far less important. From KLM s point of view, this does not matter if the predictions are good enough, but from a modeller s perspective we would like to see more consistency. However, all models are based on just 11 data points, so perhaps the lack of consistency is not surprising. Prediction intervals can easily be obtained on the assumption of Normally distributed errors: these

10 vary from +/- 2% for punctualities in the middle of the range to +/- 3% at the edges. Figure 2. Residuals against fitted values for Departure Punctuality using BB3 only. It was quite surprising that the R-squared values were as high as they were we were anticipating that a linear model would be too simple, yet it seems quite powerful. Of course regression analysis makes certain assumptions about the errors, and it is necessary to check the residuals to see if these assumptions are plausible. The plot of residuals against fitted values was obtained for each model; in no case does a systematic pattern seem plausible, and a random scatter is obtained, as in figure 2. The 3 most extreme outliers (points 5, 7 and 10) are labelled; point 5 might well have been affected by September 11, but possible reasons for the others are not known. A smooth has been applied, but its slopes are not very steep, so the assumption that the errors are independent random variables seems plausible. Similar graphs were obtained for the other 3 models. QQ plots of the residuals against Normal quantiles were also obtained. Figure 3 below shows the same case as in figure 2.

11 Figure 3. Normal QQ plot for residuals for Departure Punctuality using BB3 only. The tails of the distribution in particular are not well fitted, so the assumption that the errors are Normally distributed is perhaps questionable. Thus any confidence intervals should be treated cautiously. 4.1 Logistic Regression In any case, the response variable in all 4 models is actually a ratio that is confined to remain between 0 and 1. This means that a better theoretical model would be based on a logistic transformation, since it is theoretically possible that a simple linear model could generate predictions outside the possible range of values. For example, we can hardly have a punctuality of greater than 100%! Such a model would also be based on a more plausible probability model than the Normal distribution. However, attempts to fit such a model did not produce an improvement. A possible explanation is that the data available are all in the region of approximate linearity of the logistic curve. Consequently, any attempt to identify the turning points of the curve is likely to be rather speculative. In any case, on inspecting the coefficients of the models, it seems unlikely that

12 we would predict bizarre fractions in practice. For example, using the most extreme values observed in the 1st model above would predict only 80% departure punctuality, and in the opinion of KLM s experts it is hard to imagine physical circumstances in which these values could be exceeded simultaneously. (There is just not enough space to put many more planes, for example.) Thus, despite the attractions of a more plausible theoretical model, the airline is comfortable with the predictive ability of a simpler linear model. 5. CONCLUSIONS An analysis of the expected number of aircraft on the ground has been shown to provide a good prediction for the robustness of a given schedule. Further refinements are possible and desirable but even this work has given the operations department a better insight into what makes a schedule easier or harder to implement effectively. Some of the work that still needs to be done includes an analysis of the effect of day-to-day variations in the schedule these variations are small, but preliminary work has suggested that the definition of activity peaks needs to be tighter, and the possibility of a day-of-the-week effect should also be explored. Furthermore, the schedules examined so far have concentrated only on the European operations, where fleet homogeneity is substantial and diurnal variation is small. Incorporating the effects of the inter-continental timetable may lead to some changes in these conclusions. ACKNOWLEDGEMENTS We would like to thank the following bodies for supporting the collaboration described in this paper: The Lorentz Centre in Leiden : 45 th European Study Group for Mathematics with Industry. The EU Mathematics, Computing and Simulation for Industry Network (MACSI-net). The Smith Institute for Industrial Mathematics and Systems Engineering.

13 REFERENCES Abara J. (1989), Applying integer linear programming to the fleet assignment problem, Interfaces, 19, 4, Andresussi A., Bianco L. and Ricciardelli S. (1981). A simulation of model for aircraft sequencing in the near terminal area. European Journal of Operational Research Vol. 8, Argüello M.F., Bard, J.F. (1997), A GRASP for aircraft routing in response to groundings and delays, Journal of Combinatorial Optimization, 1, 3, Bard J. and Cunningham I.G. (1987) Improving Through-Flight Schedules, IEEE Transactions, 19: Barnhart C., Boland N.L., Clarke L.W., Johnson E.L., Nemhauser G.L and Shenoi R.G. (1998). Flight String Models for Aircraft Fleeting and Routing, Transportation Science, Focused Issue on Airline Optimization, Vol. 32, No. 3, Barnhart C., Farahat A. and Lohatepanont M. (2001). Airline Fleet Assignment: An Alternative Model and Solution Approach Based on Composite Variables, submitted to Operations Research, May Barnhart C., Kniker T., and Lohatepanont M. (2000). Itinerary Based Airline Fleet Assignment, submitted to Transportation Science. Barnhart C., Lu F., and Shenoi R. (1997). Integrated Airline Scheduling, Operations Research in the Air Industry, International Series in Operations Research and Management Science, Vol. 9, pp , edited by Prof. Gang Yu, Kluwer Academic Publishers. Barnhart C. and Talluri K. (1997). Airline Operations Research. Design and Operations of Civil and Environmental Engineering Systems Beasley J., Krishnamoorthy M, Sharaiha Y and Abramson D. (2000) Scheduling Aircraft Landings - The Static Case, Transportation Science 34: Beasley J., Sonander J, and Havelock P. (2001) Scheduling Aircraft Landings at London Heathrow using a Population Heuristic, Journal of the Operational Research Society, 52: , 2001 Bolender M.A. and Slater G.L. (2000). Evaluation of scheduling methods for multiple runways, Journal of Aircraft Vol. 37, Carr G.C., Erzberger H. and Neuman F. (1998). Airline arrival prioritization in sequencing and scheduling, 2nd USA/Europe Air Traffic Management R&D Seminar, Orlando. Available from: Carr G.C., Erzberger H. and Neuman F. (1999). Delay exchanges in arrival sequencing and scheduling, Journal of Aircraft Vol. 36, Carr G.C., Erzberger H. and Neuman F. (2000). Fast-time study of airline-influenced arrival sequencing and scheduling, Journal of Guidance, Control and Dynamics Vol. 23, Ciesielski V. and Scerri P. (1997). An anytime algorithm for scheduling of aircraft landing times using genetic algorithms, Australian Journal of Intelligent Information Processing Systems Vol. 4,

14 Ciesielski V. and Scerri P. (1998). Real time genetic scheduling of aircraft landing times, Proceedings of the 1998 IEEE International conference on Evolutionary Computation (ICEC98) Fogel D (editor), IEEE. Clarke L.W., Hane C.A. (2001), Johnson E.L., Namhauser G.L., Maintenance and crew considerations in fleet assignment, Transportation Science, 3, 3, Dear R.G. and Sherif Y.S. (1991). An algorithm for computer assisted sequencing and scheduling of terminal area operations, Transportation Research Part A Policy and Practice Vol. 25A, El Moudani W., Mora-Camino F. (2000), A dynamic approach for aircraft assignment and maintenance scheduling by airlines, Journal of Air Transport Management, 6, , Erdmann A., Noltemeier A., Schrader R. (2001), Modeling and solving an airline schedule generation problem, Annals of Operations Research, 107, 1-4, Etschmaier M. and Mathaisel D. (1985) Airline Scheduling: an Overview, Transportation Science, 19(2): Feo T.A., Bard J.F. (1989), Flight scheduling and maintenance base planning, Management Science, 35, 12, Filar J.A., Manyem P., White K. (2001), How airlines and airports recover from schedule perturbations: a survey, Annals of Operations Research, 108, 1-4, Gopalan R., Talluri K.T. (1998), Mathematical models in airline schedule planning: a survey, Annals of Operations Research, 76, 1, Hane C.A., Barnhart C., Johnson E.L., Marsten R.E., Nemhauser G.L. and Sigismondi G. (1995). The Fleet Assignment Problem: Solving a Large-Scale Integer Program, Mathematical Programming, 70,2, Hansen J.V. (2003), Genetic search methods in air traffic control, Computers and Operations Research, In press, Jarrah A.I. (2000), An efficient airline re-fleeting model for the incremental modification of planned fleet assignments, Transportation Science, 34, 4, Klincewicz J.G., Rosenwein M. B. (1995), The airline exception scheduling problem, Transportation Science, 29, 1, Kontogiorgis S., Acharya S. (1999), US Airways automates its weekend fleet assignment, Interfaces, 29, 3, Lohatepanont M. and Barnhart C. (2001). Airline Scheduling Planning: Integrated Models and Algorithms for Schedule Design and Fleet Assignment, submitted to Transportation Science, June Lohatepanont M. and Barnhart C. (2003) Airline Schedule Planning: Integrated Models and Algorithms for Schedule Design and Fleet Assignment, submitted to Transportation Science. Love M., Sorensen K.R., Larsen J., Clausen J. (2002), Disruption management for an airline rescheduling of aircraft, Applications of evolutionary computation: Proceedings of the EvoWorkshops 2002, Kinsale Ireland, Lecture notes in computer science, Vol. 2279, Springer, pp

15 Mashford J.S, Marksjo B.S. (2001), Airline base schedule optimisation by flight network annealing, Annals of Operations Research, 108, 1-4, Mathaisel D.F.X. (1997), Decision support for airline schedule planning, Journal of Combinatorial Optimization, 1, 3, Milan J. (1997). The flow management problem in air traffic control: a model of assigning priorities for landings at a congested airport, Transportation Planning and Technology Vol. 20, Odoni A.R., Rousseau J.M. and Wilson N.H.M. (1994). Models in urban and air transportation, Operations Research and the Public Sector: Handbooks in Operations Research and Management Science Vol.6, Pollock SM, Rothkopf MH and Barnett A (eds), 107, 150, Elsevier Science. Oussedik S., Delahaye D., Schoenauer M. (2000), Flights alternative routes generator by genetic algorithms, Proceedings of the 2000 congress on evolutionary computation CEC 2000, pp Rexing B., Barnhart C, Kniker T., Jarrah A. and Krishnamurthy N. (2000). Airline Fleet Assignment with Time Windows, Transportation Science, Vol. 34, No. 1, Richardson R. (1975), An optimization approach to routing aircraft, Richter H. (1989), Thirty Years of Airline Operations Research, Interfaces, 19:3-9. Rosenberger J.M., Schaefer A.J., Goldsman D., Johnson E.L., Kleywegt A.J. and Nemhauser G.L. (2003). A Stochastic Model of Airline Operations, Transportation Science, Vol. 36, No. 4. Ruland K.S. (1999), A model for aeromedical routing and scheduling, International Transactions in Operational Research, 6, 1, Rushmeier R.A, Kontogiorgis S.A. (1997), Advances in the optimization of airline fleet assignment, Transportation Science, 31, 2, Sosnowska D., Rolim J. (2001), Fleet scheduling optimization: a simulated annealing approach, The Practice and Theory of Automated Timetabling III: Selected Papers from the 3rd International Conference on the Practice and Theory of Automated Timetabling (PATAT 2000), Konstanz Germany, Lecture Notes in Computer Science, Springer, Vol. 2079, pp Subramanian R. (1994), Coldstart: fleet assignment at delta air lines, Interfaces, 24, 1, Talluri K.T. (1996), Swapping applications in a daily airline fleet assignment, Transportation Science, 30, 3, Thengvall B.G., Yu G., Bard J.F. (2001), Multiple fleet aircraft schedule recovery following hub closures, Transportation Research Part A, 35, Thengvall B.G., Bard J.F. and Yu G. (2003). A Bundle Algorithm Approach for the Aircraft Schedule Recovery Problem During Hub Closures, submitted to Transportation Science. Vazquez-Marquez A. (1991), American airlines arrival slot allocation system (ASAS), Interfaces, 21, 1, Wong G.L. (2000). The dynamic planner: the sequencer, scheduler, and runway allocator for air traffic control automation, Report NASA/TM , NASA Ames Research

16 Center, Moffett Field, CA , USA. Available from Wu C.L., Caves R.E. (2002), Towards the optimisation of the schedule reliability of aircraft rotations, Journal of Air Transportation Management, 8, Yan S., Lin C.G. (1997), Airline scheduling for the temporary closure of airports, Transportation Science, 31,1,

SIMAIR: A STOCHASTIC MODEL OF AIRLINE OPERATIONS

SIMAIR: A STOCHASTIC MODEL OF AIRLINE OPERATIONS SIMAIR: A STOCHASTIC MODEL OF AIRLINE OPERATIONS Jay M. Rosenberger Andrew J. Schaefer David Goldsman Ellis L. Johnson Anton J. Kleywegt George L. Nemhauser School of Industrial and Systems Engineering

More information

IMPROVING THE ROBUSTNESS OF FLIGHT SCHEDULE BY FLIGHT RE-TIMING AND IMPOSING A NEW CREW BASE

IMPROVING THE ROBUSTNESS OF FLIGHT SCHEDULE BY FLIGHT RE-TIMING AND IMPOSING A NEW CREW BASE Jurnal Karya Asli Lorekan Ahli Matematik Vol. 6 No.1 (2013) Page 066-073. Jurnal Karya Asli Lorekan Ahli Matematik IMPROVING THE ROBUSTNESS OF FLIGHT SCHEDULE BY FLIGHT RE-TIMING AND IMPOSING A NEW CREW

More information

Impact of Landing Fee Policy on Airlines Service Decisions, Financial Performance and Airport Congestion

Impact of Landing Fee Policy on Airlines Service Decisions, Financial Performance and Airport Congestion Wenbin Wei Impact of Landing Fee Policy on Airlines Service Decisions, Financial Performance and Airport Congestion Wenbin Wei Department of Aviation and Technology San Jose State University One Washington

More information

A Review of Airport Runway Scheduling

A Review of Airport Runway Scheduling 1 A Review of Airport Runway Scheduling Julia Bennell School of Management, University of Southampton Chris Potts School of Mathematics, University of Southampton This work was supported by EUROCONTROL,

More information

American Airlines Next Top Model

American Airlines Next Top Model Page 1 of 12 American Airlines Next Top Model Introduction Airlines employ several distinct strategies for the boarding and deboarding of airplanes in an attempt to minimize the time each plane spends

More information

Approximate Network Delays Model

Approximate Network Delays Model Approximate Network Delays Model Nikolas Pyrgiotis International Center for Air Transportation, MIT Research Supervisor: Prof Amedeo Odoni Jan 26, 2008 ICAT, MIT 1 Introduction Layout 1 Motivation and

More information

Scenarios for Fleet Assignment: A Case Study at Lion Air

Scenarios for Fleet Assignment: A Case Study at Lion Air IOSR Journal of Mathematics (IOSR-JM) e-issn: 2278-5728, p-issn: 2319-765X Volume 10, Issue 5 Ver I (Sep-Oct 2014), PP 64-68 wwwiosrjournalsorg Scenarios for Fleet Assignment: A Case Study at Lion Air

More information

Simulation of disturbances and modelling of expected train passenger delays

Simulation of disturbances and modelling of expected train passenger delays Computers in Railways X 521 Simulation of disturbances and modelling of expected train passenger delays A. Landex & O. A. Nielsen Centre for Traffic and Transport, Technical University of Denmark, Denmark

More information

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE IRPORT GROUND-HOLDING PROBLEM Lili WNG Doctor ir Traffic Management College Civil viation University of China 00 Xunhai Road, Dongli District, Tianjin P.R.

More information

Airline fleet assignment : a state of the art

Airline fleet assignment : a state of the art Airline fleet assignment : a state of the art Catherine Mancel, Felix Antonio Claudio Mora-Camino To cite this version: Catherine Mancel, Felix Antonio Claudio Mora-Camino. Airline fleet assignment : a

More information

SERVICE NETWORK DESIGN: APPLICATIONS IN TRANSPORTATION AND LOGISTICS

SERVICE NETWORK DESIGN: APPLICATIONS IN TRANSPORTATION AND LOGISTICS SERVICE NETWORK DESIGN: APPLICATIONS IN TRANSPORTATION AND LOGISTICS Professor Cynthia Barnhart Massachusetts Institute of Technology Cambridge, Massachusetts USA March 21, 2007 Outline Service network

More information

PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA

PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA SIMULATION ANALYSIS OF PASSENGER CHECK IN AND BAGGAGE SCREENING AREA AT CHICAGO-ROCKFORD INTERNATIONAL AIRPORT PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University

More information

Transportation Timetabling

Transportation Timetabling Outline DM87 SCHEDULING, TIMETABLING AND ROUTING Lecture 16 Transportation Timetabling 1. Transportation Timetabling Tanker Scheduling Air Transport Train Timetabling Marco Chiarandini DM87 Scheduling,

More information

UC Berkeley Working Papers

UC Berkeley Working Papers UC Berkeley Working Papers Title The Value Of Runway Time Slots For Airlines Permalink https://escholarship.org/uc/item/69t9v6qb Authors Cao, Jia-ming Kanafani, Adib Publication Date 1997-05-01 escholarship.org

More information

An Econometric Study of Flight Delay Causes at O Hare International Airport Nathan Daniel Boettcher, Dr. Don Thompson*

An Econometric Study of Flight Delay Causes at O Hare International Airport Nathan Daniel Boettcher, Dr. Don Thompson* An Econometric Study of Flight Delay Causes at O Hare International Airport Nathan Daniel Boettcher, Dr. Don Thompson* Abstract This study examined the relationship between sources of delay and the level

More information

Optimization of Fleet Assignment: A Case Study in Turkey

Optimization of Fleet Assignment: A Case Study in Turkey An International Journal of Optimization and Control: Theories & Applications Vol.2, No.1, pp.59-71 (2012) IJOCTA ISSN: 2146-0957 eissn: 2146-5703 http://www.iocta.com Optimization of Fleet Assignment:

More information

Combining Control by CTA and Dynamic En Route Speed Adjustment to Improve Ground Delay Program Performance

Combining Control by CTA and Dynamic En Route Speed Adjustment to Improve Ground Delay Program Performance Combining Control by CTA and Dynamic En Route Speed Adjustment to Improve Ground Delay Program Performance James C. Jones, University of Maryland David J. Lovell, University of Maryland Michael O. Ball,

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Aircraft Arrival Sequencing: Creating order from disorder

Aircraft Arrival Sequencing: Creating order from disorder Aircraft Arrival Sequencing: Creating order from disorder Sponsor Dr. John Shortle Assistant Professor SEOR Dept, GMU Mentor Dr. Lance Sherry Executive Director CATSR, GMU Group members Vivek Kumar David

More information

OPTIMAL PUSHBACK TIME WITH EXISTING UNCERTAINTIES AT BUSY AIRPORT

OPTIMAL PUSHBACK TIME WITH EXISTING UNCERTAINTIES AT BUSY AIRPORT OPTIMAL PUSHBACK TIME WITH EXISTING Ryota Mori* *Electronic Navigation Research Institute Keywords: TSAT, reinforcement learning, uncertainty Abstract Pushback time management of departure aircraft is

More information

ATM Seminar 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY. Wednesday, June 24 nd 2015

ATM Seminar 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY. Wednesday, June 24 nd 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY Christabelle Bosson PhD Candidate Purdue AAE Min Xue University Affiliated Research Center Shannon Zelinski NASA Ames Research

More information

Airline Schedule Development Overview Dr. Peter Belobaba

Airline Schedule Development Overview Dr. Peter Belobaba Airline Schedule Development Overview Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 18 : 1 April 2016

More information

Todsanai Chumwatana, and Ichayaporn Chuaychoo Rangsit University, Thailand, {todsanai.c;

Todsanai Chumwatana, and Ichayaporn Chuaychoo Rangsit University, Thailand, {todsanai.c; Using Hybrid Technique: the Integration of Data Analytics and Queuing Theory for Average Service Time Estimation at Immigration Service, Suvarnabhumi Airport Todsanai Chumwatana, and Ichayaporn Chuaychoo

More information

Dynamic Airline Scheduling: An Analysis of the Potentials of Refleeting and Retiming

Dynamic Airline Scheduling: An Analysis of the Potentials of Refleeting and Retiming Dynamic Airline Scheduling: An Analysis of the Potentials of Refleeting and Retiming Valdemar Warburg * Troels Gotsæd Hansen * Allan Larsen (corresponding) * Hans Norman** Erik Andersson*** *DTU Transport

More information

Airline Disruption Management - Perspectives, Experiences and Outlook

Airline Disruption Management - Perspectives, Experiences and Outlook Airline Disruption Management - Perspectives, Experiences and Outlook Niklas Kohl Carmen Consulting Allan Larsen Centre for Traffic and Transport, Technical University of Denmark Jesper Larsen Informatics

More information

Optimization Model Integrated Flight Schedule and Maintenance Plans

Optimization Model Integrated Flight Schedule and Maintenance Plans Optimization Model Integrated Flight Schedule and Maintenance Plans 1 Shao Zhifang, 2 Sun Lu, 3 Li Fujuan *1 School of Information Management and Engineering, Shanghai University of Finance and Economics,

More information

Overview of the Airline Planning Process Dr. Peter Belobaba Presented by Alex Heiter

Overview of the Airline Planning Process Dr. Peter Belobaba Presented by Alex Heiter Overview of the Airline Planning Process Dr. Peter Belobaba Presented by Alex Heiter Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning

More information

Weekly airline fleet assignment with homogeneity

Weekly airline fleet assignment with homogeneity Transportation Research Part B 40 (2006) 306 318 www.elsevier.com/locate/trb Weekly airline fleet assignment with homogeneity Nicolas Bélanger a, Guy Desaulniers a, François Soumis a, Jacques Desrosiers

More information

From Planning to Operations Dr. Peter Belobaba

From Planning to Operations Dr. Peter Belobaba From Planning to Operations Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 16 : 13 March 2014 Lecture

More information

PERFORMANCE MEASURES TO SUPPORT COMPETITIVE ADVANTAGE

PERFORMANCE MEASURES TO SUPPORT COMPETITIVE ADVANTAGE PERFORMANCE MEASURES TO SUPPORT COMPETITIVE ADVANTAGE by Graham Morgan 01 Aug 2005 The emergence in the 1990s of low-cost airlines and the expansion of the European travel market has shown how competition

More information

Abstract. Introduction

Abstract. Introduction COMPARISON OF EFFICIENCY OF SLOT ALLOCATION BY CONGESTION PRICING AND RATION BY SCHEDULE Saba Neyshaboury,Vivek Kumar, Lance Sherry, Karla Hoffman Center for Air Transportation Systems Research (CATSR)

More information

Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling

Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling Yan Xu and Xavier Prats Technical University of Catalonia (UPC) Outline Motivation & Background Trajectory optimization

More information

Airline Scheduling Optimization ( Chapter 7 I)

Airline Scheduling Optimization ( Chapter 7 I) Airline Scheduling Optimization ( Chapter 7 I) Vivek Kumar (Research Associate, CATSR/GMU) February 28 th, 2011 CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH 2 Agenda Airline Scheduling Factors affecting

More information

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study An Agent-Based Computational Economics Approach to Strategic Slot Allocation SESAR Innovation Days Bologna, 2 nd December

More information

MIT ICAT. Robust Scheduling. Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation

MIT ICAT. Robust Scheduling. Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation Robust Scheduling Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation Philosophy If you like to drive fast, it doesn t make sense getting a Porsche

More information

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC)

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) 1 Paradigm SHIFT Eurocontrol Experimental Centre Innovative Research June, 2005 Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) Khaled BELAHCENE (Math Mod., Airspace) Didier DOHY (ATM, System)

More information

Flight Arrival Simulation

Flight Arrival Simulation Flight Arrival Simulation Ali Reza Afshari Buein Zahra Technical University, Department of Industrial Engineering, Iran, afshari@bzte.ac.ir Mohammad Anisseh Imam Khomeini International University, Department

More information

Jeppesen Pairing & Rostering

Jeppesen Pairing & Rostering Jeppesen Pairing & Rostering Johan Kristofferson Global Program Sales Leader Crew, Ops & Analytics October 5th, 2016 What successful Airlines have in common Network (Commercial) Aircraft planning Fleeting

More information

Measure 67: Intermodality for people First page:

Measure 67: Intermodality for people First page: Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the

More information

INTEGRATE BUS TIMETABLE AND FLIGHT TIMETABLE FOR GREEN TRANSPORTATION ENHANCE TOURISM TRANSPORTATION FOR OFF- SHORE ISLANDS

INTEGRATE BUS TIMETABLE AND FLIGHT TIMETABLE FOR GREEN TRANSPORTATION ENHANCE TOURISM TRANSPORTATION FOR OFF- SHORE ISLANDS INTEGRATE BUS TIMETABLE AND FLIGHT TIMETABLE FOR GREEN TRANSPORTATION ENHANCE TOURISM TRANSPORTATION FOR OFF- SHORE ISLANDS SUILING LI, NATIONAL PENGHU UNIVERSITY OF SCIENCE AND TECHNOLOGY,SUILING@NPU.EDU.TW

More information

ACI EUROPE POSITION PAPER

ACI EUROPE POSITION PAPER ACI EUROPE POSITION PAPER November 2018 Cover / Photo: Stockholm Arlanda Airport (ARN) Introduction Air traffic growth in Europe has shown strong performance in recent years, but airspace capacity has

More information

Research Article Study on Fleet Assignment Problem Model and Algorithm

Research Article Study on Fleet Assignment Problem Model and Algorithm Mathematical Problems in Engineering Volume 2013, Article ID 581586, 5 pages http://dxdoiorg/101155/2013/581586 Research Article Study on Fleet Assignment Problem Model and Algorithm Yaohua Li and Na Tan

More information

CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS

CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS 91 CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS 5.1 INTRODUCTION In chapter 4, from the evaluation of routes and the sensitive analysis, it

More information

AI in a SMART AIrport

AI in a SMART AIrport AI in a SMART AIrport Steve Lee CIO & Group SVP(Technology) Changi Airport Group (Singapore) Pte. Ltd. 24 Oct 2017 2017 Changi Airport Group (Singapore) Pte. Ltd. Not to be used, disclosed or reproduced

More information

Route Planning and Profit Evaluation Dr. Peter Belobaba

Route Planning and Profit Evaluation Dr. Peter Belobaba Route Planning and Profit Evaluation Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 9 : 11 March 2014

More information

Airline flight scheduling for oligopolistic competition with direct flights and a point to point network

Airline flight scheduling for oligopolistic competition with direct flights and a point to point network JOURNAL OF ADVANCED TRANSPORTATION J Adv Transp 2016; 50:1942 1957 Published online 25 January 2017 in Wiley Online Library (wileyonlinelibrarycom) DOI: 101002/atr1438 Airline flight scheduling for oligopolistic

More information

EUROCONTROL EUROPEAN AVIATION IN 2040 CHALLENGES OF GROWTH. Annex 4 Network Congestion

EUROCONTROL EUROPEAN AVIATION IN 2040 CHALLENGES OF GROWTH. Annex 4 Network Congestion EUROCONTROL EUROPEAN AVIATION IN 2040 CHALLENGES OF GROWTH Annex 4 Network Congestion 02 / EUROPEAN AVIATION IN 2040 - CHALLENGES OF GROWTH - NETWORK CONGESTION IN 2040 ///////////////////////////////////////////////////////////////////

More information

Analysis of Gaming Issues in Collaborative Trajectory Options Program (CTOP)

Analysis of Gaming Issues in Collaborative Trajectory Options Program (CTOP) Analysis of Gaming Issues in Collaborative Trajectory Options Program (CTOP) John-Paul Clarke, Bosung Kim, Leonardo Cruciol Air Transportation Laboratory Georgia Institute of Technology Outline 2 Motivation

More information

The Benefits of Attendee Travel Management

The Benefits of Attendee Travel Management The Benefits of Attendee Travel Management Travel to and from a meeting or an event is very much part of each attendee s event experience. Meeting planners and attendees alike can benefit from inclusion

More information

A Simulation Approach to Airline Cost Benefit Analysis

A Simulation Approach to Airline Cost Benefit Analysis Department of Management, Marketing & Operations - Daytona Beach College of Business 4-2013 A Simulation Approach to Airline Cost Benefit Analysis Massoud Bazargan, bazargam@erau.edu David Lange Luyen

More information

Decision aid methodologies in transportation

Decision aid methodologies in transportation Decision aid methodologies in transportation Lecture 5: Revenue Management Prem Kumar prem.viswanathan@epfl.ch Transport and Mobility Laboratory * Presentation materials in this course uses some slides

More information

DMAN-SMAN-AMAN Optimisation at Milano Linate Airport

DMAN-SMAN-AMAN Optimisation at Milano Linate Airport DMAN-SMAN-AMAN Optimisation at Milano Linate Airport Giovanni Pavese, Maurizio Bruglieri, Alberto Rolando, Roberto Careri Politecnico di Milano 7 th SESAR Innovation Days (SIDs) November 28 th 30 th 2017

More information

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 5: 10 March 2014

More information

Depeaking Optimization of Air Traffic Systems

Depeaking Optimization of Air Traffic Systems Depeaking Optimization of Air Traffic Systems B.Stolz, T. Hanschke Technische Universität Clausthal, Institut für Mathematik, Erzstr. 1, 38678 Clausthal-Zellerfeld M. Frank, M. Mederer Deutsche Lufthansa

More information

RECEDING HORIZON CONTROL FOR AIRPORT CAPACITY MANAGEMENT

RECEDING HORIZON CONTROL FOR AIRPORT CAPACITY MANAGEMENT RECEDING HORIZON CONTROL FOR AIRPORT CAPACITY MANAGEMENT W.-H. Chen, X.B. Hu Dept. of Aeronautical & Automotive Engineering, Loughborough University, UK Keywords: Receding Horizon Control, Air Traffic

More information

Airport Gate Assignment A Hybrid Model and Implementation

Airport Gate Assignment A Hybrid Model and Implementation Airport Gate Assignment A Hybrid Model and Implementation Chendong Li Computer Science Department, Texas Tech University 2500 Broadway, Lubbock, Texas 79409 USA chendong.li@ttu.edu Abstract With the rapid

More information

A Coevolutionary Simulation of Real-Time Airport Gate Scheduling

A Coevolutionary Simulation of Real-Time Airport Gate Scheduling A Coevolutionary Simulation of Real-Time Airport Scheduling Andrés Gómez de Silva Garza Instituto Tecnológico Autónomo de México (IT) Río Hondo #1, Colonia Tizapán-San Ángel 01000 México, D.F., México

More information

Minimizing the Cost of Delay for Airspace Users

Minimizing the Cost of Delay for Airspace Users Minimizing the Cost of Delay for Airspace Users 12 th USA/Europe ATM R&D Seminar Seattle, USA Stephen KIRBY 29 th June, 2017 Overview The problem The UDPP* concept The validation exercise: Exercise plan

More information

Aviation Trends. Quarter Contents

Aviation Trends. Quarter Contents Aviation Trends Quarter 1 2013 Contents Introduction 2 1 Historical overview of traffic 3 a Terminal passengers b Commercial flights c Cargo tonnage 2 Terminal passengers at UK airports 7 3 Passenger flights

More information

FACILITATION PANEL (FALP)

FACILITATION PANEL (FALP) International Civil Aviation Organization WORKING PAPER FALP/10-WP/19 Revised 29/8/18 FACILITATION PANEL (FALP) TENTH MEETING Montréal, 10-13 September 2018 Agenda Item 6: Other matters FACILITATION FOR

More information

A Study of Tradeoffs in Airport Coordinated Surface Operations

A Study of Tradeoffs in Airport Coordinated Surface Operations A Study of Tradeoffs in Airport Coordinated Surface Operations Ji MA, Daniel DELAHAYE, Mohammed SBIHI ENAC École Nationale de l Aviation Civile, Toulouse, France Paolo SCALA, Miguel MUJICA MOTA Amsterdam

More information

Airlines Crew Pairing Optimization: A Brief Review

Airlines Crew Pairing Optimization: A Brief Review Airlines Crew Pairing Optimization: A Brief Review Xugang Ye* Applied Mathematics and Statistics, the Johns Hopkins University Abstract In most airlines, crew costs are the second largest direct operation

More information

FLIGHT SCHEDULE PUNCTUALITY CONTROL AND MANAGEMENT: A STOCHASTIC APPROACH

FLIGHT SCHEDULE PUNCTUALITY CONTROL AND MANAGEMENT: A STOCHASTIC APPROACH Transportation Planning and Technology, August 2003 Vol. 26, No. 4, pp. 313 330 FLIGHT SCHEDULE PUNCTUALITY CONTROL AND MANAGEMENT: A STOCHASTIC APPROACH CHENG-LUNG WU a and ROBERT E. CAVES b a Department

More information

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING Ms. Grace Fattouche Abstract This paper outlines a scheduling process for improving high-frequency bus service reliability based

More information

Predicting a Dramatic Contraction in the 10-Year Passenger Demand

Predicting a Dramatic Contraction in the 10-Year Passenger Demand Predicting a Dramatic Contraction in the 10-Year Passenger Demand Daniel Y. Suh Megan S. Ryerson University of Pennsylvania 6/29/2018 8 th International Conference on Research in Air Transportation Outline

More information

Quantitative Analysis of the Adapted Physical Education Employment Market in Higher Education

Quantitative Analysis of the Adapted Physical Education Employment Market in Higher Education Quantitative Analysis of the Adapted Physical Education Employment Market in Higher Education by Jiabei Zhang, Western Michigan University Abstract The purpose of this study was to analyze the employment

More information

Airline Delay Perturbation Problem Under Minor Disturbance NATIONAL CENTER OF EXCELLENCE FOR NEXTOR AVIATION OPERATIONS RESEARCH

Airline Delay Perturbation Problem Under Minor Disturbance NATIONAL CENTER OF EXCELLENCE FOR NEXTOR AVIATION OPERATIONS RESEARCH Institute of Transportation Studies University of California at Berkeley Airline Delay Perturbation Problem Under Minor Disturbance Sheng-Chen Alex Huang Working Paper UCB-ITS-WP-98 1 NATIONAL CENTER OF

More information

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia Preparatory Course in Business (RMIT) SIM Global Education Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia Brief Outline of Modules (Updated 18 September 2018) BUS005 MANAGING

More information

Presentation Outline. Overview. Strategic Alliances in the Airline Industry. Environmental Factors. Environmental Factors

Presentation Outline. Overview. Strategic Alliances in the Airline Industry. Environmental Factors. Environmental Factors Presentation Outline Strategic Alliances in the Airline Industry Samantha Feinblum Ravit Koriat Overview Factors that influence Strategic Alliances Industry Factors Types of Alliances Simple Carrier Strong

More information

Operations Control Centre perspective. Future of airline operations

Operations Control Centre perspective. Future of airline operations Operations Control Centre perspective Future of airline operations This brochure was developed based on the results provided by the OCC project as part of the SESAR programme. This project was managed

More information

Digital twin for life predictions in civil aerospace

Digital twin for life predictions in civil aerospace Digital twin for life predictions in civil aerospace Author James Domone Senior Engineer June 2018 Digital Twin for Life Predictions in Civil Aerospace Introduction Advanced technology that blurs the lines

More information

ARRIVAL CHARACTERISTICS OF PASSENGERS INTENDING TO USE PUBLIC TRANSPORT

ARRIVAL CHARACTERISTICS OF PASSENGERS INTENDING TO USE PUBLIC TRANSPORT ARRIVAL CHARACTERISTICS OF PASSENGERS INTENDING TO USE PUBLIC TRANSPORT Tiffany Lester, Darren Walton Opus International Consultants, Central Laboratories, Lower Hutt, New Zealand ABSTRACT A public transport

More information

Airline Scheduling: An Overview

Airline Scheduling: An Overview Airline Scheduling: An Overview Crew Scheduling Time-shared Jet Scheduling (Case Study) Airline Scheduling: An Overview Flight Schedule Development Fleet Assignment Crew Scheduling Daily Problem Weekly

More information

AIRPORT OF THE FUTURE

AIRPORT OF THE FUTURE AIRPORT OF THE FUTURE Airport of the Future Which airport is ready for the future? IATA has launched a new activity, working with industry partners, to help define the way of the future for airports. There

More information

ATTEND Analytical Tools To Evaluate Negotiation Difficulty

ATTEND Analytical Tools To Evaluate Negotiation Difficulty ATTEND Analytical Tools To Evaluate Negotiation Difficulty Alejandro Bugacov Robert Neches University of Southern California Information Sciences Institute ANTs PI Meeting, November, 2000 Outline 1. Goals

More information

Project: Implications of Congestion for the Configuration of Airport Networks and Airline Networks (AirNets)

Project: Implications of Congestion for the Configuration of Airport Networks and Airline Networks (AirNets) Research Thrust: Airport and Airline Systems Project: Implications of Congestion for the Configuration of Airport Networks and Airline Networks (AirNets) Duration: (November 2007 December 2010) Description:

More information

The aircraft rotation problem

The aircraft rotation problem Annals of Operations Research 69(1997)33 46 33 The aircraft rotation problem Lloyd Clarke a, Ellis Johnson a, George Nemhauser a and Zhongxi Zhu b a School of Industrial and Systems Engineering, Georgia

More information

A GRASP for Aircraft Routing in Response to Groundings and Delays

A GRASP for Aircraft Routing in Response to Groundings and Delays Journal of Combinatorial Optimization 5, 211 228 (1997) c 1997 Kluwer Academic Publishers. Manufactured in The Netherlands. A GRASP for Aircraft Routing in Response to Groundings and Delays MICHAEL F.

More information

Analysis of Impact of RTC Errors on CTOP Performance

Analysis of Impact of RTC Errors on CTOP Performance https://ntrs.nasa.gov/search.jsp?r=20180004733 2018-09-23T19:12:03+00:00Z NASA/TM-2018-219943 Analysis of Impact of RTC Errors on CTOP Performance Deepak Kulkarni NASA Ames Research Center Moffett Field,

More information

An Analysis of Dynamic Actions on the Big Long River

An Analysis of Dynamic Actions on the Big Long River Control # 17126 Page 1 of 19 An Analysis of Dynamic Actions on the Big Long River MCM Team Control # 17126 February 13, 2012 Control # 17126 Page 2 of 19 Contents 1. Introduction... 3 1.1 Problem Background...

More information

Development of Flight Inefficiency Metrics for Environmental Performance Assessment of ATM

Development of Flight Inefficiency Metrics for Environmental Performance Assessment of ATM Development of Flight Inefficiency Metrics for Environmental Performance Assessment of ATM Tom G. Reynolds 8 th USA/Europe Air Traffic Management Research and Development Seminar Napa, California, 29 June-2

More information

Predicting Flight Delays Using Data Mining Techniques

Predicting Flight Delays Using Data Mining Techniques Todd Keech CSC 600 Project Report Background Predicting Flight Delays Using Data Mining Techniques According to the FAA, air carriers operating in the US in 2012 carried 837.2 million passengers and the

More information

Aviation Trends. Quarter Contents

Aviation Trends. Quarter Contents Aviation Trends Quarter 3 2014 Contents Introduction... 2 1. Historical overview of traffic... 3 a. Terminal passengers... 4 b. Commercial flights... 5 c. Cargo tonnage... 6 2. Terminal passengers at UK

More information

How to Manage Traffic Without A Regulation, and What To Do When You Need One?

How to Manage Traffic Without A Regulation, and What To Do When You Need One? How to Manage Traffic Without A Regulation, and What To Do When You Need One? Identification of the Issue The overall aim of NATS Network management position is to actively manage traffic so that sector

More information

Flight Schedule Planning with Maintenance Considerations. Abstract

Flight Schedule Planning with Maintenance Considerations. Abstract Flight Schedule Planning with Maintenance Considerations Julia L. Higle Anne E. C. Johnson Systems and Industrial Engineering The University of Arizona Tucson, AZ 85721 Abstract Airline planning operations

More information

PRESENTATION OVERVIEW

PRESENTATION OVERVIEW ATFM PRE-TACTICAL PLANNING Nabil Belouardy PhD student Presentation for Innovative Research Workshop Thursday, December 8th, 2005 Supervised by Prof. Dr. Patrick Bellot ENST Prof. Dr. Vu Duong EEC European

More information

NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California

NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California All Rights Reserved 1 Topics Innovation Objective Scientific & Mathematical Framework Distinctions

More information

PLEASE SCROLL DOWN FOR ARTICLE

PLEASE SCROLL DOWN FOR ARTICLE This article was downloaded by:[wu, Cheng-Lung] On: 20 March 2008 Access Details: [subscription number 791462375] Publisher: Taylor & Francis Informa Ltd Registered in England and Wales Registered Number:

More information

Slots. The benefits of strategic slot management. Richard Matthews Slot strategy & scheduling manager. 8 th March 2013

Slots. The benefits of strategic slot management. Richard Matthews Slot strategy & scheduling manager. 8 th March 2013 Slots The benefits of strategic slot management Richard Matthews Slot strategy & scheduling manager 8 th March 2013 1 Strategy to drive growth and returns Leverage easyjet s cost advantage, leading market

More information

Introduction Runways delay analysis Runways scheduling integration Results Conclusion. Raphaël Deau, Jean-Baptiste Gotteland, Nicolas Durand

Introduction Runways delay analysis Runways scheduling integration Results Conclusion. Raphaël Deau, Jean-Baptiste Gotteland, Nicolas Durand Midival Airport surface management and runways scheduling ATM 2009 Raphaël Deau, Jean-Baptiste Gotteland, Nicolas Durand July 1 st, 2009 R. Deau, J-B. Gotteland, N. Durand ()Airport SMAN and runways scheduling

More information

ScienceDirect. Prediction of Commercial Aircraft Price using the COC & Aircraft Design Factors

ScienceDirect. Prediction of Commercial Aircraft Price using the COC & Aircraft Design Factors Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 67 ( 2013 ) 70 77 7th Asian-Pacific Conference on Aerospace Technology and Science, 7th APCATS 2013 Prediction of Commercial

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

Proceedings of the 2014 Winter Simulation Conference A. Tolk, S. Y. Diallo, I. O. Ryzhov, L. Yilmaz, S. Buckley, and J. A. Miller, eds.

Proceedings of the 2014 Winter Simulation Conference A. Tolk, S. Y. Diallo, I. O. Ryzhov, L. Yilmaz, S. Buckley, and J. A. Miller, eds. Proceedings of the 2014 Winter Simulation Conference A. Tolk, S. Y. Diallo, I. O. Ryzhov, L. Yilmaz, S. Buckley, and J. A. Miller, eds. A HYBRID OPTIMIZATION-SIMULATION APPROACH FOR ITINERARY GENERATION

More information

ONLINE DELAY MANAGEMENT IN RAILWAYS - SIMULATION OF A TRAIN TIMETABLE

ONLINE DELAY MANAGEMENT IN RAILWAYS - SIMULATION OF A TRAIN TIMETABLE ONLINE DELAY MANAGEMENT IN RAILWAYS - SIMULATION OF A TRAIN TIMETABLE WITH DECISION RULES - N. VAN MEERTEN 333485 28-08-2013 Econometrics & Operational Research Erasmus University Rotterdam Bachelor thesis

More information

An optimization model for assigning 4Dtrajectories to flights under the TBO concept

An optimization model for assigning 4Dtrajectories to flights under the TBO concept An optimization model for assigning 4Dtrajectories to flights under the TBO concept F. Djeumou Fomeni, G. Lulli, Konstantinos G. Zografos Lancaster University Management School Centre for Transportation

More information

Integrated Optimization of Arrival, Departure, and Surface Operations

Integrated Optimization of Arrival, Departure, and Surface Operations Integrated Optimization of Arrival, Departure, and Surface Operations Ji MA, Daniel DELAHAYE, Mohammed SBIHI ENAC École Nationale de l Aviation Civile, Toulouse, France Paolo SCALA Amsterdam University

More information

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue;

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue; ATTACHMENT A. GUIDANCE MATERIAL FOR DEVELOPMENT OF PRESCRIPTIVE FATIGUE MANAGEMENT REGULATIONS Supplementary to Chapter 4, 4.2.10.2, Chapter 9, 9.6 and Chapter 12, 12.5 1. Purpose and scope 1.1 Flight

More information

White Paper: Assessment of 1-to-Many matching in the airport departure process

White Paper: Assessment of 1-to-Many matching in the airport departure process White Paper: Assessment of 1-to-Many matching in the airport departure process November 2015 rockwellcollins.com Background The airline industry is experiencing significant growth. With higher capacity

More information

Foregone Economic Benefits from Airport Capacity Constraints in EU 28 in 2035

Foregone Economic Benefits from Airport Capacity Constraints in EU 28 in 2035 Foregone Economic Benefits from Airport Capacity Constraints in EU 28 in 2035 Foregone Economic Benefits from Airport Capacity Constraints in EU 28 in 2035 George Anjaparidze IATA, February 2015 Version1.1

More information

AIR TRANSPORT MANAGEMENT Universidade Lusofona January 2008

AIR TRANSPORT MANAGEMENT Universidade Lusofona January 2008 AIR TRANSPORT MANAGEMENT Universidade Lusofona Introduction to airline network planning: John Strickland, Director JLS Consulting Contents 1. What kind of airlines? 2. Network Planning Data Generic / traditional

More information