ATTEND Analytical Tools To Evaluate Negotiation Difficulty

Size: px
Start display at page:

Download "ATTEND Analytical Tools To Evaluate Negotiation Difficulty"

Transcription

1 ATTEND Analytical Tools To Evaluate Negotiation Difficulty Alejandro Bugacov Robert Neches University of Southern California Information Sciences Institute ANTs PI Meeting, November, 2000

2 Outline 1. Goals and proposed approach 2. Relation to the CAMERA-SNAP problem 3. Integration with SNAP Modeling Interfacing with complexity control/solver ANTs Encoding the problem 4. Empirical sensitivity analysis of SNAP 5. Plans

3 Approach and Key Ideas Approach Generate Negotiation Difficulty Warnings Based on on Problem Complexity Analysis Analytically resolvable: handled without negotiation Requires negotiation Sub-partitioned and rated for difficulty Negotiation difficulty Partition task task space: Sub-problems that that can can be be solved solved analytically Those Those that that truly truly require require negotiation Testbed Application Formal representation of the problem ( x? y? z)? ( x? y)? Constraint Satisfiability {p 1,p 2,p 8 } s 1 {p 2,p 8 } s 3 {p 1,p 2 } {p 1 } s 4 s 2 s 5 s 6 {p 3,p 5 } {p 2,p 3 } Applied to s 7 {p 2,p 3 } Interface SNAP: Flight mission scheduling Techniques SAT & Graph Coloring Phase Transitions Iterative Solutions

4 Initial Challenges for the Approach Early warning of inappropriate resource assignments to the CAMERA system m 1 Pilot 1 Pilot 2 m 2 Quickly identify sets of partial solutions and estimate difficulty of remaining set Identify imperative assignments

5 Squadron Capability Goals & Mission-Resource Requirements in SNAP Mix of quals that should be represented in the squadron Average Pilot CRP (combat readiness %) CRP is a fractional value for mission codes Equity in Pilot Hours E.g., within ~10% equity in a monthly basis Mission Role 1 Role 2 Pilot Aircraft Pilot Aircraft Role n Range Pilot Aircraft priority Main mission types: - FRAGS: Few Fixed time No range - Builds: Few Focus on a Pilot - Training: Many Role 1 is the trainee Need to find time slot and additional resources - Fly or Simulated

6 Challenges of the CAMERA-SNAP Domain Scheduling of large number of flight missions over long planning periods Long list of complex constraints Training Codes Prerequisites Fly Day Crew Day Day & Night Missions Turn-arounds, Pits & Briefing Time Schedule Types Instructor Requirements and Formations Range Capabilities No obvious mapping to a standard scheduling problem

7 Modeling Approach (Joint work with Cornell Group) Set of Constraints BIG CSP SNAP Negotiations Feedback to negotiations CAMERA m N Analyze Complexity & Improve Solution Domain modeling & constraints built built into into SNAP SNAP ISI and Cornell Teams Initial Modeling Approach SNAP Mission Generator: SNAP, give me the N next missions m 3 m 2 m 1 ATTEND m 1 to m N Problem Interface (Hooks for other ANTs) Dynamic Encoding {p 1,p 2,p 8 } {p 1,p 2 } s 1 {p s 2 2,p 8 } {p 1 } s 3 ( x? y? z)?( x? y)? ISI + Cornell s 4 s 5 s 6 {p 3,p 5 } {p 2,p 3 } s 7 {p 2,p 3 } N missions graph encoding

8 Graph Based Encoding Example Get a snapshot of the problem that CAMERA is working on via the Problem Interface Dynamically construct a graph representation Analyze complexity and resolve conflicts based on coloring of the graph

9 Problem Interface: Training Missions Example Each mission has N r roles (not counting the trainee pilot P T ) There are 2 (1+N r ) dimensions for each mission The problem interface will provide sets with all eligible (qualified + available) candidates for each dimension: Set P r ={P 1 (t 1 ), P 1 (t 3 ),, P 8 (t 3 )} A r ={A 3 (t 5 ), A 1 (t 3 ),, A 5 (t 3 )} A T ={A 1 (t 1 ), A 2 (t 1 ),, A 4 (t 4 )} R = {R 1 (t 1 ), R 1 (t 3 ),, R 4 (t 3 )} # Description N r N r 1 1 Pilots set with all eligible pilot slots to fly mission M i in role r=1,2,.., N r Aircrafts set with all eligible aircrafts slots to fly mission M i in role r=1,2,., N r Aircrafts set with all eligible aircrafts slots for pilot P T to fly mission M i Range set with all eligible range slots to fly mission M i Additional resource/mission related variables (e.g., CRP) Current XML implementation

10 Effective Colors Scheme Using Problem Interface For each mission construct the following time-resource table t 1 t 2 t 3 Aircraft Trainee A1, A3 A2 A1 A1, A2 Aircraft Role 2 Aircraft Role 1 Pilot Role 2 Pilot Role 1 A1 A1 A1 A1, A3 A1 A2 A1 P1 P1,P2,P7 P9 P2,P3 P5,P6 Range R1 R2 R3 R1 R2 R4 C 1 C 3 C C 2 C 5 C 4 C 7 6 C 8 time Group resource-slots into effective colors that a given mission may assume: m 1 ={C 1,C 2,.,C 8 } Finding the set of possible colors is already complex. How can we do it efficiently? Random search until reach cutoff of max trials?...

11 Graph Coloring Approach For the Effective Colors Scheme (I) Effective colors are nodes Edge connect them if they share some resource Missions are the possible ways of painting the node {m 6,m 8, m 9,m 12 } c 6 {m 1,m 2, m 77 } c 1 {m 2 } c 5 c 7 {m1,m 2,m 77} {m 1,m 2, m 3 } c 2 {m 3,m 7 } c 3 c 4 {m 1,m 2,m 3,m 4,m 6 }

12 Graph Coloring Approach For the Effective Colors Scheme (II) Alternative Graph: Missions are nodes Edge connect them if they share some resource or overlap in time Effective colors are the possible ways of painting the node This approach seems over-constraining {c 1,c 2 } m 1 {c 1,c 2, c 3 } m 2 {c 3,c 7 } m 3 m 7{c1,c 2, c 7 } {c 2 } m 5 m 4 {c 1,c 2,c 3,c 4,c 6 } Other possible SAT encoding from Cornell group

13 Complexity Analysis and Solution Finding Graph Coloring and SAT techniques Local Search Phase Transitions & Backbone Variables Issues: variable number of colors per node Efficient way of processing Generation of phase transition curves

14 Empirical Studies of SNAP Behavior wrt Resource Availability Initial attempt to gain insight on the scaling/complexity issues of SNAP Study how sensitive the system is with respect to resource availability Measurements: During execution N(t): Count the number of successful missions and record the time t at which a new mission is filled At the end of each trial run Total number of generated missions Resource availability Fraction filled Execution time

15 Control of Resource Availability Density Mon Tue Wed Thur Fri p1 80% r1 50% range blocking Interval = ½ hr pilot blocking Interval = 1 day Control availability by by randomly blocking a % of of the original availability Control Parameters: Pilot, Pilot, Aircraft Aircraft and and Range Range availability density density Pilot, Pilot, Aircraft Aircraft and and Range Range blocking interval interval

16 Instrumentation Tools Used in the Experiments Counting and downcasting messages Coding listeners we can implement actions at the sending (or receiving) time of a message Downcast a message to determine an action based on the message type

17 Near Linear Increase of Execution Time wrt the Total size of the Problem Execution Time (secs) y = 7E-05x x Total Number of Missions FRAGS only Varying Pilots Availability Ranges and Aircraft Availability fixed at 100%

18 Speedup Due to Early Pruning Strategy Used for Ranges Varying Range Availability with Aircrafts and Pilots Availability fixed at 100% 60 Ranges 100% Exectution Time (secs) Ranges 20% Total Number of Missions

19 Mission Scheduling Rate Very Sensitive to Resource Availability FRAGS 80% Training 100% Time (msecs) % pilot and range availability range availability mission number

20 Elbow Behavior In The Scheduling Rate When The Aircraft Availability Is Reduced % 10% 20% 30% 40% FRAGS only 4000 Time (msecs) % 60% % % 90% 0 100% mission number

21 Questions about Elbows What is causing the elbows? Can we avoid them? What determines their occurrence? Can we predict their onset? Andrew Parkes analytical work: search mechanism on 3-SAT formulas looks similar Experimental approach: look at resource contention at the time-slot level

22 Understanding Resource Contention: Time-Slot Resource Availability Ratios Identify resource availability levels at successful attempts Learn why and when missions fail When a mission announces that it s trying a new time-slot: Count the number of aircrafts, pilots and ranges currently competing at that time-slot Count the number of aircrafts, pilots and ranges currently available at that time slot Compute aircraft ratio, pilot ratio and range ratio as ratio = (# of available)/ (# of competing) Take into account pilot time, aircraft time and range time Ratios can indicate the probability of succeeding

23 Use Mission Ratios to predict success: 75% of Successful Missions with Ratios > % of filled missions Pilots Aircrafts Ranges availability ratio

24 Success Probability Sharp Increase for Pilot Ratio > % Unsatisfied Satisfied % % 13% 27% 25% 10 50% 33% pilot ratio

25 Success Probability Sharp Increase for Aircraft Ratio > % 2% Unsatisfied Satisfied 3% % 9% % aircraft ratio

26 Empirical Studies: Conclusions & Further Work SNAP scales nearly linearly with problem size Distinct elbows (Phase-transition like behavior) are observable Elbows occur when resource availability decreases Resource contention hinders success Challenge: use ratios to predict the position of the elbows

27 Plans, Tasks and Milestones Task 1: 1: Modeling and Analytical Tools Formal Formal modeling of of CAMERA/SNAP system Model Model FRAGS and and Training missions problems Selection and and implementation of of problem characterization algorithms Collaboration with with Cornell Team Team Task 2: 2: API specification and implementation Design Design and and implementation of of the the Problem Interface to to SNAP SNAP Implementation of of XML/XSL data data and and reports modules Task 3: 3: ANT technology integration Provide hooks hooks to to CAMERA via via the the Problem Interface to to ATTEND and and other other ANTs ANTs contractors Early Early warning of of inappropriate resource assignments in in CAMERA

28 End

29 Back Up Set: SNAP Constraints

30 Training Codes Prerequisites Prerequisites are defined in the Pilot Training Manual (PTM): For a given mission code the PTM specifies what are the prerequisite codes that a pilot must have current in order to fly the given code Code currency is not constant and codes must be refreshed in order to remain current PTM prerequisites are captured in xml form and is part of the SNAP code

31 Fly Day The Fly Day is specified as a list of time intervals The sum of the intervals duration cannot exceed the maximum fly-day length constraint (typically of 10 hrs) Usually the Fly day consists of 1 or 2 intervals Can change daily or weekly Monday Tuesday 8am-2pm 8am-6pm 5-9pm The Fly day only limits the take-off and landing periods. Take-offs and landings cannot happen outside the Fly day

32 Crew Day The crew day is the period of time a pilot can be on base Is a continuous interval typically < 12 hrs Pilots cannot be scheduled to fly outside their crew day There is a minimum distance between consecutive crew days that must be taken into account.

33 Day & Night Missions Day missions: Take-off: Lower bound is 1/2 hour after sunrise Landing: Upper bound is 1/2 hour before sunset Night missions: "Night" is defined by the amount of light (LUX) and a given time interval after sunset LUX and moon illumination and position constraints. For example a given mission might required to be performed 1hr after sunset and LUX < These rules as defined in PTM Special rules for NS qualed vs Pilot In Training

34 Turn-arounds arounds,, Pits & Briefing Time Two main scheduling schemes: Turns Pits Pits are mostly a pilot constraint A typical daily schedule combines Pits and Turns Turns are mostly a maintenance constraint

35 Pits Pit Sequence 2-leg Pit Sequence (Pilot and Aircraft are the Same) briefing (2hrs) take-off time to range (~10 mins) time in range ½ hr landing time from range (~10-20 mins) Pilots and aircrafts are the same In second leg can only fly certain missions codes restricted by the code of the first leg Time interval for which resources are needed: Pilot: From beginning of briefing of first leg to end of debriefing of the last leg Aircraft: From take-off of first leg to landing of last leg Range: individual ranges are needed only during the "time in range" interval of each leg PIT ~1/2 to 1 hr 2 nd leg take-off time to range time in range time from range landing debriefing (1 hr)

36 Turns Turn Sequence Turn Sequence (Aircraft time) briefing (2hrs) take-off time to range (~10 mins) time in range ½ hr landing time from range (~10-20 mins) TURN (2 hrs) take-off time to range (~10 mins) time in range ½ hr. Turn Sequence (Pilot time) briefing (2hrs) take-off Planes have a 2hr turnaround time No restrictions between planes, pilots and codes after the Turn Time interval for which resources are needed: Pilot: From beginning of briefing to end of debriefing Aircraft: From take-off to landing. Aircrafts unavailable for a period of 2 hrs after landing Range: during "time in range" interval time to range (~10 mins) time in range ½ hr landing time from range (~10-20 mins) debriefing (1hr)

37 Pilot, Aircraft and Ranges Time Aircraft time sequence: Time to range Time in range Return time from range Turnaround time (for Turns only) Pilot time sequence: Briefing time: 2 hours Fly: as defined in DB (typically 1 hour) Debriefing: 1 hour for training missions Ranges: Time in range: typically ½ hour

38 Schedule Types There are two basic Schedules types: Normal Schedule: The first take-off after the TURN must be at least 2 hours after the last landing of flights done before the TURN. Not all take-off must be exactly 2 hrs after the last landing Line Schedule: Planes turnaround time don't match up Planes are available for other missions after they have completed their 2hrs long turnaround time The schedule type is decided on a daily basis A Typical schedule is: 4-Pit-4 -TURN-4-Pit-4

39 Determined based on training code and pilot quals: If the pilot Instructor is qualified for the Requirements code in the "Quals Needed and to Fly Without IP" table then he can fly without and instructor If NOT qualed then needs an instructor with the qual given in the Formations "MissionSupportRoles" table. Two main formations: Sections and Divisions Section: 2 planes. Lead and Wing. Pilot Positions are: Section Lead and Wingman Division: 4 planes. Is formed by 2 Sections Pilot positions are: Division Lead, Wingman to the division lead, Section Lead and Wingman for the Section Lead Formation and the codes are in "MissionSupportRoles" table

40 Instructor Requirements and Formations II

41 Range Capabilities Range selection based on Availability Training code: suitability and preference: Each range has a list of mission codes it supports A measure of how suitable it is for that code in a scale from 0 to 5 Range are typically available in 1/2 hr slots Support merging and splitting of ranges defined on a per range basis (underutilized until guidance interface supports it): Altitude-based splitting/merging Geography-based splitting/merging

Transportation Timetabling

Transportation Timetabling Outline DM87 SCHEDULING, TIMETABLING AND ROUTING Lecture 16 Transportation Timetabling 1. Transportation Timetabling Tanker Scheduling Air Transport Train Timetabling Marco Chiarandini DM87 Scheduling,

More information

NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California

NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California All Rights Reserved 1 Topics Innovation Objective Scientific & Mathematical Framework Distinctions

More information

Airline Scheduling: An Overview

Airline Scheduling: An Overview Airline Scheduling: An Overview Crew Scheduling Time-shared Jet Scheduling (Case Study) Airline Scheduling: An Overview Flight Schedule Development Fleet Assignment Crew Scheduling Daily Problem Weekly

More information

An Analytical Approach to the BFS vs. DFS Algorithm Selection Problem 1

An Analytical Approach to the BFS vs. DFS Algorithm Selection Problem 1 An Analytical Approach to the BFS vs. DFS Algorithm Selection Problem 1 Tom Everitt Marcus Hutter Australian National University September 3, 2015 Everitt, T. and Hutter, M. (2015a). Analytical Results

More information

Airline Schedule Development Overview Dr. Peter Belobaba

Airline Schedule Development Overview Dr. Peter Belobaba Airline Schedule Development Overview Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 18 : 1 April 2016

More information

SERVICE NETWORK DESIGN: APPLICATIONS IN TRANSPORTATION AND LOGISTICS

SERVICE NETWORK DESIGN: APPLICATIONS IN TRANSPORTATION AND LOGISTICS SERVICE NETWORK DESIGN: APPLICATIONS IN TRANSPORTATION AND LOGISTICS Professor Cynthia Barnhart Massachusetts Institute of Technology Cambridge, Massachusetts USA March 21, 2007 Outline Service network

More information

PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA

PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA SIMULATION ANALYSIS OF PASSENGER CHECK IN AND BAGGAGE SCREENING AREA AT CHICAGO-ROCKFORD INTERNATIONAL AIRPORT PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University

More information

Applying Integer Linear Programming to the Fleet Assignment Problem

Applying Integer Linear Programming to the Fleet Assignment Problem Applying Integer Linear Programming to the Fleet Assignment Problem ABARA American Airlines Decision Ti'chnohi^ics PO Box 619616 Dallasll'ort Worth Airport, Texas 75261-9616 We formulated and solved the

More information

Contracting of continuing airworthiness management tasks

Contracting of continuing airworthiness management tasks Contracting of continuing airworthiness management tasks Xinming Lv, CAAC June 2014, Mongolia 1 Outline Background Reference Main Principle Implementation 2 Background Background Fast development of Chinese

More information

MIT ICAT. Robust Scheduling. Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation

MIT ICAT. Robust Scheduling. Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation Robust Scheduling Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation Philosophy If you like to drive fast, it doesn t make sense getting a Porsche

More information

Airline Scheduling Optimization ( Chapter 7 I)

Airline Scheduling Optimization ( Chapter 7 I) Airline Scheduling Optimization ( Chapter 7 I) Vivek Kumar (Research Associate, CATSR/GMU) February 28 th, 2011 CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH 2 Agenda Airline Scheduling Factors affecting

More information

Congestion. Vikrant Vaze Prof. Cynthia Barnhart. Department of Civil and Environmental Engineering Massachusetts Institute of Technology

Congestion. Vikrant Vaze Prof. Cynthia Barnhart. Department of Civil and Environmental Engineering Massachusetts Institute of Technology Frequency Competition and Congestion Vikrant Vaze Prof. Cynthia Barnhart Department of Civil and Environmental Engineering Massachusetts Institute of Technology Delays and Demand Capacity Imbalance Estimated

More information

Turboprop Propulsion System Malfunction Recog i n titi ion on an d R d Response

Turboprop Propulsion System Malfunction Recog i n titi ion on an d R d Response Turboprop Propulsion System Malfunction Recognition and Response Propulsion System Malfunction Recognition and Response The rate of occurrence per airplane departure for Propulsion System Malfunction Plus

More information

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE IRPORT GROUND-HOLDING PROBLEM Lili WNG Doctor ir Traffic Management College Civil viation University of China 00 Xunhai Road, Dongli District, Tianjin P.R.

More information

Traffic Flow Management

Traffic Flow Management Traffic Flow Management Traffic Flow Management The mission of traffic management is to balance air traffic demand with system capacity to ensure the maximum efficient utilization of the NAS 2 Traffic

More information

Enter here your Presentation Title 1

Enter here your Presentation Title 1 EXERCISE 4/ Simulation Potential Improvement Measures The European Organisation for the Safety of Air Navigation Objective Present a selection of additional improvement measures for enhanced civil-military

More information

EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS

EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS Laura Major Forest & R. John Hansman C.S. Draper Laboratory, Cambridge, MA 9 USA; lforest@draper.com

More information

epods Airline Management Educational Game

epods Airline Management Educational Game epods Airline Management Educational Game Dr. Peter P. Belobaba 16.75J/1.234J Airline Management March 1, 2006 1 Evolution of PODS Developed by Boeing in early 1990s Simulate passenger choice of airline/paths

More information

Decision aid methodologies in transportation

Decision aid methodologies in transportation Decision aid methodologies in transportation Lecture 5: Revenue Management Prem Kumar prem.viswanathan@epfl.ch Transport and Mobility Laboratory * Presentation materials in this course uses some slides

More information

Introduction Runways delay analysis Runways scheduling integration Results Conclusion. Raphaël Deau, Jean-Baptiste Gotteland, Nicolas Durand

Introduction Runways delay analysis Runways scheduling integration Results Conclusion. Raphaël Deau, Jean-Baptiste Gotteland, Nicolas Durand Midival Airport surface management and runways scheduling ATM 2009 Raphaël Deau, Jean-Baptiste Gotteland, Nicolas Durand July 1 st, 2009 R. Deau, J-B. Gotteland, N. Durand ()Airport SMAN and runways scheduling

More information

ultimate traffic Live User Guide

ultimate traffic Live User Guide ultimate traffic Live User Guide Welcome to ultimate traffic Live This manual has been prepared to aid you in learning about utlive. ultimate traffic Live is an AI traffic generation and management program

More information

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC)

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) 1 Paradigm SHIFT Eurocontrol Experimental Centre Innovative Research June, 2005 Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) Khaled BELAHCENE (Math Mod., Airspace) Didier DOHY (ATM, System)

More information

Abstract. Introduction

Abstract. Introduction COMPARISON OF EFFICIENCY OF SLOT ALLOCATION BY CONGESTION PRICING AND RATION BY SCHEDULE Saba Neyshaboury,Vivek Kumar, Lance Sherry, Karla Hoffman Center for Air Transportation Systems Research (CATSR)

More information

SYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES AND PERFORMANCE

SYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES AND PERFORMANCE 22783 Cedar Point Road, Building 2168 Patuxent River, MD 20670 Phone: 301 757 5049 301 757 2731 Fax: 301 342 5003 www.navair.navy.mil/nawcad/usntps SYLLABUS INTRODUCTION TO ROTARY WING FLYING QUALITIES

More information

Impact of Equipage on Air Force Mission Effectiveness

Impact of Equipage on Air Force Mission Effectiveness Impact of Equipage on Air Force Mission Effectiveness Presentation at ICCRTS 28 September 2006 Slide 1 Background On 3 April 1996 a military version of the Boeing 737 crashed in Dubrovnik, Croatia Sec.

More information

UC Berkeley Working Papers

UC Berkeley Working Papers UC Berkeley Working Papers Title The Value Of Runway Time Slots For Airlines Permalink https://escholarship.org/uc/item/69t9v6qb Authors Cao, Jia-ming Kanafani, Adib Publication Date 1997-05-01 escholarship.org

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Project: Implications of Congestion for the Configuration of Airport Networks and Airline Networks (AirNets)

Project: Implications of Congestion for the Configuration of Airport Networks and Airline Networks (AirNets) Research Thrust: Airport and Airline Systems Project: Implications of Congestion for the Configuration of Airport Networks and Airline Networks (AirNets) Duration: (November 2007 December 2010) Description:

More information

International Civil Aviation Organization. MIDANPIRG Air Traffic Management Sub-Group. Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018)

International Civil Aviation Organization. MIDANPIRG Air Traffic Management Sub-Group. Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018) 22/04/2018 International Civil Aviation Organization MIDANPIRG Air Traffic Management Sub-Group Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018) Agenda Item 6: ATM Safety Matters MID RVSM

More information

CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS

CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS 91 CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS 5.1 INTRODUCTION In chapter 4, from the evaluation of routes and the sensitive analysis, it

More information

Modeling Visitor Movement in Theme Parks

Modeling Visitor Movement in Theme Parks Modeling Visitor Movement in Theme Parks A scenario-specific human mobility model Gürkan Solmaz, Mustafa İlhan Akbaş and Damla Turgut Department of Electrical Engineering and Computer Science University

More information

Integrated Optimization of Arrival, Departure, and Surface Operations

Integrated Optimization of Arrival, Departure, and Surface Operations Integrated Optimization of Arrival, Departure, and Surface Operations Ji MA, Daniel DELAHAYE, Mohammed SBIHI ENAC École Nationale de l Aviation Civile, Toulouse, France Paolo SCALA Amsterdam University

More information

TRANSPORT CANADA PROFESSIONAL AVIATION CURRENCY PROGRAM Effective: 1 April 2007

TRANSPORT CANADA PROFESSIONAL AVIATION CURRENCY PROGRAM Effective: 1 April 2007 TRANSPORT CANADA PROFESSIONAL AVIATION CURRENCY PROGRAM Effective: 1 April 2007 PREAMBLE Civil Aviation Inspector and Engineering Test Pilot employees shall be provided with the opportunity to maintain

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

Mathcad Prime 3.0. Curriculum Guide

Mathcad Prime 3.0. Curriculum Guide Mathcad Prime 3.0 Curriculum Guide Live Classroom Curriculum Guide Mathcad Prime 3.0 Essentials Advanced Functionality using Mathcad Prime 3.0 Mathcad Prime 3.0 Essentials Overview Course Code Course Length

More information

Fleet Assignment Problem Study Based on Branch-and-bound Algorithm

Fleet Assignment Problem Study Based on Branch-and-bound Algorithm International Conference on Mechatronics, Control and Electronic Engineering (MCE 214) Fleet Assignment Problem Study Based on Branch-and-bound Algorithm Wu Donghua College of Continuing and Education

More information

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study An Agent-Based Computational Economics Approach to Strategic Slot Allocation SESAR Innovation Days Bologna, 2 nd December

More information

Operational Evaluation of a Flight-deck Software Application

Operational Evaluation of a Flight-deck Software Application Operational Evaluation of a Flight-deck Software Application Sara R. Wilson National Aeronautics and Space Administration Langley Research Center DATAWorks March 21-22, 2018 Traffic Aware Strategic Aircrew

More information

Extending the Reach of Your Flight Department Team

Extending the Reach of Your Flight Department Team D e d i c a t e d t o h e l p i n g b u s i n e s s a c h i e v e i t s h i g h e s t g o a l s. GA Desk Extending the Reach of Your Flight Department Team Introducing NBAA s GA Desk How often do your

More information

American Airlines Next Top Model

American Airlines Next Top Model Page 1 of 12 American Airlines Next Top Model Introduction Airlines employ several distinct strategies for the boarding and deboarding of airplanes in an attempt to minimize the time each plane spends

More information

Alpha Systems AOA Classic & Ultra CALIBRATION PROCEDURES

Alpha Systems AOA Classic & Ultra CALIBRATION PROCEDURES Alpha Systems AOA Calibration Overview The calibration of the Alpha Systems AOA has 3 simple steps 1.) (On the Ground) Zero calibration 2.) (In-flight) Optimum Alpha Angle (OAA) calibration 3.) (In-flight)

More information

Analysis of Impact of RTC Errors on CTOP Performance

Analysis of Impact of RTC Errors on CTOP Performance https://ntrs.nasa.gov/search.jsp?r=20180004733 2018-09-23T19:12:03+00:00Z NASA/TM-2018-219943 Analysis of Impact of RTC Errors on CTOP Performance Deepak Kulkarni NASA Ames Research Center Moffett Field,

More information

Planning aircraft movements on airports with constraint satisfaction

Planning aircraft movements on airports with constraint satisfaction Planning aircraft movements on airports with constraint satisfaction H.H. Hesselink and S. Paul Planning aircraft movements on airports with constraint satisfaction H.H. Hesselink and S. Paul* * AlcatelISR

More information

I R UNDERGRADUATE REPORT. National Aviation System Congestion Management. by Sahand Karimi Advisor: UG

I R UNDERGRADUATE REPORT. National Aviation System Congestion Management. by Sahand Karimi Advisor: UG UNDERGRADUATE REPORT National Aviation System Congestion Management by Sahand Karimi Advisor: UG 2006-8 I R INSTITUTE FOR SYSTEMS RESEARCH ISR develops, applies and teaches advanced methodologies of design

More information

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017 CAAC China CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision 5 10-Oct-2017 Contents Contents... 2 CCAR 121.481 General... 3 CCAR 121.483 Flight crew flight time

More information

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

/A 18 Jet as a Customer: Energy Conservation Through Demand Management

/A 18 Jet as a Customer: Energy Conservation Through Demand Management /A 18 Jet as a Customer: Energy Conservation Through Demand Management Background Fiscal austerity throughout the Defense Department Sequestration projects an annual shortfall of $55B per year through

More information

ELSA. Empirically grounded agent based models for the future ATM scenario. ELSA Project. Toward a complex network approach to ATM delays analysis

ELSA. Empirically grounded agent based models for the future ATM scenario. ELSA Project. Toward a complex network approach to ATM delays analysis ELSA Empirically grounded agent based models for the future ATM scenario SESAR INNOVATION DAYS Tolouse, 30/11/2011 Salvatore Miccichè University of Palermo, dept. of Physics ELSA Project Toward a complex

More information

Advanced Flight Control System Failure States Airworthiness Requirements and Verification

Advanced Flight Control System Failure States Airworthiness Requirements and Verification Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 80 (2014 ) 431 436 3 rd International Symposium on Aircraft Airworthiness, ISAA 2013 Advanced Flight Control System Failure

More information

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

An advisory circular may also include technical information that is relevant to the rule standards or requirements. Advisory Circular AC61-19 Pilot Licences and Ratings Flight Examiner Ratings Revision 13 02 July 2018 General Civil Aviation Authority advisory circulars contain guidance and information about standards,

More information

Aircraft Arrival Sequencing: Creating order from disorder

Aircraft Arrival Sequencing: Creating order from disorder Aircraft Arrival Sequencing: Creating order from disorder Sponsor Dr. John Shortle Assistant Professor SEOR Dept, GMU Mentor Dr. Lance Sherry Executive Director CATSR, GMU Group members Vivek Kumar David

More information

Research on Pilots Development Planning

Research on Pilots Development Planning Journal of Software Engineering and Applications 2012 5 1016-1022 http://dx.doi.org/10.4236/sea.2012.512118 Published Online December 2012 (http://www.scirp.org/ournal/sea) Ruo Ding Mingang Gao * Institute

More information

RUAT Junior Glider Design Competition Version 1.5

RUAT Junior Glider Design Competition Version 1.5 RUAT Junior Glider Design Competition Version 1.5 Version Log Version Date Changes 1.4 Jan 14 1 st Public Version 1.5 Jan 16 Clarified Launch is from spring NOT winch Extended Intent to Compete Deadline

More information

FLIGHT TRANSPORTATION LABORATORY REPORT R87-5 AN AIR TRAFFIC CONTROL SIMULATOR FOR THE EVALUATION OF FLOW MANAGEMENT STRATEGIES JAMES FRANKLIN BUTLER

FLIGHT TRANSPORTATION LABORATORY REPORT R87-5 AN AIR TRAFFIC CONTROL SIMULATOR FOR THE EVALUATION OF FLOW MANAGEMENT STRATEGIES JAMES FRANKLIN BUTLER FLIGHT TRANSPORTATION LABORATORY REPORT R87-5 AN AIR TRAFFIC CONTROL SIMULATOR FOR THE EVALUATION OF FLOW MANAGEMENT STRATEGIES by JAMES FRANKLIN BUTLER MASTER OF SCIENCE IN AERONAUTICS AND ASTRONAUTICS

More information

Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations

Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations Miwa Hayashi, Ty Hoang, Yoon Jung NASA Ames Research Center Waqar Malik, Hanbong Lee Univ.

More information

An Analysis of Dynamic Actions on the Big Long River

An Analysis of Dynamic Actions on the Big Long River Control # 17126 Page 1 of 19 An Analysis of Dynamic Actions on the Big Long River MCM Team Control # 17126 February 13, 2012 Control # 17126 Page 2 of 19 Contents 1. Introduction... 3 1.1 Problem Background...

More information

Advancing FTD technologies and the opportunity to the pilot training journey. L3 Proprietary

Advancing FTD technologies and the opportunity to the pilot training journey. L3 Proprietary Advancing FTD technologies and the opportunity to the pilot training journey L3 Proprietary Aviation Training Innovation Over the past decade the airline training industry has pursued technology to improve

More information

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016 International Civil Aviation Organization Seventeenth meeting of the GREPECAS Scrutiny Working Group (GTE/17) Lima, Peru, 30 October to 03 November 2017 GTE/17-WP/07 23/10/17 Agenda Item 4: Large Height

More information

DMAN-SMAN-AMAN Optimisation at Milano Linate Airport

DMAN-SMAN-AMAN Optimisation at Milano Linate Airport DMAN-SMAN-AMAN Optimisation at Milano Linate Airport Giovanni Pavese, Maurizio Bruglieri, Alberto Rolando, Roberto Careri Politecnico di Milano 7 th SESAR Innovation Days (SIDs) November 28 th 30 th 2017

More information

Validation of Runway Capacity Models

Validation of Runway Capacity Models Validation of Runway Capacity Models Amy Kim & Mark Hansen UC Berkeley ATM Seminar 2009 July 1, 2009 1 Presentation Outline Introduction Purpose Description of Models Data Methodology Conclusions & Future

More information

Flight Dynamics Analysis of a Medium Range Box Wing Aircraft

Flight Dynamics Analysis of a Medium Range Box Wing Aircraft AERO AIRCRAFT DESIGN AND SYSTEMS GROUP Flight Dynamics Analysis of a Medium Range Box Wing Aircraft Supervisor: Prof. Dieter Scholz Tutor: Daniel Schiktanz Warsaw University of Technology Hamburg University

More information

Integrated Disruption Management and Flight Planning to Trade Off Delays and Fuel Burn

Integrated Disruption Management and Flight Planning to Trade Off Delays and Fuel Burn Integrated Disruption Management and Flight Planning to Trade Off Delays and Fuel Burn The MIT Faculty has made this article openly available. Please share how this access benefits you. Your story matters.

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Aircraft Noise. Why Aircraft Noise Calculations? Aircraft Noise. SoundPLAN s Aircraft Noise Module

Aircraft Noise. Why Aircraft Noise Calculations? Aircraft Noise. SoundPLAN s Aircraft Noise Module Aircraft Noise Why Aircraft Noise Calculations? Aircraft Noise Aircraft noise can be measured and simulated with specialized software like SoundPLAN. Noise monitoring and measurement can only measure the

More information

A Review of Airport Runway Scheduling

A Review of Airport Runway Scheduling 1 A Review of Airport Runway Scheduling Julia Bennell School of Management, University of Southampton Chris Potts School of Mathematics, University of Southampton This work was supported by EUROCONTROL,

More information

GUIDANCE MATERIAL CONCERNING FLIGHT TIME AND FLIGHT DUTY TIME LIMITATIONS AND REST PERIODS

GUIDANCE MATERIAL CONCERNING FLIGHT TIME AND FLIGHT DUTY TIME LIMITATIONS AND REST PERIODS GUIDANCE MATERIAL CONCERNING FLIGHT TIME AND FLIGHT DUTY TIME LIMITATIONS AND REST PERIODS PREAMBLE: Guidance material is provided for any regulation or standard when: (a) (b) The subject area is complex

More information

6. Cross-Country Flight Limitations. The following criteria shall be applied to the conduct of cross-country flights.

6. Cross-Country Flight Limitations. The following criteria shall be applied to the conduct of cross-country flights. curricula; student training flights contained in CNATRA-approved curricula; and static displays in the continental United States (CONUS). TRAWING commanders may delegate this authority to squadron commanding

More information

Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling

Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling Yan Xu and Xavier Prats Technical University of Catalonia (UPC) Outline Motivation & Background Trajectory optimization

More information

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times

More information

LESSON PLAN Introduction (3 minutes)

LESSON PLAN Introduction (3 minutes) LESSON PLAN Introduction (3 minutes) ATTENTION: MOTIVATION: OVERVIEW: Relate aircraft accident in which a multi-engine airplane ran off the end of the runway. This could have been avoided by correctly

More information

First Person View Proficiency Test Guide. Revised 13/03/2018

First Person View Proficiency Test Guide. Revised 13/03/2018 First Person View Proficiency Test Guide Revised 13/03/2018 Index: 1 Introduction Pg 2 2 Definitions Pg 3 3 FPV proficiencies Pg 4 3.1 The model 3.2 The Proficiency Test 3.2.1 Oral Test 3.2.2 Pre-flight

More information

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Atlantic Interoperability Initiative to Reduce Emissions AIRE ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia

More information

A Study of Tradeoffs in Airport Coordinated Surface Operations

A Study of Tradeoffs in Airport Coordinated Surface Operations A Study of Tradeoffs in Airport Coordinated Surface Operations Ji MA, Daniel DELAHAYE, Mohammed SBIHI ENAC École Nationale de l Aviation Civile, Toulouse, France Paolo SCALA, Miguel MUJICA MOTA Amsterdam

More information

CHG 0 9/13/2007 VOLUME 2 AIR OPERATOR AND AIR AGENCY CERTIFICATION AND APPLICATION PROCESS

CHG 0 9/13/2007 VOLUME 2 AIR OPERATOR AND AIR AGENCY CERTIFICATION AND APPLICATION PROCESS VOLUME 2 AIR OPERATOR AND AIR AGENCY CERTIFICATION AND APPLICATION PROCESS CHAPTER 5 THE APPLICATION PROCESS TITLE 14 CFR PART 91, SUBPART K 2-536. DIRECTION AND GUIDANCE. Section 1 General A. General.

More information

Performance monitoring report for first half of 2015

Performance monitoring report for first half of 2015 Performance monitoring report for first half of 2015 Gatwick Airport Limited 1. Introduction Date of issue: 11 November 2015 This report provides an update on performance at Gatwick in the first half of

More information

Briefing on AirNets Project

Briefing on AirNets Project September 5, 2008 Briefing on AirNets Project (Project initiated in November 2007) Amedeo Odoni MIT AirNets Participants! Faculty: António Pais Antunes (FCTUC) Cynthia Barnhart (CEE, MIT) Álvaro Costa

More information

AIRBUS Generic Flight Test Installation

AIRBUS Generic Flight Test Installation AIRBUS Generic Flight Test Installation Jean-Pascal CATURLA AIRBUS Operations SAS, Toulouse, France ABSTRACT This paper describes new concepts of test mean and processes to perform flight test for all

More information

Scalable Runtime Support for Data-Intensive Applications on the Single-Chip Cloud Computer

Scalable Runtime Support for Data-Intensive Applications on the Single-Chip Cloud Computer Scalable Runtime Support for Data-Intensive Applications on the Single-Chip Cloud Computer Anastasios Papagiannis and Dimitrios S. Nikolopoulos, FORTH-ICS Institute of Computer Science (ICS) Foundation

More information

Applicability / Compatibility of STPA with FAA Regulations & Guidance. First STAMP/STPA Workshop. Federal Aviation Administration

Applicability / Compatibility of STPA with FAA Regulations & Guidance. First STAMP/STPA Workshop. Federal Aviation Administration Applicability / Compatibility of STPA with FAA Regulations & Guidance First STAMP/STPA Workshop Presented by: Peter Skaves, FAA Chief Scientific and Technical Advisor for Advanced Avionics Briefing Objectives

More information

INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS

INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS Andre Frieslaar Pr.Eng and John Jones Pr.Eng Abstract Hawkins Hawkins and Osborn (South) Pty Ltd 14 Bree Street,

More information

Sensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015

Sensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015 Sensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015 Acknowledgments Sherry Borener, FAA Alan Durston, Brian Hjelle, Saab Sensis Seungwon

More information

NATIONAL HEADQUARTERS CIVIL AIR PATROL CAP REGULATION DECEMBER 2012 Operations PILOT FLIGHT CLINICS

NATIONAL HEADQUARTERS CIVIL AIR PATROL CAP REGULATION DECEMBER 2012 Operations PILOT FLIGHT CLINICS NATIONAL HEADQUARTERS CIVIL AIR PATROL CAP REGULATION 60-2 12 DECEMBER 2012 Operations PILOT FLIGHT CLINICS This regulation establishes procedures for authorizing, funding, conducting and reporting Civil

More information

Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms

Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms Center for Advanced Aviation System Development Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms Dr. Lesley A. Weitz Principal Systems Engineer The MITRE Corporation,

More information

Appendix 1(a) to JCAR-FCL 1.055

Appendix 1(a) to JCAR-FCL 1.055 Flying Training Organizations for Pilot licenses and Ratings This guide gives the requirements for the issue, revalidation and variation of the approval of FTOs Introduction 1. A Flying Training Organization

More information

DGAC Costa Rica. MCAR OPS 1-Subpart Q LIMITATIONS OF FLIGHT TIME AND TIME OF SERVICE AND REST REQUIREMENTS. 30-June-2009

DGAC Costa Rica. MCAR OPS 1-Subpart Q LIMITATIONS OF FLIGHT TIME AND TIME OF SERVICE AND REST REQUIREMENTS. 30-June-2009 DGAC Costa Rica MCAR OPS 1-Subpart Q LIMITATIONS OF FLIGHT TIME AND TIME OF SERVICE AND REST REQUIREMENTS 30-June-2009 Contents Contents... 2 SUBPART Q LIMITATIONS OF FLIGHT TIME AND TIME OF SERVICE AND

More information

Quantitative Analysis of the Adapted Physical Education Employment Market in Higher Education

Quantitative Analysis of the Adapted Physical Education Employment Market in Higher Education Quantitative Analysis of the Adapted Physical Education Employment Market in Higher Education by Jiabei Zhang, Western Michigan University Abstract The purpose of this study was to analyze the employment

More information

Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis

Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis Parimal Kopardekar NASA Ames Research Center Albert Schwartz, Sherri Magyarits, and Jessica Rhodes FAA William J. Hughes Technical

More information

Air Connectivity and Competition

Air Connectivity and Competition Air Connectivity and Competition Sainarayan A Chief, Aviation Data and Analysis Section, ATB Concept of Connectivity in Air Transport Movement of passengers, mail and cargo involving the minimum of transit

More information

Two Major Problems Problems Crew Pairing Problem (CPP) Find a set of legal pairin Find gs (each pairing

Two Major Problems Problems Crew Pairing Problem (CPP) Find a set of legal pairin Find gs (each pairing Solving Airline s Pilot-Copilot Rostering Problem by Successive Bipartite Weighted Matching by Xugang Ye Applied Mathematics and Statistics, The Johns Hopkins University Motivation Crew-related related

More information

Collaborative Decision Making By: Michael Wambsganss 10/25/2006

Collaborative Decision Making By: Michael Wambsganss 10/25/2006 Collaborative Decision Making By: Michael Wambsganss 10/25/2006 TFM History De-regulation: leads to new demand patterns High fuel prices Air Traffic Controller s Strike*** TFM is born (mid 80s: eliminate

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

Approximate Network Delays Model

Approximate Network Delays Model Approximate Network Delays Model Nikolas Pyrgiotis International Center for Air Transportation, MIT Research Supervisor: Prof Amedeo Odoni Jan 26, 2008 ICAT, MIT 1 Introduction Layout 1 Motivation and

More information

Methodology and coverage of the survey. Background

Methodology and coverage of the survey. Background Methodology and coverage of the survey Background The International Passenger Survey (IPS) is a large multi-purpose survey that collects information from passengers as they enter or leave the United Kingdom.

More information

RECEDING HORIZON CONTROL FOR AIRPORT CAPACITY MANAGEMENT

RECEDING HORIZON CONTROL FOR AIRPORT CAPACITY MANAGEMENT RECEDING HORIZON CONTROL FOR AIRPORT CAPACITY MANAGEMENT W.-H. Chen, X.B. Hu Dept. of Aeronautical & Automotive Engineering, Loughborough University, UK Keywords: Receding Horizon Control, Air Traffic

More information

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan INTERNAL AUDIT DIVISION REPORT 2014/065 Audit of air operations in the United Nations Assistance Mission in Afghanistan Overall results relating to the effective management of air operations in the United

More information

Scenarios for Fleet Assignment: A Case Study at Lion Air

Scenarios for Fleet Assignment: A Case Study at Lion Air IOSR Journal of Mathematics (IOSR-JM) e-issn: 2278-5728, p-issn: 2319-765X Volume 10, Issue 5 Ver I (Sep-Oct 2014), PP 64-68 wwwiosrjournalsorg Scenarios for Fleet Assignment: A Case Study at Lion Air

More information

Appendix A. Meeting Coordination. Appendix A

Appendix A. Meeting Coordination. Appendix A Appendix A Meeting Coordination Appendix A Philadelphia International Airport Noise Compatibility Program Update FAR Part 150 Noise Compatibility Program Update Report Prepared by: DMJM Aviation AECOM

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

Overview of the Airline Planning Process Dr. Peter Belobaba Presented by Alex Heiter

Overview of the Airline Planning Process Dr. Peter Belobaba Presented by Alex Heiter Overview of the Airline Planning Process Dr. Peter Belobaba Presented by Alex Heiter Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning

More information