1 F063-B-011 Potential Procedures to Reduce Departure Noise at Madrid Barajas Airport William J. Swedish Frank A. Amodeo 7 January 2001 The contents of this material reflect the views of the authors, and do not necessarily reflect the opinions of Aeropuertos Españoles y Navegación Aérea (Aena), the U.S. Federal Aviation Administration, or any other party.
2 2 Proposed Runway Configuration 0 Predominant flow is northbound New Runways N
3 3 0 Southbound departures today can turn and avoid noisesensitive areas (red and orange) 0 Parallel departures would need to fly closer to these areas N (not to scale)
4 Independent Parallel Departures Standard ICAO/FAA Departure Procedures 4 0 Departure tracks must diverge by 15 immediately after takeoff - One track straight or turns away (implied) 760 m (2500 ft)
5 5 Southbound Departures 0 Greatest noise impact would be due to southbound departures at night ( local time), - Noise Impact is population exposed to critical noise levels = 65 dba in daytime = 55 dba at night 0 Recommendation: To reduce noise impact for these departures, use only one runway - New Runway 15L, farther away from sensitive areas - Single departure track over open land - Less capacity, but demand is light
6 6 Alternative Procedures for Parallel Departures 0 As traffic grows, single runway may not provide enough departure capacity at night 0 Varying the departure flight paths may reduce noise impact compared to standard procedures - Reduce divergence angle to avoid populated areas, or - Turn both in same direction 0 Feasibility of such techniques at Barajas is not assured
7 Reduce Divergence Angle for Independent Departures 7 0 ICAO standard procedure: 15 divergence 0 10 divergence - Implemented at Toronto, Canada (3300 m runway spacing) - Investigating 5 divergence 0 Parallel departures for 5 NM - Implemented at Paris Charles de Gaulle (3000 m runway spacing) - Requires positive course guidance (e.g., VOR on runway centerline)
8 Toronto Pearson International Airport 3300 m (10,800 ft) Runway Spacing 8 0 Even at 5 divergence, there would be more separation between adjacent aircraft than ICAO standard case (15 divergence and 760 m) until >6 NM from runway end - 10 departure divergence ==> 15 NM Toronto m (14000 ft) 3290 m (10800 ft) m (10640 ft) 3750 m (12300 ft) 760 m (2500 ft) ICAO 5 NM 6 NM
9 9 Turn Both Departures in Same Direction 0 Concept: Independent departures with same-direction turns - New procedure, not explicitly covered by ICAO PANS = Would require more analysis, much testing - Need to ensure separation between departures = Minimum straight segment required on outside runway = Protects against a slow climb to 400 ft before turn from inside runway ~ 2 NM
10 Turn Both Departures in Same Direction (continued) 10 0 Independent departures with same-direction turns - New procedure with safety issues - Straight segment before turn takes aircraft closer to noisesensitive area = Will increase noise impact compared to turn at runway end 0 Alternative concept: Dependent departures with same-direction turns - Interval (e.g., 60 sec) between departures on different runways = Provides longitudinal separation - Departure capacity is function of this interval
11 Dependent Departures with Same-Direction Turns 11 0 Advantages - Turns are not simultaneous (side-by-side) = Straight segment not required - Procedure can be implemented gradually = Start with 60 sec inter-runway separation (for radar separation), reduce as pilots and controllers gain experience and confidence 0 Some safety questions - How close could the aircraft be? - What if one aircraft goes straight ( blunders )?
12 12 Preliminary Monte Carlo Simulation 0 Used simple dynamic model to calculate the Closest Point of Approach (CPA) 0 Departures from Runways 15L/R - Turn Angles from 15R: 5, 10, 15 - Divergence: 0 (parallel), 5, 10, 15 - Also blunders (15L departure does not turn) 0 Variable parameters - Takeoff Speed - Heading after Turn - Start of Turn
13 Mean and Minimum CPAs 5 Turn 30 sec. inter-runway departure 15R separation 5 Degree Turn Mean CPA Distance (feet) Diverging Diverging turns turns are are still still required, required, to to increase increase minimum minimum CPA CPA Mean 15R #1 Mean 15R #2 Min 15R#1 Min 15R # Minimum CPA Other Turn Angle
14 Conclusions 14 0 High noise impact for southbound night departures (2% of year) can be greatly reduced by using only a single runway for departures 0 Reducing departure divergence, if feasible at Barajas, could potentially reduce noise impact and/or provide additional departure capacity 0 Dependent departure / same direction turn procedure appears promising, but further analysis is needed - Especially blunder performance
A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures
A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures Dr. Ralf H. Mayer Dennis J. Zondervan Albert A. Herndon Tyler Smith 9 th USA/EUROPE Air Traffic Management
More informationSOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports
SOURDINE II EU- 5FW project on Noise Abatement Procedures Overall view Ruud den Boer / Collin Beers Department: ATM & Airports Study of key elements weighed key elements 4th Framework Programme Definition
More informationAirfield Capacity Prof. Amedeo Odoni
Airfield Capacity Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 10 May 27, 2015 Airfield Capacity Objective:
More informationUsing PBN for Terminal and Extended Terminal Operations
Using PBN for Terminal and Extended Terminal Operations Navigation Performance Data Analysis and its Effect on Route Spacing Dijana Trenevska EUROCONTROL 27 June 2017 Content Background and Objective Data
More informationProject Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures
VIA E-MAIL Date: To: From: Subject: Boston Technical Advisory Committee (BOS/TAC) Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures At the February 17, 2006 BOS/TAC meeting several issues
More informationUPDATE ON THE 6 IDEAS (1-4) NAV CANADA
UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival
More informationCHAPTER 5 SEPARATION METHODS AND MINIMA
CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces
More informationCOMMUNITY NOISE MITIGATION SUGGESTIONS
COMMUNITY NOISE MITIGATION SUGGESTIONS Toronto Pearson is one of North America's fastest growing global hub airports, handling nearly 40 million passengers today, and well on its way to reaching greater
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationRNP AR and Air Traffic Management
RNP AR and Air Traffic Management BOEING is a trademark of Boeing Management Company. Copyright 2009 Boeing. All rights reserved. Expanding the Utility of RNP AR Sheila Conway RNP AR User s Forum Wellington,
More informationEstablishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation
Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Roland E. Weibel, Matthew W.M. Edwards, and Caroline S. Fernandes MIT Lincoln laboratory Surveillance Systems Group Ninth
More informationA Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact
A Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact ATIO/ANERS September 22, 2009 Andrew March Prof. Ian Waitz Prof. Karen Willcox Motivation
More informationKey Purpose & Need Issues
Key Purpose & Need Issues Efficiently meet demand through the 2025 planning horizon 864,000+ annual operations 180-200 operations during peak daytime hours Balance peak hour arrival/departure capability
More informationATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System
ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System L.J.P. (Lennaert) Speijker, speijker@nlr.nl WakeNet Europe, 8/9 January 2009 http://www.nlr.nl/public/hosted-sites/atc-wake
More informationTime-Space Analysis Airport Runway Capacity. Dr. Antonio A. Trani. Fall 2017
Time-Space Analysis Airport Runway Capacity Dr. Antonio A. Trani CEE 3604 Introduction to Transportation Engineering Fall 2017 Virginia Tech (A.A. Trani) Why Time Space Diagrams? To estimate the following:
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationNoise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology
Noise Abatement Arrival Procedures at Louisville International Airport Prof. John-Paul Clarke Georgia Institute of Technology The Team Noise Abatement Procedures Working Group (NAPWG) has the following
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen
Page 1 of 14 1 INTRODUCTION This guidance material has been prepared for use for the definition of protected surfaces in the vicinity of aerodromes. Survey information for an aerodrome is essential for
More informationLFPG / Paris-Charles de Gaulle / CDG
This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN
05/04/00 INTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN (Grand Cayman, Cayman Islands, 17-20 May 2000) Agenda Item 3: Air Traffic Management
More informationLondon Biggin Hill Airport Runway 03 Approach A9912 N02 DC. Noise Assessment Extended D Charles 1.0 INTRODUCTION
Project: File Ref: London Biggin Hill Airport Runway 03 Approach Date: 6 January 2016 Subject: From: Noise Assessment Extended D Charles To: Name Company Will Curtis Peter Mirams Barry Hawkins London Biggin
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationFeasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures
Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures Implications of a Pilot Survey and Laboratory Simulations Dr. Anand M. Mundra
More informationIFR SEPARATION WITHOUT RADAR
1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s
More informationFIRST FLYING TECHNIQUES - APPROACH AND LANDING
FIRST FLYING TECHNIQUES - APPROACH AND LANDING 1. Introduction We aim to teach and demonstrate how to operate a general aviation aircraft and show some basic techniques and manoeuvres that every real pilot
More informationRevised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Noise Compatibility Committee
Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Presentation to: Noise Compatibility Committee October 29, 2015 Ted Baldwin What are NADPs? Departure
More informationDeparture Noise Mitigation Review. Dr Darren Rhodes Civil Aviation Authority 18 July
Departure Noise Mitigation Review Dr Darren Rhodes Civil Aviation Authority 18 July 2018 1 Departure Noise Review: Terms of Reference Conduct a review of the existing policy objectives and desired outcomes
More informationApplication of the reduced runway separation minima at the Sheremetyevo airport RUSSIAN FEDERATION
Application of the reduced runway separation minima at the Sheremetyevo airport RUSSIAN FEDERATION Use of the runway system at aerodrome Sheremetyevo Aerodrome has two close parallel RWYs Separation between
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationBirmingham Airport Airspace Change Proposal
Birmingham Airport Airspace Change Proposal Deciding between Option 5 and Option 6 Ratified Version 1. Introduction Birmingham Airport Limited (BAL) launched the Runway 15 departures Airspace Change Consultation
More informationCAUTION: WAKE TURBULENCE
CAUTION: WAKE TURBULENCE This was the phrase issued while inbound to land at Boeing Field (BFI) while on a transition training flight. It was early August, late afternoon and the weather was clear, low
More informationPART 210 NOISE ABATEMENT AND RUNWAY PROCEDURES NOISE ABATEMENT AND PREFERENTIAL RUNWAY USE PROCEDURES
PART 210 NOISE ABATEMENT AND RUNWAY PROCEDURES 210.01 NOISE ABATEMENT AND PREFERENTIAL RUNWAY USE PROCEDURES 210.01-1 Establishment Of Procedures; FAA Guidelines This Rule establishes preferential runway
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationAtlanta NextGen PBN Activities
Atlanta NextGen PBN Activities Presentation to: Name: Date: EWG Ops SC Meeting Jim Arrighi RNAV/RNP Group Jim Allerdice A80 May 18, 2010 0 0 Atlanta Performance Based Navigation Project Planning Seven
More informationOperational Demonstration of a Performance-Based Separation Standard at The Hartsfield-Jackson Atlanta International Airport
Operational Demonstration of a Performance-Based Separation Standard at The Hartsfield-Jackson Atlanta International Airport Implementation and Benefits of Equivalent Lateral Spacing Operation (ELSO) Departures
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More information! Figure 1. Proposed Cargo Ramp at the end of Taxiway Echo.! Assignment 7: Airport Capacity and Geometric Design. Problem 1
CEE 4674: Airport Planning and Design Spring 2014 Assignment 7: Airport Capacity and Geometric Design Solution Instructor: Trani Problem 1 An airport is designing a new ramp area to accommodate three Boeing
More informationMinimum Safe. Federal Aviation Administration Altitude Warning. Presented to: Pan American Aviation Safety Summit; Sao Paulo, Brazil
Minimum Safe Altitude Warning Presented to: Pan American Aviation Safety Summit; Sao Paulo, Brazil By: Date: Glenn W. Michael Manager, CAST International Operations April 21, 2010 MSAW Overview A general
More informationNational Transportation Safety Board Recommendation and FAA Air Traffic Orders
Page 1 of 8 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Chad E. Leqve, Director Environment (725.6326) SUBJECT: NOISE OVERSIGHT COMMITTEE (NOC) CONVERGING RUNWAY OPERATION (CRO)
More informationEnvironmental benefits of continuous descent approaches at Schiphol Airport compared with conventional approach procedures
Environmental benefits of continuous descent approaches at Schiphol Airport compared with conventional approach procedures F.J.M. Wubben and J.J. Busink Nationaal Lucht- en Ruimtevaartlaboratorium National
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationAnalysis of Air Transportation Systems. Airport Capacity
Analysis of Air Transportation Systems Airport Capacity Dr. Antonio A. Trani Associate Professor of Civil and Environmental Engineering Virginia Polytechnic Institute and State University Fall 2002 Virginia
More informationChapter 6. Nonradar. Section 1. General DISTANCE
12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG
More informationInterval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms
Center for Advanced Aviation System Development Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms Dr. Lesley A. Weitz Principal Systems Engineer The MITRE Corporation,
More informationEvaluation of Strategic and Tactical Runway Balancing*
Evaluation of Strategic and Tactical Runway Balancing* Adan Vela, Lanie Sandberg & Tom Reynolds June 2015 11 th USA/Europe Air Traffic Management Research and Development Seminar (ATM2015) *This work was
More informationCommunity Noise Consortium Meeting (CNC)
Community Noise Consortium Meeting (CNC) November 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered
More informationA Standard for Equivalent Lateral Spacing Operations
Ninth USA/Europe Air Traffic Management Research and Development Seminar (ATM2011) A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures Dr. Ralf H. Mayer, Dennis
More informationAtlantic Interoperability Initiative to Reduce Emissions AIRE
ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia
More informationNOISE ABATEMENT PROCEDURES
1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions
More informationPacifica. Short Term Aircraft Noise Monitoring
Short Term Aircraft Noise Monitoring March March, Pacifica Prepared for the Oddstad Boulevard Park Pacifica Avenue Neighborhoods by San Francisco International Airport Noise Abatement Office P.O. Box 8097
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationArriving and departing aircraft at Edinburgh Airport
Arriving and departing aircraft at Edinburgh Airport Contents Introduction... 3 Arriving aircraft... 3 The Instrument Landing System (ILS)... 6 Visual Approach... 6 Non Directional Beacon Approach... 6
More informationSULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11
KURDISTAN REGIONAL GOVERNMENT SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 SEPARATION STANDARDS & APPLICATIONS International and Local Procedures ( First Edition ) April 2012 Ff Prepared By Fakhir.F.
More informationICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations
ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This
More informationTAKEOFF SAFETY ISSUE 2-11/2001. Flight Operations Support & Line Assistance
TAKEOFF SAFETY T R A I N I N G A I D ISSUE 2-11/2001 Flight Operations Support & Line Assistance Flight Operations Support & Line Assistance Introduction The purpose of this brochure is to provide the
More informationLFMN / Nice Côte-d Azur / NCE
This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main
More informationMarch 2016 Safety Meeting
March 2016 Safety Meeting AC 61 98C Subject: Currency Requirements and Guidance for the Flight Review and Instrument Proficiency Check Date: 11/20/15 AC No: 61-98C Initiated by: AFS-800 Supercedes: AC
More informationAll-Weather Operations Training Programme
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 3 OF 2014 Date: OPERATIONS CIRCULAR Subject: All-Weather Operations Training Programme 1. INTRODUCTION In order to
More informationIndependent Parallel Runway Visual Approach in Beijing Capital Airport
Independent Parallel Runway Visual Approach in Beijing Capital Airport SUMMARY Basic Concepts of Visual Approach The Promoting Process Of Visual Approach (including The Preparation) The Implementation
More informationGENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3
IBAC TECHNICAL REPORT SUMMARY Subject: NAT Operations and Air Traffic Management Meeting: North Atlantic (NAT) Procedures and Operations Group Meeting 2 Reported by Tom Young POG2 took place at the ICAO
More informationConsideration will be given to other methods of compliance which may be presented to the Authority.
Advisory Circular AC 139-11 Revision 2 Use of day-vfr aerodromes 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that
More informationQuiz 2 - Solution. Problem #1 (50 points) CEE 5614 Fall Date Due: Wednesday November 20, 2013 Instructor: Trani
CEE 5614 Fall 2013 Quiz 2 - Solution Date Due: Wednesday November 20, 2013 Instructor: Trani Problem #1 (50 points) The North Atlantic Organized System (OTS) is typically made up of 6 Eastbound Track as
More informationKTRK HIGH. Truckee Tahoe Airport Truckee, California, United States
Diagram #1: Abatement Arrival Procedures All Aircraft Categories / All Runways p. 1 of 9 Diagram #2: Abatement Departure Procedures All Aircraft Categories / All Runways p. 2 of 9 NOISE ABATEMENT PROCEDURES
More informationAny queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:
Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations
More informationSPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR
Phone: 248-4384186 AFS: FSIAYNYX FAX: 248-4384179 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT
More informationThe Departure Regulator: A Working Paper
The Departure Regulator: A Working Paper Isaac Robeson Georgia Institute of Technology Dr. John-Paul Clarke Georgia Institute of Technology September 2010 Abstract Increased efficiency at airports is necessary
More informationDon-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs
Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India
More informationQUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS
QUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS FOREWORD It takes a cross-industry effort to ensure that every flight happens safely and efficiently airlines, air navigation services, airport authorities,
More informationDubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept
DANS LIDAR wake vortex data campaign, deployment of Dependent Diagonal approaches and ongoing work to prepare RNP Parallel Approach Transition (RPAT) concept for implementation Roberto Ghidini Dubai contest
More informationRNAV - RNP. July 2010
RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve
More informationNon Compliant Approach Balancing the risk with SMI
Non Compliant Approach Balancing the risk with SMI Safety forum: Airborne conflict Yann Le Fablec Head of Safety & Performance Dept / DSNA 11th of June 2014 Direction des services de la Navigation aérienne
More informationTORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT
TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT Noise and the GTAA The GTAA is sensitive to the issue of aircraft noise and how it affects our neighbours. Since assuming responsibility for Toronto
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationINCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER
INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER 09-2020 By Chun-Hsing Ho, Dwight D. Eisenhower Fellow Department of Civil and Environmental
More informationFlight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures
Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the
More informationAirspace Encounter Models for Conventional and Unconventional Aircraft
Airspace Encounter Models for Conventional and Unconventional Aircraft Matthew W. Edwards, Mykel J. Kochenderfer, Leo P. Espindle, James K. Kuchar, and J. Daniel Griffith Eighth USA/Europe Air Traffic
More informationNavigation - Runways. Chap 2, Nolan
Navigation - Runways Chap 2, Nolan 1 Runways Runways numbered to correspond to magnetic bearing Runway 27 has magnetic bearing 270 degrees Active Runway selected for headwind greater than 5 knots When
More informationANALYSIS OF POTENTIAL BENEFITS OF WIND DEPENDENT PARALLEL ARRIVAL OPERATIONS
ANALYSIS OF POTENTIAL BENEFITS OF WIND DEPENDENT PARALLEL ARRIVAL OPERATIONS Dr. Ralf H. Mayer, The MITRE Corporation, McLean, VA Abstract This paper documents the results of fast-time simulations evaluating
More informationDEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS
DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS 1.Define wind Coverage (AUC NOV/DEC 2010),(AUC NOV/DEC 2011)
More informationName of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:
Phase I Submission Name of Program: Equivalent Lateral Spacing Operation (ELSO) Name of Program Leader: Dr. Ralf Mayer Phone Number: 703-983-2755 Email: rmayer@mitre.org Postage Address: The MITRE Corporation,
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationRe: Findings Regarding Possible Impacts of Proposed Rockfort Quarry on Aviation Activities at Brampton Airport
Mr. Christopher J. Tzekas, Partner, WeirFoulds LLP, The Exchange Tower, Suite 1600, P.O. Box 480, 130 King Street West, Toronto, Ontario, M5X 1J5. May 8, 2010. Re: Findings Regarding Possible Impacts of
More informationIFR FLIGHT BRIEFING. This IFR flight briefing presentation has been made concise and simple in order to easily handle the IFR flight preparation.
IFR FLIGHT BRIEFING 1. Introduction This IFR flight briefing presentation has been made concise and simple in order to easily handle the IFR flight preparation. As IVAO, in a simulated area, is different
More informationREGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application
Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation
More informationAPPENDIX X: RUNWAY LENGTH ANALYSIS
APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More informationNoise Compatibility Report
` Noise Compatibility Report 2018 1st Quarter May 22, 2018 Disclaimer Sound levels were unavailable between Oct. 6 th and May 22 nd, 2018. On May 22 nd, new state of the art monitors were installed. Adherence
More informationBoeing Aircraft and the Impact on Airports
International Civil Aviation Organization on Pavement Management Systems Lima, Peru November 19-22, 2003 Boeing Aircraft and the Impact on Airports Orest Shepson Principal Engineer - Airport Technology
More informationOpportunities to improve noise management and communications at Heathrow
Opportunities to improve noise management and communications at Heathrow Summary of a dialogue between Aviation Environment Federation, British Airways, HACAN, Heathrow Airport and NATS 1. Introduction
More information1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.
ALBUQUERQUE INTERNATIONAL SUNPORT AIRCRAFT HOLD LINE LOCATION ANALYSIS WHITE PAPER JUNE 24, 2016 HOLD LINE LOCATION ISSUE The location of many of the taxiway hold lines at the Sunport do not meet current
More informationIMPROVING ATM CAPACITY WITH "DUAL AIRSPACE": A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY
IMPROVING ATM CAPACITY WITH "DUAL AIRSPACE": A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY Jean-Yves GRAU - SynRjy Didier DOHY - NeoSys Laurent GUICHARD EUROCONTROL Sandrine GUIBERT
More informationPROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS
PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a
More informationMeasurement of environmental benefits by ICAO Secretariat
International Civil Aviation Organization Measurement of environmental benefits by ICAO Secretariat ICAO PBN TF Sven Halle ICAO EUR/NAT Office ICAO EUR/NAT Office PBN Workshop 1 Overview KPA ASSEMBLY RESOLUTION
More informationWake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007
Wake Vortex R&D Status Briefing NBAA Convention By: Steve Lang Date: September 2007 Topics for Today Wake Turbulence Program Overview Near Term Achievements The Future Wake Program Activities Near-Term
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationEXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS
EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS Laura Major Forest & R. John Hansman C.S. Draper Laboratory, Cambridge, MA 9 USA; lforest@draper.com
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,
More information