Potential Procedures to Reduce Departure Noise at Madrid Barajas Airport

Size: px
Start display at page:

Download "Potential Procedures to Reduce Departure Noise at Madrid Barajas Airport"

Transcription

1 F063-B-011 Potential Procedures to Reduce Departure Noise at Madrid Barajas Airport William J. Swedish Frank A. Amodeo 7 January 2001 The contents of this material reflect the views of the authors, and do not necessarily reflect the opinions of Aeropuertos Españoles y Navegación Aérea (Aena), the U.S. Federal Aviation Administration, or any other party.

2 2 Proposed Runway Configuration 0 Predominant flow is northbound New Runways N

3 3 0 Southbound departures today can turn and avoid noisesensitive areas (red and orange) 0 Parallel departures would need to fly closer to these areas N (not to scale)

4 Independent Parallel Departures Standard ICAO/FAA Departure Procedures 4 0 Departure tracks must diverge by 15 immediately after takeoff - One track straight or turns away (implied) 760 m (2500 ft)

5 5 Southbound Departures 0 Greatest noise impact would be due to southbound departures at night ( local time), - Noise Impact is population exposed to critical noise levels = 65 dba in daytime = 55 dba at night 0 Recommendation: To reduce noise impact for these departures, use only one runway - New Runway 15L, farther away from sensitive areas - Single departure track over open land - Less capacity, but demand is light

6 6 Alternative Procedures for Parallel Departures 0 As traffic grows, single runway may not provide enough departure capacity at night 0 Varying the departure flight paths may reduce noise impact compared to standard procedures - Reduce divergence angle to avoid populated areas, or - Turn both in same direction 0 Feasibility of such techniques at Barajas is not assured

7 Reduce Divergence Angle for Independent Departures 7 0 ICAO standard procedure: 15 divergence 0 10 divergence - Implemented at Toronto, Canada (3300 m runway spacing) - Investigating 5 divergence 0 Parallel departures for 5 NM - Implemented at Paris Charles de Gaulle (3000 m runway spacing) - Requires positive course guidance (e.g., VOR on runway centerline)

8 Toronto Pearson International Airport 3300 m (10,800 ft) Runway Spacing 8 0 Even at 5 divergence, there would be more separation between adjacent aircraft than ICAO standard case (15 divergence and 760 m) until >6 NM from runway end - 10 departure divergence ==> 15 NM Toronto m (14000 ft) 3290 m (10800 ft) m (10640 ft) 3750 m (12300 ft) 760 m (2500 ft) ICAO 5 NM 6 NM

9 9 Turn Both Departures in Same Direction 0 Concept: Independent departures with same-direction turns - New procedure, not explicitly covered by ICAO PANS = Would require more analysis, much testing - Need to ensure separation between departures = Minimum straight segment required on outside runway = Protects against a slow climb to 400 ft before turn from inside runway ~ 2 NM

10 Turn Both Departures in Same Direction (continued) 10 0 Independent departures with same-direction turns - New procedure with safety issues - Straight segment before turn takes aircraft closer to noisesensitive area = Will increase noise impact compared to turn at runway end 0 Alternative concept: Dependent departures with same-direction turns - Interval (e.g., 60 sec) between departures on different runways = Provides longitudinal separation - Departure capacity is function of this interval

11 Dependent Departures with Same-Direction Turns 11 0 Advantages - Turns are not simultaneous (side-by-side) = Straight segment not required - Procedure can be implemented gradually = Start with 60 sec inter-runway separation (for radar separation), reduce as pilots and controllers gain experience and confidence 0 Some safety questions - How close could the aircraft be? - What if one aircraft goes straight ( blunders )?

12 12 Preliminary Monte Carlo Simulation 0 Used simple dynamic model to calculate the Closest Point of Approach (CPA) 0 Departures from Runways 15L/R - Turn Angles from 15R: 5, 10, 15 - Divergence: 0 (parallel), 5, 10, 15 - Also blunders (15L departure does not turn) 0 Variable parameters - Takeoff Speed - Heading after Turn - Start of Turn

13 Mean and Minimum CPAs 5 Turn 30 sec. inter-runway departure 15R separation 5 Degree Turn Mean CPA Distance (feet) Diverging Diverging turns turns are are still still required, required, to to increase increase minimum minimum CPA CPA Mean 15R #1 Mean 15R #2 Min 15R#1 Min 15R # Minimum CPA Other Turn Angle

14 Conclusions 14 0 High noise impact for southbound night departures (2% of year) can be greatly reduced by using only a single runway for departures 0 Reducing departure divergence, if feasible at Barajas, could potentially reduce noise impact and/or provide additional departure capacity 0 Dependent departure / same direction turn procedure appears promising, but further analysis is needed - Especially blunder performance

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures Dr. Ralf H. Mayer Dennis J. Zondervan Albert A. Herndon Tyler Smith 9 th USA/EUROPE Air Traffic Management

More information

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports SOURDINE II EU- 5FW project on Noise Abatement Procedures Overall view Ruud den Boer / Collin Beers Department: ATM & Airports Study of key elements weighed key elements 4th Framework Programme Definition

More information

Airfield Capacity Prof. Amedeo Odoni

Airfield Capacity Prof. Amedeo Odoni Airfield Capacity Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 10 May 27, 2015 Airfield Capacity Objective:

More information

Using PBN for Terminal and Extended Terminal Operations

Using PBN for Terminal and Extended Terminal Operations Using PBN for Terminal and Extended Terminal Operations Navigation Performance Data Analysis and its Effect on Route Spacing Dijana Trenevska EUROCONTROL 27 June 2017 Content Background and Objective Data

More information

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures VIA E-MAIL Date: To: From: Subject: Boston Technical Advisory Committee (BOS/TAC) Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures At the February 17, 2006 BOS/TAC meeting several issues

More information

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

COMMUNITY NOISE MITIGATION SUGGESTIONS

COMMUNITY NOISE MITIGATION SUGGESTIONS COMMUNITY NOISE MITIGATION SUGGESTIONS Toronto Pearson is one of North America's fastest growing global hub airports, handling nearly 40 million passengers today, and well on its way to reaching greater

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

RNP AR and Air Traffic Management

RNP AR and Air Traffic Management RNP AR and Air Traffic Management BOEING is a trademark of Boeing Management Company. Copyright 2009 Boeing. All rights reserved. Expanding the Utility of RNP AR Sheila Conway RNP AR User s Forum Wellington,

More information

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Roland E. Weibel, Matthew W.M. Edwards, and Caroline S. Fernandes MIT Lincoln laboratory Surveillance Systems Group Ninth

More information

A Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact

A Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact A Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact ATIO/ANERS September 22, 2009 Andrew March Prof. Ian Waitz Prof. Karen Willcox Motivation

More information

Key Purpose & Need Issues

Key Purpose & Need Issues Key Purpose & Need Issues Efficiently meet demand through the 2025 planning horizon 864,000+ annual operations 180-200 operations during peak daytime hours Balance peak hour arrival/departure capability

More information

ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System

ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System L.J.P. (Lennaert) Speijker, speijker@nlr.nl WakeNet Europe, 8/9 January 2009 http://www.nlr.nl/public/hosted-sites/atc-wake

More information

Time-Space Analysis Airport Runway Capacity. Dr. Antonio A. Trani. Fall 2017

Time-Space Analysis Airport Runway Capacity. Dr. Antonio A. Trani. Fall 2017 Time-Space Analysis Airport Runway Capacity Dr. Antonio A. Trani CEE 3604 Introduction to Transportation Engineering Fall 2017 Virginia Tech (A.A. Trani) Why Time Space Diagrams? To estimate the following:

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology Noise Abatement Arrival Procedures at Louisville International Airport Prof. John-Paul Clarke Georgia Institute of Technology The Team Noise Abatement Procedures Working Group (NAPWG) has the following

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 14 1 INTRODUCTION This guidance material has been prepared for use for the definition of protected surfaces in the vicinity of aerodromes. Survey information for an aerodrome is essential for

More information

LFPG / Paris-Charles de Gaulle / CDG

LFPG / Paris-Charles de Gaulle / CDG This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN

INTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN 05/04/00 INTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN (Grand Cayman, Cayman Islands, 17-20 May 2000) Agenda Item 3: Air Traffic Management

More information

London Biggin Hill Airport Runway 03 Approach A9912 N02 DC. Noise Assessment Extended D Charles 1.0 INTRODUCTION

London Biggin Hill Airport Runway 03 Approach A9912 N02 DC. Noise Assessment Extended D Charles 1.0 INTRODUCTION Project: File Ref: London Biggin Hill Airport Runway 03 Approach Date: 6 January 2016 Subject: From: Noise Assessment Extended D Charles To: Name Company Will Curtis Peter Mirams Barry Hawkins London Biggin

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures

Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures Implications of a Pilot Survey and Laboratory Simulations Dr. Anand M. Mundra

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

FIRST FLYING TECHNIQUES - APPROACH AND LANDING

FIRST FLYING TECHNIQUES - APPROACH AND LANDING FIRST FLYING TECHNIQUES - APPROACH AND LANDING 1. Introduction We aim to teach and demonstrate how to operate a general aviation aircraft and show some basic techniques and manoeuvres that every real pilot

More information

Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Noise Compatibility Committee

Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Noise Compatibility Committee Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Presentation to: Noise Compatibility Committee October 29, 2015 Ted Baldwin What are NADPs? Departure

More information

Departure Noise Mitigation Review. Dr Darren Rhodes Civil Aviation Authority 18 July

Departure Noise Mitigation Review. Dr Darren Rhodes Civil Aviation Authority 18 July Departure Noise Mitigation Review Dr Darren Rhodes Civil Aviation Authority 18 July 2018 1 Departure Noise Review: Terms of Reference Conduct a review of the existing policy objectives and desired outcomes

More information

Application of the reduced runway separation minima at the Sheremetyevo airport RUSSIAN FEDERATION

Application of the reduced runway separation minima at the Sheremetyevo airport RUSSIAN FEDERATION Application of the reduced runway separation minima at the Sheremetyevo airport RUSSIAN FEDERATION Use of the runway system at aerodrome Sheremetyevo Aerodrome has two close parallel RWYs Separation between

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

Birmingham Airport Airspace Change Proposal

Birmingham Airport Airspace Change Proposal Birmingham Airport Airspace Change Proposal Deciding between Option 5 and Option 6 Ratified Version 1. Introduction Birmingham Airport Limited (BAL) launched the Runway 15 departures Airspace Change Consultation

More information

CAUTION: WAKE TURBULENCE

CAUTION: WAKE TURBULENCE CAUTION: WAKE TURBULENCE This was the phrase issued while inbound to land at Boeing Field (BFI) while on a transition training flight. It was early August, late afternoon and the weather was clear, low

More information

PART 210 NOISE ABATEMENT AND RUNWAY PROCEDURES NOISE ABATEMENT AND PREFERENTIAL RUNWAY USE PROCEDURES

PART 210 NOISE ABATEMENT AND RUNWAY PROCEDURES NOISE ABATEMENT AND PREFERENTIAL RUNWAY USE PROCEDURES PART 210 NOISE ABATEMENT AND RUNWAY PROCEDURES 210.01 NOISE ABATEMENT AND PREFERENTIAL RUNWAY USE PROCEDURES 210.01-1 Establishment Of Procedures; FAA Guidelines This Rule establishes preferential runway

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Atlanta NextGen PBN Activities

Atlanta NextGen PBN Activities Atlanta NextGen PBN Activities Presentation to: Name: Date: EWG Ops SC Meeting Jim Arrighi RNAV/RNP Group Jim Allerdice A80 May 18, 2010 0 0 Atlanta Performance Based Navigation Project Planning Seven

More information

Operational Demonstration of a Performance-Based Separation Standard at The Hartsfield-Jackson Atlanta International Airport

Operational Demonstration of a Performance-Based Separation Standard at The Hartsfield-Jackson Atlanta International Airport Operational Demonstration of a Performance-Based Separation Standard at The Hartsfield-Jackson Atlanta International Airport Implementation and Benefits of Equivalent Lateral Spacing Operation (ELSO) Departures

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

! Figure 1. Proposed Cargo Ramp at the end of Taxiway Echo.! Assignment 7: Airport Capacity and Geometric Design. Problem 1

! Figure 1. Proposed Cargo Ramp at the end of Taxiway Echo.! Assignment 7: Airport Capacity and Geometric Design. Problem 1 CEE 4674: Airport Planning and Design Spring 2014 Assignment 7: Airport Capacity and Geometric Design Solution Instructor: Trani Problem 1 An airport is designing a new ramp area to accommodate three Boeing

More information

Minimum Safe. Federal Aviation Administration Altitude Warning. Presented to: Pan American Aviation Safety Summit; Sao Paulo, Brazil

Minimum Safe. Federal Aviation Administration Altitude Warning. Presented to: Pan American Aviation Safety Summit; Sao Paulo, Brazil Minimum Safe Altitude Warning Presented to: Pan American Aviation Safety Summit; Sao Paulo, Brazil By: Date: Glenn W. Michael Manager, CAST International Operations April 21, 2010 MSAW Overview A general

More information

National Transportation Safety Board Recommendation and FAA Air Traffic Orders

National Transportation Safety Board Recommendation and FAA Air Traffic Orders Page 1 of 8 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Chad E. Leqve, Director Environment (725.6326) SUBJECT: NOISE OVERSIGHT COMMITTEE (NOC) CONVERGING RUNWAY OPERATION (CRO)

More information

Environmental benefits of continuous descent approaches at Schiphol Airport compared with conventional approach procedures

Environmental benefits of continuous descent approaches at Schiphol Airport compared with conventional approach procedures Environmental benefits of continuous descent approaches at Schiphol Airport compared with conventional approach procedures F.J.M. Wubben and J.J. Busink Nationaal Lucht- en Ruimtevaartlaboratorium National

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

Analysis of Air Transportation Systems. Airport Capacity

Analysis of Air Transportation Systems. Airport Capacity Analysis of Air Transportation Systems Airport Capacity Dr. Antonio A. Trani Associate Professor of Civil and Environmental Engineering Virginia Polytechnic Institute and State University Fall 2002 Virginia

More information

Chapter 6. Nonradar. Section 1. General DISTANCE

Chapter 6. Nonradar. Section 1. General DISTANCE 12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG

More information

Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms

Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms Center for Advanced Aviation System Development Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms Dr. Lesley A. Weitz Principal Systems Engineer The MITRE Corporation,

More information

Evaluation of Strategic and Tactical Runway Balancing*

Evaluation of Strategic and Tactical Runway Balancing* Evaluation of Strategic and Tactical Runway Balancing* Adan Vela, Lanie Sandberg & Tom Reynolds June 2015 11 th USA/Europe Air Traffic Management Research and Development Seminar (ATM2015) *This work was

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) November 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered

More information

A Standard for Equivalent Lateral Spacing Operations

A Standard for Equivalent Lateral Spacing Operations Ninth USA/Europe Air Traffic Management Research and Development Seminar (ATM2011) A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures Dr. Ralf H. Mayer, Dennis

More information

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Atlantic Interoperability Initiative to Reduce Emissions AIRE ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia

More information

NOISE ABATEMENT PROCEDURES

NOISE ABATEMENT PROCEDURES 1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions

More information

Pacifica. Short Term Aircraft Noise Monitoring

Pacifica. Short Term Aircraft Noise Monitoring Short Term Aircraft Noise Monitoring March March, Pacifica Prepared for the Oddstad Boulevard Park Pacifica Avenue Neighborhoods by San Francisco International Airport Noise Abatement Office P.O. Box 8097

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

Arriving and departing aircraft at Edinburgh Airport

Arriving and departing aircraft at Edinburgh Airport Arriving and departing aircraft at Edinburgh Airport Contents Introduction... 3 Arriving aircraft... 3 The Instrument Landing System (ILS)... 6 Visual Approach... 6 Non Directional Beacon Approach... 6

More information

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 KURDISTAN REGIONAL GOVERNMENT SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 SEPARATION STANDARDS & APPLICATIONS International and Local Procedures ( First Edition ) April 2012 Ff Prepared By Fakhir.F.

More information

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This

More information

TAKEOFF SAFETY ISSUE 2-11/2001. Flight Operations Support & Line Assistance

TAKEOFF SAFETY ISSUE 2-11/2001. Flight Operations Support & Line Assistance TAKEOFF SAFETY T R A I N I N G A I D ISSUE 2-11/2001 Flight Operations Support & Line Assistance Flight Operations Support & Line Assistance Introduction The purpose of this brochure is to provide the

More information

LFMN / Nice Côte-d Azur / NCE

LFMN / Nice Côte-d Azur / NCE This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main

More information

March 2016 Safety Meeting

March 2016 Safety Meeting March 2016 Safety Meeting AC 61 98C Subject: Currency Requirements and Guidance for the Flight Review and Instrument Proficiency Check Date: 11/20/15 AC No: 61-98C Initiated by: AFS-800 Supercedes: AC

More information

All-Weather Operations Training Programme

All-Weather Operations Training Programme GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 3 OF 2014 Date: OPERATIONS CIRCULAR Subject: All-Weather Operations Training Programme 1. INTRODUCTION In order to

More information

Independent Parallel Runway Visual Approach in Beijing Capital Airport

Independent Parallel Runway Visual Approach in Beijing Capital Airport Independent Parallel Runway Visual Approach in Beijing Capital Airport SUMMARY Basic Concepts of Visual Approach The Promoting Process Of Visual Approach (including The Preparation) The Implementation

More information

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3 IBAC TECHNICAL REPORT SUMMARY Subject: NAT Operations and Air Traffic Management Meeting: North Atlantic (NAT) Procedures and Operations Group Meeting 2 Reported by Tom Young POG2 took place at the ICAO

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-11 Revision 2 Use of day-vfr aerodromes 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that

More information

Quiz 2 - Solution. Problem #1 (50 points) CEE 5614 Fall Date Due: Wednesday November 20, 2013 Instructor: Trani

Quiz 2 - Solution. Problem #1 (50 points) CEE 5614 Fall Date Due: Wednesday November 20, 2013 Instructor: Trani CEE 5614 Fall 2013 Quiz 2 - Solution Date Due: Wednesday November 20, 2013 Instructor: Trani Problem #1 (50 points) The North Atlantic Organized System (OTS) is typically made up of 6 Eastbound Track as

More information

KTRK HIGH. Truckee Tahoe Airport Truckee, California, United States

KTRK HIGH. Truckee Tahoe Airport Truckee, California, United States Diagram #1: Abatement Arrival Procedures All Aircraft Categories / All Runways p. 1 of 9 Diagram #2: Abatement Departure Procedures All Aircraft Categories / All Runways p. 2 of 9 NOISE ABATEMENT PROCEDURES

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations

More information

SPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR

SPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR Phone: 248-4384186 AFS: FSIAYNYX FAX: 248-4384179 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT

More information

The Departure Regulator: A Working Paper

The Departure Regulator: A Working Paper The Departure Regulator: A Working Paper Isaac Robeson Georgia Institute of Technology Dr. John-Paul Clarke Georgia Institute of Technology September 2010 Abstract Increased efficiency at airports is necessary

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

QUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS

QUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS QUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS FOREWORD It takes a cross-industry effort to ensure that every flight happens safely and efficiently airlines, air navigation services, airport authorities,

More information

Dubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept

Dubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept DANS LIDAR wake vortex data campaign, deployment of Dependent Diagonal approaches and ongoing work to prepare RNP Parallel Approach Transition (RPAT) concept for implementation Roberto Ghidini Dubai contest

More information

RNAV - RNP. July 2010

RNAV - RNP. July 2010 RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve

More information

Non Compliant Approach Balancing the risk with SMI

Non Compliant Approach Balancing the risk with SMI Non Compliant Approach Balancing the risk with SMI Safety forum: Airborne conflict Yann Le Fablec Head of Safety & Performance Dept / DSNA 11th of June 2014 Direction des services de la Navigation aérienne

More information

TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT

TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT Noise and the GTAA The GTAA is sensitive to the issue of aircraft noise and how it affects our neighbours. Since assuming responsibility for Toronto

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER

INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER 09-2020 By Chun-Hsing Ho, Dwight D. Eisenhower Fellow Department of Civil and Environmental

More information

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the

More information

Airspace Encounter Models for Conventional and Unconventional Aircraft

Airspace Encounter Models for Conventional and Unconventional Aircraft Airspace Encounter Models for Conventional and Unconventional Aircraft Matthew W. Edwards, Mykel J. Kochenderfer, Leo P. Espindle, James K. Kuchar, and J. Daniel Griffith Eighth USA/Europe Air Traffic

More information

Navigation - Runways. Chap 2, Nolan

Navigation - Runways. Chap 2, Nolan Navigation - Runways Chap 2, Nolan 1 Runways Runways numbered to correspond to magnetic bearing Runway 27 has magnetic bearing 270 degrees Active Runway selected for headwind greater than 5 knots When

More information

ANALYSIS OF POTENTIAL BENEFITS OF WIND DEPENDENT PARALLEL ARRIVAL OPERATIONS

ANALYSIS OF POTENTIAL BENEFITS OF WIND DEPENDENT PARALLEL ARRIVAL OPERATIONS ANALYSIS OF POTENTIAL BENEFITS OF WIND DEPENDENT PARALLEL ARRIVAL OPERATIONS Dr. Ralf H. Mayer, The MITRE Corporation, McLean, VA Abstract This paper documents the results of fast-time simulations evaluating

More information

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS 1.Define wind Coverage (AUC NOV/DEC 2010),(AUC NOV/DEC 2011)

More information

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number: Phase I Submission Name of Program: Equivalent Lateral Spacing Operation (ELSO) Name of Program Leader: Dr. Ralf Mayer Phone Number: 703-983-2755 Email: rmayer@mitre.org Postage Address: The MITRE Corporation,

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

Re: Findings Regarding Possible Impacts of Proposed Rockfort Quarry on Aviation Activities at Brampton Airport

Re: Findings Regarding Possible Impacts of Proposed Rockfort Quarry on Aviation Activities at Brampton Airport Mr. Christopher J. Tzekas, Partner, WeirFoulds LLP, The Exchange Tower, Suite 1600, P.O. Box 480, 130 King Street West, Toronto, Ontario, M5X 1J5. May 8, 2010. Re: Findings Regarding Possible Impacts of

More information

IFR FLIGHT BRIEFING. This IFR flight briefing presentation has been made concise and simple in order to easily handle the IFR flight preparation.

IFR FLIGHT BRIEFING. This IFR flight briefing presentation has been made concise and simple in order to easily handle the IFR flight preparation. IFR FLIGHT BRIEFING 1. Introduction This IFR flight briefing presentation has been made concise and simple in order to easily handle the IFR flight preparation. As IVAO, in a simulated area, is different

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

APPENDIX X: RUNWAY LENGTH ANALYSIS

APPENDIX X: RUNWAY LENGTH ANALYSIS APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

Noise Compatibility Report

Noise Compatibility Report ` Noise Compatibility Report 2018 1st Quarter May 22, 2018 Disclaimer Sound levels were unavailable between Oct. 6 th and May 22 nd, 2018. On May 22 nd, new state of the art monitors were installed. Adherence

More information

Boeing Aircraft and the Impact on Airports

Boeing Aircraft and the Impact on Airports International Civil Aviation Organization on Pavement Management Systems Lima, Peru November 19-22, 2003 Boeing Aircraft and the Impact on Airports Orest Shepson Principal Engineer - Airport Technology

More information

Opportunities to improve noise management and communications at Heathrow

Opportunities to improve noise management and communications at Heathrow Opportunities to improve noise management and communications at Heathrow Summary of a dialogue between Aviation Environment Federation, British Airways, HACAN, Heathrow Airport and NATS 1. Introduction

More information

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions. ALBUQUERQUE INTERNATIONAL SUNPORT AIRCRAFT HOLD LINE LOCATION ANALYSIS WHITE PAPER JUNE 24, 2016 HOLD LINE LOCATION ISSUE The location of many of the taxiway hold lines at the Sunport do not meet current

More information

IMPROVING ATM CAPACITY WITH "DUAL AIRSPACE": A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY

IMPROVING ATM CAPACITY WITH DUAL AIRSPACE: A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY IMPROVING ATM CAPACITY WITH "DUAL AIRSPACE": A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY Jean-Yves GRAU - SynRjy Didier DOHY - NeoSys Laurent GUICHARD EUROCONTROL Sandrine GUIBERT

More information

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a

More information

Measurement of environmental benefits by ICAO Secretariat

Measurement of environmental benefits by ICAO Secretariat International Civil Aviation Organization Measurement of environmental benefits by ICAO Secretariat ICAO PBN TF Sven Halle ICAO EUR/NAT Office ICAO EUR/NAT Office PBN Workshop 1 Overview KPA ASSEMBLY RESOLUTION

More information

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007 Wake Vortex R&D Status Briefing NBAA Convention By: Steve Lang Date: September 2007 Topics for Today Wake Turbulence Program Overview Near Term Achievements The Future Wake Program Activities Near-Term

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS

EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS Laura Major Forest & R. John Hansman C.S. Draper Laboratory, Cambridge, MA 9 USA; lforest@draper.com

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,

More information