Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Similar documents
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Public Information Center August 12, 2010

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Pardon Our Dust Public Information Meeting

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster

Fairfax County Parkway Widening Fairfax County

VDOT Culpeper District John Lynch, P.E. District Administrator December 12, 2013

25 th Avenue Grade Separation. September 13, 2017

Design Meeting Presentation

I-35 Reconstruction Project

25 th Avenue Grade Separation. December 13, 2017

State Project Reconstruction I-84

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

Route 29 Solutions Projects

Neighbourhood Committee NDG - Westmount. September 12, 2016

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

Major Projects Overview

Projected Advertisement Date

Viaduct Demolition at Girard Interchange

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

TYPICAL SECTION OF IMPROVEMENT

PROGRESS PARK CONNECTOR

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Wichita Falls MPO - MTP Project List 1 of 6

I-75 in Hamilton County Project Termini

A VISION FOR I-95. January 12, Delaware Department of Transportation

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Transportation TRANSPORTATION PROJECTS

PRIORITIES COMMITTEE MEETING

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

1.0 Purpose and Organization of the Community Impact Assessment Addendum

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

Table 2: FFYs Transportation Improvement Program (TIP) Development Universe of Projects

McCORMICK QUARRY BRIDGE EAST SHORE EXPRESSWAY BRIDGE WITOLD H. KLOCZKOWSKI, P.E. PROJECT MANAGER COMMONWEALTH ENGINEERS & CONSULTANTS, INC.

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

November 21, 2012 Barbara Kelleher, (954)

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Pre-Construction Public Meeting July 2017

FDOT Treasure Coast Traffic Report through

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Culpeper District. Albemarle County Monthly Report. September 2012

AGENDA ITEM I-6 Public Works

Whittier Bridge Project

South of Fraser Transportation Priorities March 2017 Engagement

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

List of Our Ongoing Noise and Vibration Monitoring Projects

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

TRAIL ANNUAL REPORT

G Street Undercrossing. City Council Meeting Date: November 3, 2008

Basic Project Information

Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates

DHS Consolidation at St. Elizabeths Master Plan Amendment. Transportation Interstate 295 / Malcolm X Avenue Interchange

October 18, Terry Hartwick Director, North Little Rock Parks and Recreation 2700 Willow Street North Little Rock, AR 72114

El Dorado County / Tahoe Roadwork Schedule

25 th Avenue Grade Separation. Community Meeting November 13, 2018

SAN RAFAEL City Council January 20, 2015

CITY COUNCIL AGENDA MEMORANDUM

Public Open House. Chief Peguis Trail Project

5.7 Local road upgrades

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Constructor: Joseph B. Fay

10.0 Recommendations Methodology Assumptions

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Northeast Corridor Transportation Update

Hartsfield Jackson Update prepared for:

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

September 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10

York Region Rapid Transit Corporation. City of Vaughan VMC Sub-Committee October 18, 2017

Surgical Services and Observation Unit Project Given by Highland Hospital to the Highland Park Community.

I-15/Tropicana Interchange. Planning & Environmental Linkage Meeting

Progress Report for Projects of Regional Significance

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

A. CONCLUSIONS OF THE FGEIS

TORONTO TRANSIT COMMISSION REPORT NO.

Williamsburg Town Hall Meeting

INTERSTATE MANAGEMENT PROGRAM FOR THE FY2015 TIP FOR DVRPC SUBREGION

Progress Report for Projects of Regional Significance

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Transcription:

Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1

Agenda Project Update Overview Bid and Contract Award Schedule Preliminary Construction Schedule 2

Proposed Roadway Improvements Widen roadway into median to add 1 travel lane in each direction Restore breakdown lanes and provide widened shoulder at median New Kendrick St. interchange New collector/distributor roads, Kendrick St. Highland Ave. Auxiliary lanes in each direction between Highland Ave. & Rte. 9 Reconfigure Rte. 9 interchange 3

Bridges and Walls Bridges 3 Replacement Bridges 1 Widening 1 Removal RR Bridge 1 New Bridge Retaining Walls 16 Locations Total Length 9,986 LF Noise Barriers 7 Locations Total Length 10,424 LF 4

Project Limits Project Limits: North of MBTA RR Bridge Project Limits: North of Rte. 9 5

Project Limits Off-Site Mitigation Site at Great Plain Avenue 6

Project Limits Noise Barrier Along I-95 SB north of Route 9 7

Bid and Award Schedule Contractor Bids Opened July 22 nd Barletta Heavy Division was the apparent low bidder @ $137,590,000 Early September Contractor NTP October 2014 Construction Start January 2019 Construction Completion 8

Preliminary Construction Schedule Notice-to-Proceed to Contractor: Sept. 2014 Estimated Completion Dates of Construction Stages: Stage 1: October 2015 Stage 2: September 2017 Stage 3: May 2018 Stage 4: September 2018 Stage 5: December 2018 Partial Opening of Kendrick St. Interchange: July 2016 Substantial Completion: December 2018 9

Existing Lane Configuration 10

Future Lane Configuration 4 Travel Lanes in each direction south of Highland Ave. 5 Travel Lanes in each direction between Highland Ave. and Rte. 9 New Kendrick Street Interchange Collector-Distributor Roadways between Kendrick St. and Highland Ave. Reconfigured Rte. 9 Interchange 11

Stage 1 Construction: Sept. 2014 Oct. 2015 12

Stage 2 Construction: Oct. 2015 Sept. 2017 13

Stage 3 Construction: Sept. 2017 May 2018 14

Stage 4 Construction: May 2018 Sept. 2018 15

Stage 5 Construction: Sept. 2018 Dec. 2018 16

Questions 17

South Project Limit to Kendrick Street 18

South Project Limit to Kendrick Street 19

South Project Limit to Kendrick Street 20

New Kendrick Street Interchange 21

Existing Kendrick Street Bridge 22

Proposed Kendrick Street Bridge Looking East 2 Span Similar to Existing Constructed in 2 Stages 23

New Ramp K-1 over Ramp K-2 Bridge 24

New Ramp K-1 over Ramp K-2 Bridge 25

New C/D Roads Between Kendrick Street and Highland Avenue Collector/ Distributor Road Collector/ Distributor Road 26

Existing Highland Avenue Interchange 27

Proposed Highland Avenue Interchange 28

Proposed Highland Avenue Bridge 29

MBTA Railroad Bridge & Retaining Wall at 32 Fremont Street Remove Existing Bridge New Retaining Wall P 30

Add-A-Lane Contract V New Auxiliary Lanes Between Highland Avenue and Route 9 Sudbury Aqueduct 31

New Auxiliary Lanes Between Highland Avenue and Route 9 32

Central Avenue Bridges 33

Central Avenue Bridges - Modifications 34

Route 9 Interchange 35

Reconfiguration of the Route 9 Interchange 36

Reconfiguration of the Route 9 Interchange Relocate SB offramp on improved alignment Remove I-95 SB loop ramp Relocate NB off-ramp on improved alignment Remove I-95 NB loop ramp 37

Proposed Route 9 Bridge 38

Incentives/Disincentives Milestone #2 Substantial Completion $30,000/day $4,020,000 maximum Milestone #3 Completion of Br. No. N-04-027 and Ramps K-3 and K-4 $11,000/day $407,000 maximum 39