SOUTH CAROLINA AERONAUTICS COMMISSION

Similar documents
AVIATION AND SPACEPORT OFFICE DISTRICT 3 REPORT J UNE 2015 STATEWIDE. Airfield. Pavement Management

AVIATION AND SPACEPORT OFFICE DISTRICT 6 REPORT JU NE STATEWIDE. Airfield. Pavement Management

Appendix B PAVEMENT CONDITION AND HISTORY

PAVEMENT CONDITION REPORT

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Statewide Airfield Pavement Management Program. District 5 Report

Statewide Airfield Pavement Management Program. District 1 Report

Statewide Airfield Pavement Management Program. District 7 Report

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

GREATER ORLANDO AVIATION AUTHORITY

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

Chapter 8.0 Implementation Plan

Table of Contents. Overview Objectives Key Issues Process...1-3

City of Tallahassee, FL Department of Aviation

Chapter 9 Airport Financial Plan

JOHNSTON COUNTY AIRPORT AUTHORITY

Chapter 4 Airport Facility Requirements

MassDOT Aeronautics Division Capital Improvements Presentation

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Port of Friday Harbor

Chapter 1 Introduction and Project Overview

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

BOARD OF AIRPORT COMMISSIONERS

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

CHAPTER 1: INTRODUCTION

AVIATION. MichiganReportCard.com 5

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT

RESOLUTION NO

Agenda: SASP SAC Meeting 3

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Runway Roughness Evaluation- Boeing Bump Methodology

FORECASTING FUTURE ACTIVITY

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

Airport Master Plan 1

Merritt Island Airport

Chapter 1 Introduction and Project Overview

Session Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau

CHAPTER 3 ALTERNATIVES CONSIDERED

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

Airport Master Plan Open House Front Range Airport February 23, 2017

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

Airport Closure Evaluation Report Silver Bay Municipal Airport (BFW) Prepared by MnDOT Office of Aeronautics

Dallas Executive Airport Town Hall Meeting April 3, 2014

Passenger Facility Charge Application #1

TECHNICAL PAPER

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

Airport Finance 101 Session 3 - Capital Funding

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

AIRPORT MASTER PLAN UPDATE

Andres Lainoja Eesti Lennuakadeemia

Budapest, Hungary 2015

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

Runway Roughness Evaluation- Boeing Bump Methodology

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Runway Roughness Evaluation- Boeing Bump Methodology

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Runway Length Analysis Prescott Municipal Airport

Table of Contents Facility Requirements Overview Airport Capacity and Delay Analysis... 1

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

Lake Tahoe Airport Master Plan

General Aviation Master Plan Update

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Construction of Pyongyang International Airport IP6

Pavement maintenance management systems

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Addendum - Airport Development Alternatives (Chapter 6)

Airport Safety Management Systems: Integrating Planning Into the Process

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

3.1 Facility Requirements Overview Airfield Facility Requirements... 1

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Nantucket Memorial Airport Master Plan Update

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

1.0 PURPOSE 2.0 REFERENCES 3.0 BACKGROUND

PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico.

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

ACI Webinar Airport Capital Investment CIP Financial Planning

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

CATCODE ] CATCODE

Transcription:

SOUTH CAROLINA AERONAUTICS COMMISSION STATEWIDE AIRFIELD PAVEMENT MANAGEMENT SYSTEM UPDATE AIRPORT: LEXINGTON COUNTY AT PELION 106 AIRPORT ROAD PELION, SC 29123 SOUTH CAROLINA AERONAUTICS COMMISSION 2553 AIRPORT BLVD. WEST COLUMBIA, SC 29170

Executive Summary Federally obligated airports are required as part of their Grant Assurances to perform detailed inspection of airfield pavements as part of an ongoing Airport Pavement Management Program (PMP). The FAA PMP is described in FAA Advisory Circular 150/5370-7B Airport Pavement Management Program (PMP). The detailed airfield pavement inspection required under the PMP can be performed using the Pavement Condition Index (PCI) method. This method is an objective process to assess pavement condition following the guidance found in ASTM D5340-12, Standard Test Method for Airport Pavement Condition Index Surveys. During a PCI inspection, a qualified inspector visually assesses pavements and identifies signs of deterioration. Pavement deterioration is characterized in terms of distinct distress types, severity levels and quantity of each of the identified distress. This distress information is utilized to calculate a deduct value which results in a numeric PCI value representing the overall condition of the pavement. The PCI values range from 100 (newly constructed GOOD pavement with no distresses) to 0 (a condition category where the pavement has completely FAILED). The PCI methodology analyzes the overall pavement condition and provides the airport owners with a snapshot of the current pavement condition and a relative indication of the degree of maintenance, repair, or rehabilitation needs that may be required to sustain functional pavement. Because pavement is a dynamic structure, the PMP should be a living and continuously updated element of each airport s infrastructure program. The program should include regularly scheduled PCI inspections. This will aid airport owners in evaluating not only the existing conditions of their airfield pavements but also the rate of pavement degradation. This will assist airport owners in selecting maintenance and repair techniques or activities and the knowledge to proactively implement them in a timely manner.

The information collected as part of this PCI effort will provide the Airport operators, engineers, and maintenance personnel with the following: The present airport airfield pavement system inventory; The present condition of the Airport maintained airfield pavement network (runway, taxiway, and apron), as a whole and further subdivided into Branch, Section, and Sample; Forecast of future performance of the Airport s airfield pavement network and for each individual Section; An estimate of current maintenance needs based on an understanding of the deterioration of the pavements; A schedule of maintenance needs based on forecasted pavement conditions; The South Carolina Aeronautics Commission (SCAC) inspected Lexington County at Pelion Airport on December 7th, 2016 collecting PCI data for the airports pavements. The results of the PCI inspection are documented in the sections below.

Lexington County PCI Summary

Summary of Results 6J0 Lexington County Airport at Pelion Pavement Condition Index (2016) Table 1 Pavement Condition Index Summary for 2016 Branch Name Branch ID Section ID PCI Condition Rating Area (SF) Runway 18-36 RW36LX 10 59 Fair 260100 Parallel Taxiway TWLX 10 95 Good 27560 Parallel Taxiway TWLX 20 64 Fair 131244 Taxiway TWLX 30 64 Fair 26673 Taxiway TWLX 40 42 Poor 18099 Apron APLX 10 50 Fair 49186 Apron APLX 20 78 Satisfactory 37326 Apron APLX 30 95 Good 18419 Apron APLX 40 85 Satisfactory 17143

Summary of Results 6J0 Lexington County Airport at Pelion Forecasted Pavement Condition Index 2017-2021 Table 2 Pavement Condition Index Forecast 2017-2021 Network ID Branch ID Section ID 2017 2018 2019 2020 2021 Runway 18-36 RW36LX 10 57 56 54 52 50 Parallel Taxiway TWLX 10 93 92 90 88 86 Parallel Taxiway TWLX 20 62 61 59 57 55 Taxiway TWLX 30 62 61 59 57 55 Taxiway TWLX 40 40 39 37 35 33 Apron APLX 10 48 47 45 43 41 Apron APLX 20 76 75 73 71 69 Apron APLX 30 93 92 90 88 86 Apron APLX 40 83 82 80 78 76

Summary of Results 6J0 Lexington County Airport at Pelion Major Rehabilitation Planning 2017-2021 Table 3 Major Rehabilitation Planning 2017-2021 Program Year Branch ID Section ID Area (SF) PCI Before Rehabilitation Type Planning Cost 2017 RW36LX 10 260100 57 AC Reconstruction $ 2,536,000 2018 TWLX 40 17143 39 AC Reconstruction $ 189,000 2019 APLX 10 49186 45 AC Reconstruction $ 541,000 2020 TWLX 20, 30 150771 57 AC Reconstruction $ 1,658,000 2021 $ - Notes. 1. Planning costs shown above are based upon typical construction costs per square foot for the PCI level of each of the Branches. 2. The rehabilitation costs are rounded to the nearest thousand and are intended for budget planning only. Actual rehabilitation costs will require detailed project level investigation and cost analysis to determine the appropriate method of rehabilitation. 3. The rehabilitation schedule shown above assumes NO budget constraints and is not a promise of impending funding from either the FAA or SCAC. The rehabilitation schedule and associated costs are intended to give each airport owner planning level pavement condition information which can be coordinated with the annual Airport Capital Improvement Program (ACIP).

Lexington County System Inventory Exhibit

Lexington County Pavement Condition Index

Lexington County PCI Summary Units

Lexington County Taxiway and Apron Photos

Runway Longitudinal and Transverse Cracking and Block Cracking

Taxiway Longitudinal and Transverse Cracking and Block Cracking

Apron Longitudinal and Transverse Cracking, Block Cracking and Weathering

Lexington County Taxiway Field Data and Apron Field Data