MARSHALL Subdivision. Township of Springwater, County of Simcoe. Traffic Brief for: Ontario Inc. Type of Document: Final Report

Similar documents
2006 TRAFFIC ZONE BOUNDARIES. Zone Numbers & Detailed Definitions

Dufferin County Housing Market Update Orangeville November 24, 2015

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Metrics Sales Average Price Total Total

Compliance Statistics:

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Sales & Average Price By Major Home Type. Metrics Sales Average Price Total Total

Sales & Average Price By Major Home Type. Metrics Sales Average Price Total Total

Sales & Average Price By Major Home Type November 2015 Metrics Sales Average Price Total Total

Sales & Average Price By Major Home Type December 2015 Metrics Sales Average Price Total Total

Western Development Lands Transportation Brief Richmond Village, (Ottawa), ON Mattamy Homes. Prepared By: Stantec Consulting Ltd.

A. CONCLUSIONS OF THE FGEIS

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

Appendix B Profile of Ontario Federal Program Non-Profit Housing Co-operatives January 2018

Sales & Average Price By Major Home Type 1,7 August 2013 Average Price Total Total

Low-Rise Home Types Drive June Price Growth

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

Sales & Average Price By Major Home Type 1,7 July 2012 Average Price Total Total

Tight Market Drives Double-Digit Price Growth

Detached 986 3,143 4,129 $793,842 $597,404 $644,313 Yr./Yr. % Change 20.7% 19.6% 19.8% 6.5% 8.0% 7.6%

Sales & Average Price By Major Home Type 1,7 August 2014 Average Price Total Total

Sales & Average Price By Major Home Type 1,7 April 2013 Average Price Total Total

Sales & Average Price By Major Home Type 1,7 June 2014 Average Price Total Total

Strong Average Price Growth in September

Sales & Average Price By Major Home Type 1,7 December 2014 Average Price Total Total

Average Home Price Up Strongly in 2012

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Lake Erie Commerce Center Traffic Analysis

Sales & Average Price By Major Home Type 1,7 November 2013 Average Price Total Total

February Price Growth Continues in February. Economic Indicators. TorontoMLS Sales Activity 1,7. TorontoMLS Average Price 1,7 $510,580 $500,249

Average Price up in March and First Quarter

Note: the Rent Review Guideline mandates an increase of 2.6% for 2000, and 2.9% for Sales 2, Dwelling Type Single Detached Semi Detached

Detached 1,050 3,421 4,471 $1,042,405 $709,116 $787,388 Yr./Yr. % Change 4.3% 17.3% 14.0% 15.9% 10.0% 10.9%

Sales & Average Price By Major Home Type 1,7 February 2012 Average Price Total Total

Sales & Average Price By Major Home Type 1,7 January 2015 Average Price Total Total

Sales & Average Price By Major Home Type 1,7 January 2014 Average Price Total Total

Sales & Average Price By Major Home Type 1,7 October 2013 Average Price Total Total

Neighbourhood Corner Kingsway

Sales & Average Price By Major Home Type 1,7 March 2014 Average Price Total Total

The Toronto Real Estate Board. Single-Family Residential Breakdown

Strong Sales/Price Growth Continue in 2012

Number of New MLS Listings Single-Family Residential Breakdown 21.8%

Strong market sustained in April

Market Watch. 1997: Best year for the decade! The Toronto Real Estate Board

Market Watch. The Toronto Real Estate Board

Sales & Average Price By Major Home Type 1,7 February 2014 Average Price Total Total

Table of Contents. Requests by the Public 1. Response Rate Compliance 3. Appeals 17. Privacy Complaints 34. Provincial Ministries and Agencies

Market Watch. Hot market continues through June. The Toronto Real Estate Board. Single-Family Residential Breakdown

Transport Impact Assessment

Prices Stable, Sales Ease in June

ROUTE A Monday, December 18, 2017 Tuesday, December 19, 2017 Wednesday, December 20, 2017 Thursday, December 21, 2017 Friday, December 22, 2017

Sales & Average Price By Major Home Type 1,7 April 2014 Average Price Total Total

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Pedestrian Safety Review Spadina Avenue

Treasure Island Supplemental Information Report Addendum

TORONTO TRANSIT COMMISSION REPORT NO.

Madison Metro Transit System

CURRICULUMVITAE. David A. McKay, BES, MSc, MCIP, RPP PROFESSIONAL ASSOCIATIONS PROFESSIONAL HISTORY

Descriptions of routes identified in the Province-wide Cycling Network

Transportation Impact Assessment Paradise Shores RV Resort Development Stettler County, Alberta Progress Update February 2018 PO#

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

7 TOWN OF BRADFORD WEST GWILLIMBURY OPA 15 INFORMATION REPORT ON THE BRADFORD BYPASS

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

NTARIO S INFR STRUCTURE

TECHNOLOGY QUALITY OF LIFE CAREER CHOICES INNOVATION GTA RAPID TRANSIT URBAN LIVING TOP RANKED SCHOOLS FUN HOUSING OPTIONS ARTS NATURE STYLE CULTURE

Freymond Aggregates Quarry Bay Lake Rd., Twp. of Faraday

MUNICIPALITY OF ANCHORAGE

1.2 Corridor History and Current Characteristics

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

2 YORK REGION TRANSIT MOBILITY PLUS 2004 SYSTEM PERFORMANCE REVIEW

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Cv-c; Re: Hotel Development Charges in York Region. March 24, 2016

Submitted to: NYX CAPITAL CORP. 1131a Leslie Street, Suite 201 Toronto, Ontario M3C 3L8 Attention: Mr. Tim Jessop Development Manager

Establishing a National Urban Park in the Rouge Valley

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Public Meeting Information Report Development Approval and Planning Policy Department

INFORMATION ONLY. Subject: Metrolinx Presentation Date: June 22, 2015

5.1 Traffic and Transportation

INTERACTIVE COMMUTE MAP CLICK ON YOUR CITY OF RESIDENCE ON THE MAP BELOW TO EXPLORE YOUR COMMUTE OPTIONS

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Federal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority

001 Ajax 87, , Algoma Manitoulin 51,566 76, * 003 Aurora Oak Ridges Richmond Hill 78, ,581.70

383 Herring Cove Road Traffic Impact Statement. April Prepared for. Servant Dunbrack McKenzie & MacDonald Ltd.

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

Ontario Municipal Board Commission des affaires municipales de l Ontario

Potomac River Commuter Ferry Feasibility Study & RPE Results

PROPOSED ALTERATION AND EXPANSION OF THE MOUNT PEARL MUNICIPAL BOUNDARY TO INCLUDE THE AREA OF THE FORMER PEARL ESTATE LANDS & ENVIRONS

ITS. Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning. January 9, 2013

Freymond Aggregates Quarry 2287 Bay Lake Road Twp. of Faraday, Hastings County

Urban Growth Centres in the Greater Golden Horseshoe

Construction Staging Adelaide Street West

2017 Market Rent Index Table

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

4 York Region 2017 Vacant Employment Land Inventory

Transcription:

MARSHALL Subdivision Township of Springwater, County of Simcoe Traffic Brief for: 489469 Ontario Inc. Type of Document: Final Report Project Number: JDE 1521 Date Submitted: October 19 th, 2016 10 / 19 / 16 John Northcote, P.Eng. Professional License #: 100124071 JD Northcote Engineering Inc. 86 Cumberland Street Barrie, ON 705.725.4035 www.jdengineering.ca

Legal Notification 489469 Ontario Inc. This report was prepared by JD Northcote Engineering Inc. for the account of 489469 Ontario Inc. Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties. JD Northcote Engineering Inc. accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this project. ii

Table of Contents 489469 Ontario Inc. 1 Introduction... 4 1.1 Background... 4 1.2 Study Scope and Objectives... 4 2 Information Gathering... 5 2.1 Street and Intersection Characteristics... 5 3 Proposed Development... 5 3.1 Traffic Generation... 5 3.2 Traffic Assignment... 6 4 Site Access Analysis... 7 5 Summary... 8 List of Tables Table 1 Estimated Traffic Generation of Proposed Development... 6 Table 2 Subject Site Trip Distribution... 6 List of Figures Figure 1 Proposed Site Location and Study Area... 4 Figure 2 Peak Hour Traffic Assignment for Proposed Development... 7 List of Appendices APPENDIX A Draft Plan of Subdivision APPENDIX B Transportation Tomorrow Survey Data Excerpt iii

1 Introduction 1.1 Background 489469 Ontario Inc. [the Developer] is proposing the construction of a residential subdivision consisting of 11 single-family detached units. The subject site is located in the west side of Alexander Street and municipally known as 8 and 14 Alexander Street in the community of Anten Mills, in the Township of Springwater [Township], County of Simcoe [County]. Lots 2 11 will be accessed via an extension of the north end of Ghibb Avenue, which will connect to Alexander Street at Pineview Avenue. Lot 1 will have access directly onto Alexander Street, north of Pineview Avenue. The Developer has retained JD Northcote Engineering Inc. [JD Engineering] to prepare this traffic brief in support of the draft plan of subdivision application. Figure 1 illustrates the location of the subject site as well as the location of the proposed site access intersection. The proposed draft plan of subdivision is shown in Appendix A. 1.2 Study Scope and Objectives Based on discussions with the Township and County, the purpose of this traffic brief is to identify the potential impacts to traffic flow on the surrounding road network as a result of the proposed development. The analysis includes a review of the proposed traffic volumes during the weekday morning [AM] and afternoon [PM] peak hour. Figure 1 Proposed Site Location and Study Area 4

2 Information Gathering 2.1 Street and Intersection Characteristics Alexander Street is a local road with a two-lane rural cross-section and no sidewalk. Alexander Street has an assumed (unsigned) speed limit of 50km/h. Alexander Street is under the jurisdiction of the Township. Ghibb Avenue is a local road with a two-lane urban cross-section and no sidewalk. Ghibb Avenue has an assumed (unsigned) speed limit of 50km/h. Ghibb Avenue has not yet been assumed by the Township; however, it is planned to become a Township road. Pineview Avenue is a local road with a two-lane rural cross-section and no sidewalk. Pineview Avenue has an assumed (unsigned) speed limit of 50km/h. Pineview Avenue is under the jurisdiction of the Township. Horseshoe Valley Road West (County Road 22) is a primary arterial road with a two-lane rural cross-section and no sidewalk. Horseshoe Valley Road West has a posted speed limit of 60km/h in the study area. There are no auxiliary lanes or turning restrictions at any of the intersections in the study area. Currently, there is no traffic control at the intersection of Alexander Street / Pineview Avenue. No transit service is provided within the study area. The North Simcoe Rail Trail extends along the west side of the subject site. The North Simcoe Rail Trail is 30 kilometers long and connects with the Tiny Trail to the north and extends another 22 kilometers to Penetanguishene and is part of the Trans Canada Trail system. This trail has a gravel surface and is approximately three metres wide in the study area. There are no planned transportation infrastructure improvement within the study area that would have a notable impact on the traffic patterns or road capacity. 2.2 Other Development in the Study Area Through our discussions with the Township, we are aware of two developments in the study area. The Estates of Anten Mills development is currently working on developing Draft Plan conditions for a 76 single-detached residential development located on the west side of Wilson Drive south of the existing built boundary of Anten Mills. The Tenac Ridge subdivision, which involves the construction of the portion of Ghibb Avenue that will connect to the subject site, is currently under construction. This development includes 15 single-detached residential units. 3 Proposed Development 3.1 Traffic Generation The subject site will consist of 11 single-family detached residential units. The Institute of Transportation Engineers [ITE] produces a document entitled Trip Generation (9 th Edition), which is used to predict the number of trips associated with new developments. The ITE is a 5

well-recognized agency throughout North America, and has completed numerous studies to identify trip rates associated with various types of developments including retail, residential, recreational, institutional, industrial, and office. Single-Family Detached Housing (ITE #210) land-use was applied for the proposed development. Based on the limited access to alternative modes of transportation in the study area, we have ignored the impact of any modal split for the proposed traffic generation. Utilizing the ITE generation rates, the estimated trip generation for the 11 single-family detached residential units was calculated and has been summarized below in Table 1. The average rate was applied for the peak hour of generator for the AM and PM period (0.77 trips / unit and 1.02 trips / unit respectively). The peak traffic generation periods for the proposed development and the adjacent streets are anticipated to be concurrent. Table 1 Estimated Traffic Generation of Proposed Development Land Use Single-Family Detached Housing ITE Land Use: 210 AM Peak Hour PM Peak Hour Units IN OUT TOTAL IN OUT TOTAL 11 2 6 8 7 4 11 3.2 Traffic Assignment For the purposes of this study, it has been assumed that all traffic generated by the proposed development will be new traffic and would not be in the study area if the development was not constructed. Although one unit will have direct access onto Alexander Street, in order to be conservative, we have assumed that all 11-units will access the site via Ghibb Avenue. The ITE data provides the anticipated percentage of new traffic entering and exiting during the peak hour. The distribution of traffic beyond the local area has been calculated based on the 2006 Transportation Tomorrow Survey [TTS] data for the County (excerpt attached as Appendix B). TTS data provides historical origin and destination work trip percentages for specific areas within the County and the Greater Toronto and Hamilton Area [GTHA]. All development within the subject site is residential and the critical case reviewed in this analysis is the AM and PM peak hour. Consequently, traffic distribution for the trips generated by the subject site is expected to generally follow commuter travel patterns. Our analysis is based on the egressing traffic and the work trip destination percentages. Logically, the distribution of ingress traffic will follow the inverse of the exiting traffic distribution. For each of the individual areas identified in the TTS data, we have selected the probable route of travel, assuming that people will select their route primarily based on travel time. We have also distributed the utilization of each of the internal roads based on the ultimate destination in conjunction with the proposed subject site layout. Table 2 illustrates the distribution of egress trips within the study area, generated by the Subject Site. Direction Table 2 Subject Site Trip Distribution North via Coughlin Road South via Wilson Drive East via CR 22* West via CR 22* Egress 0% 47% 26% 27% *Horseshoe Valley Road West [CR 22] 6

Using this traffic distribution pattern, the development traffic assignment for the AM and PM peak hour was calculated and has been illustrated in Figure 2. Figure 2 Peak Hour Traffic Assignment for Proposed Development 4 Site Access Analysis The total traffic generated by the proposed development is relatively low. Based on our observation of the traffic volumes in the study area during our site visit, the existing local road network can accommodate the additional traffic from the proposed development and will continue to provide significant excess capacity. As noted in Section 2.1, the intersection of Alexander Street / Pineview Street is currently uncontrolled and traffic generally treats this intersection as a curve in the road. Based on our 7

observations during our site visit, the existing south leg of the intersection acts like a driveway access. For the proposed intersection configuration, intersection signage is recommended to control the movement of traffic. Based on the methodology outlined in the Ontario Traffic Manual, Book 5, the proposed Ghibb Avenue / Alexander Street / Pineview Avenue intersection will not meet the minimum traffic volume criteria for all-way stop control (350 vph). Consequently, two-way stop control is recommended for the proposed cross-intersection. Based on the low volume of traffic on the south approach, it is recommended that two-way stop control is provided on the Alexander Street approaches to the intersection. Stop-bar pavement marking is not recommended at this intersection, since all approaches are local roads. The available sight distance for the proposed cross-intersection has been reviewed during our site visit. The available sight distance in each case meets the minimum requirement for sight stopping distance for a design speed of 60km/h, as identified in the Transportation Association of Canada Geometric Design Guidelines for Canadian Roads (75-85 metres). Based on our review, the proposed Ghibb Avenue / Alexander Street / Pineview Avenue intersection, with two-way stop control on Alexander Street, will provide safe and efficient conveyance of the future traffic volumes. The minor additional traffic generated by the subject site is expected to have a negligible impact on the traffic operations at the intersection of Alexander Street / Horseshoe Valley Road West. The existing intersection spacing between Alexander Street and Coughlin Road Horseshoe Valley Road West is short (83 metres measured centre of intersection to centre of intersection); however, the volume of traffic travelling from Coughlin Road to Alexander Street and vice versa is expected to be relatively low. Consequently, the impact of the short intersection spacing is not anticipated to result in any operational or safety issues. A trail connection is recommended from the northwest corner of Ghibb Avenue to the North Simcoe Rail Trail to provide access for the existing and proposed residents in the area. 5 Summary The Developer retained JD Engineering to complete a Traffic Brief in support of the Draft Plan Application for the proposed, located on the west side of Alexander Street and municipally known as 8 and 14 Alexander Street in the community of Anten Mills, Township of Springwater. The proposed draft plan is shown in Appendix A. This chapter summarizes the conclusions and recommendations from the study. 1. The Developer is proposing to construct 11 single-family detached residential units. 2. Lots 2 11 will be access via an extension of the north end of Ghibb Avenue, which will connect to Alexander Street at Pineview Avenue. Lot 1 will have driveway access directly onto Alexander Street, north of Pineview Avenue. 3. The proposed development is expected to generate a total of 8 AM and 11 PM peak hour trips. 4. Two-way stop control is recommended for the proposed intersection of Ghibb Avenue / Alexander Street / Pineview Avenue. Stop control is recommended on the Alexander Street approach. 8

5. The available sight distance for the proposed intersection meets the minimum requirement identified in the Transportation Association of Canada Geometric Design Guidelines for Canadian Roads. 6. A trail connection is recommended from the northwest corner of Ghibb Avenue to the North Simcoe Rail Trail. 9

Appendix A Draft Plan of Subdivision 10

Appendix B Transportation Tomorrow Survey Data Excerpt 11

COUNTY OF SIMCOE 2006 STATISTICS 44 EMPLOYMENT WORK TRIP ORIGINS AND DESTINATIONS Simcoe Number of People 0 10000 20000 30000 40000 50000 60000 70000 80000 Origin %: Destination %: Distribution of work trips destined for Simcoe Total: 61,200 Distribution of work trips made by Simcoe residents Total: 88,400 N Barrie York Toronto Origin %, Destination % Municipality 73%, 51% Simcoe 3%, 6% City of Orillia Orillia Peel External Durham Dufferin Orangeville Halton Guelph Kawartha Lakes Waterloo TOTAL EMPLOYMENT IN SIMCOE: 85,100 Employment Location of Simcoe Residents Home Location of People Employed in Simcoe 1% Tiny 6% Penetanguishene 12% Midland Brant Town of Orangeville City of Guelph Waterloo Wellington City of Hamilton 1%, 0% Dufferin Halton 1%, 6% Peel 15%, 14% City of Barrie 3%, 12% York 1%, 9% City of Toronto 0%, 1% Durham City of Kawartha Lakes DISTRIBUTION IN SIMCOE Origin %, Destination % Municipality 4%, 1% Tiny 5%, 4% Penetanguishene 8%, 9% Midland Peterborough City of Peterborough Brantford Brant Hamilton Niagara 10% Collingwood 3% Wasaga Beach 3% Clearview 6% Springwater 1% Tay 5% Oro- Medonte 3% Severn 6% Ramara City of Brantford Niagara 7%, 7% Collingwood 4%, 2% Wasaga Beach 5%, 2% Clearview 3%, 2% Springwater 4%, 1% 2%, 1% Tay Severn 3%, 1% Oro- Medonte 1%, 2% Ramara Peterborough City Peterborough CFB Borden 2% Adjala- Tosorontio 7% Essa 8% Innisfil CFB Borden 2%, 1% 6%, 3% Adjala- Essa Tosorontio 5%, 3% Innisfil Wellington 19% New Tecumseth 8% Bradford West Gwillimbury 7%, 9% New Tecumseth 4%, 3% Bradford West Gwillimbury