Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.

Similar documents
OR MISSION TRAIL ELEMENTARY

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Independence: overview

SANTA FE. 82: p.108 POLLINATOR PRAIRIE PARK. 86: p : p : p.113. ARROWHEAD PARK 151st St. 41: p.102. Indian Creek Greenway PARK

SERVICE AREA BOUNDARIES Beginning SFY2018

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Site Location and Setting

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

Non-Motorized Transportation

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations

Royal Gorge Far Out Trail to Le Point

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

University Region Non-Motorized Plan 2015

EVERknowledgeable EVERresponsive EVERhonorable EVERGREEN.

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

SCOPING INFORMATION PACKET

TABLE 1: STARTER PROJECTS YEARS SERVICES THAT CONTINUE IN EXISTING FORM

FEASIBILITY CRITERIA

Corridor Management Committee Meeting. April 2, 2014

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Each picture below has a brief explanation of the alignment. Please review and feel free to send any questions you might have.

Airport Planning Area

MEETING MINUTES District 1 Trail Planning Meeting 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Study Overview and Context

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

The Transportation Corridor Overlay District

ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE

1.2 Corridor History and Current Characteristics

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

Southwest LRT Alignment Video Narration

South Bay Metro Green Line Extension

September 14, Comments of the Colorado Trail Foundation On the USFS Scoping Notice of August 13, 2010 RE: the relocation of the CDNST/CT Page 1

CITY COUNCIL AGENDA MEMORANDUM

Basic Project Information

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

Transportation TRANSPORTATION PROJECTS

Segment 2: La Crescent to Miller s Corner

Figure San Dimas Bonita at San Dimas Avenue (view looking west)

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths.

COMMENT PERIOD INTRODUCTION

A VISION FOR EL MIRAGE

Cabarrus County line. Overland Connector. to Newell Park. Overland Connector

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

STOCKING CENTENNIAL BLVD, THE NATIONS 1,429-11,982 RSF CREATIVE OFFICE + RETAIL + WAREHOUSE STOCKING 51 OAKPOINT REAL ESTATE 1

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

Welcome to the Future Kingston Point Rail Trail!

Confluence of Long Creek. Bellhaven Road. Approximate Corridor Length: 1.5 miles. Mecklenburg County Greenway Master Plan

Welcome to the Cross County Trail Public Input Session!

County of Peterborough Active Transportation Master Plan

Waukee Trailhead Public Art and Amenities Project

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Needham Heights Neighborhood Association February Rail Trail Overview

Downtown to Defiance Trolley Key Messages Jan. 2017

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000.

TRAILS INTERSECTION SIGNS

Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar

CHAPTER FOUR: TRANSPORTATION

Dungeness Recreation Area County Park Master Plan

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

Trail Feasibility Study

// LEARN // ENGAGE // VOLUNTEER // DONATE // PROJECT OVERVIEW MAP

Dallas Love Field Capital Program. September 16, 2015

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

Sacramento Placerville Transportation Corridor Alternatives Analysis

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

Town of Frisco. Trails Master Plan. Legend. Planning Area 1. i l. 9 Campground. Lake Hill Development. Giberson Property. Frisco Transit Center

Clackamas County Development Agency

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

Understanding Your I-66 Trip

BACK COUNTRY UNIT PREFERRED ALTERNATIVE

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Northeast Corridor Transportation Update

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017

GATEWAY PHASE 2. U.S. Forest Service and the Mount Shasta Trails Association

South cedar creek. Connectivity Plan

Restoration of Historic Streetcar Services in Downtown Los Angeles

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

Introduction. Project Overview

Claremont Project Background and Update Community Meeting September 11, 2017

WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan.

EXECUTIVE SUMMARY FALL Introduction. Findings

Transcription:

Raytown: overview Blue Ridge Cut-off map 18: p.42 RICE- TREMOTI HOME Raytown Tfwy KASAS 17: p.41 JUCTIO WITH ROCK ISLAD LIE RIGHT OF WAY 16: p.40 BUS STOP AT E 51ST AD BLUE RIDGE (KASAS ) Sterling Ave E 53rd St KASAS The City of Raytown includes approximately 4 4.25 miles of the historic route, almost entirely along Blue Ridge Boulevard. It also includes one public historic trail site the Rice-Tremonti Home a public park affliated with the trail Cave Spring Park and a local historical society museum providing interpretive materials on the trails. Only one very minor deviation from the historic route is required through the center of downtown Raytown. A major opportunity for trail connections is coming to Raytown in the near future: the trail to be constructed along the former Chicago, Rock Island and Pacific railroad (commonly known as the Rock Island Line) intersects the historic trail alignment in the center of Raytown, and will ultimately connect the Kansas City Metro area to Katy Trail State Park, a rail trail that spans the entire state of Missouri. Connections to public transit are currently available at the northeast corner of Raytown, at East 51st St and Blue Ridge Boulevard, and along the west edge of the city, on Blue Ridge Boulevard/Blue Ridge Cutoff. To capitalize on historic trail and recreational connection opportunities, trailheads could potentially be located at Cave Spring Park, the intersection with the Rock Island Line right of way in downtown Raytown, and the Rice-Tremonti Home. Identification of an appropriate location for a minor trailhead (Level I, page 162) in the northeast corner of the Raytown would be desirable; one possibility might be in connection with a bus stop along Blue Ridge Boulevard near East 51st Street, although this would be in Kansas City rather than Raytown. The final length of the proposed retracement route within Raytown is 4.33 miles. P. 162 LEGED Shared use path Proposed HT alignment Mountain bike trail CAVE SPRIG PARK 19: p.43 Blue Pkwy / MO-350 E Gregory Blvd 0 0.2 0.4 0.8 Proposed HT alignment - other segments Approximate historic trail route City boundaries Bike lane Marked bike route Marked share the road Unmarked share the road Pedestrian hiking trail # Equestrian trail Bus & public transit routes HT sites HT trailhead opportunities Beginning/end of segments Schools Bus stops Segment number & page Map data sources: see Appendix E, p. 212 38 Trail alignments: Raytown

Raytown: overview KASAS As the historic route follows Blue Ridge Boulevard across Raytown, and that road also connects historic trail sites, schools, the proposed Rock Island Line - Katy Trail Connector and Raytown s downtown commercial district, very few decisions in terms of the preferred routing of the constructed HT needed to be made within the scope of this project. Raytown Tfwy Sterling Ave E 53rd St Blue Ridge Cut-off Blue Ridge Elementary and ew Trails Early Learning Center Raytown Historical Society Raytown Central Middle IDEPEDECE Streetscape improvements on, looking west. at Sterling, looking north. Photos: Vireo Rice-Tremonti Home rock island line - katy trail connector Cave Spring Park E Gregory Blvd LEGED: SEE OPPOSITE PAGE west of downtown, looking west. Raytown Historical Society Museum, on. Trail alignments: Raytown 39

Raytown: Segment 16 LEGED: SEE OPPOSITE PAGE KASAS TRAILHEAD: BUS STOP AT 51ST AD BLUE RIDGE (KCMO) 15 E 51st St 1.49. Blue Ridge Boulevard from East 51st Street at boundary with City of Kansas City to East 59th Street. CORRIDOR COECTIOS: Connects to transit at East 51st Street Connects to Raytown Middle and Schools E 53rd St OPPORTUITIES: The City of Raytown is considering a reduction of the road by a lane to allow room for improved sidewalks along this stretch of Blue Ridge Boulevard RELATIOSHIP TO HISTORIC ROUTE: This segment is directly on the historic route of all three trails throughout its length. E 56th St KASAS 17 Raytown Central Middle orthern Ave Sterling Ave Woodson Rd at Sterling Ave looking southwest. Photo: Vireo 40 Trail alignments: Raytown

Raytown: Segment 17 Cedar Ave 16 0.51. Blue Ridge Boulevard from East 59th Street to East 63rd Street in downtown Raytown. ISSUES: Many sidewalks may need improvement here Raytown Rd Raytown Central Middle E 61st St CORRIDOR COECTIOS: Connects to Raytown Middle and Schools Passes thorough Raytown s downtown commercial area and recent streetscape improvements on East 63rd Street OPPORTUITIES: Future streetscape improvements may extend recent work on East 63rd Street northwest along Blue Ridge Boulevard On looking north near Raytown School. Photo: Vireo Raytown Trafficway RELATIOSHIP TO HISTORIC ROUTE: The historic route of the trail cuts just to the north of the Blue Ridge Boulevard/East 63rd Street intersection. The southern half of this segment diverges from the historic route slightly to follow existing road right-of-ways. 18 Raytown Historical Society On at E 62nd St looking north. Photo: Vireo Overton Ave E 66th Terr Rock Island Line - Katy Trail Connector Raytown Rd Willow Ave LEGED Proposed HT alignment Proposed HT alignment - other segments Approximate historic trail route City boundaries Bike lane Marked bike route Marked share the road Unmarked share the road Pedestrian hiking trail # Shared use path Mountain bike trail Equestrian trail Bus & public transit routes HT sites HT trailhead opportunities Schools Bus stops Adjacent segment number Map data sources: see Appendix E, p. 212 Recent streetscape redevelopment at Blue Ridge and, looking south. Photo: PS Trail alignments: Raytown 41

Raytown: Segment 18 LEGED: SEE OPPOSITE PAGE E 61st St Kentucky Blue Ridge Park Elm Lake Raytown Trafficway 1.40. East 63rd Street west to Blue Ridge Boulevard, Blue Ridge southwest to Blue Ridge Boulevard/Cut-off, then south to intersection with Missouri way 350. ISSUES: Challenging intersection crossings for pedestrians on major streets (East 63rd Street and Blue Ridge Cut-off/Blue Ridge Boulevard) 17 TRAILHEAD: JUCTIO WITH ROCK ISLAD LIE CORRIDOR COECTIOS: Connects to future Rock Island Line - Katy Trail Connector Directly passes Raytown Historical Society and Rice-Tremonti Home Connects to Blue Ridge Elementary School Connects to transit at Blue Ridge Boulevard and Missouri way 350 KASAS Blue Ridge Cut-off E 65th St Rice-Tremonti Home Blue Ridge Elementary and ew Trails Early Learning Center Raytown Historical Society Rock Island Line - Katy Trail Connector OPPORTUITIES: The upcoming construction of a hiking-biking trail along the former Rock Island Line, to connect to Katy Trail State Park, is an opportunity for a major trailhead (Level I or II, page 162) and junction in the heart of Raytown P. 162 RELATIOSHIP TO HISTORIC ROUTE: This segment is directly on the historic route of all three trails throughout its length. Local knowledge suggests that for some part its period of use the historic trail followed a route from Raytown Center to the Rice-Tremonti Home as shown by the dotted purple line on this map, ( ) which may be interpreted in the area. Lane Ave Laurel Ave 19 Blue Trafficway - MO 350 Elm Ave Raytown Rd E 69th St ew streetscape on looking east. Photo PS Rice-Tremonti Home entrance off of E 65th St. Photo: Vireo 42 Trail alignments: Raytown

Raytown: Segment 19 18 Cedar Ave 0.93. Blue Ridge Boulevard from just north of Blue Trafficway/Missouri way 350 to boundary with City of Kansas City near East 75th Street. ISSUES: Busy multi-lane road with sidewalk only on one side of the road for most of this segment Floral Hills Cemetery Blue Tfway - MO 350 E 69th St CORRIDOR COECTIOS: Connects to Cave Spring Park Could provide safe pedestrian connection to nearby Westridge Elementary School (off map to southwest) Parallels transit route throughout its length OPPORTUITIES: Cave Spring Park is in the vicinity of the Barnes Farm, a campground used by historic trail travelers; it offers an opportunity for an HT trailhead and/or enhanced HT experience and interpretive developnent south of MO 350, looking south. Photo: Vireo TRAILHEAD: CAVE SPRIG PARK E Gregory Blvd RELATIOSHIP TO HISTORIC ROUTE: This segment is directly on the historic route of all three trails throughout its length. Cave Spring Park Existing parking and visitor center at Cave Spring Park. Photo: Vireo KASAS 20 E 75th St LEGED Proposed HT alignment Proposed HT alignment - other segments Approximate historic trail route City boundaries Bike lane Marked bike route Marked share the road Unmarked share the road Pedestrian hiking trail # Shared use path Mountain bike trail Equestrian trail Bus & public transit routes HT sites HT trailhead opportunities Schools Bus stops Adjacent segment number Map data sources: see Appendix E, p. 212 across from Cave Spring Park, looking south. Photo: Vireo Trail alignments: Raytown 43