: Loan NSUP Islamic Development Bank (IDB) Loan No. IND-174, IND-175, IND-176 Nama Konsultan

Similar documents
Nomor & Periode Invoice : No. 30 Periode (Oktober 2017) Realisasi Invoice : 17 November 2017

REKAPITULASI INVOICE PERIODE FEBRUARY 2014 REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS II)

Contract Amandement No. 2 Previous Comulative Total Claim Total Comulative Balance Discription

Contract ADVANCE PAYMENT Amandement No. 1 Previous Comulative Total Claim Total Comulative Balance Discription

CONTRACT AMENDMENT No.1

PT. KOGAS DRIYAP KONSULTAN in JV with PT. PERENTJANA DJAJA

CONTRACT AMENDMENT No.2

PT. KOGAS DRIYAP KONSULTAN in JV with PT. PERENTJANA DJAJA

VOTE 55 COMMISSION FOR HUMAN RIGHTS AND GOOD GOVERNANCE

: Loan NSUP Islamic Development Bank (IDB) Loan No. IND-174, IND-175, IND-176 Nama Konsultan

INDONESIA TOURISM INVESTMENT INVITATION

Contract Previous Comulative Total Claim Total Comulative Balance Discription

THE PREMIUM CITY AIR TRANSPORT

International Civil Aviation Organization. Twenty-Fourth South East Asia ATM Coordination Group (SEACG/24) Bangkok, Thailand, March 2017

Buyondo Herbert. January 15 th to 18 th 2017

Procurement Plan National PPFD

Charterhouse Salary Guide UAE

IND-175, IND-176 & : ) : : : PT.

CHAPTER III DISCUSSION. A. Sriwijaya Air. Bundjamin, and Andy Halim. Sriwijaya Air made the routes of its first flight from

Implementation of Tourism Destination Development Program in Batu City

INDONESIA-MALAYSIA-THAILAND GROWTH TRIANGLE SUB-REGIONAL COOPERATION

ANGLIAN WATER GREEN BOND

Luky Eko Wuryanto Deputy Minister for Infrastructure & Regional Development, Coordinating Ministry of Economic Affairs Executive Secretary of KP3EI

ROAD DEVELOPMENT AND MODERNISATION IN INDONESIA HERRY VAZA DIRECTOR OF INSTITUTE OF ROAD ENGINEERING INDONESIA

PT GARUDA INDONESIA (PERSERO) Tbk.

Terms of Reference: Introduction

Road Rehabilitation Project

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Sustainable Urban Transport Development in Indonesia

INVEST IN BOUNTIFUL. THE best performing stock exchange for longterm investors

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Tourism Inhambane Baseline Survey

Corporate Presentation PT Garuda Indonesia (Persero) Tbk

Corporate Presentation PT Garuda Indonesia (Persero) Tbk

Enhanced Engagement Terms of Reference:

Overview of political and governance issues

Libraries without borders: redefining the model of student support

* Head of the UNESCO-ICOMOS Documentation Centre.

Transport and Climate Change Week: SUSTAINABLE URBAN TRANSPORT DEVELOPMENT IN INDONESIA

EXHIBITORS' INVITATION

Manila, November Consultative Group Meeting. Slum Upgrading. Farouk Tebbal, Andrea Merrick

Network integration modelling of feeder and BRT(bus rapid transit) to reduce the usage of private vehicles in Palembang s suburban area

EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE.

PERTH AND KINROSS COUNCIL. 5 October 2016 COMMUNITY PLANNING PARTNERSHIP UPDATE

BOARD OF MANAGEMENT OF ROYAL EDINBURGH AND ASSOCIATED HOSPITALS. 7 Structure and Membership of Board of Management and Committees,

Committee. Presentation Outline

Statistical Evaluation of Seasonal Effects to Income, Sales and Work- Ocupation of Farmers, the Apples Case in Prizren and Korça Regions

NETLIPSE Infrastructure Project Assessment Tool

St. John s Urban Region Agriculture Appeal Board. Annual Performance Report. April 1, 2017 to March 31, 2018

Personal 898 $951, $0.00 $98, $472, $478, Real 5 $6,812, $0.00 $56, $4,486, $2,326,517.

Resume Of Mr. Hendrikus Eko Yulianto

INDONESIA S COMPLETE END-TO-END SOLUTION FOR THE CONSTRUCTION INDUSTRY

THE WORLD URBAN FORUM EXHIBITION E

Citi Prestige Presents a Photography Exhibition Hidden Realm: Underwater Series 2

REGIONAL INVESTMENT FORUM (RIF)

Improving Statistical Capacities of Tourism in Turkey

Orientation Programme (Tier-1) Newly recruited JETs/ MGR of HR Discipline 4-29 April, Ms. Santosh Singh

MEMORANDUM FOR THE HONG KONG COMMITTEE FOR PACIFIC ECONOMIC COOPERATION (HKCPEC)

SUSTAINABLE TRANSPORT IN METROPOLITAN AREAS AND REGIONS

International Development Association

Title II.A. Nonpublic Travel Policy

AMENDMENT CONTRACT NO. 17

RUTH H. POTOPSINGH

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

AN ECONOMIC PERSPECTIVE ON THE 5 YEARS AFTER ITS LAUNCH

2017 Infrastructure Summit WRAP-UP

Operational Evaluation of a Flight-deck Software Application

NO CODE MDA TOTAL PERSONNEL TOTAL OVERHEAD TOTAL RECURRENT TOTAL CAPITAL TOTAL ALLOCATION

Representative Project Qualifications. Indonesia

41 th MEETING OF THE FIG/IHO/ICA INTERNATIONAL BOARD ON STANDARDS OF COMPETENCE FOR HYDROGRAPHIC SURVEYORS AND NAUTICAL CARTOGRAPHERS (IBSC41)

U.S. India Aviation Cooperation Program. Air Traffic Management Training Program Update March 2009

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY

WORLD TOURISM ORGANIZATION (UNWTO) Final Report WORKSHOP ON TOURISM STATISTICS (SESRIC-TR MINISTRY OF CULTURE AND TOURISM-TURKSTAT-UNWTO)

A to Z HOTEL APHRODITE - HOTEL DIRECTORY

1.1. The purpose of this report is to seek approval for the adoption and publication of the Sports Pitches Strategy for East Dunbartonshire.

Tourism Development in Temajuk: Reveal the Tourism Potential in Borderland Indonesia and Malaysia

INDONESIA TOURISM INVESTMENT INVITATION

Improving our roads to drive our future

UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION CONVENTION CONCERNING THE PROTECTION OF THE WORLD CULTURAL AND NATURAL HERITAGE

Destination NSW USA Roadshow 2018 PROSPECTUS

Inclusion on the City of Toronto's Heritage Register Midtown in Focus Phase 1: Main Street Properties

Sales of IT Hardware in The Gambia

IOM Mission in Kosovo

Ferry Terminal Development Project

HALCYONAGRI. Q Results. 5 December 2014

Indonesian Ecotourism Network Jl. Jatipadang IA No.8 Jakarta Phone: ( ) INDONESIA

SAMPLE RFP TEMPLATE - TRAVEL MANAGEMENT SERVICES

Triple Play Networking in a Cruise Ship Environment

Kalimantan Balikpapan

The Infrastructure Development and Competitiveness of Smes in Implementation of Creative Industries of Palembang City

Curriculum Vitae Brian Joseph Waddell

INDONESIA-MALAYSIA-THAILAND GROWTH TRIANGLE

Lippo Malls Indonesia Retail Trust 4Q 2016 Results Presentation

Love Field Customer Facility Charge Ordinance

PROGRESS ON INDONESIAN ACTIVITIES OF SATREPS MCCOE DURING

DESTIMED PROJECT CALL FOR EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF ECOTOURISM PILOT ACTIONS IN CROATIAN MPAS

Whenever you are hosting an event, turn to the serene setting of the Courtyard by Marriott

THE ERGONOMIC DESIGN OF A MINI HOTEL FOR INDONESIAN TRAVELLERS

SPOTLIGHT ON STUDENT ACCOMMODATION FABBY ERNESTA

1.0 BACKGROUND NEW VETERANS CHARTER EVALUATION OBJECTIVES STUDY APPROACH EVALUATION LIMITATIONS... 7

Transcription:

NATIONAL SLUM UPGRADING PROGRAM (NSUP) - FY 2018 KOTA TANPA KUMUH "KOTAKU" SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT Nomor Loan : Loan NSUP Islamic Development Bank (IDB) Loan No. IND-174, IND-175, IND-176 Nama Konsultan : PT. Prismaita Cipta Kreasi Paket : MONITORING & EVALUATION CONSULTANT - WILAYAH 1 Nomor & Tanggal Kontrak : HK.02.03/MEC/NSUP-IDB/SATKER-PKPBM/04/2018-02 April 2018 Periode Kontrak : 02 April 2018 sd 30 September 2021 TOTAL Contract Amount I REMUNERATION 16.627.000.000 1.1 Professional Staff 11.137.000.000 1,2 Sub Professional Staff 5.490.000.000 II DIRECT REIMBURSABLE COST 9.976.095.000 2.1 Supporting Staff 1.092.000.000 2.2 Duty Travel 1.107.600.000 2.3 Office Rental 992.500.000 2.4 Vehicles Rental 1.627.500.000 2.5 Communication (telephone, faximili & Internet) 231.000.000 2.6 Utilities Expenses 441.000.000 2.7 Office Equipment 723.500.000 2.8 Secondary Data 80.000.000 2.9 Pre-Test Instrument 40.000.000 2.10 Instrument Production 841.120.000 2.11 Delivery Instrument 160.000.000 2.12 Lumpsum Surveyor 337.500.000 2.13 Recruitment and Training /Refreshing 636.000.000 2.14 FGD 1.207.000.000 2.15 Workshop & Disemination inc. material kit 388.500.000 2.16 Reporting TOTAL 70.875.000 26.603.095.000

Baseline Survey of NSUP IDB I REMUNERATION 2.848.500.000 Professional Staff 1.626.000.000 Team Leader/ Evaluation or Social Expert Prs-Month 6 Co.Team Leader for Evaluation/ Evaluation Expert Prs-Month 6 Co.Team Leader for Study/ Study Expert Prs-Month 6 Quantitative Evaluation Specialist Prs-Month 6 Qualitative Evaluation Specialist Prs-Month 6 Sampling Specialist/Statistician Prs-Month 6 Econometric Specialist Prs-Month 6 Infrastructure Quality Specialist (Civil Engineer) Prs-Month 6 Local Government or Public Policy Expert Prs-Month 6 Computer Programmer Prs-Month 3 Urban Planner Specialist Prs-Month 3 Training Specialist Prs-Month 3 Sub-Professional Staff 1.222.500.000 Data Cleaning Specialist (2 prs; @3 Month) Prs-Month 6 Supervisor (15 person; @2Month) Prs-Month 30 Junior Researcher (15 person; @2 month) Prs-Month 30 Enumerator (45 prs) Prs-Month 45 Data Editor (30 prs; @10 days) Prs-Day 300 Data Entry Operator (45 prs; @8 days) Prs-Day 360 II DIRECT REIMBURSABLE COST 2.447.325.000 2,1 Supporting Staff 156.000.000 Office Manager Prs-Month 6 Secretary Prs-Month 6 Computer Operator (3 person; @6 months) Prs-Month 12 Office Boy Prs-Month 6 Security Prs-Month 6 2,2 Duty Travel 276.900.000 Transport (at cost) from Jakarta to: Jakarta - NAD Round Trip 3 4.000.000 12.000.000 Jakarta - Medan Round Trip 3 3.800.000 11.400.000 Jakarta - Pekanbaru Round Trip 3 2.500.000 7.500.000 Jakarta - Tanjung Pinang Round Trip 3 2.500.000 7.500.000 Jakarta - Padang Round Trip 3 3.000.000 9.000.000 Jakarta - Bengkulu Round Trip 3 2.000.000 6.000.000 Jakarta - Jambi Round Trip 3 2.000.000 6.000.000 Jakarta - Palembang Round Trip 3 2.000.000 6.000.000 Jakarta - Pangkal Pinang Round Trip 3 2.000.000 6.000.000 Jakarta - Bandar Lampung Round Trip 3 1.500.000 4.500.000 Jakarta - Bandung Round Trip 3 500.000 1.500.000 Jakarta - Serang Round Trip 3 500.000 1.500.000 Jakarta - Pontianak Round Trip 3 2.000.000 6.000.000 Jakarta - Tarakan Round Trip 3 2.500.000 7.500.000 OSA Prs/days 225 300.000 67.500.000 Hotel Accommodation Prs/days 180 600.000 108.000.000 Inland Transport trip 45 200.000 9.000.000 2,3 Office Rental 227.500.000 Office Space Rental M2/Month 1020 125.000 127.500.000 Furniture & Air Conditioner (AC) LS 1 100.000.000 100.000.000 2,4 Vehicles Rental 341.250.000 Jakarta (central office, 2 units x 6 months) Month 12 7.500.000 90.000.000

Baseline Survey of NSUP IDB Outside Jakarta/survey (14 prov x 5 days x 1 Times) Days 75 500.000 37.500.000 car rental for Supervisor (15 prs x 1 mth) Month 15 6.000.000 90.000.000 motorcycle for enumerator & data editor Days 1650 75.000 123.750.000 2,5 Communication (telephone, faximili & Internet) 33.000.000 Telephone (top-up voucher for central & field) Month 6 4.000.000 24.000.000 Internet (top-up voucher for central & field) Month 6 1.500.000 9.000.000 2,6 Utilities Expenses 63.000.000 Office Supply and Consumable Month 6 5.000.000 30.000.000 Computer Supply Month 6 3.000.000 18.000.000 Photo Copy Supply Month 6 2.500.000 15.000.000 2,7 Office Equipment 338.000.000 A. Main Equipment Computer Notebook 15 units (purchase) 15 10.000.000 150.000.000 Computer Desktop 6 units (purchase) 6 8.500.000 51.000.000 Printer Laser Jet 1 unit (purchase) 2 2.500.000 5.000.000 Printer Color A3 1 unit (purchase) 1 4.000.000 4.000.000 Scanner 1 unit (purchase) 1 2.000.000 2.000.000 LCD Projector 1 unit (purchase) 1 7.500.000 7.500.000 B. Field Equipment Computer Notebook (rental) for Supervisor (15 person) Month 30 600.000 18.000.000 Computer Notebook (rental) Junior Researcher (30 persons) Month 60 600.000 36.000.000 Computer Notebook (rental) Data Entry Opearator (45 persons) Day 360 75.000 27.000.000 Computer Notebook (rental) Data Editor (30 persons) Day 300 75.000 22.500.000 Printer (rental) for Supervisor (15 Persons) Month 30 500.000 15.000.000 2,7 Secondary Data LS 1 20.000.000 20.000.000 2,8 Pre-Test Instrument LS 1 10.000.000 10.000.000 2,9 Instrument Production 250.550.000 Fieldwork manual/guideline Package 143 100.000 14.300.000 Data processing manual/guideline Package 143 100.000 14.300.000 Supplies (paper, ballpoint, notes, etc) for field work and data processing Package 143 50.000 7.150.000 Questionnaires Package 10740 20.000 214.800.000 2.10 Delivery Instrument LS 1 40.000.000 40.000.000 2,11 Lumpsum Surveyor 90.000.000 Collecting Data in Province Package 1800 50.000 90.000.000 2,12 Recruitment and Training /Refreshing 159.000.000 Recruitment for Field Supervisor, Field Editor, & Local Enumerator (15 province) LS 1 15.000.000 15.000.000 Training for Field Supervisor, Field Editor, & Local Enumerator (360 x 2 days) Package 360 250.000 90.000.000 Local transportation for participants Trip 360 100.000 36.000.000 Supplies (paper, ballpoint, notes, etc) Package 360 50.000 18.000.000 2,13 FGD 309.375.000 FGD in Wards (450 Wards x 1 Times) Prs/days 4500 50.000 225.000.000 FGD in Kota/Kab (45 Kota/Kab x 1 Times) Prs/days 1125 75.000 84.375.000 2,14 Workshop & Disemination inc. material kit 112.500.000 Workshop Pra Survey (Preparation Criteria of sample location & Survey Prs/days 60 350.000 21.000.000 Workshop Findings Result Survey Prs/days 90 350.000 31.500.000 Workshop Final Results (Final Report) Prs/days 120 500.000 60.000.000

Baseline Survey of NSUP IDB 2,15 Reporting 20.250.000 Inception Report Exemplar 30 75.000 2.250.000 Field Analisys Report Exemplar 30 100.000 3.000.000 Proceeding of FGD Exemplar 30 100.000 3.000.000 Draft Final Report Exemplar 30 150.000 4.500.000 Final Report + CD Exemplar 30 250.000 7.500.000 TOTAL 5.295.825.000

Impact Evaluation of ICDD Phase III I REMUNERATION 4.823.500.000 Professional Staff 3.301.000.000 Team Leader/ Evaluation or Social Expert Prs-Month 12 Co.Team Leader for Evaluation/ Evaluation Expert Prs-Month 12 Co.Team Leader for Study/ Study Expert Prs-Month 12 Quantitative Evaluation Specialist Prs-Month 12 Qualitative Evaluation Specialist Prs-Month 12 Sampling Specialist/Statistician Prs-Month 12 Econometric Specialist Prs-Month 10 Infrastructure Quality Specialist (Civil Engineer) Prs-Month 12 Local Government or Public Policy Expert Prs-Month 10 Community Empowerment Specialist Prs-Month 6 Computer Programmer Prs-Month 6 Training Specialist Prs-Month 4 Micro finance or Entrepreneurship Expert Prs-Month 4 Institutional Expert Prs-Month 4 Sub-Professional Staff 1.522.500.000 Data Cleaning Specialist (2 prs; @3 Month) Prs-Month 6 Supervisor (15 person; @2Month) Prs-Month 30 Junior Researcher (30 person; @2 month) Prs-Month 60 Enumerator (45 prs) Prs-Month 45 Data Editor (30 prs; @10 days) Prs-Day 300 Data Entry Operator (45 prs; @8 days) Prs-Day 360 II DIRECT REIMBURSABLE COST 2.559.995.000 2,1 Supporting Staff 312.000.000 Office Manager Prs-Month 12 Secretary Prs-Month 12 Computer Operator (3 person; @6 months) Prs-Month 24 Office Boy Prs-Month 12 Security Prs-Month 12 2,2 Duty Travel 276.900.000 Transport (at cost) from Jakarta to: Jakarta - NAD Round Trip 3 4.000.000 12.000.000 Jakarta - Medan Round Trip 3 3.800.000 11.400.000 Jakarta - Pekanbaru Round Trip 3 2.500.000 7.500.000 Jakarta - Tanjung Pinang Round Trip 3 2.500.000 7.500.000 Jakarta - Padang Round Trip 3 3.000.000 9.000.000 Jakarta - Bengkulu Round Trip 3 2.000.000 6.000.000 Jakarta - Jambi Round Trip 3 2.000.000 6.000.000 Jakarta - Palembang Round Trip 3 2.000.000 6.000.000 Jakarta - Pangkal Pinang Round Trip 3 2.000.000 6.000.000 Jakarta - Bandar Lampung Round Trip 3 1.500.000 4.500.000 Jakarta - Bandung Round Trip 3 500.000 1.500.000 Jakarta - Serang Round Trip 3 500.000 1.500.000 Jakarta - Pontianak Round Trip 3 2.000.000 6.000.000 Jakarta - Tarakan Round Trip 3 2.500.000 7.500.000 OSA Prs/days 225 300.000 67.500.000 Hotel Accommodation Prs/days 180 600.000 108.000.000 Inland Transport trip 45 200.000 9.000.000 2,3 Office Rental 255.000.000 Office Space Rental M2/Month 2040 125.000 255.000.000 2,3 Vehicles Rental 428.750.000 Jakarta (central office, 2 units x 12 months) Month 24 7.500.000 180.000.000 Outside Jakarta/survey (14 prov x 5 days x 1 Times) Days 70 500.000 35.000.000 car rental for Supervisor (15 prs x 1 mth) Month 15 6.000.000 90.000.000 motorcycle for enumerator & data editor Days 1650 75.000 123.750.000 2,4 Communication (telephone, faximili & Internet) 66.000.000 Telephone (top-up voucher for central & field) Month 12 4.000.000 48.000.000 Internet (top-up voucher for central & field) Month 12 1.500.000 18.000.000

Impact Evaluation of ICDD Phase III 2,5 Utilities Expenses 126.000.000 Office Supply and Consumable Month 12 5.000.000 60.000.000 Computer Supply Month 12 3.000.000 36.000.000 Photo Copy Supply Month 12 2.500.000 30.000.000 2,6 Office Equipment 148.500.000 A. Main Equipment Computer Notebook 3 units (purchase) 3 10.000.000 30.000.000 B. Field Equipment Computer Notebook (rental) for Supervisor (15 person) Month 30 600.000 18.000.000 Computer Notebook (rental) Junior Researcher (30 persons) Month 60 600.000 36.000.000 Computer Notebook (rental) Data Entry Opearator (44 persons) Day 360 75.000 27.000.000 Computer Notebook (rental) Data Editor (30 persons) Day 300 75.000 22.500.000 Printer (rental) for Supervisor (15 Persons) Month 30 500.000 15.000.000 2,7 Secondary Data LS 1 20.000.000 20.000.000 2,8 Pre-Test Instrument LS 1 10.000.000 10.000.000 2,9 Instrument Production 216.220.000 Fieldwork manual/guideline Package 128 100.000 12.800.000 Data processing manual/guideline Package 128 100.000 12.800.000 Supplies (paper, ballpoint, notes, etc) for field work and data processing Package 128 50.000 6.400.000 Questionnaires Package 9211 20.000 184.220.000 2.10 Delivery Instrument LS 1 40.000.000 40.000.000 2,11 Lumpsum Surveyor 90.000.000 Collecting Data in Province Package 1800 50.000 90.000.000 2,12 Recruitment and Training /Refreshing 159.000.000 Recruitment for Field Supervisor, Field Editor, & Local Enumerator (15 province) LS 1 15.000.000 15.000.000 Training for Field Supervisor, Field Editor, & Local Enumerator (360 x 3 days) Package 360 250.000 90.000.000 Local transportation for participants Trip 360 100.000 36.000.000 Supplies (paper, ballpoint, notes, etc) Package 360 50.000 18.000.000 2,13 FGD 278.875.000 FGD in Wards (389 Wards x 1 Times) Prs/days 3890 50.000 194.500.000 FGD in Kota/Kab (44 Kota/Kab x 1 Times) Prs/days 1125 75.000 84.375.000 2,14 Workshop & Disemination inc. material kit 112.500.000 Workshop Pra Survey (Preparation Criteria of sample location & Survey Instruments) Prs/days 60 350.000 21.000.000 Workshop Findings Result Survey Prs/days 90 350.000 31.500.000 Workshop Final Results (Final Report) Prs/days 120 500.000 60.000.000 2,15 Reporting 20.250.000 Inception Report Exemplar 30 75.000 2.250.000 Field Analisys Report Exemplar 30 100.000 3.000.000 Proceeding of FGD Exemplar 30 100.000 3.000.000 Draft Final Report Exemplar 30 150.000 4.500.000 Final Report + CD Exemplar 30 250.000 7.500.000 GRAND TOTAL TOTAL 7.383.495.000

Mid Term Evaluation of NSUP IDB VOL RATE AMOUNT I REMUNERATION 4.921.500.000 Professional Staff 3.399.000.000 Team Leader/ Evaluation or Social Expert Prs-Month 12 Co.Team Leader for Evaluation/ Evaluation Expert Prs-Month 12 Co.Team Leader for Study/ Study Expert Prs-Month 12 Quantitative Evaluation Specialist Prs-Month 12 Qualitative Evaluation Specialist Prs-Month 12 Sampling Specialist/Statistician Prs-Month 12 Econometric Specialist Prs-Month 10 Infrastructure Quality Specialist (Civil Engineer) Prs-Month 12 Local Government or Public Policy Expert Prs-Month 10 Community Empowerment Specialist Prs-Month 4 Computer Programmer Prs-Month 6 Urban Planner Specialist Prs-Month 6 Training Specialist Prs-Month 4 Micro finance or Entrepreneurship Expert Prs-Month 4 Institutional Expert Prs-Month 4 Sub-Professional Staff 1.522.500.000 Data Cleaning Specialist (2 prs; @3 Month) Prs-Month 6 Supervisor (15 person; @2Month) Prs-Month 30 Junior Researcher (30 person; @2 month) Prs-Month 60 Enumerator (45 prs) Prs-Month 45 Data Editor (30 prs; @10 days) Prs-Month 300 Data Entry Operator (45 prs; @8 days) Prs-Day 360 II DIRECT REIMBURSABLE COST 2.594.825.000 2,1 Supporting Staff 312.000.000 Office Manager Prs-Month 12 Secretary Prs-Month 12 Computer Operator (3 person; @6 months) Prs-Month 24 Office Boy Prs-Month 12 Security Prs-Month 12 2,2 Duty Travel 276.900.000 Transport (at cost) from Jakarta to: Jakarta - NAD Round Trip 3 4.000.000 12.000.000 Jakarta - Medan Round Trip 3 3.800.000 11.400.000 Jakarta - Pekanbaru Round Trip 3 2.500.000 7.500.000 Jakarta - Tanjung Pinang Round Trip 3 2.500.000 7.500.000 Jakarta - Padang Round Trip 3 3.000.000 9.000.000 Jakarta - Bengkulu Round Trip 3 2.000.000 6.000.000 Jakarta - Jambi Round Trip 3 2.000.000 6.000.000 Jakarta - Palembang Round Trip 3 2.000.000 6.000.000 Jakarta - Pangkal Pinang Round Trip 3 2.000.000 6.000.000 Jakarta - Bandar Lampung Round Trip 3 1.500.000 4.500.000 Jakarta - Bandung Round Trip 3 500.000 1.500.000 Jakarta - Serang Round Trip 3 500.000 1.500.000 Jakarta - Pontianak Round Trip 3 2.000.000 6.000.000 Jakarta - Tarakan Round Trip 3 2.500.000 7.500.000 OSA Prs/days 225 300.000 67.500.000 Hotel Accommodation Prs/days 180 600.000 108.000.000 Inland Transport trip 45 200.000 9.000.000 2,3 Office Rental 255.000.000 Office Space Rental M2/Month 2040 125.000 255.000.000 2,3 Vehicles Rental 428.750.000

Mid Term Evaluation of NSUP IDB VOL RATE AMOUNT Jakarta (central office, 2 units x 12 months) Month 24 7.500.000 180.000.000 Outside Jakarta/survey (14 prov x 5 days x 1 Times) Days 70 500.000 35.000.000 car rental for Supervisor (15 prs x 1 mth) Month 15 6.000.000 90.000.000 motorcycle for enumerator & data editor Days 1650 75.000 123.750.000 2,4 Communication (telephone, faximili & Internet) 66.000.000 Telephone (top-up voucher for central & field) Month 12 4.000.000 48.000.000 Internet (top-up voucher for central & field) Month 12 1.500.000 18.000.000 2,5 Utilities Expenses 126.000.000 Office Supply and Consumable Month 12 5.000.000 60.000.000 Computer Supply Month 12 3.000.000 36.000.000 Photo Copy Supply Month 12 2.500.000 30.000.000 2,6 Office Equipment 118.500.000 B. Field Equipment Computer Notebook (rental) for Supervisor (15 person) Month 30 600.000 18.000.000 Computer Notebook (rental) Junior Researcher (30 persons) Day 60 600.000 36.000.000 Computer Notebook (rental) Data Entry Opearator (44 persons) Day 360 75.000 27.000.000 Computer Notebook (rental) Data Editor (30 persons) Day 300 75.000 22.500.000 Printer (rental) for Supervisor (15 Persons) Month 30 500.000 15.000.000 2,7 Secondary Data LS 1 20.000.000 20.000.000 2,8 Pre-Test Instrument LS 1 10.000.000 10.000.000 2,9 Instrument Production 250.550.000 Fieldwork manual/guideline Package 143 100.000 14.300.000 Data processing manual/guideline Package 143 100.000 14.300.000 Supplies (paper, ballpoint, notes, etc) for field work and data processing Package 143 50.000 7.150.000 Questionnaires Package 10740 20.000 214.800.000 2.10 Delivery Instrument LS 1 40.000.000 40.000.000 2,11 Lumpsum Surveyor 90.000.000 Collecting Data in Province Package 1800 50.000 90.000.000 2,12 Recruitment and Training /Refreshing 159.000.000 Recruitment for Field Supervisor, Field Editor, & Local Enumerator (15 province) LS 1 15.000.000 15.000.000 Training for Field Supervisor, Field Editor, & Local Enumerator (360 x 3 days) Package 360 250.000 90.000.000 Local transportation for participants Trip 360 100.000 36.000.000 Supplies (paper, ballpoint, notes, etc) Package 360 50.000 18.000.000 2,13 FGD 309.375.000 FGD in Wards (450 Wards x 1 Times) Prs/days 4500 50.000 225.000.000 FGD in Kota/Kab (45 Kota/Kab x 1 Times) Prs/days 1125 75.000 84.375.000 2,14 Workshop & Disemination inc. material kit 112.500.000 Workshop Pra Survey (Preparation Criteria of sample location & Survey Prs/days 60 350.000 21.000.000 Workshop Findings Result Survey Prs/days 90 350.000 31.500.000 Workshop Final Results (Final Report) Prs/days 120 500.000 60.000.000 2,15 Reporting 20.250.000 Inception Report Exemplar 30 75.000 2.250.000 Field Analisys Report Exemplar 30 100.000 3.000.000 Proceeding of FGD Exemplar 30 100.000 3.000.000 Draft Final Report Exemplar 30 150.000 4.500.000 Final Report + CD Exemplar 30 250.000 7.500.000 GRAND TOTAL TOTAL 7.516.325.000

Impact Evaluation of NSUP IDB I REMUNERATION 4.033.500.000 Professional Staff 2.811.000.000 Team Leader/ Evaluation or Social Expert 12 Co.Team Leader for Evaluation/ Evaluation Expert 12 Co.Team Leader for Study/ Study Expert 12 Quantitative Evaluation Specialist 12 Qualitative Evaluation Specialist 12 Sampling Specialist/Statistician 12 Econometric Specialist 6 Infrastructure Quality Specialist (Civil Engineer) 12 Local Government or Public Policy Expert 6 Urban Planner Specialist 6 Computer Programmer 6 Sub-Professional Staff 1.222.500.000 Data Cleaning Specialist (2 prs; @3 Month) 6 Supervisor (15 person; @2Month) 30 Junior Researcher (15 person; @2 month) 30 Enumerator (45 prs) 45 Data Editor (30 prs; @10 days) 300 Data Entry Operator (45 prs; @8 days) 360 II DIRECT REIMBURSABLE COST 2.373.950.000 2,1 Supporting Staff 312.000.000 Office Manager 12 Secretary 12 Computer Operator (3 person; @6 months) 24 Office Boy 12 Security 12 2,2 Duty Travel 276.900.000 Transport (at cost) from Jakarta to: Jakarta - NAD 3 4.000.000 12.000.000 Jakarta - Medan 3 3.800.000 11.400.000 Jakarta - Pekanbaru 3 2.500.000 7.500.000 Jakarta - Tanjung Pinang 3 2.500.000 7.500.000 Jakarta - Padang 3 3.000.000 9.000.000 Jakarta - Bengkulu 3 2.000.000 6.000.000 Jakarta - Jambi 3 2.000.000 6.000.000 Jakarta - Palembang 3 2.000.000 6.000.000 Jakarta - Pangkal Pinang 3 2.000.000 6.000.000 Jakarta - Bandar Lampung 3 1.500.000 4.500.000 Jakarta - Bandung 3 500.000 1.500.000 Jakarta - Serang 3 500.000 1.500.000 Jakarta - Pontianak 3 2.000.000 6.000.000 Jakarta - Tarakan 3 2.500.000 7.500.000 OSA 225 300.000 67.500.000 Hotel Accommodation 180 600.000 108.000.000 Inland Transport 45 200.000 9.000.000 2,3 Office Rental 255.000.000 Office Space Rental 2040 125.000 255.000.000 2,3 Vehicles Rental 428.750.000 Jakarta (central office, 2 units x 12 months) 24 7.500.000 180.000.000 Outside Jakarta/survey (14 prov x 5 days x 1 Times) 70 500.000 35.000.000

Impact Evaluation of NSUP IDB car rental for Supervisor (15 prs x 1 mth) 15 6.000.000 90.000.000 motorcycle for enumerator & data editor 1650 75.000 123.750.000 2,4 Communication (telephone, faximili & Internet) 66.000.000 Telephone (top-up voucher for central & field) 12 4.000.000 48.000.000 Internet (top-up voucher for central & field) 12 1.500.000 18.000.000 2,5 Utilities Expenses 126.000.000 Office Supply and Consumable 12 5.000.000 60.000.000 Computer Supply 12 3.000.000 36.000.000 Photo Copy Supply 12 2.500.000 30.000.000 2,6 Office Equipment 118.500.000 B. Field Equipment Computer Notebook (rental) for Supervisor (15 person) 30 600.000 18.000.000 Computer Notebook (rental) Junior Researcher (30 persons) 60 600.000 36.000.000 Computer Notebook (rental) Data Entry Opearator (44 persons) 360 75.000 27.000.000 Computer Notebook (rental) Data Editor (30 persons) 300 75.000 22.500.000 Printer (rental) for Supervisor (15 Persons) 30 500.000 15.000.000 2,7 Secondary Data 1 20.000.000 20.000.000 2,8 Pre-Test Instrument 1 10.000.000 10.000.000 2,9 Instrument Production 123.800.000 Fieldwork manual/guideline 116 100.000 11.600.000 Data processing manual/guideline 116 100.000 11.600.000 Supplies (paper, ballpoint, notes, etc) for field work and data processing 116 50.000 5.800.000 Questionnaires 4740 20.000 94.800.000 2.10 Delivery Instrument 1 40.000.000 40.000.000 2,11 Lumpsum Surveyor 67.500.000 Collecting Data in Province 1350 50.000 67.500.000 2,12 Recruitment and Training /Refreshing 159.000.000 Recruitment for Field Supervisor, Field Editor, & Local Enumerator (15 province) 1 15.000.000 15.000.000 Training for Field Supervisor, Field Editor, & Local Enumerator (360 x 3 days) 360 250.000 90.000.000 Local transportation for participants 360 100.000 36.000.000 Supplies (paper, ballpoint, notes, etc) 360 50.000 18.000.000 2,13 FGD 309.375.000 FGD in Wards (450 Wards x 1 Times) 4500 50.000 225.000.000 FGD in Kota/Kab (45 Kota/Kab x 1 Times) 1125 75.000 84.375.000 2,14 Workshop & Disemination inc. material kit 51.000.000 Workshop Pra Survey (Preparation Criteria of sample location & Survey 30 350.000 10.500.000 Workshop Findings Result Survey 30 350.000 10.500.000 Workshop Final Results (Final Report) 60 500.000 30.000.000 2,15 Reporting 10.125.000 Inception Report 15 75.000 1.125.000 Field Analisys Report 15 100.000 1.500.000 Proceeding of FGD 15 100.000 1.500.000 Draft Final Report 15 150.000 2.250.000 Final Report + CD 15 250.000 3.750.000 GRAND TOTAL TOTAL 6.407.450.000