Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering

Similar documents
2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski

A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.

Coastal Management: Treasure Island - Long Key Nourishment

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

The Galveston Seawall

Norfolk District North Atlantic Division

U.S. Army Corps of Engineers Wilmington District

Great Lakes Navigation System Buffalo District

Hurricane Irma: Palm Beach County Coastal Storm Damage Assessment

Economic Impacts of Beach Nourishment in Texas

PORT EVERGLADES SAND BYPASS PROJECT

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

7/21/2014. New Jersey Waterway Debris Removal from Superstorm Sandy: Unprecedented! Superstorm Sandy. Superstorm Sandy.

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

Riverine Sand Mining/Scofield Island Restoration (BA-40)

DOES BEACH NOURISHMENT PROTECT PROPERTY VALUES FROM HURRICANES? THE CASE OF THE 2004 AND 2005 HURRICANES

Buffalo District Navigation Program Overview

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

Stakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

Ongoing Projects 3/16/2017 2

OWN A PIECE OF PARADISE. SEABROOK ISLAND.

USACE GALVESTON DISTRICT PROJECT UPDATE

- NEUTRAL. Savannah ORGIA PETER SALAMON MASTER OF URBAN DESIGN THESIS SAVANNAH COLLEGE OF ART AND DESIGN MAY 2015

KINGSTON HARBOUR IN THE YEAR SEMINAR SPONSORED BY NEPA 2003 November 06

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

Proposed Cherry Grove Canals Dredging Project

Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018

Norfolk District North Atlantic Division

Water Resources Update after NCGA Long Session

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech

Port of Kalama, New Approach to Maintenance Dredging

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012

Intense Hurricane Strike Reconstruction, Vieques, Puerto Rico

Potential Application of. Shore-Stabilizing Structures along an Open-Coast Shoreline. Christopher G. Creed, P.E. 23 rd Annual National Conference on

Waterway Access and the Atlantic Intracoastal Waterway in Florida

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

www: vermilionparishpolicejury.com

REVISED DRAFT Integrated Hurricane Sandy General Reevaluation Report and Environmental Impact Statement. Atlantic Coast of New York

EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST

PUBLIC WORKS DEPARTMENT

Draft Town Board Meeting Minutes March 12, 2019

PUBLIC WORKS DEPARTMENT

WHY THERE IS NO STORM SURGE PROTECTION FOR THE LAKE PONTCHARTRAIN BASIN

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

Mini-budget Workshop Coastal Projects

The Corps of Engineers Dredges on the West Coast

BENEFICIAL USE OF DREDGED MATERIAL DISPOSAL HISTORY HOUMA NAVIGATION CANAL, LA

CHAPTER 186. Shore Protection Plan for the Nile Delta Coastline. A.L. Kadib, Member, ASCE^, A.T. Shak, A. Member, ASCE< 2 ), A.A.

UAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

Engineering With Nature Geographic Project Mapping Tool (EWN ProMap)

Brevard County Utility Services Department

Resolution NOW THEREF ORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONER S OF MANATEE COUNTY, FLORIDA:

BENEFICIAL USE OF DREDGED MATERIAL PILOT PROGRAM

Effects of Sea Level Rise and Storm Surge Events On Cape May County s Tourism and Commerce

Frank A. Rush, Jr., Town Manager

Beach Management Hayling Island. Marc Bryan - Coastal Engineer Havant, Portsmouth and Gosport Coastal Partnership

Overview of Park Board Budgets & Industry Forecasts. Kelly de Schaun, Executive Director

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY

Annual Port Review. June 22, 2016

September 5, 2013 Volume 3, Issue 9

Firework Fires. Data Dates of Incidents Number of Incidents Percentage of Incidents July 3-6, % All other dates 28 65% Grand Total %

ORDINANCE NO. C-16- WHEREAS, the proposed minimum seawall elevation exceeds the current maximum by 0.7 feet (8.4 inches); and

1. USACE Response to Sandy Ports 2. NAVFAC Response to Sandy - Base 3. USSOUTHCOM/NAVFAC Response in HaiC Port Au Prince Port

Beach Monitoring and Hotspots

The History & Management of the Atlantic Intracoastal Waterway in Florida

Using Managed Retreat to Address Coastal Erosion in Brewster

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

CHAPTER 241. SAND BYPASSING TO "PLAYA DE CASTILLA" (HUELVA SPAIN) Jose Fernandez (1) Gregorio Gomez Pina (2) Angel Mufloz (3)

ANNEX F TO HURRICANE PLAN TRAFFIC MANAGEMENT

ANNUAL REPORT AWARDS. PARKS. EVENTS. charlestoncountyparks.com

The major parties key coastal policy initiatives

Presented to: City of Petaluma City Council

Port MacKenzie Rail Extension

Cofferdam Performance Hurricanes Harvey & Irma

# BATHS # BEDROOMS MONTHLY RATE NORTH MYRTLE BEACH WINTER/MONTHLY RENTAL HOMES

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas

TENTATIVE SCHEDULE

Keansburg: Satellite Photo by USGS. Township of Middletown, and the western tip of Keansburg is adjacent to the Borough of

MOBILE DISTRICT 2018 DREDGING PROGRAM

Alternative Highest & Best Use Analysis Boutique Hotel

Coastal Structures in Kagoshima Coastline, Japan Ejria Binti Saleh Universiti Malaysia Sabah, Sabah, Malaysia

City of Fairborn State of the City Address Presented by Mayor Dan Kirkpatrick

What s Next for the Beach?

Civil Works Program Trends

Southwind Marina Sinton Drive Pensacola, Florida Unique Opportunity to Acquire a 90 Slip Marina With Excellent Investment Potential

Port MacKenzie Rail Extension

LOW $86,900 $0 AVERAGE $331,914 $0 ACTIVE CLIENT SEARCH

Capital Planning City of Ocean City 1

Quarterly Report. 4 December February 2014

2012 DoD MENTOR-PROTÉGÉ CONFERENCE 8 MARCH

EXECUTIVE SUMMARY COMMONWEALTH OF PUERTO RICO FY 2004-FY2009 MAP MODERNIZATION BUSINESS PLAN. Page i

The reasons why coastal management is needed in Minehead:

Transcription:

Edisto Beach Renourishment and Groin Lengthening Project Tim Kana Coastal Science & Engineering

Hurricane Matthew 8 Oct 2016 Cat 1 Storm @ Edisto Beach Worst Surge Event Since DAVID in 1979 Tides ~ 5 ft above normal

Hurricane Matthew 8 Oct 2016 9 October 2017 Steven Traynum

Hurricane Matthew 9 October 2017 Steven Traynum

Hurricane Matthew Groin 16 Nancy St 9 October 2017 Steven Traynum

Groins 28-29 Point St Hurricane Matthew 9 October 2017 Steven Traynum

Hurricane Matthew Standing Flood Waters at The Point 9 October 2017 Steven Traynum

Hurricane Matthew 9 October 2017 Steven Traynum

Hurricane Matthew 9 October 2017 Steven Traynum

Hurricane Matthew 9 October 2017 Steven Traynum

Hurricane Matthew 9 October 2017 Steven Traynum

Baynard St Fairfield Cabana Hurricane Matthew 9 October 2017 Steven Traynum Jenkins St

Hurricane Matthew 9 October 2017 Steven Traynum

Hurricane Matthew 11 October 2017 Luke Fleniken

Hurricane Matthew Thank you National Guard! 11 October 2017 Luke Fleniken

CSE founded in 1984 CSE Most SC nourishment and groin experience of any private group Completed over 40 nourishment projects since the 1980s. Major projects at Myrtle Beach, Seabrook, Hunting, Edisto, Kiawah, Folly, Bogue Banks (NC), Nags Head (NC).

The Setting Edisto Beach Setting 2008 2012 Edingsville-Botany Bay

September 2012 Condition Why is Edisto Beach so shelly?

Edisto Beach 5.8 miles from Jeremy Inlet to Big Bay Creek First Development - ~1920 ~3.4 miles of upland along the Atlantic ~190 oceanfront homes in project area ~2,180 residential units Beach Nourishments: 1954, 1995, 2006 Groins 34 groins built between 1948 and 1975 Groins rehabilitated in 1995 Federal Study Initiated 2003 Ongoing CSE Studies 2012 Built on USACE

1954 Edisto Beach Nourishments 1995 First SC Nourishment Project! 1955-2010 Adjusted Cost: $15,500,000 ~$15.50 per foot of shoreline per year (Kana 2012) 2006

Beach Volume Changes Since 2006 Project Areas Lost ~450,000 cy (~51% of Fill) Between 2006 & 2015

Volume Changes Since 2006

2015 Condition Exposed Seawall Cell 1 Cell 3 Cell 2 Cell 11

Groin 16-2015 These Building Setbacks Became the Target Minimum Condition for CSE s 2017 Plan

2012 Groin Extension Study

2012 Groin Extension Study

2012 Groin Extension Study Compared groin lengths relative to houses Extensions based on condition of groin 16 Extensions would protect stable dunes in chronically eroded areas

2017 Project Larger than USACE initial nourishment plan Expanded by State & FEMA funds Sought most beneficial combination of nourishment/groin lengthening Timely Implementation possible after Hurricane Matthew Included lengthening for 26 groins The Town was able to accomplish full plan Nourishment volume greatly exceeds trapping capacity of the groins

Project Funding Town of Edisto Beach State of SC (Nourishment Fund) SCPRT (Park pro rata share) Colleton County Sales Tax Fund FEMA (post-joaquin Grant) FEMA (post-matthew Grant) 3,000,000 6,800,000 3,270,000 4,000,000 1,100,000 1,400,000 Total 19,570,000 Covers construction, engineering, permitting, sand fencing, environmental protection & contingency

Borrow Area 2006 Area Borrow Area was evaluated as part of the USACE planning Additional borings were obtained to determine changes since 2008 Most of the 2006 borrow area filled in with sandy material

2017 Beach Nourishment Project Dredge Savannah Marinex Construction Inc

Project Limits Design - 1,006,000 Cubic Yards Contractor: Marinex Construction Inc. Charleston SC

2017 Construction First Day of Pumping 25 January Groin Extensions 25 January 2017 Tim Kana 26 January 2017 Haiqing Kaczkowski

2017 Construction Finn s Restaurant after Matthew Cleanup Before Nourishment 6 February 6 Feb January 2017 Steven Traynum

2017 Construction Included Storm Berm 6 February 2017 Steven Traynum

2017 Construction Groin 28 Extension Placing Grout 27 February 2017 Steven Traynum

2017 Construction Groin 8 Extension Driving Sheetpiles 27 February 2017 Steven Traynum

2017 Construction Groin 8 Extension Placing Mattresses To Stabilize the Armorstone 27 February 2017 Steven Traynum

2017 Construction Groin 8 Extension Placing Armorstone for Scour Portection 3 March 2017 Andy Hammill

2017 Construction Groin 8 Extension Preparing Cap 15 March 2017 Steven Traynum

2017 Construction Groin 8 Pouring Cap 15 March 2017 Steven Traynum

2017 Construction Second Landing Zone Cell 19 near Fairfield Cabana 9 March 2017 Steven Traynum

2017 Construction 20 April 2017 Nourishment Complete

2017 Construction Groin 1 Extension @ State Park 20 April 2017 Steven Traynum

20 April 2017 20 April 2017 2017 Construction

20 April 2017 2017 Construction

20 April 20 April 2017 2017 2017 Construction

20 April 20 2017 April 2017 2017 Construction

2017 Construction 20 April 2017 20 April 2017

20 April 20 April 2017 2017 2017 Construction

20 April 20 April 2017 2017 2017 Construction

20 April 2017 20 April 2017 2017 Construction

Post Construction - Expectations 2006 Project

Post Construction - Expectations The Point

Expected Outcome 17 Feb 2007 ~8 months after nourishment Photo by Tim Kana Project Director

Edisto Beach Project - 2017 Town of Edisto Beach Acknowledgements Jane Darby, Mayor Susan Hornsby, Councilwoman Jerome Kizer, Councilman Crawford Moore, Councilman Patti Smyer, Councilman Iris Hill, Town Manager Thank you! Photo by Steven B. Traynum Project Manager www.coastalscience.com