Chapter 4 Airport Facility Requirements

Similar documents
Chapter 5 Airport Development Alternatives

Addendum - Airport Development Alternatives (Chapter 6)

DRAFT MASTER PLAN UPDATE

Chapter 4 Airport Facility Requirements

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

Chapter 4 Airport Facility Requirements. Introduction

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Chapter 5 Airport Facility Requirements

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

PORT OF PORTLAND. Chapter Six AIRPORT PLANS

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

Grants Pass Airport Master Plan & Airport Layout Plan Update

OVERVIEW BASIC DESIGN FACTORS. Demand Determinants

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS

MASTER PLAN CONCEPT 1 DRAFT

Appendix C AIRPORT LAYOUT PLANS

Study Committee Meeting. September 2015

Airfield Design OVERVIEW BASIC DESIGN FACTORS. Airport Role

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES

Chapter 4 Airport Capacity Assessment and Identification of Facility Needs

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

4.0 FACILITY REQUIREMENTS

Chapter 4 Facility Requirements

Airfield Design. Public Review Draft OVERVIEW BASIC DESIGN FACTORS. Airport Role

CHAPTER 3 ALTERNATIVES CONSIDERED

FACILITY REQUIREMENTS 5.1 Introduction

Preliminary Findings of Proposed Alternative

CHAPTER 3 FACILITY REQUIREMENTS

Public Information Meeting. September 2015

Appendix A - Glossary

R FAA


FINAL SUMMARY REPORT

Appendix 6.1: Hazard Worksheet

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

Acronyms. Airport Layout Plan Report Appendix A A-1

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Technical Advisory Committee Meeting February 29, 2016

3 INTRODUCTION. Chapter Three Facility Requirements. Facility Requirements PEAKING CHARACTERISTICS

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

AIRPORT FACILITY REQUIREMENTS

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

JANUARY 2013 Friedman Memorial Airport Pomeroy, Chris

CHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION

Table of Contents. Overview Objectives Key Issues Process...1-3

What is an Airport Master Plan?

8.0 AIRPORT LAYOUT PLANS

Merritt Island Airport

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005

1 DRAFT. General Aviation Terminal Services Aircraft Hangars Aircraft Parking Aprons Airport Support Facilities

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Capacity Analysis & Facility Requirements

C > Capacity Analysis and Facility Requirements

TECHNICAL REPORT #3 Palm Beach International Airport Demand/Capacity and Facility Requirements

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

5. Facility Requirements

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Chapter 4 Development Alternatives

Facility Requirements

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS

CHAPTER FOUR. Airport Facility Requirements. Introduction Page 4-2. Airfield Capacity Analysis Page 4-2. Skylark Field Airport Airport Master Plan

Chapter 5. Facility Requirements

Table of Contents Facility Requirements Overview Airport Capacity and Delay Analysis... 1

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

RECOMMENDED MASTER PLAN CONCEPT

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Chapter 9 - AIRPORT SYSTEM DESIGN

Chapter 5 Facility Requirements

CHAPTER 1: INTRODUCTION

Chapter 4.0 Facility Requirements

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

3.1 Facility Requirements Overview Airfield Facility Requirements... 1

2.0 INVENTORY OF EXISTING CONDITIONS

Chapter Three AIRPORT FACILITY REQUIREMENTS

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

5.0 ALTERNATIVES ANALYSIS

FACILITY REQUIREMENTS CHAPTER

4. Demand/Capacity Assessment and Facility Requirements

Airport Master Plan Update

INVENTORY OF EXISTING FACILITIES & ACTIVITY

General Aviation Master Plan Update

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

STUDY WORK GROUP MEETING No. 3. November 29, 2016

4.0 FACILITY REQUIREMENTS

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

Chapter One INVENTORY

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Transcription:

Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1

Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2

RPZ - ROAD RPZ - NON-AIRPORT PROPERTY OWNERSHIP TAXILANE OFA (PARKED VEHICLES) * TAXILANE/TAXIWAY OBJECT FREE AREA PARKED VEHICLES OBSERVED IN VARIOUS HANGAR ROWS. * auburn municipal airport airport master plan airfield conformance fig. 4-1 FIGURE 4-1 AIRFIELD CONFORMANCE

NE E STREET TAXILANE OFA (HANGARS) TAXILANE OFA (PARKED AC) TAXILANE OFA (PARKED VEHICLES) * RPZ (AIRPORT CONTROL) * TAXILANE/TAXIWAY OBJECT FREE AREA PARKED VEHICLES OBSERVED IN VARIOUS HANGAR ROWS. NE D STREET NOTE: FOR HANGAR DOOR SIZES (<45') TAXILANE OFA CLEARANCE BASED ON ALT. FAA FORMULA (1.2 X AC WINGSPAN + 20 FEET) PROVIDES AN ACCEPTABLE LEVEL OF SAFETY FOR 72' + SPACING. RUNWAY 16-34 auburn municipal airport airport master plan east landside (south area) conformance fig. 4-2 FIGURE 4-2 EAST LANDSIDE (SOUTH AREA) CONFORMANCE

TAXILANE OFA (HANGARS) TAXILANE OFA (PARKED AC) TAXILANE OFA (PARKED VEHICLES) * NE E STREET TAXILANE (AC FUEL ISLAND) * TAXILANE/TAXIWAY OBJECT FREE AREA PARKED VEHICLES OBSERVED IN VARIOUS HANGAR ROWS. NOTE: FOR HANGAR DOOR SIZES (<45') TAXILANE OFA CLEARANCE BASED ON ALT. FAA FORMULA (1.2 X AC WINGSPAN + 20 FEET) PROVIDES AN ACCEPTABLE LEVEL OF SAFETY FOR 72' + SPACING. RUNWAY 16-34 auburn municipal airport airport master plan east landside (north area) conformance fig. 4-3 FIGURE 4-3 EAST LANDSIDE (NORTH AREA) CONFORMANCE

2001-2020 Airport Master Plan Update Overview TABLE 4-1: SUMMARY OF 2001-2020 AIRPORT MASTER PLAN UPDATE RECOMMENDED PROJECTS AND CURRENT STATUS Completed? Yes/No Projects CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-6

Design Aircraft CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-7

OPTION: ADG II DEVELOPMENT RESERVE CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-8

Airport Design Standards CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-9

TABLE 4-2: AIRPORT DESIGN STANDARDS SUMMARY (DIMENSIONS IN FEET) FAA Standard Runway 16/34 Existing Conditions 1 Airplane Design Group I A&B Aircraft (Small Aircraft) Approach Visibility 1- mile (Reserve) Airplane Design Group II A&B Aircraft (Small Aircraft) Approach Visibility 1- mile CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-10

CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-11

INSTRUMENT APPROACH NOTE: CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-12

TABLE 4-3: COMPARISON OF KEY DEVELOPMENT SETBACKS/CLEARANCES FOR CIRCLING AND STAIGHT-IN INSTRUMENT APPROACHES FOR RUNWAY 16/34 Item Runway 16/34 Circling Approach Procedure (Utility Visual, Current Standard, as depicted on 2002 Airspace Plan) Runway 16/34 Straight-In Approach Procedure (Utility Non-Precision Instrument) (Optional Future Standard) CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-13

N AUBURN WAY NE 22ND STREET NE E STREET 7:1 (30') 7:1 (30') NE D STREET 7:1 (20') 7:1 (20') 7:1 (10') 7:1 (30') 7:1 (30') 7:1 (10') 7:1 (20') 7:1 (20') 7:1 (10') 7:1 (10') 250' PRIMARY SURFACE RUNWAY 16-34 500' PRIMARY SURFACE 7:1 (10') 7:1 (10') 7:1 (20') 7:1 (20') 7:1 (10') 7:1 (30') 7:1 (30') 7:1 (10') 7:1 (20') 7:1 (20') NE 30TH STREET 7:1 (30') 7:1 (30') auburn municipal airport airport master plan setbacks based on instrument approach type fig. 4-4 FIGURE 4-4 SETBACKS BASED ON INSTRUMENT APPROACH TYPE

Runway Safety Area (RSA) CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-15

Runway Safety Area (RSA) Existing/Future Standard ARC B-I Small Reserve ARC A/B -II Runway Object Free Area (ROFA) CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-16

Existing/Future Standard ARC B-I Small Runway Object Free Area (ROFA) Reserve ARC A/B -II CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-17

ADG I OBJECT FREE AREA (3880' X 250') ADG I RUNWAY SAFETY AREA (3880' X 120') ADG II OBJECT FREE AREA (4000' X 500') N AUBURN WAY ADG II RUNWAY SAFETY AREA (4000' X 150') PROPERTY LINE NE 22ND STREET NE E STREET NE D STREET NE 30TH STREET auburn municipal airport airport master plan fig. 4-5 runway safety area & object free area (adg I & adg II reserve)

Obstacle Free Zone (OFZ) Taxiway Safety Area CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-19

Taxiway/Taxilane Object Free Area CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-20

TAXIWAYS CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-21

LEGEND AIRPLANE DESIGN GROUP I (89') AIRPLANE DESIGN GROUP II (131') * POTENTIAL AREA OF CONFLICT PROPERTY LINE * * * * * * * * 89' ADG I 131' ADG II 89' ADG I 131' ADG II auburn municipal airport airport master plan parallel taxiway ofa (ag I & adg II reserve) fig. 4-6

TAXILANES CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-23

CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-24

Building Restriction Line (BRL) EAST BRL (307 FEET FROM RUNWAY CENTERLINE) CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-25

WEST BRL (251 FEET FROM RUNWAY CENTERLINE) Runway Protection Zones (RPZ) CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-26

3 Aircraft Parking Line 3 CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-27

CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-28

Runway - Parallel Taxiway Separation FAR Part 77 Surfaces TABLE 4-4: FAR PART 77 AIRSPACE SURFACES Item Runway 16/34 (Utility - Visual) (Current Standard, as depicted on 2002 Airspace Plan) Runway 16/34 (Utility Non-Precision Instrument) (Optional Future Standard) CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-29

auburn municipal airport airport master plan far part 77 fig. 4-7

height Hazard Airspace Surfaces auburn municipal airport airport master plan far part 77 fig. 4-8

Approach Surfaces CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-32

PRIMARY SURFACE TRANSITIONAL SURFACE HORIZONTAL SURFACE CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-33

CONICAL SURFACE Airside Requirements RUNWAYS CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-34

4 FAA Advisory Circular (AC) 150-5325-4B, Runway Length Requirements for Airport Design CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-35

TABLE 4-5: FAA RECOMMENDED RUNWAY LENGTHS FOR PLANNING- (FROM FAA COMPUTER MODEL) CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-36

NE 30TH STREET NE 30TH STREET NE E STREET NE E STREET NE 15TH STREET NE 15TH STREET NE 15TH STREETNE 15TH STREET RUNWAY 3400' X 75' (EXISTING) RUNWAY 3400' X 75' (EXISTING) NE 30TH STREET NE 30TH STREET NE E STREET NE E STREET NE 15TH STREET NE 15TH STREET NE 15TH STREET NE 15TH STREET NOTE: 1. THE INFORMATION DEPICTED IN THIS FIGURE IS FOR RUNWAY LENGTH NOTE: ILLUSTRATION PURPOSES ONLY AND DOES NOT REFLECT A SPECIFIC 1. THE RECOMMENDATION INFORMATION DEPICTED OR RUNWAY IN THIS CONFIGURATION. FIGURE IS FOR RUNWAY LENGTH ILLUSTRATION PURPOSES ONLY AND DOES NOT REFLECT A SPECIFIC RECOMMENDATION OR RUNWAY CONFIGURATION. RUNWAY 4060' X 75' (SMALL AIRPLANES WITH 10 OR MORE SEATS) RUNWAY 4060' X 75' (SMALL AIRPLANES WITH 10 OR MORE SEATS) auburn municipal airport airport master plan runway lengths for planning fig. 4-9 FIGURE 4-7 RUNWAY LENGTHS FOR PLANNING FIGURE 4-7 RUNWAY LENGTHS FOR PLANNING

AIRFIELD PAVEMENT CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-38

TABLE 4-6: SUMMARY OF AIRFIELD PAVEMENT CONDITION (PCI RATINGS) PAVEMENT 2012 PCI RATING 1,2 2017 PCI RATING 2 2022 PCI RATING 2 CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-39

TAXIWAYS CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-40

AIRFIELD INSTRUMENTATION, LIGHTING AND MARKING CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-41

ON FIELD WEATHER DATA CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-42

Landside Facilities AIRCRAFT PARKING AND TIEDOWN APRON CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-43

CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-44

AIRCRAFT HANGARS CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-45

TABLE 4-7: APRON AND HANGAR FACILITY REQUIREMENTS SUMMARY Item Base Year (2012) 2017 2022 2027 2032 Based Aircraft Forecast 274 280 291 308 329 Aircraft Parking Apron (Note: capacities reflect current configuration of existing apron areas, actual capacity when reconfigured may be significantly different.) CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-46

Surface Access and Vehicle Parking Support Facilities AVIATION FUEL STORAGE CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-47

AIRCRAFT WASH DOWN FACILITIES AIRPORT UTILITIES SECURITY Property Acquisition CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-48

West Landside Area Facility Requirements Summary CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-49

CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-50 AUBURN MUNICIPAL AIRPORT AIRPORT MASTER PLAN TABLE 4-8: FACILITY REQUIREMENTS SUMMARY Item Short Term Long Term

AIRFIELD CAPACITY CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-51