This document is being shared by the Parks, Recreation and Musuem Advisory Board at the request of Golden citizens and in order to be transparent

Similar documents
Each picture below has a brief explanation of the alignment. Please review and feel free to send any questions you might have.

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

$866,000. $1,400,000 Health Benefits $13,156,000 TOTAL ANNUAL DIRECT BENEFITS. $10,890,000 Economic Benefits

SOUTH INTERCHANGE AREA

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

Attendance Presentation

EXECUTIVE SUMMARY FALL Introduction. Findings

Nov. 19 th Public Workshop Summary

10/25/2013. What is the SCORP?! 2013 Local Government Survey 2013 Statewide Public Survey Advisory Group Priority Areas Your Suggestions!

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

NEW MEADOWS PARK PROPOSED MASTER PLAN

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Welcome to the future of Terwillegar Park a Unique Natural Park

ROAD AND TRAIL PROJECT APPROVAL

Sawtooth National Forest Fairfield Ranger District

Daisy Dean Trail 628/619 ATV Trail Construction

Route 29 Solutions Projects

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Discussion Paper: Development of a Plan for Trails on Public Land

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

KAWATHA TRANS CANADA TRAIL ADJACENT PRIVATE LAND OWNERSHIP SURVEY

Meeting Report. Listening Session for Greenways + Blueways May 27, LaPorte County Solid Waste & Water Conservation Office, 6:00 8:00

Central Cascades Wilderness Strategies Project

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park

Kitsap County Department of Community Development

LESSON 9 Recognizing Recreational Benefits of Wilderness

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Appendix 6 Fulbourn Greenway Review

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm

Welcome to the Cross County Trail Public Input Session!

Penzance Heliport Ltd.

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

FEASIBILITY CRITERIA

4.0 Context for the Crossing Project

FINCH HYDRO CORRIDOR TRAIL PROJECT

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015

Tallahassee-St. Marks Historic Railroad Trail

River First Initiative and Waterworks Park

Finn Creek Park. Management Direction Statement Amendment

Land Management Summary

5.0 OUTDOOR RECREATION OPPORTUNITIES AND MANAGEMENT

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Flow Stand Up Paddle Board Parkway Plan Analysis

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Vision for the San Juan Islands Scenic Byway

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Sevierville, TN. Technical Appendices

Public Comment. Comment To consider extending State Park lands above River Mile 7.0

January 14, Orange County Transportation Authority Attn: M2 NCCP/HCP 550 South Main Street P.O. Box Orange, CA

Lanie Fleischer Chester Creek Trail Improvements Public Meeting #2. February 4, 2014

Assessing Your Trails, Keeping Them Safe and Enjoyable

MORGAN CREEK GREENWAY Final Report APPENDICES

Port Gamble Shoreline Area Conceptual Trail Proposal

Classifications, Inventory and Level of Service

Evergreen Trail School

River Parks Trail: Tulsa, Oklahoma

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

Response to Public Comments

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan

Wilds. Headwaters. Lakes. Oxbows. Falls

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

Design Charrette Public Meeting

MUNICIPALITY OF ANCHORAGE

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

OPEN SPACE ADVISORY COMMISSION Monday, February 20, 2017 Breckenridge Town Hall Lower Level Conference Room 150 Ski Hill Road

A Master Plan is one of the most important documents that can be prepared by an Airport.

The Future of the Road to Revolutions. A Battle Road Scenic Byway Public Forum November 9, 2010

Trails and Towers El Camino Real and the Verde Power Line in Santa Fe County

Dungeness Recreation Area County Park Master Plan

S Central Coast Heritage Protection Act APRIL 21, 2016

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

that the only option proposed for the Christmas Tree Farm

Strengthening the Ontario Trails Strategy. Report on Consultations and the Environmental Bill of Rights Registry

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council

Dear Councilmembers of the Arts, Entertainment, Parks and River Committee:

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008

Rogue River Access and Management Plan Draft Alternatives

BUCKS COUNTY TRAILS. September 10, 2015 Presentation to:

RIVER ACCESS STRATEGY

Mechanized River Valley Access Public Engagement Report. April 2015

A VISION FOR EL MIRAGE

A BOAT RAMP TO NOWHERE

PAUL S PLACE ELK, DEER AND VIEWS FISHTAIL, MONTANA

Coronado National Forest Santa Catalina Ranger District

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths.

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

Interoffice Memorandum

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

CHAPTER 1 EXECUTIVE SUMMARY

Clam Harbour Provincial Park

Transcription:

This document is being shared by the Parks, Recreation and Musuem Advisory Board at the request of Golden citizens and in order to be transparent about what documents and information was shared during the August 28, 2018 Public Meeting. The Board is not endorsing the following information, nor are we vouching for its accuracy; several items have been contested as inaccurate from other parties. The Board will be reviewing the elements listed here and investigating for accuracy or clarity over the next month with the goal of addressing or responding to each item.

Single Track Sidewalks Friends of Kinney Run Public Comment Session, Shelton Elementary Aug 28, 2018

Introduction and Background 200+ residents of Stonebridge and adjacent communities OPPOSE THE PLAN STS Trails do not meet City objectives Redundant trail system Do not connect neighborhoods Do not serve an underserved user or population High Risk: Giddyup Golden is a volunteer group with no formal commitment with the city Property, Wildlife, impact to serenity and primitive environmental state This is not Free There will be costs to the city. Unintended Consequences: erosion, social trails, additional traffic and visitors

City Staff Report to City Council Oct 2017 In general, there is not support for the plan 13 Documented Concerns Construction would need to comply with all city standards and could require environmental analyses and permits. Most of the proposal provides a redundant trail system by being in close proximity to multi use trails. Very few of the proposed routes are located where there is no trail access. This single track is not an identified, underserved element of the community. There are 230+ miles of multiuse and single track in Jefferson County and around the Golden area. is this the greatest priority or need in the community? Does this upset any balance of protection of natural resources versus recreational use and impact? Eventual responsibility of the City for long-term maintenance and liability. Buy in and sign off from affected adjacent property owners is important https://www.guidinggolden.com/1855/documents/2278

Consider the Resource Land Wildlife Serene, Uninterrupted landscape Erosion Trees and slow growing vegetation will be removed Irreversible impact (costly to restore)

Consider your Neighbors Why we chose to live here Would you want these trails visible from your home? A significant number of your neighbors do not Do you want more people parking in your neighborhood? NO More Noise? NO Night Riding (bike headlights)? NO

Consider Long Term Effects What will the land and trails look like in 5 years? 10? 20? Changes in Technology ebikes? Who will maintain? When GGU moves to the next neighborhood? When money runs out? No contractual commitment How can/will the land be restored? Any vegetation disturbance in native areas is much more difficult to restore, taking years to repair. Staff Report, Oct 2017

Environmental Impacts Paved Path was constructed to prevent erosion and destruction of natural areas Sensitive wildlife habitat Not a simple trail to build (rocks, 4x4 posts, signs, drainage, tree removal) Potential to create more social trails, cross cutting, and braiding Golden Vision 2030, "We value proximity of open space, natural beauty and will preserve access to experience these". We have already achieved this in our neighborhoods https://www.cityofgolden.net/media/gv2030_%20final_120910.pdf

Kinney Run Trail Current State How is a dirt trail a better nature experience than this?

Trail Damage: Issues to consider Heavy use causes erosion and trail widening Loss of vegetation and more visible from a distance

Social Trails and Cross Cutting Apex Park County tried to block Park users bypass blocked area causing further erosion/damage Kinney Run Trail (Today) Creating new trails opens more options for social trail creation High Speed Entry/Exit from Paved Trail will cause Yielding conflicts with Paved trail users

Elk Herd Video Wildlife Impact

Neighborhood Impact Why we chose to live here Expectation that the open space would remain undeveloped and natural Use by non-residents Trail use Parking Use as corridor only

Conclusion Redundant trail does not serve an underserved part of the community City Staff does not support this plan High Risk for Environment, Wildlife, and Scenic damage Significant impact to neighbors that border the trails Unintended consequences Traffic, Noise, Congestion, Trail Conflicts Significant Construction Project with high impact No formal, contractual commitment to ensure long term sustainability

More information at www.friendsofkinneyrun.com