Site Location and Setting

A. CONCLUSIONS OF THE FGEIS

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Pedestrian Safety Review Spadina Avenue

Treasure Island Supplemental Information Report Addendum

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

1.2 Corridor History and Current Characteristics

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

4. Safety Concerns Potential Short and Medium-Term Improvements

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

DOGWOOD AT VILLA AVENUE PROJECT

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

5.1 Traffic and Transportation

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

TRANSPORTATION ELEMENT

Transport Impact Assessment

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT STUDY REPORT FOR PROPOSED OFFICE PROJECT AT 959 SEWARD STREET IN HOLLYWOOD SNYDER PARTNERS

Appendix 4.1 L. No-Build Project Descriptions

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Airport Planning Area

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction Staging Adelaide Street West

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

V. DATA COLLECTION PROGRAM

Arlington County Board Meeting Project Briefing. October 20, 2015

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

Traffic Analysis Final Report

Glasgow Street Traffic Review

PUBLIC INFORMATION SESSION #2

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Chapter 4.0 Alternatives Analysis

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

November 21, 2012 Barbara Kelleher, (954)

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011

McLean Citizens Association Transportation Committee Project Briefing


Basic Project Information

US 380 FEASIBILITY STUDY

FINAL TERMINAL TRAFFIC MONITORING STUDY

STAR Bond Development

Caliber Charter School VALLEJO, CA

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

MARSHALL Subdivision. Township of Springwater, County of Simcoe. Traffic Brief for: Ontario Inc. Type of Document: Final Report

CHAPTER 4: ALTERNATIVES

Route 29 Solutions Projects

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Non-Motorized Transportation

SCOPING INFORMATION PACKET

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

Public Information Meetings. October 5, 6, 7, and 15, 2015

San Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center

Westover Metropolitan Airport Master Plan Update

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

383 Herring Cove Road Traffic Impact Statement. April Prepared for. Servant Dunbrack McKenzie & MacDonald Ltd.

Cell: (408) Release MA June 25, 2012

This report recommends two new TTC transit services in southwest Toronto.

Washington St. & Ash Coulee Dr./43 rd Ave Intersection Study

Western Development Lands Transportation Brief Richmond Village, (Ottawa), ON Mattamy Homes. Prepared By: Stantec Consulting Ltd.

Appendix B Connecting Track Options Evaluation Criteria

Northeast Stoney Trail In Calgary, Alberta

ROUTE 20 CORRIDOR STUDY ---- Orange County, Virginia

ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

US Route 3 Corridor Study: Phase I. Town of Boscawen & City of Franklin, New Hampshire

Sky Temporary Car Park Transport Statement

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Union Station Rail Corridor East

Public Open House. Chief Peguis Trail Project

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Transportation TRANSPORTATION PROJECTS

PROGRESS PARK CONNECTOR

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

RW Bruhn Bridge and Approaches Project

Transcription:

LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i

ii

Table of Contents Chapter Page I. Introduction...1 II. Project Location and Description...1 III. Existing Transportation System...1 IV. Summary of Lake Erie Industrial Park GEIS Traffic Impact Study...3 V. Sensitivity Analysis...7 VI. Conclusion...7 iii

I. Introduction The project area, formerly known as the Lake Erie Industrial Park and now known as Lake Erie Commerce Center, was the subject of a previous SEQR review that included the preparation of a Generic Environmental Impact Statement (GEIS). The SEQR process for this project was completed in 1999 and included the completion of a Traffic Impact Study (TIS), which was conducted in 1994. As part of the development of the Supplemental Draft Generic Environmental Impact Statement (SDGEIS) for the Lake Erie Commerce Center, a was conducted to provide an update to the TIS completed as part of the original GEIS. This traffic analysis assesses existing traffic operations on the street network in the vicinity of the project and evaluates potential traffic impacts that could result from build out of the Lake Erie Commerce Center. II. Project Location and Description The proposed action involves an application from the Hamburg New York Land Development Company for the approval of Pre-Permitted Site Designation for approximately 131 acres of land situated at the intersection of NYS Route 5 and Bayview Road, in the Town of Hamburg, Erie County, New York. The project site consists of approximately 131 acres of land located on the north and south sides of Bayview Road, immediately east of NYS Route 5. The subject property is bisected by Bayview Road, with approximately 70 acres situated south of this roadway and the remaining 61+/- acres located to the north. The project site is comprised primarily of open lands, with areas of brush and woodlands, and a few small areas of wetlands. With the exception of one single-family residential dwelling, there are no structures exist on the site III. Existing Transportation System Roadways Lake Shore Road (NYS Route 5) is the principal arterial that provides north-south access through the project area, linking the area with the City of Buffalo and the City of Lackawanna to the north and the Town of Evans to the south. Milestrip Road (NYS Route 179) and Big Tree Road (US Route 20A) provide primary access to/ from the east. Camp Road (NYS Route 75) also ties into Lake Shore Road from the southeast. Lake Shore Road (NYS Route 5) is a six-lane divided highway between St. Francis Drive (NYS Route 75) and NYS Route 179 (Mile Strip Expressway) and is classified as a Principle Arterial. The posted speed limit is 55 mph and the Average Annual Daily Traffic (AADT) is 40,925 vehicles. 1

Bayview Road is a two-lane road classified as a Collector east of NYS Route 5. The posted speed limit is 35 mph and the AADT is 2,050 vehicles. West of Route 5, Bayview Road is a two-lane local street between NYS Route 5 and Hoover Road. There is a left turn lane for southbound NYS Route 5 traffic turning left onto eastbound Bayview Road. Where Bayview Road crosses NYS Route 5, a no left turn sign prohibits left turns from northbound NYS Route 5 to westbound Bayview Road. St. Francis Drive Extension (NYS Route 75) is a four-lane roadway between Camp Road and NYS Route 5 and is classified as a Principle Arterial. The posted speed limit is 45 mph and the AADT is 18,300 vehicles. Big Tree Road is a two-lane roadway between St. Francis Drive and Bayview Road and is classified as a Minor Arterial. The posted speed limit is 45 mph and the AADT is 6,250 vehicles. Mile Strip Expressway (NYS Route 179) is a four-lane highway classified as an Expressway. The posted speed limit is 55 mph and the AADT is 20,210 vehicles. Public Transit The Town of Hamburg is serviced by five Metro Bus routes. The Express Route #74 Hamburg and Express Route #76 Lotus Bay are the only routes that provide service in the vicinity of the Lake Erie Commerce Center, offering stops at the Athol Springs Park & Ride. This facility serves as an automobile/ transit transfer point for commuters in the Hamburg area. The NFTA has expanded and upgraded the facility at Athol Springs to accommodate more passengers and provide more efficient service. This facility is located just off NYS Route 5 on the access road that connects Big Tree Road to the St. Francis traffic circle (just south of the project site). Railroad The CSX and Norfolk Southern Railroads operate rail lines for the commercial transport of freight, which traverse the western portion of the Town in a northeast-southwest orientation. CSX operates three sets of tracts that run parallel to and approximately ½ mile inland from NYS Route 5. Norfolk Southern operates a single track that runs just east of and parallel to the CSX tracks. Bayview Road crosses the railroad tracks with an at-grade crossing. Pedestrian/ Bicycle There are no sidewalks on any of the adjacent roadways and pedestrian and bicycle facilities are limited. There is a sidewalk that was recently constructed along the northbound lanes of NYS Route 5 north of the project site, but no pedestrian access to the site is provided. 2

The Hamburg Local Waterfront Revitalization Program (LWRP) calls for the expansion of pedestrian and bicycle opportunities along a tourist route that runs along NYS Route 5 and Bayview Road. IV. Summary of Lake Erie Industrial Park GEIS Traffic Impact Study With the development of the Lake Erie Industrial Park GEIS TIS in 1994, various scenarios were developed to evaluate potential impacts from alternative development phasing of the project. In order to evaluate the impact that the development of the industrial park would have on nearby intersections, manual turning movement counts were conducted in 1992 for the AM, midday, and PM peak hours. The following intersections were counted and then modeled in the original TIS to evaluate existing 1992 traffic operations, 1994 conditions (including 1992 conditions + Ravenwood Park North traffic + Phase I traffic), 1997 conditions (including 1992 conditions + normal growth to 1997 + Ravenwood Park North traffic + Phase I and II traffic), and 2002 conditions (including 1992 conditions + normal growth to 2002 + Ravenwood Park North traffic + Phase I, II, and III traffic): 1. NYS Route 5/ Bayview Road (Phase I only) 2. NYS Route 5/ Proposed Site Road (Phases II and III only) 3. NYS Route 5/ NY Route 179 Traffic Circle 4. NYS Route 5/ Old Big Tree Road/ Hoover Road 5. St. Francis Traffic Circle 6. St. Francis Drive/ Old Big Tree Road 7. St. Francis Drive/ Camp Road 8. Old Big Tree Road/ Lakeshore Road Extension 9. Big Tree Road/ Propose Site Road (Phase III only) Existing Conditions The results of the traffic modeling output of the original TIS indicate that under the 1992 existing conditions, all intersection approaches operate at a LOS D or better, except for the following: 1. Eastbound Bayview Road to northbound NYS Route 5 operates at a LOS E during the AM peak hour. 2. Eastbound and westbound Bayview Road to southbound NYS Route 5 operate at a LOS E during the PM peak hour. 3

Phase I Lake Erie Commerce Center Phase I development consists of two buildings of 50,000 to 60,000 square feet each to be located on the north side of Bayview Road between the power lines and NYS Route 5. Each building was assumed to have a single driveway to Bayview Road. Two scenarios were developed for this phase. For each scenario, the intersection of NYS Route 5 and Bayview Road would remain as it presently exists. Scenario 1 Scenario 1 under Phase I assumes that Bayview Road would remain open and would not contain a cul-de-sac at the railroad tracks. The results of the traffic modeling output for Phase I, Scenario 1 indicate that all intersection approaches operate at a acceptable LOS E or better, except for the following: 1. Eastbound Bayview Road through movement at the northbound NYS Route 5 lanes operates at a LOS F during the AM peak hour. 2. The analysis indicates that improvements to the intersection under Phase I do not appear to be justified because existing problems at the intersection are related to safety and not capacity. Scenario 2 Scenario 2 under Phase I assumes that Bayview Road would contain a cul-de-sac on either side of the railroad tracks. The results of the traffic modeling output for Phase I, Scenario 2 indicate that all intersection approaches operate at a LOS E or better. A capacity and safety analysis of the intersection of NYS Route 5 and Bayview Road, assuming completion of Phase I, suggests that closure of Bayview Road at the railroad tracks would result in significantly better conditions at the NYS Route 5/ Bayview Road intersection than would occur if Bayview Road remained open. Phase II During Phase II development, the remaining land north of Bayview Road would be developed (415,769 square feet), and the following assumptions regarding road access were made: 1. A cul-de-sac at the western end of Bayview Road would cut off access to NYS Route 5. 2. A new internal road would be constructed to intersect with the remaining section of Bayview Road and extend north and west to intersect with NYS Route 5. Phase II scenarios for the proposed development and road modifications. Scenario 1 Scenario 1 of Phase II assumes that the new internal road would form a T intersection with NYS Route 5; the existing NYS Route 5/ Hoover Road intersection remains open; 4

the section of Bayview Road west of NYS Route 5 would remain as would the intersection with NYS Route 5; and the small section of Bayview Road between the NYS Route 5 directional roadways would be removed. The results of the traffic modeling output for Phase II, Scenario 1 indicate that all intersection approaches operate at an acceptable LOS E or better, except for the following: 1. Left turns from the Site Road to southbound NYS Route 5 operate at a LOS F during the AM and PM peak hour. 2. Southbound NYS Route 5 left turn at the Site Road operates at a LOS F during the AM peak hour. 3. Left turns from Hoover Road to northbound NYS Route 5 operate at a LOS F during the AM and PM peak hour. Scenario 2 Scenario 2 of Phase II assumes that the new internal road would form a four-way intersection with NYS Route 5 and Hoover Road, with the west leg of that intersection forming a new connecting roadway between NYS Route 5 and Hoover Road; the existing NYS Route 5/ Hoover Road intersection would be eliminated and Hoover Road would contain a cul-de-sac at the north end; the intersection of NYS Route 5 and the section of Bayview Road west of NYS Route 5 would be removed and Bayview Road would contain a cul-de-sac on the western side of NYS Route 5. The results of the traffic modeling output for Phase II, Scenario 2 indicate that all intersection approaches operate at an acceptable LOS E or better, except for the following: 1. Left turns from the Site Road to southbound NYS Route 5 operate at a LOS F during the AM and PM peak hour. 2. Southbound NYS Route 5 left turn at the Site Road operates at a LOS F during the AM peak hour. Scenario 3 Scenario 3 under Phase II assumes that Bayview Road will remain open and will not contain a cul-de-sac at the railroad tracks; the new internal road would form a four-way intersection with NYS Route 5 and a new roadway connection between NYS Route 5 and Hoover Road; the existing NYS Route 5/ Hoover Road intersection would remain open; and the section of Bayview Road west of NYS Route 5 would contain a cul-de-sac at NYS Route 5. The results of the traffic modeling output for Phase II, Scenario 3 indicate that all intersection approaches operate at an acceptable LOS E or better, except for the following: 1. Left turns from the Site Road to southbound NYS Route 5 operate at a LOS F during the AM and PM peak hour. 2. Southbound NYS Route 5 left turn at the Site Road operates at a LOS F during the AM peak hour. 5

3. Left turns from Hoover Road to northbound NYS Route 5 operate at a LOS F during the AM and PM peak hour. 4. Right turns from the Site Road to northbound NYS Route 5 operate at a LOS F during the AM peak hour. Phase III Phase III development will occur on lands south of Bayview Road (451,717 square feet), and includes the following assumptions: 1. Extending the north-south internal roadway from Bayview Road south to Big Tree Road. 2. The traffic circle at St. Francis Drive/ Lake Shore Road Extension/ Big Tree Road would be eliminated and replaced by a conventional intersection. 3. The northbound lanes of St. Francis Drive Extension (a 700-foot section north of the traffic circle) would be relocated to run directly adjacent to the existing southbound lanes. The road presently used for the northbound lanes would be utilized as a service roadway to an existing trucking company. 4. Two alternative modifications to Big Tree Road were examined: o The section of Big Tree Road east of the traffic circle would be retained. The intersection of St. Francis Drive/ Big Tree Road/ Lake Shore Road would be a four-way intersection. Old Big Tree Road between NYS Route 5 and Big Tree Road would become a local access road for residential purposes, as well as for other development. Regular traffic flow would generally use Big Tree Road rather than Old Big Tree Road. o The section of Big Tree Road east of the traffic circle would be removed. The intersection of St. Francis Drive and Lake Shore Road would become a T intersection. The existing sections of Big Tree Road, both east and west of St. Francis Drive would become the primary east-west route to take advantage of the existing traffic signal at Big Tree Road and St. Francis Drive, to use the straighter road alignment on Old Big Tree Road, and to avoid the complicated geometry of the existing intersection of NYS Route 5/ Lake Shore Road/ Old Big Tree Road. 5. Lake Shore Road west of the traffic circle would be reconfigured to the east to improve the intersection of Old Big Tree Road and Lake Shore Road just east of NYS Route 5. 6. The entrance to the Lake Erie Commerce Center at Big Tree Road would be as far west of the railroad overpass as practical to maximize the sight distance for vehicles entering Big Tree Road. 7. The existing business on NYS Route 5 would have a driveway to the new internal roadway. The results of the traffic modeling output for Phase III indicate that all intersection approaches operate at an acceptable LOS D or better, except for the following: 6

1. Left turns from the Site Road to southbound NYS Route 5 operate at a LOS E during the AM peak hour. 2. Left and right turns from Hoover Road to NYS Route 5 operate at a LOS E during the AM and PM peak hour. V. Sensitivity Analysis When performing a traffic analysis for a GEIS where specific users and site access locations are not yet known, the worst case scenario is used to determine the worst possible impact that the full build out of the project site could have on the transportation system. With a GEIS, it is helpful to conduct a sensitivity analysis, which essentially indicates the build threshold the site can handle before traffic operations begin to fail and transportation improvements are needed in order to mitigate the impacts of the project and maintain acceptable traffic operations. It is possible that supplemental traffic analyses can be conducted when build thresholds are reached to reaffirm existing traffic operations and determine if transportation improvements are still necessary or when development is proposed that will generate traffic greater than or less than what was evaluated in the TIS. Using a sensitivity analysis, development of the Lake Erie Commerce Center that can occur before the outlined transportation improvements will be required include construction as identified in Phase I development of the original TIS. This includes two buildings of 50,000 60,000 square feet each along Bayview Road with single driveway access to Bayview Road. Since traffic operations are impacted by trip generation and not the size of buildings, development that could occur before transportation improvements will be required would equate to any combination of buildings/ uses that generate a total of 100 trips during either the AM or PM peak hour. VI. Conclusion One building has already been constructed a 10,000 square foot Woodlawn Autoworkers Federal Credit Union. Using the ITE Trip Generation Manual. 8 th Edition, the trip generation from this building is estimated to be approximately 20 vehicles during the PM peak hour and isn t in operation during the AM peak hour of the adjacent roadways. Since one building has already been constructed within the Lake Erie Commerce Center generating approximately 20 trips during the PM Peak hour, it would be assumed that any remaining development within the project site will only be permitted to generate additional 80 or so trips during the PM Peak hour before LOS degradation occurs at nearby intersections. However, compared to the manual turning movement counts conducted for the original TIS, the 2011 traffic counts of adjacent roadways reported by the NYSDOT and GBNRTC show that traffic volumes on adjacent streets (NYS Route 5, Bayview Road, Big 7

Tree Road, and St. Francis Drive Extension) have actually decreased a total of 10-15% over the last 20 years. This would suggest that even with the traffic generated by the credit union, traffic volumes on adjacent roadways in 2011 are less than that observed in 1992. This means that additional development within the Lake Erie Commerce Center (in addition to the credit union) that generates traffic no greater than 100 trips in a peak hour would likely not result in any degradation to the LOS of nearby intersections. Therefore, in addition to the existing Woodlawn Autoworkers Federal Credit Union, additional development that could occur within the Lake Erie Commerce Center before the outlined phased transportation improvements will be required would equate to any combination of buildings/ uses located on Bayview Road, with single access to Bayview Road only, that generate a total of 100 trips during either the AM or PM peak hour. Any development occurring within Lake Erie Commerce Center that would generate traffic in excess of 100 AM or PM peak hour trips would either need to mitigate traffic impacts according to the phased transportation improvements identified in the original TIS and summarized in this document or a new traffic impact study would need to be conducted to determine whether conditions have changed to warrant alternative mitigation measures. 8