Laxon Terrace - Sarawia. Click to add title. Street Rail Level Crossing. Public Forum. December

Similar documents
Sarawia Street Laxon Terrace Rail Level Crossing Removal

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Level Crossing Risk Assessment Polegate MCB

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:

CBD Rail Link Business Case

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

M621. Junctions 1 to 7 Improvement scheme. Share your views

We further recognise that some pain and changes are required from the entire City in order to construct and deliver the project.

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway

A. CONCLUSIONS OF THE FGEIS

SR 934 Project Development And Environment (PD&E) Study

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Glasgow Street Traffic Review

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

Lake Erie Commerce Center Traffic Analysis

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

SAMTRANS SERVICE PLAN

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

Dufferin Jog Elimination Project

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Casa Loma Heritage Conservation District (HCD) Study. Community Consultation Meeting #1 Summary Report

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

A Master Plan is one of the most important documents that can be prepared by an Airport.

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

GOLD COAST AIRPORT - Runway 14 southern departures trial

INFORMATION FOR LONGFORD, HARMONDSWORTH, SIPSON, HARLINGTON AND CRANFORD CROSS COMMUNITIES

Alternatives. Introduction. Range of Alternatives

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

Network of International Business Schools

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Becker County Trail Routing Feasibility Study

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE

South East Queensland Stabling Site Selection Report January 2014

Construction Staging Adelaide Street West

Regulatory Committee

Have your say... on the Ian McKinnon Drive Cycleway Project

Abstract. 1 Introduction

waterview connection Completing the Western Ring Route the Waterview Connection

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

Riverbank Precinct Footbridge

Public Open House. Chief Peguis Trail Project

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

London Borough of Barnet Traffic & Development Design Team

Union Station Queens Quay Transit Link Study

Maryland Transit Administration. Master Plan Alignment Trail

Report on Hamilton to Auckland Passenger Rail

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

John Betts School Crossing Review

Performance Based Navigation Literature Review

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

Community Noise Consortium Meeting (CNC)

Waterfront Concept Plan: Community Survey Summary

City of Fremantle. Joel Levin, Aha! Consulting INTRODUCTION 2 BACKGROUND 3

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

Trigger Point Justification Note 30 th August 2013

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

To apprise Council of the process and timeline for the preparation of the Final Concept Plan and report; and

TfL Planning. 1. Question 1

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

The decision on whether to take enforcement action falls outside the scope of delegated powers.

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Darwin Airport Aircraft Noise Information Report

Appendix 8 Sawston Greenway Review

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

King s Dyke Level Crossing Replacement - Initial Investigation

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

KING STREET TRANSIT PILOT

Contracting of continuing airworthiness management tasks

FEASIBILITY CRITERIA

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

145th Crossing Sammamish River Trail Connection Tourism District Pedestrian Enhancement. ~ King County PIBBI. YourBigBa~

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Newcastle Transport Program Newcastle Light Rail Determination Report

Madison Metro Transit System

Coronado National Forest Santa Catalina Ranger District

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

Perth and Kinross Council Development Management Committee 24 May 2017 Enforcement Report by Interim Head of Planning

Transcription:

Laxon Terrace - Sarawia Click to add title Street Rail Level Crossing Public Forum December 2012 www.aucklandtransport.govt.nz

Overview of Presentation Objectives and Reasons for Separation Project Background Options Considered Options Developed Furneaux Way through road Newmarket Park through road Cowie Street Bridge Non-Cost Evaluation Traffic Effects Benefit Cost Ratio Comparison

Meeting Objectives Auckland Transport s objectives for today s meeting; Outline the reasons for separation of Laxon Terrace/Sarawia Street Overview the options considered Present the developed options and analysis Seek feedback Discuss next steps

Background The crossing is located 2 minutes northeast of Newmarket Centre, where Sarawia Street meets Laxon Terrace The efficiency and safety of future rail operations depend on the removal of the level crossing between Sarawia Street and Laxon Terrace Currently the level crossing provides the only vehicular access for Laxon Terrace and Youngs Lane AT has commissioned an investigation into the options allowing closure of the crossing while retaining vehicle and pedestrian access.

Laxon Terrace/Sarawia Street Separation Why? Removal of existing level crossing required to: Improve safety at the busiest train crossing in the country Allow greater frequency of services Increase efficiency and effectiveness of rail operations Address long standing community concerns

Options Considered 1. Vehicle Underpass: Underpass from Sarawia Street considered previously and dismissed due to gradient and construction risk 2. Over Rail Bridges: Options for bridges from either Sarawia Street or Cowie Street have been previously explored by KiwiRail in 2011, with the Sarawia Street bridge option dismissed due to gradient issues 3. Newmarket Park Roads: Options for a road through / around the park have been explored by Auckland Transport. Both roads carry with them high construction risk due to ground stability and impact the public amenity of the park 4. Link Road: Options to link Laxon Terrace with Furneaux Way have been explored 5. Pedestrian Routes: In addition to the vehicular access, alternative pedestrian access schemes have been identified and assessed including a pedestrian bridge, pedestrian only level crossing and path directly adjacent to the rail line into Newmarket Station

Options Developed Furneaux Way through road Newmarket Park through road Cowie Street Bridge Alternative Pedestrian Routes Sarawia Street Bridge Cowie Street Bridge Level Crossing

Furneaux Way through road Single Lane shared

Furneaux Way through road Double Lane Separated

Newmarket Park through road Road Alignment

Newmarket Park through road Car Parking Options Using existing parking area Retaining same number of parks

Cowie Street Bridge

Alternative Pedestrian Routes Pedestrian Bridges

Alternative Pedestrian Routes Pedestrian Rail Level Crossing

Non-Cost Evaluation - Criteria 1. Vehicular Access Laxon Terrace/Youngs Lane: The quality and ease of access to Laxon Terrace/Youngs Lane, also taking into consideration the additional length of travel. 2. Pedestrian Access Laxon Terrace/Youngs Lane: As above but for pedestrian access to Laxon Terrace/Youngs Lane. 3. Environmental Effect: Visual and noise impact. 4. Impact on Road Network: Effects on the wider road network. 5. Safety: Road and Rail safety issues relating to each option. 6. Rail Network Operations: Safety and efficiency of rail operations. 7. Neighbour Impact: Affected properties and park issues.

Non-Cost Evaluation - Scoring Furneaux Way Access Newmarket Park through Road Cowie Street Bridge Vehicular Access Laxon Terrace/Youngs Lane Pedestrian Access Laxon Terrace/Youngs Lane Environmental effect (Visual and Noise) Impact on Road Network Safety Rail Network Operations Neighbour Impact

Traffic Effects Each option has been investigated to determine the impact on the wider transport network. In conclusion the impact on the wider network is minimal, with the following predicted impacts: An increase of 8 seconds to wait times from Newmarket Park onto Ayr Street during peak periods (Newmarket Park Option) An increase of 2 5 seconds to the wait times from Cowie Street during peak periods (Bridge Option) An increase of 1 second to the wait times from James Cook Crescent during peak periods (Furneaux Way Option) A decrease of 1 second to the wait times from Sarawia Street during peak periods (all options)

Benefit Cost Ratio (BCR) Comparison Furneaux Way Access (Single Lane Shared Option) Newmarket Park Road Cowie Street Bridge BCR 2.9 1.8 2.1

In Conclusion Auckland Transport welcome your feedback on this matter. Please leave your comments on the presentation boards and survey sheets or alternatively contact: Adrian Price Adrian.Price@aucklandtransport.govt.nz Finally Auckland Transport would like to thank you all very much for your time this evening.