Investing in Transport Infrastructure: Architecture to Economic Development 10 October 2012

Similar documents
Philippine Transport Sector. September 2015

NEW BOHOL (PANGLAO) AIRPORT

Urban and Inter-urban Rail Projects. 26 April 2018 AmCham Hall

TAPP II: Infrastructure Tracker (projects and policy reforms) As of April 3, 2018

Aviation and Airports

TAPP II: Infrastructure Tracker (hard and soft) As of February 25, 2018 Funding Type

Republic of the Philippines Department of Transportation

According to the newly appointed Department of

Ex-Ante Evaluation Southeast Asia Division 5 Southeast Asia and Pacific Department, JICA 1. Name of the Project

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

STATUS OF PPP PROJECTS AS OF 05 OCTOBER 2011

100 Days Roadmap of The Department of Transportation. July 2016 Manila

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

Metro Green Line to LAX. January, 2012

Megawide Construction Corporation FY 2016 Analysts Briefing 06 April 2017

Press Release March 1, Refer to: Anna Salgado

Megawide Construction Corporation FY 2017 Analysts Briefing 12 April 2018

ANALYST BRIEFING Financial Highlights As of 1H 2018

TERMINAL DEVELOPMENT PLAN

Annual Shareholders Meeting Presentation

UPDATES ON THE NATIONAL TOURISM DEVELOPMENT PLAN

JAIPUR METRO. One of the world s fastest project completions. A presentation by. Nihal Chand Goel Chairman & MD Jaipur Metro Rail Corporation

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

PRIVATE SECTOR WISHLIST

Record-high arrivals sustain occupancy

Laguna. There are two trunklines connecting the province of Laguna with Metro Manila. These are:

Aviation, Rail, & Trucking 6-1

Linking Modes to Transform the Perth Public Transport Network. Mark Burgess Managing Director, Public Transport Authority

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

Edmonton International Airport Master Plan Open House Display Boards April 16, 2011

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

Introduction. Market Opportunity

Whangarei Airport. Prepared by Carine Andries 10/20173

Project Advisory Group. May 23, 2013

DOWNTOWN BRT ALTERNATIVE - 19th AVE

Auckland Airport: the next 20 years and beyond

Presentation to the DRCOG Board August 16, 2017

TORONTO TRANSIT COMMISSION REPORT NO.

Comparison of Bangkok & Kuala Lumpur

Current and Forecast Demand

Birmingham Airport 2033

Hyderabad Metro Rail in PPP Mode

Page 1 of 5 As of 20 March 2009

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

FAQ RAPID KL AIRPORT SHUTTLE (updated as of 31th Jan 2019)

Technical Advisory Committee. May 14, 2013

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

City of Sacramento Sacramento Intermodal Transportation Facility Draft WP # 3 Transit Operational Requirements

CASE STUDY The New Guayaquil International Airport

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

Aviation Summit Design and Construction Services

Why we re here: For educational purposes only

On March 8, 1996, a little more than a year after the airline industry was liberalized by the government, History.

Rapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019

Transport and Climate Change Week: SUSTAINABLE URBAN TRANSPORT DEVELOPMENT IN INDONESIA

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

SOLIDARIDAD 2020 AGENDA

NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012

Collier County Airport Authority. Joint Automated Capital Improvement Program

MAPS FOR SHUTTLE AND PICK UP SERVICES

Land Use Policy Considerations

Existing Facilities. Current and Forecast Demand

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Myanmar s CNS/ATM Development Master Plan

ZANZIBAR AIRPORTS AUTHORITY PROJECTS

AirRail Africa 2016 Conference Planning for Rail Connections to CTIA and KSIA

HOSPITALITY INVESTMENT CONFERENCE PHILIPPINES 2016 TOURISM INVESTMENT IN THE PHILIPPINES

Image Project Name Location Services Rendered

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010

TRANSPORTATION: Airports and Aviation Services

AIR TRAVEL AND ITS POTENTIAL FOR DEVELOPMENT OF THE SAARC REGION

Bloomberry Cruise Ship Port Under development

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives

Strategic Transport Forum 21 st September 2018

Khon Kaen Light Rail Transit

Ex-Ante Evaluation (for Japanese ODA Loan)

Creating Sustainable Communities Through Public Transportation

Connect Oregon IV Final Review Committee Final Recommendation

50th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS, Bangkok, Thailand, 1 4 July 2013

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

PFC Quarterly Status Report September 30, 2016

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Introduction of HANEDA and Infrastructure investment by Japan. Oct 18, 2014 Japan Airport Terminal Co., Ltd.

YOUR JOURNEY BEGINS WITH US.

GATWICK AND WANDSWORTH

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018

Aviation Development

A Public Transportation Review Evaluating Metro s Operational Efficiency, Service Capacity and Fiscal Impact

STUDY ON SOEKARNO HATTA INTERNATIONAL AIRPORT EXPANSION AND UPGRADING PROJECT IN JAKARTA IN THE REPUBLIC OF INDONESIA

Base Governor (Updated 4/20/17) First Special Session HF 3 Transportation - Ch. 3. Conference Position 5/1/2017. Conf Position Changes FY 18-19

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Page 1 of 7 FULL TRANSCRIPT: WESTERN SYDNEY AIRPORT ANIMATION VIDEO

CLARK INTERNATIONAL AIRPORT CORPORATION

A Presentation to: Project Advisory Group Meeting #6

PLAN MAESTRO DE TRANSPORTE SOSTENIBLE EN GUATEMALA

Transcription:

DOTC Projects Investing in Transport Infrastructure: Architecture to Economic Development 10 October 2012

Situation before the construction / rehabilitation / expansion of Atimonan Port:

Situation after the construction / rehabilitation / expansion of Atimonan Port:

LRT Line 1 South Extension Project: Extension of existing LRT Line 1 from Baclaran to Bacoor, Cavite providing 11.7 km. of rail, 8 stations (+2 future stations), 3 intermodal facilities, 1 satellite depot and up to 156 rolling stock Project Cost: Php 60.63 B Funding: Hybrid PPP (Civil Works and Systems), ODA (Rolling Stock) Current Daily Traffic 500,000 Forecasted Daily Traffic (2015) 750,000 4

LRT Line 1 South Extension Project: Extension of existing LRT Line 1 from Baclaran to Bacoor, Cavite providing 11.7 km. of rail, 8 stations (+2 future stations), 3 intermodal facilities, 1 satellite depot and up to 156 rolling stock Project Cost: Php 60.63 B Funding: Hybrid PPP (Civil Works and Systems), ODA (Rolling Stock) Current Daily Traffic 500,000 Forecasted Daily Traffic (2015) 750,000 5

LRT Line 2 East Extension Project: Extension of existing LRT Line 2 from Santolan to Masinag, Antipolo providing 4.2 km. of rail and 2 stations. Project Cost: Php 9.76 B Funding: GAA (Civil Works), ODA (Systems), PPP (Operations & Maintenance) Current Daily Traffic 212,600 Forecasted Daily Traffic (2015) 312,600 6

Contactless Automated Fare Collection System Project: Replacement of current magnetic stripe ticketing system on LRT 1, LRT 2, MRT 3 with a contactless AFCS. Project Cost: Php 1.7 B Current traffic on all 3 lines: 1.2 million passengers daily 7

Cebu Bus Rapid Transit (BRT) Project Project: Establishment of the first BRT system in the Philippines 23-km demonstration corridor in Cebu City, with 33 stations 176 buses that will run through dedicated and exclusive bus-ways from Bulacao to Talamban, with a link to Cebu s South Road Property Bus projected to be available every 3 to 5 minutes at every station Forecasted traffic: 330,000 passengers daily (2015) 8

Integrated Transport System Project Project: Construction of 3 terminals to connect provincial buses with other modes of transportation Current provincial bus traffic: 7,800 Terminals: 2 south, 1 north 9

Mactan-Cebu International Airport Project: Construction of new international PTB to accommodate 3.5 MPA and upgrading of existing PTB for domestic operations Project Cost: Php 10.2 B AIR TRAFFIC PTB* Current 6.2 MPA 38,000 sq. m Forecast / After Project Dom (2025) 6.2 MPA (additional) 5,487 sq. m Int l (2025) 1.9 MPA (new) 27,000 sq. m 10

Project: Construction of a new airport at Panglao Island, Bohol, to replace the Tagbilaran Airport New Bohol Airport Project Cost: Php 7.4 B AIR TRAFFIC PTB Current 756,197 passengers 850 sq. m Forecast / After Project Up to A320 (2025) 1.7 MPA* (new) 8,271 sq. m 11 *MPA Million Passengers per Annum

Puerto Princesa Airport Project: Capacity expansion and improvement of runway, navigational aids, and utility systems Project Cost: Php 4.5 B AIR TRAFFIC PTB Current 988,972 passengers 2,366 sq. m Forecast / After Project (2025) 2.0 MPA (new) 10,000 sq. m Up to A330 12

Bicol International Airport Project: Construction of a new airport at Daraga, Albay, to replace the existing Legaspi Airport Project Cost: Php 4.7 B AIR TRAFFIC PTB* Current 514,630 passengers 910 sq. m Forecast / After Project Up to A320 (2025) 428,000 passengers (new) 5,487 sq. m 13 *PTB Passenger Terminal Building

Project: Development of new airport to replace domestic airports at Lumbia and Iligan Laguindingan Airport Project Cost: Php 7.9 B AIR TRAFFIC PTB Current (Lumbia) 1,442,959 passengers 3,872 sq. m Forecast / After Project (2023) 3.9 MPA (new) 7,984 sq. m Up to A320 14

Project: Capacity expansion through construction of new PTB, runway, apron, taxiway and VPA Tacloban Airport Project Cost: Php 2.9 B AIR TRAFFIC PTB Current 1,009,575 passengers 4,890 sq. m Forecast / After Project (2025) 2.8 MPA (new) 10,960 sq. m Up to A320 15

Clark Airport Project: Development of FS for Clark Airport Present traffic: 767,109 passengers Current PTB Size: 9,000 sq. m Expanded PTB (2013): 15,000 sq. m Forecasted traffic: 4.5 M passengers (2020)* Clark Civil Aviation Area: 2,367 has. *Study on the Airport Strategy for the Greater Capital Region in the Republic of the Philippines, JICA, Nov 2011. 16

Commuter and Airport Express Alignments: PNR ROW and NLEX ROW Clark International Airport (CIA) NLEX Alignment 108 kms Bulacan PNR Alignment 86kms Caloocan Central CBD NAIA Southrail 17

Thank you.