BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway

Similar documents
Wellington City Council. Design Report: The Parade Island Bay

Item 3.1 Attachment 1

POST CONSTRUCTION ROAD SAFETY AUDIT. Island Bay Cycleway

Appendix C Stage 1 Road Safety Audit

Otorohanga Stopbank Pathway - Project Overview

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

FUTURE AIRSPACE CHANGE

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Council Briefing Minutes

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

Glasgow Street Traffic Review

The Point Roundabout Improvement Scheme

Pattullo Bridge Replacement Project

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Queen s Circus Roundabout

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

Rangitīkei District Council

John Betts School Crossing Review

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,

1. Case Study Area and Character Sections

A Master Plan is one of the most important documents that can be prepared by an Airport.

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands

Riverbank Precinct Footbridge

Major Scheme Business Case Summary Report for Programme Entry

Pattullo Bridge Replacement Project

Rangiriri Bypass. A top priority. The route. Timing WAIKATO EXPRESSWAY

Mercer Island Town Center Stakeholder Meeting E. June 10, 2015

8.01 MEMORA DUM. Mayor and Council. Steven Lan, P.Eng., Director of Engineering. March 31, Pattullo Bridge Replacement Update /PBR

Committee. Presentation Outline

Christ Church Grammar School, Claremont

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

Madison Metro Transit System

5.7 Local road upgrades

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

Western Bay of Plenty District Council

Commissioning Director - Environment

Special Council Agenda

OPEN A G E N D A TEMPORARY ROAD CLOSURES SUBCOMMITTEE MEETING. Meeting Date: Thursday, 8 February 2018

SAN JOSE CAPITAL OF SILICON VALLEY

Santos Tour Down Under Tour Village and Bike Expo

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

Have your say... on the Ian McKinnon Drive Cycleway Project

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

The Strategic Commercial and Procurement Manager

#1. Why is the City doing this project?

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015

A summary report on what the community told us

BARROW GURNEY PARISH COUNCIL

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Spadina Avenue Built Form Study Preliminary Report

Air Operator Certification

places Mooloolaba s heart five

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

National Health Workforce Innovation and Reform Strategic Framework for Action

Michigan s Engineering Safety Program for Local Roadways

New free City connector bus service

SHIRLEY/PAPANUI COMMUNITY BOARD 1 JUNE 2011

4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding.

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

Downtown Mobility Hub: Draft New Precinct Plan. Art Gallery of Burlington September 7, 2017

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Part four. In this part you will find: The next steps to deliver the master plan

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

A30 Chiverton to Carland Cross Statement of Community Consultation

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

FINCH HYDRO CORRIDOR TRAIL PROJECT

Community Sports Hub

The Future of Street Lighting in Leeds November 2017 to January 2018 Public Consultation Document

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

The Twentieth Annual EPICS User Conference

The Cobham Room, Novotel Hamilton Tainui, 7 Alma Street, Hamilton

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

BHP Billiton Global Indigenous Peoples Strategy

Strategic Plan Mt Eden Village Inc T: W: mounteden.co.nz E:

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

ACORNS PROJECTS LIMITED

POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE. Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority (SPA)

Response to the London Heathrow Airport Expansion Public Consultation

2. STAKEHOLDER FEEDBACK // What We Heard

GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED

US 380 FEASIBILITY STUDY

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

TALLAWONG STATION PRECINCT SOUTH CONCEPT PROPOSAL STATE SIGNIFICANT DEVELOPMENT APPLICATION

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

Land Management Summary

Chapter 1: Introduction Draft

Brampton, Ontario REQ. no.: PLANNING, DESIGN & DEVELOPMENT COMMITTEE

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Western Bay of Plenty District Council

Weymouth Promenade Lighting

Transcription:

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say Love the Bay Delivering on the Cycleway Consultation open from 31 July to 13 August 2017 1

Introduction After the Love the Bay community-based design project, four design options for the Island Bay Parade and cycleway are open for public consultation from 31 July 2017 to 13 August 2017. The Designs Option A Roadside cycle lane original layout with enhancements The four design options incorporate extensive community engagement, the outcomes of the Love the Bay project to date, transport engineering practice, NZTA guidelines and council strategies, including the Urban Growth Plan, Cycling Master Plan and Framework and Long Term Plan. This document contains summaries of each of the designs: Option A roadside cycle lane Original layout with enhancements Option B one-way separated kerbside cycleway road level current layout with enhancements Option C one-way separated kerbside cycleway above road level Option D one-way separated kerbside cycleway above road level, with angle parking Each design summary includes an indicative cost for implementation. These costs are estimates for the purpose of guiding your preference and will be refined once detailed design is completed. The costs reflect community feedback to address safety concerns, environmental considerations, landscaping and broader urban design opportunities along the length of The Parade. Go to wcc.govt.nz/theparade to find further information about each of the options, frequently asked questions, and information about other designs that were considered. Tell us what you think by 9pm, Sunday 13 August 2017. This will be your last opportunity to have a say on your preferred option for The Parade. You can give feedback online at wcc.govt.nz/theparade, email your thoughts to theparade@wcc.govt.nz or post the enclosed form to us (no stamp needed). What s happening now? We are asking you to give feedback on the designs by either selecting your preferred design OR ranking one or more of the designs in order of your preference. The results will feed into recommendations being prepared by Council officers for consideration by Council (Mayor and councillors) on 14 September 2017. It is expected that Council will determine a final outcome for the cycleway design at this meeting. This consultation is the last opportunity for the public to have a say on their preferred option. The designs will also be on display at the Love the Bay drop-in shop at 132 The Parade throughout the consultation period (31 July 13 August). Monday Tuesday Wednesday Thursday Friday Saturday Sunday 4pm 7pm 11am 4pm 11am 7pm 9am 3pm closed 10am 4pm closed Councillors will be on site at the shop at appointed times if you would like to discuss your preferences with one of them directly. Visit wcc.govt.nz/theparade to see when councillors will be in attendance, frequently asked questions, detailed design reports, or to make an online submission. While we encourage and appreciate comments and discussion on social media, these will not be taken as formal submissions. Please also make a submission online at wcc.govt.nz/theparade or using the enclosed paper form to ensure your view is heard. Approx 14.8m current/proposed road width Prior to the construction of the Island Bay Cycleway, The Parade south of Medway Street had kerbside parking, a roadside cycle lane, and traffic lanes separated by a central flush median. Option A proposes a design that, as close as safely possible, reflects this. Changes have been made to reflect the requirements of the 2016 post-construction safety audit and peer review, and newer NZTA and engineering safety guidelines. It is these requirements that preclude a return to the exact original design. Changes also extend the cycle treatment along the length north of Medway Street to the Dee Street roundabout. No reduction in the current pedestrian footpath width is expected. Approx 15.6m current/proposed road width This option requires the conversion of the angle parking to parallel parking within the business area between Medway Street and Avon Street, and removal of the flush median. Removal of some 40 parking spaces in the residential area is designed to address the safety issues identified with visibility and vehicle manoeuvring to and from The Parade at driveways. Within the business area, the conversion to parallel parking will remove some 17 spaces in order to support a consistent cycleway design along The Parade. The indicative cost for Option A is $4.1 million. 2 3

Option B One-way separated kerbside cycleway road level current layout with enhancements Option C One-way separated kerbside cycleway above road level Approx 14.8m current road width Approx 10.4m proposed road width Approx 14.8m current/proposed road width Approx 15.6m current road width Approx 15.6m current/proposed road width Approx 10.4m proposed road width This option retains the current layout of a kerbside cycleway at road level. Design refinements include a raised concrete traffic island between the cycleway and parked vehicles and extension of the cycle treatment along the entire length of The Parade to the Dee Street roundabout. No reduction in the current pedestrian footpath width is expected. Removal of some 40 parking spaces in the residential area is designed to address the safety issues identified with visibility and vehicle manoeuvring to and from The Parade at driveways. This option requires the conversion of the angle parking to parallel parking within the business area between Medway Street and Avon Street, and removal of the flush median. Within the business area, the conversion to parallel parking will remove some 17 spaces in order to support a consistent cycleway design along The Parade. The indicative cost for Option B is $5.2 million. This option also provides a separated kerbside cycleway, with the cycleway above road level, either at mid-height between the roadway and footpath or at footpath level. A kerb will separate the cycleway vertically from the roadway (and footpath if at halfkerb height), and horizontal separation for cyclists from parked vehicles is provided by a 1m safety strip. Extension of the cycle treatment along the entire length of The Parade to the Dee Street roundabout is proposed. Removal of some 40 parking spaces in the residential area is designed to address the safety issues identified with visibility and vehicle manoeuvring to and from The Parade at driveways. This option results in a reduction in the existing pedestrian footpath width to 2.4m on the west side of the residential area. Within the business area, the west side pedestrian footpath reduces to 5.2m width, the east side increases to 3.5m width. This option requires the conversion of the angle parking to parallel parking within the business area between Medway Street and Avon Street, and removal of the flush median. Within the business area, the conversion to parallel parking will remove some 17 spaces in order to support a consistent cycleway design along The Parade. The indicative cost for Option C is $6 million. 4 5

Option D One-way separated kerbside cycleway above road level, with angle parking Approx 14.8m current road width Approx 11.4m proposed road width Approx 15.6m current road width Approx 13.2m proposed road width Where did these designs come from? All of the feedback obtained through the Love the Bay drop in sessions, workshops and other channels were used to develop a set of design statements describing what is important to the community and how people interact with The Parade. Along with engineering best practice, the design statements were used to develop these design options. The designs retain the current layout with refinements, return to the previous layout with refinements and introduce two other options. Refinements to the current and previous cycleway designs have been included to address safety and broader urban design ideas arising from urban design and engineering practice as well as community input. The high level designs here are intended to convey the general layout of the road. During the community feedback process a number of issues have been raised, including parking, locations of bus stops and costs for each design. Given their significance, these topics are more fully discussed online at wcc.govt.nz/theparade. Detailed designs for the entire length of The Parade will be developed after the Council decides on an option. What happens next? The results of this consultation will be presented to the City Strategy Committee on 14 September 2017. The Council (Mayor and Councillors) will consider the consultation feedback along with the outcomes of the Love the Bay process, NZTA guidelines, budgetary implications and council strategy when making their decision. The Council will then agree on the preferred option with the intention for implementation to begin in spring 2017. Implementation will require detailed design and construction plans for the entire length of The Parade. Regardless of the option chosen on September 14, when making changes to the road layouts like this, the detailed plans must also be consulted on and then approved by the Council. The diagram below outlines the indicative timeline to undertake design and construction. We will endeavour to bring this forward where possible and to consider a staged approach for different sections of The Parade. How will the outcomes of this consultation be used? This consultation is to provide qualitative and quantitative feedback to help the Council understand the views held by the people of Island Bay and Wellington. The submissions will be analysed, including by location, to develop a more complete picture of public preferences. The outcome of the consultation will be independently collated and analysed by the Council s Research and Evaluation team. The consultation feedback will inform the final report on the Island Bay Parade and Cycleway to be deliberated by Council on 14 September 2017. This option is similar to Option C, providing a separated kerbside cycleway, with the cycleway above road level (either at mid-height between the roadway and footpath, or at footpath level). A kerb will separate the cycleway vertically from the roadway (and footpath if at half-kerb height), and horizontal separation for cyclists from parked vehicles is provided by a 900mm safety strip (600mm at the angle parking area). Extension of the cycle treatment along the entire length of The Parade to the Dee Street roundabout is proposed. Removal of some 40 parking spaces in the residential area is designed to address the safety issues identified with visibility and vehicle manoeuvring to and from The Parade at driveways. This option retains the existing eastern footpath width. This option results in a reduction in the existing west side pedestrian footpath width to 1.6m, and provides a 1m flush median between traffic lanes within the residential area. Within the business area, the west side pedestrian footpath reduces to 3.4m width, and the majority of the western kerbside angle parking remains between Medway Street and Avon Street. Within the business area, two parking spaces will be removed. The indicative cost for Option D is $6.2 million. Indicative timeline 14 September 2017 City Strategy Committee receives consultation feedback and makes decision on preferred option October 2017 Detailed 2-D designs developed Mid-November to mid- December 2017 Consultation on road changes February 2018 Council committee meeting, and processes, to agree on recommended design March April 2018 Construction and engineering plans developed, safety audit conducted May 2018 Procurement Late May 2018 Construction begins 6 7

J004025 Privacy All submissions (including name and contact details) are provided in their entirety to elected members. Submissions (including names but not contact details) will made available to the public at our office and on our website. Personal information will also be used for the administration of the consultation process including informing you of the outcome of the consultation. All information collected will be held by Wellington City Council, 101 Wakefield Street, Wellington, with submitters having the right to access and correct personal information. Contact Person Phil Becker, theparade@wcc.govt.nz, 04 499 4444, wcc.govt.nz/theparade J004025 8